Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Bids - JC Lauber Site Improvements Proj No 118-083B - Selge Construction Co., Inc.
J CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORKw. Project Name JC Lauber Site Improvements Project No, 118-083B For Bids Due September 20, 2018 PART I (Must be completed for all bids. Please type or print) Date: 9/20/18 Bidder (Firm): Selge Construction Co., Inc. Address: 2833 S. 11th Street City/State/Zip: Niles,MI 49120 Telephone Number: ( 2_69 -684-0842 Agent of IBldder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: J.C. Lauber Site Irnprovements the City of South Bend, Indiana, in accordance with plans and specifications prepared by: H John Wentz Architect and dated August -31 ', 2018 for the sum of (enter the Total Bid as shown on the Proposal) Six Hundred Seventy Five Thousand Seven Hundred Twenty _jj_� �,724�-25 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) Four Dollars and Twenty Five Cents. The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendurns attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By ,(Signature) Robert Kuhns, Project Engineer The above bid is accepted this Subject to the following conditions: Gary A. blot, President Elizabeth A. Maradik, Member (Printed Name of Person Signing) ACCEPTANCE day of Suzanina M. Fritzbergi, Member Therese J, Dorau, Member James A. Mueller, Member Attest: Linda M. Martin, Clerk Version 10/17/2017 Contractor's Bid for Public Works - 2 20 Project Name Project No. For Bids Due OlAll 1- B,ID/P,ROPOSAL CITY OF SOUTH BEND 1865 JC Lauber Site Improvements 11 8-083B September 20, 2018 Item No. Description Quantity Unit Unit Price Total Amount 1 MOBILIZATION/DEMOBILIZATION 1 LS 2 CONSTRUCTION ENGINEERING I LS _r I o ." 5 , �S' MAINTENANCE OF TRAFFIC: 3 SIGNAGE, BARRICADES, 1 LS DETOUR, ETC. INCLUDING PERMIT FEES 4 NILES AVE. PAVEMENT REMOVAL 169 Sy (X) 4A NILES AVE. PAVEMENT REPLACEMENT 169 SY *17, 7,,,.-) 5 COMMERCIAL DRIVEWAY REMOVAL 37 SY . . . . . ..... . ')10 0 5A COMMERCIAL DRIVEWAY REPLACEMENT 37 SY 0 0 6 STD. SIDEWALK REMOVAL 20 SY 6A STD. SIDEWALK REPLACEMENT 20 SY PERVIOUS CONCRETE 7 SIDEWALK REPLACEMENT (IF 100 SY 33 5 llk/ REQ'D) 8 ON -SITE PAVEMENT REMOVAL 160 SY 0 8A ON -SITE PAVEMENT REPLACEMENT 160 SY 0"/;X7, CUT EXISTING SANITARY 9 LATERAL & HOOK UP NEW LATERAL INCLUDING TAP (FEES. 1 LS 10 4" SANITARY LATERAL 20 LF 11 6" SANITARY LATERAL 90 LF 12 1,000 GAL. GREASE TRAP 1 LS 13 SEWER CLEAN -OUT 3 EA 14 3" WATER TAP, IN EXISTING MAIN, INCLUDING TAP FEES 1 EA 15 6" WATER TAP IN EXISTING MAIN, INCLUDING TAP FEES 11 EA a6c) 60 16 3" D.I,P. 110 LF c', 17 3" WATER SHUT-OFF VALVE I EA 18 6" D1P, 66 LF 19 6" WATER SHUT -,OFF VALVE I EA 6" TAP INTO EXISTING, STORM 20 SEWER FOR NEW LATERAL, I LS INCLUDING TAP FEES 21 6" STORM SEWER 68 LF 4) 4, 7 /3 001 22 ON -SITE WORK I LS 23 EXCAVATION OF UNSUITABLE SOILS 25 CYS BASE BID TOTAL —J/.. ; ALTERNATE #1 Item No. Description Quantity Unit Unit Price Total Amount 1 ORNAMENTAL FENCE AND GATES 1 LS Yk/ I r ALTERNATE TOTALN ALTERNATE#2 I Item No. Description Quantity Unit Unit Price Total Amount 1 CONCRETE PARKING LOT 1 LS ALTERNATE T . OTAL ALTERNATE43 Item No. Description Quantity Unit Unit Price Total Amount I ASPHALT PARKING LOT 1 LS a o ALTERNATETOTAL Bidder (Firm): Set cfe ConSf-riie-ijnn Pn., Tmg. Address: 2833 S. 11th Street City/State/Zip: Niles, MI 49120 Telephone Number: (269 65194-0842 (Signature) Robert Kuhns, Project Engineer (Printed Name of Person Signing) When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRV PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF MICHIC-AN ) ) SS: BERRIEN COUNTY ) The undersigned Contractor, being duly sworn upon hislherlits oath, affirms under the penalties of perjury that: I. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in [ran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of [ran; or Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 10/17/2017 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program, The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 1011712017 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 20th day of5ppteq114W— 18 Subscribed and sworn to before me this My Commission Expires n7.j25.jqn20 Selge Construction Co., Inc. Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Robert Kuhns, Project Engineer Printed Name and Title 20th day of September— )1 18 -Y 4Noary Public County of Residence Berrien Ry%, I Pt, B U C MY G G1 U IV! K"-, " j(,,N 7,2' UO Av......... CO Version 10/17/2017 Contractor's Bid for Public Works - 6 13 10 COLINTY-Crry MILDINO 227 W, JEFFERSON Bom,EVARD Sot riti BEND, INDIAN A 46601-1830 Date: To: From Subject Project Name: Project No.: PII()Nr,, 574/235-9251 FAX 574/ 235-9,171 TDD 574/ 235-5567 CITY OF Sou-n-i BEND PI.,'7E Bui-ri(w,"(J, MAYOR BOARD OF PUBLIC WORKS September 18, 2018 All Planholders Linda M. Martin, Clerk, Board of Public Works Addendum Number: I J.C. Lauber Site Improvements 118-083B Date Received: 7111 9-� � This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: .......... Date: C� � I P � I CID MERCHANTS r BONDING COMPANY,� MERCHANTS BONDING COM13ANY (MUTUAL) P.O. Box 14498, DES MOINES, lowA 50306-3498 I'HONL (800) 678-8171 FAX: (515) 243-3854 Bid Bond CONTRACTOR., (Name, legal stalus and address) Selge Construe6on Co, Inc. 2833 S. I I th Street Niles, M1 49120 OWNER: (Name, legal staters and address) City of South Bend, Indiana, Board of Public Works County -City Building, Room 1316 227 W. Jefferson Blvd South Bend, IN 46601 BOND AMOUNT: Five Percent (5%) of Accompanying Bid PROJECT: (Naive, location or address, and P)-ojecl nianher, if any) J,C. Lauber Site Improvements, Project No. 11 8-083B 504 E. LaSalle Ave., South Bend, Indiana Bond Number: SURETY: (Name, legal slatus and principal place of business) Merchants Bonding Company (Mutual) A Cot oraflon 6700 *Cstown Parkway, West Des Moines, ]A 50266 This document has important legal consequences. Consultation with, an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and inaterial furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this, Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid, Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified In the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the terns Contractor in this, Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the PrQject, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a coinnion law bond. Signed and sealed this 20th day of (fVilness) September, 2018 Selge Constr=6011 CO, Inc. (Principal) (Seal) Robert Kuhns, Project Engineer MerchautsiBonding Company (Mutual) (S? I I -e (Seal) (title /J.Kevin Hughes, Attorney -in- .ican nstitute of Architects (AIA),. 