Loading...
HomeMy WebLinkAboutAmendment to PSA - Donohue & Associates - South Well Field Improvements (2)1316 COUNTY-Crry Buil,A)INO 227 WAFTFERSON BOULEVARD SOUTH BEND. INDIANA46601-1930 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 25, 2018 James Hurst Donohue & Associates, Inc. 100 North Michigan Street, Suite 510 South Bend, IN 46601 R.E. Amendment to Professional Services Agreement Dear Mr. Hurst: NIONT: 574/235-9251 FAX 574/ 235-9171 The Board of Public Works, at its meeting held on September 25, 2018, approved the above referenced amendment regarding additional work for the South Well Field improvements in the amount of $ 100,000, for a new total of $250,000. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk, Enclosure GM�y A. Ga,o'r SUZANNA M. FRITZBEiw, E1.,1ZAB1-,T11 A. MARADIK JAMFS A, MUELLER Ti IERF'SEJ. DORAU This is EXHIBIT K, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated Au ug st 8, 2017, AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: August 8, 2017 b. Owner: Board of Public Works, City of South Bend, Indiana Engineer: Donohue & Associates, Inc. d. Project: 2017 South Well Field Water Treatment Plant & Pressure District Improvements 2. Description of Modifications: a. Engineer shall perform or furnish the following Additional Services: 1) The Scope of Services as identified in Task Order #04 to the Continuing Professional Services Agreement dated August 8, 2017 for the 2017 South Well Field, Water Treatment Plant & Pressure District Improvements project. b. The schedule for rendering services is modified as identified in Task Order #04 to the Continuing Professional Services Agreement dated August 8, 2017 for the 2017 South Well Field, Water Treatment Plant & Pressure District Improvements project.: 3. Agreement Summary (Reference only) a. Original Agreement amount: $ 150,000.00 b. Net change for prior amendments: $ 0.00 c. This amendment amount: $100,000.00 d. Adjusted Agreement amount: $250,000.00 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is 09/25/2018 . Page 1 (Exhibit K—(Amendment to owner -Engineer Agreement)-- Attachment 1) EJCDC E-500 Agreement Betiveen owner and Engineer for Professional services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. OMNER: 110ard !!! �fia-*'Wfts­ 0 Title: IM MINIMUM 3y: ritle: Vice resident )ate Signed: September 24, 2018 Page 2 (Exhibit K— (Amendment to Owner -Engineer Agreement) —Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright C MOB National society or Professionals Engineers for EJCDC All rights reserved, TASK ORDER #04 TO CONTINUING PROFESSIONAL SERVICES AGREEMENT Between Board of Public Works, City of South Bend, Indiana (Owner) and Donohue & Associates, Inc. (Donohue) Date of Original Executed Agreement: August 8, 2017 Task Order #04: South Wellfield, WTP and Distribution System Improvements Design This Task Order includes engineering services for the design, bidding, easement acquisition and construction assistance of the proposed improvements to the South wellfield, water treatment plant and distribution system, as described in the Needs Assessment Report produced through Task Order #01 and #02. The major Project improvements include: 1. Removal of existing pumps and motors in Well No. 4A and Well No. 5, and replacement with new pumps, motors and VFDs sized to provide the pressures required for direct supply into the South Pressure District, The design of the upgrades will include pump sizing and selection, 2. Modifications to the Chlorine Room necessary to accommodate the following: a. Increased chlorine storage to three, 1-ton cylinders. L Installation of a supplemental chlorine feed system — consisting of vacuum regulator, automatic chlorine gas feeder panel, ejector, and booster pump —to increase the total instantaneous chlorine, dosing capacity. c. 'Upgrades to the exhaust ventilation capacity to provide 60 air changes per hour (approximately 5,000 cfm). 3. Modifications to chlorine feed, mixing and control, including: a. New 1pre-chlorination vault for adding chlorine to the 16—in. raw water line for breakpoint chlorination upstream of the CAC contactors, b. New static mixer and vault on the 16-1n. raw water line within at the point of initial chlorine addition. c. Ammonia analyzer for monitoring raw water ammonia concentrations and for chlorine feed control. d. Chlorine residual analyzer for breakpoint free chlorine residual monitoring and chlorine, feed trimming control. e. New chlorine residual analyzer for finished water free chlorine residual monitoring and optional trimming control, f, New static mixer in 16-1n, finished water line following the final chemical addition. 