Loading...
HomeMy WebLinkAboutAward Quotation - Lime Bike Parking Areas Project No 118-059R - The Airmarking Co Inc9V 1316 COUNTY-Crry BUILDING V140Nr 574/235-9251 227 M'. JEJERSON 130(j1.EVARI) FAX 574/ 2359171 Soi rii BFND. INDIANA 46601-1930 " - 7", ", ,, X CITY OF SOUTH BEND PETE BUTTIGIECY, MAYOR BOARD OF PUBLIC WORKS October 9, 2018 Greg Lowe The Airmarking Co,, Inc. 1544 N. SR 25, PO Box 526 Rochester, IN 46975 RE: Quotation Award — Lime Bike Parking Areas — Project No. 11 8-059R Dear Mr. Lowe: The Board of Public Works at its meeting held on October 9, 2018, awarded the above referenced quotation to you in the amount of $9,800. Please forward the following documents inonesubmittal by October 23, 2018 to my attention for Board of Public Works approval: 1) One (1) original of the Contract (enclosed); and 2) Certificate of Insurance naming the City of South Bend as an additional insured. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, T-Y Linda M. Martin, Clerk GAR4, A. Git,m' SUZANNA M. F12I1ZBERci E1,1ZABET1 i A. MARADIK JAMEs A. MUELLER 'Mf,;,'w:.sr- J. DoRAU INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Sue Ellen Doudrick, Assistant City Engineer SUBJECT: Award Project No. 118-059 Project Name: Bike Parking Areas DATE: October 9, 2018 On October 9, 2018, the Board of Public Works opened and read quotes for the above project. I have reviewed them and found them correct. The bidders ranked as follows: Bidder Base Quote Alternate A Quote Amount 1, The Airmarking Co., Inc. $6,300 $3,500 $9,800 I recommend award of a contract for _Bike Parking Areas to the lowest responsive 1 responsible bidder, Airmarking Co. Inc. in the amount of $9,800 Sufficient funds have been has appropriated from Complete Streets Transportation 404-1001- 460-42.03. Please call with your questions. 1� 0 A i� A Re wk-. NOIN Lime Bike Parking Areas 118.069IR October 4. 2018 before 9:30 AM (Local Time) (Must be completed for all quotes. Please type or print) Date: October 4,2018 Firm: The Airmarking Co.,Inc. Address: 1544 N. SR 25 P.O. Box 526 City/State/Zip: Rochester, IN 46975 Telephone Number: ( 574)223-5817 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Lime Bike Parkine Areas Protect No. 118-059R the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Department of Public Works and dated -October 4,2018 for the sum of (enter the Total Quote as shown on the Proposal) NINE THOUSAND EIGHT HUNDRED DOLLARS AND NO CENT'S ($ 9,800.00 (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addenclums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost 4f units must be the same as that shown in the original contract if accepted by the City of South Bend. f the e is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attar t' By Gr/e _g Lwe President (Printed Name of Person signing) ACCEPTANCE The above, quote is accepted this ? day of 20 Subject to the following conditions: BQARD OF PUBLIOI�s el A 'j Gary A.&Qil- Presidrnt ERali-eth A Va-ridk, Member James A. Mueller, Member A A 1wze", Suzanng M'FYitzberg, Member h rase J. Dorau, Member a M. Martin, Clerk Version 10/1,8/2016 Page - 1 Public Works Quote QUOTEIPROPOSAL CITY OF SOUTH BEND PROJECT NAME Lime Bike Parking Areas PROJECT NO. 118-059R QUOTES DUE October 4, 2018 before 9.30 AM (Local Time) BASE OUOTE: Locations 1 & 2 (See Appendices) Item No. Description Quantity Unit Unit Price Total Amount 1 Mobilization & Demobilization with Maintenance of Traffic 1 LS 500.00 $ 500.00 2 Line, Epoxy, Solid