'I e language; in this CON 0657 (2/15) Printed in cooperation with Arnei i ' document conforms exactly to the guage used in AIA Document A3 I O-Bid Bond-20 10 MERCHANTSS BONDING COMPANY,. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Connie J Messer; Dawn M Pequignot; Elaine K Miller; Harold E Everett; J Kevin Hughes; Jada M Karst; Jessica K Callahan; Marie E Comparet; Melinda Jagger; Thomas J VanDyck; Tom McGovern their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This rower -of -Attorney is granted and is signed and seated by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seat of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages andlor final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall net relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 14th day of July 2017 ' ''•QO r. � �• MERCHANTS BONDING COMPANY (MUTUAL) �y:� RZ % .' �p�A9� MERCHANT NATIONAL BONDING, INC. -o- C:d : .ti: z -o- _ � y 2003 :`�i : : y� 1933 �•' c: By a • d�' �p '+,��'••.....••:� .`�� "'. lt/"� �••� P7-,� resident STATE OF IOWA "a.iss .+.*'+`` `•• •.. •. a COUNTY OF DALLAS ss. On this this 14th day of July 2017 before me appeared Larry Taylor, to me personally known, who being by me duty sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. E AI ICIA K, GRAM Commission Number 767430 My Commission Expires April 1, 2020 Notary Public (Expiration of notary's commission does not invalidate this instrument) 1, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 20th day of September 2018 • a01IG . Ca hA •. •. 20©3 1933 ; c; Secretary .,.�i�..••,�•••.��,,. ..,�W. .••tea•• � '••...••• P(0A0018 (3117) .... its .+•'``` plum 9 ITU WC 9 11 0-Ir-Alt" IM an"] Ion IN 3 U1111I 1-14 LLOOMILIMIMG CHECKLIST FOR BIDDERS Project Name JC Lauber Site Improvements Project No. 118-083B For Bids Due September 20, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Cerfificatioln of use of United States Steel Products or Foundry Products. Proof of MiBEANBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/VVBE Contacted X Form [MWBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of'the need to read and comply with the specifications. Bidder: Selge Construction Co., Inc. Date: 9/20/18 By Authorized Representative: Signature: Print Name & Title: Robert Kuhns, Project Enclineer Version 10/17/2017 Contractor's Bid for Public Works - 1 PART 11 (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/herlits bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. See attached 2. Attach a listing of public works projects currently in process of construction by your organization. See attached 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. We have never failed to complete a project. 4. Attach references from private firms for which you have performed work. See attached SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other info mati�ln �rhicr YOH bell ve would er�abL� the Cit of South Rend to consider your bid.) War wi e c P eted in an or er y mann , accor in specifications and as best suits the Owner and its Engineer. 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. See attached; bond not required. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. See attached; bond not required 4. Attach a listing of equipment you have available to use for the proposed project. See attached; we own our equipment. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. Yes. SECTION III CONTRACTOR'S FINANCIAL STATEMENT See attached. Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 10/17/2017 Contractor's Bid for Public Works - 3 LLJ uj U) 2 CL w 0I ui z F- uj z M Lu 0 U) w (n IL UJ (o 0 a. 0 z i LU'Uj 02 0 z 0 z (L LU in CL w 0 LL w co M' I , E 4i E cu z 15 a) co m 00 dp 4 6 Ln CN 4 CN Ln b9- P4 ro 0 co C, �0- dP , CL 0 E 0 E 0 C! < W 0') r- 0 0 co tpl- 0 CL r-i 0 Z 1 4 cu (L (D U) CL, CL — u 0,' 0 U) 4ffY 4-4 i2 'co 8- 0 C) 't X; CL N as (D CD r- o lz r-A 00 (D F En N (D I M M 'N Lo LU co 03• N �o 4 tD U) 0 H rcs. m 110 00 M, 4J fU IN ai E CD CITY OF SOUTH BEND of MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY ? . DEVELOPMENT PROGRAM FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS `"= ,xss az.S This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: Project Name: Bidder: Contact Person: Address: 118-083B JC Lauber Site Im Date: 9/20/18 5elge Construction Co., Inc. Robert Kuhns, Project Engineer Telephone: 574-292-8943 2833 S. 11th Street City: Niles State: MI zip: 49120 Email: bkuhns@selgeconstruction.corn To determine whether a bidder has demonstrated good faith efforts to reach the MBEIWBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South B urres that all perspective bidders complete no less than 2 of the following: 9�ttend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and -� subcontracting opportunities. (� Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. C2,, Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBEIWBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBEIWBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBEANBE's with adequate information about the plans, specifications and other �v requirements of the subcontract and did not reject MBEANBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 10/17/2017 Contractor's Bid for Public Works - 11 , '11,11, I ,O�Tq CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM P134 F FORM MWBE-2.11 i965 MBEMBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF 1 Project Numiber: 118-083B MBE BE Participation Goal 7.1%, Project Name: JC Lauber Site Improvements, Bidder: Selge Construction Co., Inc. 13y:--l-:;;I- P. Robert Kuhns, Project Engineer 9/20/18 (Signature) (Title) (Date) MBEANBE Firm State Batricading, Inc. Owner or Contact at MBE/WBE Firm James Michalski Telephone: 574-287-2078 Fax: 574-287-1744 Email: statebarricadel@aol.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Traffic control and sign post installation RESULTS OF CONTACT WITH THE MBEANBE FIRM: ---- Bid a Pted M1BEfWBE Firm Owner or Contact at MBENVBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: Version 10/17/2017 Contractor's Bid for Public Works - 12 -0 d 0 :3 a) 0 >0 N co oE -i , 0)(9 A 0 (r 10 0 to CL iv .0 CO ca ....... .... 