4. Upgraded control programming to execute a breakpoint chlorination and disinfection control strategy using on-line ammonia analysis coupled with an effluent flow signal and a feedback signal from a chlorine residual analyzer. 5. New backwash discharge piping from the WTP and connection to the 36-inch RCP sewer to the west of the WTP property. 6. New 20-inch finished water main routed west to the abandoned railroad bed, west of the South Well Field, and then south to the 12-in. water line along Ireland Road - serving as a direct distribution line from the WTP and the South Pressure District. Note: Another route may be considered pending the results of the ownership search of the abandoned railroad corridor. A. SCOPE OF SERVICES Design & Bidding Services Deliverables • Prepare the following deliverables: o Preliminary (50%) Design o Final (90%) Design o Bidding Documents (100%) suitable for public bidding • Coordinate with the Owner to incorporate Owner's standard front-end specification documents and format. • Prepare specifications using the Construction Specifications Institute (CSI) 16 Division, 3-part format. • Prepare drawings using Donohue CADD standards. • Provide Bidding Documents in the form of .pdf electronic files, as well as three (3) hard copies of the Final Bidding Documents. Drawings will be 11-in x 17-in size. Project Management Prepare a Project work plan containing the project background, project goals and objectives, task - based project scope, project schedule including del[verables schedule, staffing plan with staff` responsibility assignments, and other information which may be appropriate. • Provide monthly progress reports to Owner as part of the monthly invoicing process to document services performed and schedule status. 1. Preliminary, (50%) Design LL Donohue Project Manager will meet with the Owner's staff in a Project Kick-off Meeting with other Donohue project staff attending remotely by conference call to review Project goals, Project responsibilities, review proposed Project improvements, and review the prepared schedule for the Project. Similar design review meetings will be conducted by Donohue for the Intermediate and Final Design reviews. Page 2 of 6 1.2. Request additional information from the Owner necessary for development of the design documents. Review available studies, reports, drawings, and information regarding the South WF and WTP. 1.3. Prepare front-end specifications to the approximate 50% completion stage using Owner's standard front-end sections, and include an outline of anticipated technical specifications. 1.4. Incorporate the survey information collected as part of Task Order 403 into the design documents. 1.5. Retain the services of a geotechnical firm to perform geotechnical borings at intervals along the routes of the finished water main and the backwash waste sewer to determine underground conditions and bedding requirements for underground lines. 1.5. Perform detailed hydraulic calculations of system curves for new well pump selections, incorporating information from previous hydraulic modeling completed as part of Task Order #2. 1.7. Prepare flowsheets and preliminary process and instrumentation diagrams (P&iDs) for the proposed improvements. 1.8. Perform preliminary equipment selections based on preferences of Owner's staff and Donohue recommendations. 1.9. Perform hydraulic calculations for process piping, and determine sizing requirements for new process lines, structures and equipment. 1.10. Identify major utilities and their approximate locations within the Project site limits. 1.11. Utilizing available drawings, field visit observations and discussion with Owner, prepare preliminary layout drawings for Project facilities. 1.12. Prepare a Preliminary Functional Description of the upgraded chlorine feed system and controls. 