White, 4 inches 1 LS $ (Location 9 — see Appendix B) 1 3 Pavement Message Marking, Epoxy, White, 2 EA $ (P) (Location 1 — see Appendix B) 200.00 400.00 4 Pavement Message Marking, Epoxy, White, 1 EA $ Bicycle (Location 9 —see Appendix 8) 1,350.00 1,350.00 5 Line, Epoxy, Solid White, 4 inches 1 LS $ (Location 2 — see Appendix B) 1,200.00 1, 200.00 6 Pavement Message Marking, Epoxy, White, 1 LS $ Bicycle (Location 2 — see Appendix B) 1 350.00 1,350.00 Total Amount of Base Quote $ 6,300.00 ALTERNATE A: Location 3 (see Aanendices) Item No. Description Quantity Unit Unit Price Total Amount 1 Mobilization & Demobilization with Maintenance of Traffic 1 LS 500. 0 $ 2 Line, Epoxy, Solid White, 4 inches 1 LS $ (Location 3 — see Appendix B) 1,250.00 1, 250.00 3 Pavement Message Marking, Epoxy, 2 EA $ White, (P) (Location 3 — see Appendix 8) 200.00 400.00 4 Pavement Message Marking, Epoxy, 1 EA $ White, Bicycle (Location 3 — see Appendix B) 1,350.00 1, 350.00 Total Amount of Alternate A Quote $ 3,500.00 Base Quote Total $6.300.00 Alternate A Quote Total $3,500.00 Base Quote + Alternate A Quote Total $9,800-p0 SPECIAL NOTE: 3 WEEKS TO GET MATERIALS SO NEED TO KNOW ASAP. Version 10/18/2016 Page - 2 Public Works Quote BOARD OF PUBLIC WORKS CITY OF SOUTH BEND,, INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 9th Day of October, 2018, by and between, The Airmarking Co., Inc., 1544 N. SR 25, PO Box 526, Rochester, IN 46975, HEREINAFTER called the Contractor, and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. DESCRIPTION: COMPLETION DATE: AMOUNT: FUNDING: 118-059R LIME BIKE PARKING AREAS SEE SPECIFICATIONS $9,800 COMPLETE STREETS TRANSPORTATION The unit prices for this improvement were those prices as received and accepted by the Board on the 9th Day of October, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. Gary A. Gilot, President Suzanna M. Fritzberg, Member THE AIRMARKING CO., INC. Elizabeth A, Maradik, Member Printed Name James A. Mueller, Member Signature Therese J. Dorau, Member Attest: Linda M. Martin, Clerk CERTIFICATION (To be completed if Contractor is a Corporation) 1, , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate Seal BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 1019/2018 Department Public Works Name Sue Ellen Doudrick Division/Bureau Engineering BPW Date 10/9/18 Phone Extension 5992 I Legal F-11 Attorney Name: Clara McDaniels Controller review is required for all Contracts $5,000,00 or more and Controller El greater than one year in length per the City Purchasing Policy Purchasing F Michael Schmidt LJ Agreement Amendment H Contract L] Proposal Ll Addendum F-I Professional Services n Resolution F-1 Bid Opening n Bid Award ❑ Req. to Advertise El Title Sheet M Quote Opening Z Quote Award E] Change Order No. F-1 C/O & PCA No. El PCA Ease/Encroach. ❑ Traffic Control: Other: Company or Vendor Name New Vendor MBE/BE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Airmarking E] Yes Z No If Yes, Approved by Purchasing E]­MBE El WBE El No El Yes Name of Company Bike Parkin Areas 118-059R Complete Streets Transportation 404-1001-460-42.03 $9,800 Unit Prices Installation of bike parking spaces throughout downtown South Bend for the Department of Comm u n4yjqyestment.. [:] Required Contractor's Certification Forms, Attached (Non - Collusion, Non-Doscrumination, Non -Debarment, E-Verify, Iran, etc.) Amount of H Increase $ 0 Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Copy Original 0 F-1 F-1 El El El