1 0 $,,6e - -2 co 0) r_ CL (6 < It :5 CL 0 V) co r, -Ft 0 C2 IE E M CIO) ILI 4, 6 06 U) �T ic wo C(0) 9 -P � A Wt 0 V) to 0 E 3� !�� NO 60 , �T c E t 65 (d ciE ��JIML,j t 6 C, % I a U., at 0a a ':1 3:,� 6 0 Cj - LOO :01 a �2 E wo 0 CO ID 0- 0 :3 CJ 0 E Das s - 00 < Ol' c8) 'Ea 0) JCL tr) MOM "III IIYpu 5 E CL t.��N LO 0 _0 W-am 0 C� 7 to, L4 CLO6 51 0 CL o 6 Of 0 D -E 4 C 6a 5O 0 C) C) 7) 0 -0 _0 go TO M 51 I If, 2 �D co -C C: jz()z"-7-j3:U-WW- Z 2 OCDC z a5 — wo -0. 0 w 0 0QWOF Fn-j 0 0 , W T ED IT 0 Z LL 0 Z 0 Z 7 0 ;j� :j �D c 1 T w W cc co 0) a) 5-CO: CL ca �Z<w cww <—l--CEO= C�5 E 2- 0) w TLW d 0 . I-- z C)z ZT- .0, 8 - t �Ot� w P -ji Z 3: w W Oj-Z t6 73 0 (D 2 - cr M W ) --a, 0 E.,.-JJJL-,OC)ODI:CC OT-z< cc W QW5 WO on , �-- i,- Occ j �?<F—Wob z 0 ci.a� F- C)0�--j WOODU-0 w 0 ED '0 0 2< 1 j L - L zo wx - z cc Li- -i (D C -0 Z 0 zMM200M cr 0 m M-OUb-L'OaO,)j()w W Iwo w '4 z cc 2 . wLm5zd LL FOW cp% -0 C, 0 OD06M DOzjzLLW :) 0 �C-, C: c (!05 =R Vx- � Ow , 0 0 , z F < P IL 0 -j 0 z <0 to co 05-M (D r .6 cal 0, C (0 0 -0 w 6 (D a UFco J T mT 0 CO - 7�6 c6 0 Om a, :3—W g dQJ too t5 -s c w m 0 cn M CL = as - _j 3 E ci t U) 0 LU (D 0 10 71 00 70 -0 1 -0, as gi 05 >; � (D, z 0 w w R ? > -C 0 R ? �8 U) T!- -. n - � f—nn w-r- =m 5 " - 7 Z. G E 7. ab 0 2 :3-0 C) 0 (0 ca 0 -. E acyC7z Ca f; ,r C.- (0 0) U) a) Q- — 0— .-00 -F-l z 10 Cc: g 0,) 'a) s 4) 10 E *0 a) -5 E �) Z E -C c 0 C) C: 0 0 0 (0 c :3 2 U) a) s wo r c 0 C: b C) t? F co c c a) 0 0 n E o -D F � 6) -, C6 Ld co, (D, zw -0 :f�- 0 0 (n E z F- z A) OR CS -E FT �� c 0 01-5 .as cc CL Cc Ir U) z v < < 0 a) 0 -- :a Lu, Ca — '- - 10 U) E, V) E D 0 -r- W:D w — 0 dd�a AsaY- 0 - L=U) '02 � T- 1- Ir F- CL T- -5 00 S td C) cf) U) E (0 C', CO,) m "0 a) Go -ca (MocDOUJO ',D E 6 m C) Z) 5 W LU ID -J, Z -0 -D�jv E 8 m _26.88 ID < 0 co 0) CC -(0 W LL Lu L cc �g �2 'D o �F- - jo -0 SO COI) i7- 0) a) t 6 h 17 11) rr (J) U) Ozq- -WCO c: < - UJ C 0 ct 0 cc w w (1 00 -7 w (D w w w U- z a) -.55 — .,:i� 00 -r �O w 0 CC () 0 0 0 0 Fc- 0 - W Q) 't 0 (D 0)0 0 OD� — C)- �COO 'E (D W I-- 'a) (Z -0 Cr C) -za (0 �j ID (D C: uj :r a-) 0 W OE,F= >-JO 000 < a c w IL I a) — N Ljj 4i ca')� co -bj D 0 CE Lu C) m z W 0 C2. U) cr U- �- Cc E, Q) - 0wwC LL -C ±V 6 0 n zl:) t, c — 0 2 w < Z 60M CD C) 0 - 6 .15 0) w > U) 0 O� 0 _c6n,ogwC} - 0 (0 . rl� C: z Z 8 $� q ().F_ LL ID,c w w La w0coz (D -i ui p < T- tu 1� 0- T- -0 0 1: L; U) m Z 0 (6 E co do' ;�e � cv � qi •;; ni �, �w ��j � iY go GV � ?' 9 i7 0� W -7 (o � q 0- "(j. d c co GCS O CL O le --c Mlllluui, "(i 0 (.. } m O r� w co 0 {,S c�3 �� 0 o U 4 Cei"C3�y Cry ark E 'D 15 L 6 O a) 76 a5 —0 E t co C: ID Lo r5 * c eC 0 Sri f E QL -o i ram- Cr y a CON Z* te. � � Lo as h _ Z m 0— - o c� csa ,- f c c c v °� Cs C'0 o-a 6 m p ai C LU a ✓,.,„ r J ol J, M o r cz .� � • ' . �. 0' • 1 f y cl �Yy ((D (D w (D M (0 3: (D - t CD 7 C"1co �-:]7. q 3000) �1 � cD3 C(nw p7 r p 3 0' 7 00 CD A� CID + � O � � 3- W 3kv � N�0 � (D � f T 1 :3 . :_cOCa Cm7cL�Q� 0- CO a 0 't �a T 5. ' (D C7 0 p + (3) 0 cD r I� �' C2 CS CC 0 03�� � C 0 � o c - Co (1B " ITT rw � L C) (D -Mw ( Z) C Cl)1Q+ -n a�-4 00 3', 000 -'-(D(IDg+ 21 c� ?' ( a ' IOU (D �( trims 3(D � CD ` 0) c Cu 0 0 : S CQ :°L �-DCuC� (D (nV cn(7, (D C: d3 a a (n (0 :3"_ C L a e Ck (0� � 0 3 Wa 73 m c. er> q ro a � zy 0 CO P) 5 :7w 5= 5 c m- co D -- - i � m ara tI, w 5, C L P, 1 (0 :7 y+ (n 0-'? K:o C Kc(D W)o w � (c, 0WKE CD (D Co - w M n=°arc ` ? ICJ :7 C-(ca fes +� u Q W :3 (D w (Da � c (D a°(D C ° < 0 =yam w C: Chu ) 0G ¢' ro x'�' "pa c _.7� (ra ea e a W (Dr r-(D (no Fyc (D CD—• r- (D 737 C • :D cr Cb N Zr S CID CS c CD a�C3 a D m N G7 0 c(] m C} (ra PL PART II — SECTION I — EXPERIENCE QUESTIONNAIRE 2. Attach a listing of public works projects currently in process of construction by your organization. Contract Amount 873 600 Class of Work Water Main Replacement Expected Completion Date Fall 2020 Name and Address of Owner Cfty of Niles 558/559 585 182 Bike/Pedestrian Path Fall 2018 INDOT R37501A 562 537 476 WM/Services Install & Remove Fall 2018 CiV of Elkhart k568 2 169 846 Sewer Street Reconstruction Winter 2018 Ci1y of Warsaw 572 1 938 001 Sidewalks Fall 2018 INDOT 39513A 573 1 004 807 Sewer Rehabilitation Fall 2018 Ci1y of Warsaw 574 540 896 Bike/Pedestrian Path Fall 2018 INDOT 38061 578 359 600 Lift Station Fall 2018 Ci of Brid man 584 $4 150 000 Streetsca es Winter 2018 City of Elkhart 587 1 236 464 Road Recon/Sidewalks Fall 2018 Ci1y of Mishawaka 588 372 046 Ironworks Phase 11 Fall 2018 Ci1y of Mishawaka 589 98 000 Creek Re air Fall 2018 Ci1y of South Bend 590 1 13l 000 Road Improvements Fall 2018 Cily of South Bend 592 52 800 Roto Rooter Jet Removal Fall 2018 Ci1y of South Bend 594 123 246 Pond Rehabilitation Fall 2018 39"' N. Conservancy, LaPorte 20 000 Bike Path Rehab Fall 2018 Niles Township 596 $694,500 Lift Station - Spring. 2019 Town of Brennen (597) 4 414 937 Sewer Installation Spring 2019 LaGrange 598 $1 474 749 Rodgers Lake Spring 2019 Poka on Band Dowa iac 600 227 750 Watermain Winter 2018 Benton Charter Twp, MI 601 $370 000 Sidewalks Curb Landscape 2019 City of Elkhart 603 650 468 __.-Spring Water Main Spring 2019 Indiana -American Water 604 "Attachment 4. List references of private firms for which you have performed work. Environmental Restoration Geocel Holding Corporation 1668 Fabrick Drive PO Box 398 St. Louis, MO 63026 Elkhart, IN 46516 Siemens Medical Solutions Diagnostics Mr. Tom Lienczewski 3400 Middlebury Street Elkhart, IN 46516 South Bend Orthopedics Elm Road Medical Campus 53880 Carmichael Drive South Bend, IN 46635 Brandywine Community Schools John H. Jarpe, Ed. D., Superintendent 1830 S. Third Street Niles, Ml 49120 Gateway Development Mr. Dan Brekke 56199 Parkway Ave., Suite 1 Elkhart, IN 46516 Palisades Park Country Club 79336 Ravine Way Covert, MI 49043 Jimmerson Shores Cooperative 4508 Denali Cove Ft, Wayne, IN 46845 Remington Park Subdivision Wagner Land Development 3325 Middlebury Elkhart, IN 46516 Augustine Lakes Subdivision c/o Miller Builders PO Box 229 Granger, IN 41530 AM General Rolland Miller 13200 McKinley Highway Mishawaka, IN 46545 Noble Americas South Bend Ethanol 3201 W. Calvert Street South Bend, IN 46613 Dometic Corporation Glenn Kimmerly 509 S. Poplar Street LaGrange, IN 46761 Notre Dame Federal Credit Union Bob Green PO Box 7818 Notre Dame, IN 46556 Arbor Lakes Apartments Edward Rose Development 6100 Newport Rd Kalamazoo, ml 49003 Chicago Trail Farms Robert L. Runkle 27551 US 12 Edwardsburg, MI 49112 