1.13. Prepare a preliminary design submittal consisting of written descriptions of the Project indicating the proposed facilities along with the basis for selection, the final design criteria, a summary of hydraulic design calculations, a listing of any potential conflicts including environmental or utility impacts and proposed resolutions, any special construction requirements/procedures that may be known at the preliminary design stage, a listing of permits required for construction approval, preliminary design drawings that are at the approximate 50% design completion point, and opinion of the probable construction cost based on the preliminary design documents. 1.14. Perform an internal quality review of the preliminary design deliverables, and submit up to five (5) copies of the preliminary design submittal (50%) to the owner for review and comment. 1.15. Conduct a Preliminary Design meeting with the Indiana Department of Environmental Management (IDEM) for in preparation of their review of this project. 1.16. Conduct a 50% Design Review Meeting with the Owner, and incorporate comments and any necessary changes into the design. Page 3 of 6 2. Flnal 90% Design 2.1. Prepare final design drawings to the approximate 90% completion stage. Design drawings will be prepared on 11" x 17" half -sized sheets. 2.2. Update specifications to the approximate 90% completion stage, In addition to Owner - required front-end sections, other standard front-end bidding and contract documents will be prepared using applicable Engineers Joint Contract Documents Committee (EJCDC) documents for Division 0. 2.3. Update the opinion of the probable construction cost based on the 90% design completion documents. 2.4. Perform an internal quality review of the 90% completion design documents. 2.5. Submit Permitting Documents stamped and signed by a professional engineer licensed in the State of Indiana to the Indiana Department of Environmental Management (IDEM) for permit review, and assist Owner in responding to IDEM questions in obtaining the permit. Donohue will pay the associated permit fees. 2.6. Submit up to five (5) sets of 90% design completion drawings (half-size), specifications, and opinion of the probable construction cost to the Owner for review and comment. PDF versions of the documents (drawings and specifications) will be provided as well. 2.7. Conduct a 90% design completion review meeting with the Owner, and incorporate comments and any necessary changes into the design. 3. Biddinx Documents Phase 3.1. Prepare Bidding Documents (100% Design) for City use in bidding the Project. 3.2. Submit up to three (3) sets of the Bidding Documents to the Owner. 3.3. Provide Owner with updated Final Bidding Documents incorporating any revisions as required by IDEM following their review. 4. Biddins 4.1. Submit Final PDF version of Bidding Documents to Owner for their distribution and advertisement of the project. 4.2, Conduct Pre -Bid Meeting for prospective bidders, and Issue minutes from Pre -Bid Meeting. 4.3. Issue addenda as appropriate to interpret, clarify or expand the Bidding Documents. 4.4. Consult with and advise the Owner as to the acceptability of prime contractors, and subcontractors, suppliers and other persons and organizations proposed by the prime contractors (herein referred to as the "Contractor") for those portions of the work, as to which such acceptability is required by the Bidding Documents. 4.5. Consult with the Owner regarding the acceptability of substitute materials and equipment proposed by the Contractor when substitution prior to the award of contract is allowed by the Bidding Documents. Page 4 of 6 C. COMPENSATION 1. Task Order #04 shall be compensated for the total, not -to -exceed amount of $240,000 in accordance with the following breakdown: Task 1. Design Services Fee Type Amount Lump Sum $140,000 2. Bidding Services Lump Sum $9,500 3. Easement Acquisition Services Hourly, NTE $14,500 Total Amount $164,000 APPROVED FOR OWNER By: Printe Title, Date: Printed Name- James 1. Hurst, P.E. Title: Vice President Date: 0 � 942? Page 6 of 6 4.6. Attend the Bid Opening, prepare bid tabulation sheets, and assist the Owner In evaluating the bids or proposals and in assembling and awarding contracts for construction, materials, equipment and services. 