HomeMy WebLinkAbout6B (6)� 6 C 67)
me m • rand u m a18, *o
Community & Economic Development
1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021
To: Redevelopment Commission, Board of Public Works
From: Bill Schalliol, Economic Development Planner %___
Subject: Resolution 3005 and Addendum To Master Agency Agreement
ACSNA Project Exterior Site Improvements
Date: January 20, 2012
Attached to this memorandum is Resolution 3005 and Addendum To Master Agency Agreement for
the ACSNA Project Exterior Site Improvements. The improvements are necessary to facilitate the
CBOC VA project that will be located in the former Gates Toyota building located at 333 W Western
Avenue. The improvements consist of exterior building improvements and improvements to the
parking area located west of the building.
The exterior building improvements consist of aesthetic and functional project components. To
meet current code, all of the windows along the alley or east side of the building will need to be
blocked in or replaced with new fire code -rated windows to meet code for building spacing. Also, all
of the windows on the second floor will be covered over or modified to present a uniform
appearance for the south and west faces of the building. The windows are not being replaced or
filled in because of the uncertainty with the reuse of the second floor space in the future. Once all of
the exterior work is done, the east, south and west faces of the building will be painted in the
southern half (old section) of the building complex.
The site improvements include work to make the parking and walk areas more accessible for the
future site use. Key items will include the removal of Franklin Street and shifting the drive to the
west to create a drop -off area in front of the building and then create a more ADA compliant parking
area connection to the building. New curb, walk and landscaping will be done as part of this work
too.
The total project budget for all of this work is $432,000. The work will all be publically bid through
the Board of Public Works.
Staff requests approval of Resolution 3005 and the Addendum To Master Agency Agreement for the
ACSNA Project Exterior Site Improvements Project.
What We Do Today Makes A Difference!
a
c
a
a
a
S
W-44 GntWAV UNWOM
.1jellf till
U*jn "alfrol loci 11119111 C, 1 :4
woords !z gz
;surd u?nrtqu�siq
UVIL AM WVLL M
Swvdg OH a
W-W = ,ill INII lz�p
4 � IwRdS OH = I Woods
t L Seovdg OH 11 f)lJf)Llf3fl Plrn"W�f 01 woodS zL
•US OH Ir 0(1 L .0 swedS z
• madse 11 jvjojL Zq
WW NS SOMMS 4 JSJOJ- ()SL *4t "Dods 9L
0
101 11• 9180S o noodS 9 L
%oz'lz ounr
zi squeumoidwi Burped AL mods 5;z
COUG-4 AWN IlWMI
MM !0 TM AM WVLJ M
ejrqnj Ge
Avg #9 joLpwV
J"Lpgo 'StL AN WOU IN -O—LtW 3LVW MW
moomla etaedg eir4rW ge
.9 U AN tOVU
RESOLUTION NO. 3005
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF
AN ADDENDUM TO THE MASTER AGENCY AGREEMENT
(ACSNA Project Exterior Site Improvements)
WHEREAS, effective January 1, 2012, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2012; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the ACSNA Project Exterior Site Improvements to the Master Agency Agreement
by way of this Addendum.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Addendum to Master
Agency Agreement (ACSNA Project Exterior Site Improvements) and hereby authorizes
its execution in substantially the form attached hereto with such changes as the
Commission may deem necessary or appropriate upon the advice of counsel, said
execution thereof to be conclusive evidence of the Commission's approval of such
changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
January 24, 2012, at 4:00 p.m., in Room 1308, County -City Building, South Bend,
Indiana 46601.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
ADDENDUM TO
MASTER AGENCY AGREEMENT
(ACS/VA Project Exterior Site Improvements)
3005 -12
This Addendum to Master Agency Agreement (this "Addendum "), made and
entered into as of the 14th day of February, 2012, by and between the South Bend
Department of Redevelopment, acting by and through its Redevelopment Commission
(the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly
organized and existing pursuant to the laws of the State of Indiana, acting by and through
its Board of Public Works (the "BPW ") for purposes of the Commission designating the
BPW to act as the Commission's agent to undertake the ACS /VA Project Exterior Site
Improvements (the "Project ").
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2012; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the ACS /VA Project Exterior Site Improvements to the Master Agency Agreement
by way of this Addendum.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being more specifically described in "Exhibit A ", attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Commission staff members are authorized to execute on behalf of the
Commission any documents necessary to carry out the intent of this resolution.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Don Inks, Member
ATTEST:
Linda Martin, Clerk
Exhibit "A"
ACSNA Project Exterior Site Improvements
See attached budget proposal for both exterior building and general site improvements
VA Outpatient Clinic Project — Downtown South Bend
General Site Improvements
Base bid improvements
$ 210,000.00
Alternate #1 — AEP equipment relocation
$ 40,000.00
Alternate #2 — Resurface parking area
$ 63,220.00
Alternate #5 — Curbing within parking lot
$ 11,140.00
Contingency
$ 32,436.00
Total $ 356,796.00
General Exterior Building Improvements
Alternate #1 — Alley window replacement $ 16,490.00
Alternate #4 — Second story window covering $ 33,070.00
Alternate #5 — Painting of building $ 18,950.00
Contingency $ 6,851.00
Total $ 75,361.00
Total required for Exterior Improvements $ 432,157.00