Flaherty & Collins Art Smith One Indiana Square, Suite 3000 Indianapolis, IN 46204 Aeroplex FM Stone Real Estate 421 S. Second St. Elkhart, IN 46516 4. List references of private firms for which you have performed work, continued. Garden Homes Altera LeRoy Yoder David Kline 17874 SR 23 600-888 Dunsmuir Street South Bend, IN 46635 Vancouver, BC 6C3K4 DJ Landscaping Pleasant Shores Front Lot Development 4436 Broadmoor Ave John Wilhelm Grand Rapids, MI 49512 2020 E. Washington Blvd., Suite 400 Ft. Wayne, IN 46803 Elkhart Community Schools 2720 California Road Pokagon Gaming Authority Elkhart, IN 46514 1111 Wilson Road New Buffalo, MI 49117 URS Corporation Anthony J. Limke M.A.A.C. 36 E. Seventh St., Suite 2300 PO Box 262 Cincinnati, OH 45202 Niles, MI 49120 Overlook Apartments Signature Construction 8888 Keystone Crossing Indianapolis, IN 466244 ENGINEERING REFERENCES Selge Construction Rich Zielinski 317-547-5580 American Structurepoint 7260 Shadeland Station, Suite 100 Indianapolis, IN 46256 Jeremy Roschyk 574-288-4580 Donahue & Associates 100 N. Michigan, Ste 510 South Bend, IN 46601 Andy Lemberis 574-236-4400 DLZ Indiana, LLC 2211 East Jefferson Blvd. South Bend, IN 46615 Paul Hummel 574-234-3167 Lawson Fisher Associates, P.C. 525 West Washington Avenue South Bend, IN 46601 John Olsen 269-428-4424 Merritt Engineering, Inc. 4568 Red Arrow Highway Stevensville, MI 49127 Rick Keller 574-272-3525 Keller Engineering, Inc. 54365 30th Street South Bend, IN 46635 Kenneth Jones 574-293-7762 Jones, Petrie, Rafinski, Inc. 200 Nibco Parkway Dr Elkhart, IN 46516 Matt Davis 269-927-0100 Wightman and Associates, Inc. 2303 Pipestone Road Benton Harbor, MI 49022 Jason Durr 574-282-8001 Christopher B. Burke Engineering, LLC 220 West Colfax Avenue, Suite 500 South Bend, IN 46601 John Linn 574.232-8700 Abonmarche Consultants of IN, Inc. 750 Lincolnway East South Bend, IN 46601 David Harvey Fleis & Vanderbrink Engineering, Inc. 2960 Lucerne Drive, S.E. Grand Rapids, MI 49546 3 1. What public works projects has your organization completed for the period of five (5) years prior to the date of the current bid? CONTRACT WHEN NAME AND ADDRESS AMOUNT CLASS OF WORK COMPLETED OF OWNER $1,490,854.00 WATER MAIN 2016 CITY OF MISHAWAKA 1600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $257.718.00 CURB & SIDEWALK RENOVATIONS 2016 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 574-235-9216 $267,718.00 SEWER CLEANOUT 2016 CITY OF WARSAW I PO BOX 817, WARSAW, IN 46581 - 574-372-9545+ $1,218,351.00 FORCE MAIN IMPROVEMENTS 2016 SYRACUSE TURKEY CREEK RSD FORCE MAIN $641,406,00 WASTEWATER LIFT STATION 2016 CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN. IN $53,525.00 PARKING LOT IMPROVEMENTS 2016 CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN $1,618,027.95 STORM SEWER SYSTEM IMPROVEMENTS 2016 SOUTH BEND NOBLE AMERICAS ETHANOL PLANT $131,550.00 LIFT STATION RENOVATION 2016 VILLAGE OF CASSOPOLIS 1 117 S. BROADWAY, CASSOPOLIS, MI 49031 $510,690.00 WASTEWATER TREATMENT LAGOON 2016 DOWAGIAC POKAGON BAND RODGERS LAKE $64.000.00 ADA RAMP INSTALLATION 2016 CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN $72.410.00 ACCESS ROADWAY IMPROVEMENTS 2016 CITY OF SOUTH BEND ! 227 W. JEFFERSON BLVD_ SOUTH BEND, IN 46601 -574-235-9216 $15,660,00 ACCESS ROADWAY IMPROVEMENTS 2016 CITY OF SOUTH BEND! 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $161,100.00 SANITARY SEWER POND REPAIR 2016 SOUTH BEND NOBLE AMERICAS ETHANOL PLANT - UPV $137.695.00 STORM SEWER IMPROVEMENTS 2016 SOUTH BEND PRECISION WALL SYSTEMS STORM SEWER & LOT $365.881,00 SANITARY SEWER IMPROVEMENTS 2016 SOUTH BEND ETHANOL SANITARY SEWER $80,000.00 SNOW PLOWING 2016 SOUTH BEND 1 MISHAWAKA MEIJER STORE SNOW PLOWING $96,694.00 NORTH AREA SITE IMPROVEMENTS 2016 LAGRANGE DOMETIC III $92.815.00 SEWER IMPROVEMENTS 2016 NILES 2016 SEWER IMPROVEMENTS $62,590.00 MANHOLE REPAIRS 2016 NILES TWP MANHOLE REPAIRS, BELL ROAD, NILES MI 49120 $167.850.00 SANITARY SEWER IMPROVEMENTS 2016 SOUTH BEND 11N TEK IIN KOTE SANITARY SEWER $14,435.00 ADA PARKING LOT IMPROVEMENTS 2016 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-W16 $143,730,00 CONCRETE APRON EXPANSION 2016 ELKHART INDIANA FLIGHT CENTER $299,880.29 SIDEWALK PROJECT 2016 TOWN OF MIDDLEBURY 1418N MAIN, MIDDLEBURY, IN 1574-825-1499 $166,333.00 LOT DRAINAGEIEROSION PROTECTION 2016 SOUTH BEND ST, PAUL'S ASSISTED LIVING CENTER PARKING LOT $100,970.00 WATER VALVE REPLACEMENT 2016 MISHAWAKA BODINE STATE PARK FISH HATCHERY $55,000.00 PARKING LOT IMPROVEMENTS 2017 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $2,071.944.00 WASTEWATER COLLECTION SYSTEM 2017 TOWN OF NORTH WEBSTER, PO BOX 95, NO. WEBSTER, IN 46555 $635,773.00 ROAD AND SIDEWALK 2017 CITY OF STURGIS, 130 N. NOTTAWA ST., STURGIS, MI 49091 $362,165.00 WTP BACKWASH PUMP STATION 2017 TOWN OF MIDDLEBURY, 418 N. MAIN ST., MIDDLEBURY, IN 46540 $126,000.00 SEWER AND PARKING LOT REPAIR 2017 SOUTH BEND CLINIC, 211 N. EDDY ST., SOUTH BEND, IN $1,652,481.00 LIFT STATION & FORCEMAIN 2017 VILLAGE OF PAW PAW, 111 E MICHIGAN, PAW PAW, MI 49079 $4,655.327.00 SANITARY & WATER IMPROVEMENTS 2017 TOWN OF NEW CARLISLE/ PO BOX 6, NEW CARLISLE, IN 465521574-654-3733 W81,453.00 LINDEN LTCP PHASE II 2017 CITY OF MISHAWAKA 1600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $62,785.00 FORCEMAIN 2017 CITY OF ELKHART 1229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $8,434,889.00 SOLAR POWER INSTALLATION 2017 SPARVAN PV11lNOVATEUS SOLAR J MICHIGAN STATE UNIVERSITY $197,240.00 OSBORNE STORM WATER PUMP STATION 2017 CITY OF WARSAW 1 PO BOX 817, WARSAW, IN 46581 - 574-372-9545+ $2,860,242.00 WESTERN AVE STREET/SIDEWALK 2017 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46901 -574-235-9216 $23,865.00 ADA RR PARKING LOT AND WALKS 2017 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294 5471 $1,316,160.00 WW COLLECTION SYSTEM 2017 VILLAGE OF CASSOPOLIS 1 117 S. BROADWAY, CASSOPOLIS, M€ 49031 $1,273,288.00 DRAIN 1 CREEK 2017 NEW BUFFALO TWP.117655 CLAY ST., NEW BUFFALO, MI 49117 SECTION II - PLAN AND EQUIPMENT QUESTIONNAIRE 2. (SUBCONTRACTORS LIST) WORK PERFORMED: Bailey Aggregates Aggregate Trucking 12609 Indianapolis Rd Yoder, IN 46798-9733 Brusky Construction Aggregate Trucking 70569 Elizabeth St Niles, MI 49120 V & R Trucking Aggregate Trucking 1845 Elmer St South Bend, IN46628 Niblock Excavating, Inc. Asphalt Construction PO Box 211 Bristol, IN 46507 Riefh-Riley Construction Co., Inc. Asphalt Construction