5. Easement Acquisition Services 5.1. Retain the services of a sub -consultant to prepare and develop easement documents for the Owner's use in acquiring the utility easements associated with the construction of the new water main. 5.2. Services will include coordination with the current property owners, as needed to secure the easements for the Owner's use. 5.3. Up to six (6) sets of easement documents and associated coordination/communication with the existing Owners is anticipated. B. PROJECT TIMING 1. Donohue shall be authorized to commence the Services set forth herein upon signed approval of this Task Order 404. Given execution of this Task Order #04 to commence all Scope of Services items, the anticipated project schedule will be as follows: Description Date Assumptions/Notes 50% Review Submittal to Owner 10/29/18 Notice -to -Proceed received by 09/20/18 50% Coordination w/ IDEM 11/05/18 90% Review Submittal to Owner 01/07/19 50% Comments Received by 11/09/18 IDEM Submittal 01/07/19 50% Comments Received by 11/09/18 Bid Documents Submittal 02/11/19 90% Comments Received by 01/18/19 Bid Advertisement No. 1 02/22/19 Assuming 2-month IDEM Review Bid Advertisement No. 2 03/01/19 Bid Opening 03/12/19 Bid Award 03/26/19 Construction April 2019 -- December 2019 Page 5 of 6 tt m (7 m �a umi ui d V p a � � m r� m m N F e h �. 1i'e i � lY R`i sti M to NY' � �t N N N tl F m ai m ei vY vd fff ve W w N u6 m ✓i' '. m m m � 44 F. i+l v N V 1': r. 4 FiP. p ti tvi o G �i m ' i�p N of N Ntr,W' m - N N Ci ' rA M N T ah 1 N �l N N w cm,4 P W N m +Fl W ^A W u@ M M tra uJ W W a w M W US m t� S 0 N N I V w F4 V t w ,a h F^ W�ry o�pp � xr 4� t N a W 4l �n N I I iti W IlJ � V V N'., cNJ'y W p Mu .> m a m.. � F^a G} I by m N a W1: a zm } h .W a C� v- V W ybba W W ey uf' ih N w N a Nw a N N IYY m N N V r M d4; W � � � n TH v a n $ ❑ � � � � tm p.. c � 'u M P. '9 di is v1 oY yhv o }� y � dI a o ._ >a m d .. a a it "' a mu—n E 9 ' m -„„ 6 ® c d v E. m c v a 'a M ... F 7 a. LA c2 YK� IX : O q. '.0 C4 �R is a: to IL Pd m. d C8 d ff Re� 4 1 r ,r — - — r — N ri rd ti N cI M v n Task Order Log Project Name:. City of South Bend - South Wellfield, Plant & Pressure Vane Improvements Project No.: 13298 Project Status: Active Date: September 23, 2018 Project Budget Authorizations: 08/08/1i7 Professional Services Agreement $ 150,000.00 09,Q5118 AmendrrientNo 1 tOfR:,000.0G7 Total Project Budget $ 250,000.00 Task Authorized Total Order Approval Active ! Completion Task Order Invoiced to Available Task No. Phase Name Date Complete Date Budget Date Order Budget rrNOR„ % / r '.'i r/J/ �r/��///�/�,/i. 0 Distribution I-Ine, Survey and Railroad 0511$718 Active 1 gY1 0l f $ 29,800,009,$00,00 Corridor Ownership Research crrttr aRieid„ f�n and Distribution 04 Systerrrr finprovornents L)os° gn TE13 $ 164, 010, 00 $ 164, 0001, 0 on Construction 05 06 ....... .._ Total $ 260,000.00 $ 56,199.64 $ 193,800.36 UntleaigoatodProjpot;Ood et $ M. N 9 q 0 B 09/24/18 2018-09-23_SB-5outhWellPieldWTP_13298 - TaskOrderLog.xlsx BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 9/24/2018 Department Public Works Name Sue Ellen Doudrick Division/Bureau Engineering BPW Date, 9/25/2018 Phone Extension 5922 R aired Prior to Submittal to hoard Legal Z Attorney Name: Clara McDaniels Controller z Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Z Michael Schmidt Z Agreement Amendment El Contract Ll Proposal Ll Addendum F Professional Services F Resolution F Bid Opening EJ Bid Award Req. to Advertise E] Title Sheet EJ Quote Opening El Quote Award E] Change Order No. F-1 C/O & PCA No. F1 PCA F-1 Ease/Encroach. ❑ Traffic Control: F— Other: Company or Vendor Name New Vendor MBEA(VBE Contractor MBEANBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Donohue & Associates F1 Yes E No If Yes, Approved by Purchasing, E] MBE 0 WB,E F No E] Yes Name of Company South Well Field Improvements 117-059 SSDATIF Amendment Total $100,000 (New Total + Original PSA = $250,0001) Of the new totai, $14,500 is HNTE, The remaining amount is Lump Sum. Terms of Contract Purpose/Description South Well Field Improvements — Design & Bidding Services (Lumps Sum) and Easement Acquisition Services (HNT ;) _ F-1 Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Required For Change,Orders On!y Amount of ❑ increase $ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % I Dispersal After Approval Copy Original F1 Ed Herman F-1 Ron O'Connor ❑ 1-1