PO Box 477 Goshen, IN 46527-0477 Walsh & Kelly, Inc. Asphalt Construction 1700 E. Main St. Griffith, IN 46319-2999 Michigan Paving & Materials Co. Asphalt Construction 2300 Gendenning Kalamazoo, MI 49003 Baker Corporation ByPass Pump Rental 2205 E. Lincoln Hwy Chicago, IL 60411 Concrete Sawing & Coring, LLC Concrete Coring Cutting PO Box 907 Niles, MI 49120 Abonmarche Consultants, LLC. Construction Engineering 750 Lincolnway East South Bend, IN 46601 SUBCONTRACTOR LIST WORK PERFORMED Jones Petrie Rafinski, Inc, Construction Engineering 412 S. Lafayette Blvd South Bend, IN 46601 Wightrnan & Associates Construction Engineering 2303 Pipestone Rd Benton Harbor, MI 49022 Dewind Dewatering Dewatering 9150 961h Ave. Zeeland, MI 49464 Bender Electric Electrical Wiring PO Box 143 Cassopolis, MI 49031 Hawk Enterprises, Inc, Electrical/Signal/Signage 1850 E. North Street Crown Point, IN 46307 Custom. Fence Co Fencing PO Box 526 Niles, MI 49120 Mike's Fencing Fencing 68021 SR 19 North Nappanee, IN 46550 Milestone Fence Fencing 13399 McKinley Hwy Mishawaka, IN 46545 C-Tech Corporation Guard Rails 5300 W. 100 N. Boggstown, IN 46110-9706 Lowe Construction Jack and Bore 2535 Bader Road Horton, MI 49246 Weaver Consultants, LLC Laboratory Testing 7121 Grape Rd Granger, IN 46530 2 SUBCONTRACTOR LIST WORK PERFORMED Acorn Landscaping, LLC Landscape/Restoration 24930 Kern Rd. South Bend, IN 46614-9787 Fuerbringer Landscaping & Design, Inc. Landscape/Restoration 25530 Brick Road South Bend, IN 46628 Slussers Green Thumb, Inc. Landscape/Restoration PO Box 33 Logansport, IN 46947-0033 Turf Services Landscape/Restoration 57780 Sink Road Dowagiac, MI 49047 Ferguson Waterworks 91934 Lift Station Installation 1077 Oliver Plow Ct South Bend, IN 46601 Best Sweeping Specialists, Inc. Road Sweeping/Dust Control 632 S. Sixth Street Goshen, IN 46526 A-1 Striping Service, Inc. Road Striping 56825 Spirea Rd. New Carlisle, IN 46552 The Airmarking Co., Inc. Road Striping 1544 North State Road 25 Rochester, IN 46975 Michiana Contracting, Inc. Traffic Signal Work PO Box 929 Plymouth, IN 46563 Rathco Traffic Control 6742 Lovers Lane Portage, MI 49002 Give `Em A Bralce Traffic Control 2610 Sanford Ave Grandville, MI 49418 3 SUBCONTRACTOR LIST WORK PERFORMED State Barricading, Inc. Traffic Control 24963 U.S. 20 West South Bend, IN 46628 KC Tree Tree Removal 1320 Third Street Osceola, IN 46561 Payne's Services Tree Removal 30296 Redfield St Niles, MI 49120 Construction Video Media Video Taping 111 E. Newberry St. Romeo, MI 48065 Watson Tree Service, Inc. Tree Removal 2953 E. Detroit Road Niles, MI 49120 SIT Bancroft Electric Electrical 25020 SR 2 South Bend, IN 46619 2018 4 Selge Construction Co., Inc. SECTION It - PLAN AND EQUIPMENT QUESTIONNAIRE 4. What equipment do you have available to use for the proposed project? QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 CATERPILLAR HYD. EXCAVATOR MODEL 325L 1994 1 CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY 1994 1 KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD. 1988 1 KOEHRING 866 HYD. BACK HOE 4 YD. 1979 2 KOEHRING 505 HYD. BACK HOE 2 112 YD. 1969&70 1 BANTAM TRUCK CRANE 1 JOHN DEERE 455G CRAWLER LOADER 1989 3 RUBBER TIRE LOADERS 2 112 TO 5 YD. MACHINES 1 JOHN DEERE 544 RUBBER TIRE LOADERS 1990 1 JOHN DEERE 624G LOADER 3 112 YD. 1994 1 JOHN DEERE 570A ROAD GRADER 1980 1 INTERNATIONAL T.D. DOZER 1972 1 CATERPILLAR D5C DOZER 1992 1 CATERPILLAR D4C DOZER SERIES 3 1979 1 FORD F800 UTILITY TRAILER WITH HI RANGER 1985 1 MACK CL713 DUMP TRUCK 1996 1 MACK CL713 TRACTOR 1997 1 FERGUSON TANDEM DRUM VIBRATOR ROLLER 1979 1 FORD TRACTOR MODEL LN 8000 1993 1 MACK RD68 TRACTOR 1996 1 FORD F800 DUMP TRUCK 1998 1 MACK DUMP TRUCK MODEL GU813 2015 PAGE 2 - SECTION 11, PLAN AND EQUIPMENT QUESTIONNAIRE QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 MACK TRACTOR, MODEL CL713 1995 1 MACK TRACTOR MODEL CL713 1996 1 JOHN DEERE 955 TRACTOR W/TILLER, BOX SCRAPER, BRO( 1991 1 JOHN DEERE 955 4WD TRACTOR W/TILLER AND BROOM 1994 1 CATERPILLAR MODEL CS433 COMPACTOR 1996 1 PEMBERTON 72" DITCH CL. BUCKET FOR CAT 30OLE 1996 1 HARTMAN FABCO CONVEYOR 1979 1 FELCO ROLLER BEDDING CONVEYOR W/6 CY HOPPER 1991 1 FELCO BEDDING CONVEYOR, STAND. SLIDER, W/2' EXTENS 1994 WITH 6 CYLINDER HOPPER 1 150 KW CAT. GENERATOR, ELECTRIC PUMPS, DEEP WELLS, HYDRAULIC CLAM, ETC., COMPLETE 1 ONAN 30 KW STANDBY POWER ENGINE GENERATOR, TRAILER MOUNTED, W/CABLE & DIESEL FUEL TANKS, SUBMERSIBLE SEWER PUMP 1 EARTH BORING MACHINE 48" AND ACCESSORIES 1975 1 VERMEER 4" LW HAMMERHEAD MOLE 1995 1 VERMEER 3" HAMMERHEAD MOLE 1995 1 DITCH WITCH DIRECTIONAL BORE SYSTEM 1995 1 MELROE 853C BOBCAT 1995 1 VERMEER D-24x40 NAVIGATOR DIRECTIONAL BORE SYSTEd 1997 1 FINN HYDROSEEDER W/ ATTACH., GROUNDHOG 1997 1 CLEAN EARTH SFE-JET-VAC 1998 1 MCELROY #412 HYDRAULIC FUSION UNIT 1998 1 BELSHE T9 TRAILER 1998 2 928G CATERPILLAR WHEEL LOADERS 1998 1 PC200-6 KOMATSU EXCAVATOR 1996 1 VS 63-20-D Grout Machine 2016 PAGE 3 - SECTION II, PLAN AND EQUIPMENT QUESTIONNAIRE QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 NPK 8XA HYDRAULIC HAMMER 1998 1 EX750 - HITACHI EXCAVATOR 1998 1 FELCO VIBRATORY COMPACTOR BUCKET 1998 1 JCB 411 TOOL CARRIER, WITH FORKS 1998 1 DITCH WITCH JET TRAC MODEL 920L WI MUD MIXER, SUBSI 1999 1 ROSCO RB48 SWEEPER, WITH SNOW PLOW 1999 1 STERLING L8513 DUMP TRUCK 1999 1 920L DITCH WITCH DIRECTION BORE SYSTEM 1999 1 FREIGHTLINER FL80 DUMP TRUCK 2000 1 FREIGHTLINER FL112 DUMP TRUCK 2000 1 PMD 800 VAC-TRON VACUUM 2000 1 VERMEER T-555 TRACK TRENCHER 2000 1 DITCH WITCH JT7020 BORING UNIT 2000 1 MCS-325 PORTABLE BENTONITE MIXING & RECYCLING SYS- 2000 1 VOLVO L70D WHEEL LOADER 2000 1 CATERPILLAR 930 WHEEL LOADER 2000 1 KOMATSU WA250-3 WHEEL LOADER 2001 1 KOMATSU WA120-3 WHEEL LOADER 2001 1 EASI-POUR COMPACT 880 SLIPFORM TRIMMER/PAVER 2001 INCLUDES FORMS AND CONCRETE TOOLS 1 KOMATSU PC128US -2 006487 EXCAVATOR 2001 1 KOMATSU PC228US LC-3 020533 EXCAVATOR 2001 1 BLAW-KNOX RW 195 ROAD WIDNER 1970 1 CHAMPION 730A VHP MOTOR GRADER 1999 1 BOBCAT SKID STEER LOADER, MODEL 773K 2001 1 TREMIX COMPACTOR MODEL MV80 2001 PAGE 4 - SECTION II, PLAN AND EQUIPMENT QUESTIONNAIRE QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 CMI SF3002 SLIPFORM PAVER 1999 3 JOHN DEERE 1-650H, 2-550H CRAWLER DOZERS 2001 1 GMC WHITE TRACTOR TRUCK 1993 1 KOMATSU PC3001-C-61-E EXCAVATOR 2001 1 KUBOTA L3010HST TRACTOR 2002 1 TRAILER EXPESS 18' FLATBED TANDEM AXLE TRAILER 2002 1 TC-600 TEXTUREICURE MACHINE & ACCESSORIES 2002 1 CURB FORM C55629 2002 1 FELCO 30 X 60 COMPACTOR BUCKET 2002 1 CATERPILLAR CH85 CHALLENGER TRACTOR 2003 2 MISKIN SP-C17 SCRAPERS 2003 1 DYNA-PACK MODEL CC122 VIBRATORY ROLLER 2003 1 AMERICAN AUGER BORING MACHINE 2003 1 DITCH WITCH SK500 UNIT W/AUGER & TRENCHER 2004 2 FELCO COMPACTION BUCKETS 2004 1 SCISSOR LIFT 2004 1 DITCH WITCH JT27T2 WITH ATTACH./PIPE 2005 1 DITCH WITCH JT2020 WITH ATTACH./PIPE 2005 1 VERMEER D36X50 NAVIGATOR W/ATTACH. 2005 1 YANMAR VI080 MINI EXCAVATOR 2016 3 JOHN DEERE LOADERS MODEL 544J 2005 1 FELCO MINI CONVEYOR 2005 1 D36X50 NAVIGATOR 2006 1 DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER 2006 PAGE 5 - SECTION II, PLAN AND EQUIPMENT QUESTIONNAIRE QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 2 DITCH WITCH VAC SYSTEM WITRAILER 2006 1 ROADTEC RX700-4 MILLING MACHINE 2006 1 IHI IC30-2 CRAWLER CARRIER 2006 1 JOHN DEERE 450D EXCAVATOR 2006 1 INTERNATIONAL 4900 6 X. 6 WATER TRUCK 1998 1 CATERPILLAR 328D EXCAVATOR 2007 1 CATERPILLAR 321CLCR EXCAVATOR 2007 1 CATERPILLAR 314 CLCR EXCAVATOR 2007 1 YANMAR V1075 EXCAVATOR 2008 1 MR MANHOLE CUTTER EXTRACTOR & AUGER 2008 1 INGERSOLL RAND VIBRATORY COMPACTOR SD100D 2008 1 12" - 36" BUTT FUSION MACHINE 2009 1 VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS 2009 1 CATERPILLAR CH 85E TRACTOR 2010 2 ROME SCRAPER PANS 2010 1 KOMATSU PC490LC-10 EXCAVATOR 2012 1 KOMATSU PC39OLC-10 EXCAVATOR 2012 1 JOHN DEERE 700K DOZER 2012 1 JOHN DEERE 650K DOZER 2012 3 JOHN DEERE 544K LOADERS 2012 2 MOVAX-SP60 HAMMERS 2013 1 ISCO FUSION MACHINE 2014 2 JOHN DEERE 245 LC EXCAVATOR 2014 1 JOHN DEERE 544K 4WD LOADER 2014 PAGE 6 - SECTION 11, PLAN AND EQUIPMENT QUESTIONNAIRE QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 KENWORTH DUMP TRUCK 2001 1 KENWORTH T-800 CUMMINS TRACTOR 2016 1 ETNYRE TRAILER WITH 4TH FLIP AXLE 2015 1 JOHN DEERE 245 LC EXCAVATOR 2015 3 ARTIC SNOW PUSHER PLOWS W/QUICK COUPLERS 2015 2 YANMAR V1055 MINI EXCAVATOR 2015 3 WESTERN PLOWS 2015 1 DITCH WITCH TRACKER WITH BEACON/DISPLAY 2016 9 CATERPILLAR COMPACT TRACK LOADERS 2016 1 PERCUSSION DRILL 2016 2 YANMAR Vio35-6 MINI EXCAVATORS 2016 1 YANMAR Vio45 MINI EXCAVATOR 2016 1 KENWORTH DUMP TRUCK 2006 1 ROFHDR ROADWIDENER 2017 CEMENT SAWS, AIR COMPRESSORS, WELL POINT PUMPS, WELL POINTING EQUIPMENT, 4000 GAL. WATER TANKER & JET PUMP, BROOMS, SHOP TRAILERS, 3 FIELD OFFICE TRAILERS, COMPACTORS, POWER MORTAR MIXERS, TAMPERS, LASER BEAMS, SMALL TOOLS, 3 TANDEM DUMP TRUCKS, 1 SEMI - DUMP TRAILER, 4 LOWBOY TRAILERS, 3 TRUCK TRACTORS, PORTABLE TRAFFIC LIGHTS, PORTABLE FLASHING SIGN, STEEL SHEETS, GENERATORS, PAVING BREAKERS, ROCK DRILLS, TRENCH BOXES, WELLS CARGO PUMP TRAILER, 3 WELLS CARGO TOOL TRAILERS, WELLS CARGO CYCLE WAGON, 1 FRUEHAUF TRAILER, HENDERSON BLADE RAKE, PROSSER PUMPS, VIBRATORY ASPHALT PLATE, 1255HP DIALGRADE LASERS, INGERSOLL-RAND LIGHT TOWER, TAG TRAILER, ROSCO SWEEPER, FORKLIFT, CURB FORMS, DITCH WITCH SUB SITES, GENERATORS, VARIOUS BUCKETS, DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER), VARIOUS TRAILERS, TEREX PAVING KIT, REROUND TOOL, SCRAPER TOOL, ELECTRIC PROCESSOR, 24" DIPS INSERT SET, HEATER ASSEMBLY FOR FUSION MACHINE, AUGER VERMEER DIRECTIONAL DRILL, LOCATORS CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name JC Lauber Site Improvements Project No. For Bids Due 118-083B September 20, 2018 Contractor Name: Selge Construction Co., Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID, INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 3151 for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established, Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 4/1712015 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee, Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 4/17/2015 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 4/17/2015 General Conditions - 8 Ilia, 11.1511112-1110. J�� (a) Acknowledoements: W I L"" By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (i i) I 1Z By checking this box, I hereby, acknowledge that the City reserves the, right to request supplemental information, additional verification of any information provided, and! may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible, Additionally, I acknowledge that all information provided to the City shall be regarded as public records. By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished (iv) upon request. By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed, Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachimen 0) (d) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). List identifying all former business names. Any determinations by a couirt or governmentM agency any violations of federal state, or local laws including, but not limited to, violations, of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by andl registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. V Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6, Evidence that I am utilizing a surety company which is an the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 4/1712015 General Conditions - 9 I (ix, , Written, statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. 0) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: SepfPmhP-r 20f 2018 (Sign Here) Robert KLihns, Project Engineer (Print Name Here) Selge Construction Co., Inc. (Name of Company) 2833 S. 11th Street (Address of Company) Niles (City) Michigan 49120 (State) 269-684-0842 (Telephone Number) Version 4/17/2015 General Condftions - 10 (bj,Attachment (i) State of Indiana Office of the Secretary of State Miscellaneous ieMFw 07/24/2018 Total No. of pages 1 In Witness Whereof, I have caused to be affixed my signature and the seal of the State. of Indiana, at the City of Indianapolis, September 19, 2018 CONNIE LAWSON SECRETARY OF STATE 197203-307 / 10572060 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate Expires on October 19, 2018. Page 1 Of 2 CertificatelD:10572060 Business Name: SELGE CONSTRUCTION CO INC Entity Type: Foreign For -Profit Corporation Creation Date: 03/15/1972 Principal Office Address: 2833 S. 11th Street, NILES, M1, 49120, USA Jurisdiction of Formation: Michigan BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE j 09/19/2018 02:58 PM Business ID: 197203-307 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 03/31/2020 Date: Original Formation Date: 01/01/1800 Years Due: BUSINESS ID BUSINESS TYPE BUSINESS NAME ENTITY CREATION DATE JURISDICTION OF FORMATION PRINCIPAL OFFICE ADDRESS YEARS NAME ADDRESS APPROVED AND FILED CONNIE LAWSON INDIANA SECRETARY OF STATE 02/08/2019 03:00 PM 197203-307 Foreign For -Profit Corporation SELGE CONSTRUCTION CO INC 03/15/1972 Michigan 2833 S. 1 Ith Street, NILES, MI, 49120, USA 2018/2019 BRENT E. INABNIT 210 S. MICHIGAN AVE, SOUTH BEND, IN, 46624, USA SERVICE OF PROCESS EMAIL brenti@sni-law.com I acknowledge that the Service of Process email provided above is the email address at which electronic set -vice of process may be accepted and is publicly viewable. TITLE NAME ADDRESS TITLE NAME ADDRESS President SELGE.MARVIN, Jr. 2833 S 11TH ST., NILES, MI, 49120, USA Secretary VICKI A. PRIEST 2833 S. 1 ITH STREET, NILES, MI, 49120, USA Page 2 Of 4 CertificateID:10518314 - Page I of 2 - APPROVED AND FILED CONNIE LAWSON INDIANA SECRETARY OF STATE 02/08/2018 03:00 PM THE SIGNATOR(S) REPRESENTS THAT THE REGISTERED AGENT NAMED IN THE APPLICATION HAS CONSENTED TO THE APPOINTMENT OF REGISTERED AGENT, IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY February 8, 2018. SIGNATURE, Vicki A. Priest TITLE Secretary Business ID: 197203-307 Filing No.: 7829899 Page 3 Of 4 CertiFicate1D:10518314 - Page 2 of 2 - Will 0 SU. CU Ii•1 RM 7: t• 2833 S.11e' Street Niles, Michigan 49120 P:269.684.0842 F:269.684.0846 www.selgeconstruction.com July 17, 2018 Office of the Indiana Secretary of State 302 W. Washington Street, Room E108 Indianapolis, IN 46204 To Whom It May Concern, Approved and Filed 197203.30717971578 Filing Date: 07/24/2018 Effective :07123/2018 11:00 CONNIE LAWSON Indiana Secretary of State SELGE CONSTRUCTION CO INC. and its employees will comply with Ind. Code chapter 8-1-26. Thank you Sincerely, �M Leonard L vingston Safety and Resources Manager YoirSA-re JUL 19 2018 Page 4 Of 4 CertificatelD:10518314 STATE OF INDIANA OFFICE OF THE SECRETARY OF STATE CERTIFICATE OF AUTHORIZATION To Whom These Presents Come, Greetings: I, TODD ROKITA, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records, and proper official to execute this certificate. I further certify that records of this office disclose that SELGE CONSTRUCTION CO INC duly filed the requisite documents to commence business activities under the laws of State of Indiana on March 15, 1972, and was in existence or authorized to transact business in the State of Indiana on February 10, 2010. I further certify this For -Profit Foreign Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution or expiration has been bled or taken place. In Witness Whereof, I have hereunto set city hand and affixed the seal of the State of Indiana, at the city of Indianapolis, this Tenth Day of February, 2010. TODD ROKITA, Secretary of State 197203-307 12010021072953' `:,. ch street • Niles, ,Michigan 49120 84 0842 • (fax) 269.684 Q846` ow, se lgecon structi on xo m ers that are not pre -qualified.) (b) Attachment (iv)-& (v) Selge Construction Staffing Capabilities and Employee Statement At Selge Construction we are proud to be part of the Christian Labor Association (CLA) Local Union 10. Being part of the CLA provides an organized workforce that has gone through rigorous training and provides premium pay and benefits to everyone on staff. Our team is comprised of 75 individuals (15 office members and 60 field personnel). The team is made up of male, female, and minority members. The average employee at Selge Construction has been with the company for 14 years. Each person on your project will be properly classified as an employee under all applicable state and federal laws and local ordinances. There will not be any temporary laborers on this project. Selge has never defaulted on a contract and we do not bid any work that we cannot complete. Based on our current schedule and capabilities, we will utilize 100% Selge employees and equipment for your project. We do not foresee any issues being able to complete the project within the designated schedule. Let there be no doubt that Selge Construction has sufficient employees and resources to complete the work we are bidding. (b) Attachments: (vi ) INDIANA DEPARTMENT OF TRANSPORTATION Driving Indiana's Economic Growth 100 North Senate Avenue PHONE: (317) 233-2412 Eric Holcomb, Governor Roorn N750 Joe McGuinness, Commissioner Indianapolis, Indiana 46204 January 10, 2018 Bruce Dickie Manager of Safety & Resources Selge Construction Re: 2018 OJT Training Program Agreement Selge Construction: Enclosed you will find a copy of the approved 2018 OJT Program and Partnership Agreement. The primary objective of the program is to provide training and advancement opportunities to minorities and women toward journey level positions in all phases of the highway construction industry. Thank you in advance for your participation in the Program and I look forward to working with you this year. Please feel free to contact me at 317-233-2412 or kdaniels2@indot.in.gov if you have any questions. Res p ctfully, Katie Daniels Contract Compliance Specialist Indiana Department of Transportation - Economic Opportunity Division Enclosure www.in.gov/dot/ An Equal Opportunity Employer Step 1; Determine the tota( number of hours worked, in the highway construction trades on I1DOT federal -aid contracts (either as a prime contractor or subcontractor) during the past three years. Do nat include hours worked on state, -funded and private work. 5-1OURS WORKED DURING 2015 HOURS .2016 HOURS HOURS TOTAL Step 2: Add the total nlunber of hours from each year and divide by three (3): 11, 784 + 122 _r 2526 14 432 - 3 2615 2016 2017 Average Hours Step 3; Multiply the "Average Hours." by five percent (5%); 4 �11 X OS w 240 Avcmge Hato 2018 Training G0a1 1 hereby agree to all of the terms and conditions contained herein and affirm under penalty and perjury that the information stated above. is true and accurate. FOR CONTRACTOR USE FOR 1(NDOT USE Company Nanoa - Autfmizcd Si� Date i Sel e Constructio Co. Inc Bruce Safety & Resources n. coin .please Much Section 1.16 and return to INDOT cJo Katie Dunfers tit i��`wi rl,zfr�iorrl�vr'. 7 (b) Attachments: (vii) GENERAL SUBSTANCE ABUSE POLICY DRUG -FREE WORKPLACE POLICY In compliance with federal requirements for creating a drug -free workplace, SELGE CONSTRUCTION CO., INC. is instituting the following Drug -Free Workplace Policy. This policy supplements SELGE CONSTRUCTION CO,, INC. and is necessary because of our government contracts. To assist in ensuring compliance with SELGE CONSTRUCTION CO., INC. Drug - Free Workplace Policy, we have established a drug -free awareness program to inform employees about: I. The dangers of drug abuse in the workplace, 2. SELGE CONSTRUCTION CO., INC. policy of maintaining a drug -free workplace, 3. Any available drug counseling, rehabilitation, and employee assistance programs. 4. The penalties that may be Imposed upon employees for drug violations. Participation in SELGE CONSTRUCTION CO., INC. Drug -Free Awareness Program by all employees is MANDATORY. SELGE CONSTRUCTION CO., INC. reserves the right to interpret, modify, or expand upon this policy In whole or in part, with or without notice. SELGE CONSTRUCTION CO., INC. has adopted the following policy. Compliance with this drug and alcohol policy is a condition of employment with SELGE CONSTRUCTION CO., INC. A. Illegal Drugs. The use, sale, purchase, manufacture, possession, or transfer of an illegal drug or alcohol, or being under the influence of an Illegal drug or alcohol during the work time or at any time while on SELGE CONSTRUCTION CO., INC. property or in a vehicle on SELGE CONSTRUCTION CO., INC, business, is absolutely prohibited. B. legal Drugs. The use or being under the influence, of any legal drug by any employee during working time or -at any time on SELGE CONSTRUCTION CO., INC. property or In a vehicle of SELGE CONSTRUCTION CO., INC, is prohibited -if such use or influence may 20 detrimentally affect the safety of co-workers or members of the public, the employees job performance, or the safe or efficient operation of SELGE CONSTRUCTION CO., INC. An employee whose use of a legal drug may result in such detrimental effects must report such drug use to SELGE CONSTRUCTION CO., INC, C. Consequence of Violating the Drug Abuse Policy. Violation of this drug abuse policy will result in the following forms of action; After the first positive test, an employee must be; • Suspended from work without pay for thirty (30) days, • Directed to a program of treatment or rehabiiltation at the cost to the employee and subject to unannounced drug testing for one (1) year, beginning the day the employee returns to work. • After the second positive test, an employee will be terminated. • Employees who test positive for alcohol at a rate .02 or greater, but who does not exceed .04 shall be suspended without pay for at least 24 hours and will not be allowed to resume their normal duties until they pass a retest. Such employees may be required to complete an approved rehabiiltation program at the employee cost. Employees who test positive for alcohol at a rate of .04 or greater will be suspended without pay and will not be allowed to resume their normal duties until they have successfully completed an approved rehabilitation program at the employee cost or may be subject to immediate termination. D. Employees, who refuse to consent to a drug and/or alcohol test, refuse to complete the necessary paper work, attempt to tamper with the results of the test, fall to fully cooperate with the testing procedure, refuse to undergo treatment for drug or alcohol abuse or fail to fully cooperate in the treatment program will be subject to immediate termination. E. SELGE CONSTRUCTION CO., INC. reserves the right to discipline, up to and including Termination for any first time offenders of the drug and alcohol policy. • SELGE CONSTRUCTION CO., INC. will determine which drugs and/or alcohol testing will be performed. All testing shall be performed by a facility selected by SELGE CONSTRUCTION CO., INC. in its sole discretion. Such testing shall be performed by trained medical professionals and in such a manner as to comply with all regulations issued by the Department of Transportation, including 49 CFR Parts 40 and 382 establishing various procedures for the specimen collection, handling, testing and retesting. SELGE CONSTRUCTION CO., INC. will follow the Department of 21 Transportations guidelines, as they may be amended from time to time, for determining if an employee tests positive for drugs or alcohol. TESTING PROCEDURES During the course of employment and employee may be required to undergo further medical tests, as will as periodic drug and alcohol screenings, The substance abuse policy is outlined more detail in this handbook. SELGE CONSTRUCTION CO., INC. will pay for any expense associated with a medical examination or drug and alcohol screening, All medical records will be kept confidential and maintained in a file separate from an applicants or employees personnel file, Questions concerning medical examinations or drug and alcohol screenings should be directed to a Safety/Resource Manager. I. PREEMPLOYMENT DRUG SCREENS. All prospective new employees to the company will be tested For the use of Illegal drugs and controlled substances. Employment will be denied to any applicant or employee who refuses to consent to a drug and/or alcohol test or who tests positive, 2. RANDOM TESTING. All employees will be subject to random testing without warning. 3. REASONABLE SUSPICTION TESTING. If SELGE CONSTRUCTION CO., INC. suspects that an employee has violated SELGE CONSTRUCTION CO., INC. Substance Abuse Policy or suspects that employees work performance or on the job behavior may be affected by the use of drugs or alcohol, such employee will be required to submit to an appropriate drug or alcohol test. Factors which may warrant reasonable suspicion testing include observations by a trained supervisor or other company officials of specific, contemporaneous, particularly observations. concerning the employees appearance, behavior, odor, speech or other observations characteristic such as sudden changes In behavior, repeated failure to follow instructions, discovery of alcohol, illegal or.other suspicious substances in the employees possession or near the employees workplace, unexplained or frequent absences, and personality changes. 4. RETURN TO DUTY TESTING. Any employee returning from layoff or leave of absence of more than four ' (4) weeks in duration shall be required to submit to an appropriate drug or alcohol test before returning to or resuming work for SELGE CONSTRUCTION CO., INC. 5, POST -ACCIDENT TESTING. All employees will be required to submit to an appropriate drug and alcohol test following a work -related incident or on the job accident. JAWARY 1, 2007 22 (b) Attachments: (i) SELGE CONSTRUCTION CO., INC. COMPLETED PROJECT DESCRIPTIONS Description: Mishawaka Bodine Valve #2 Replacement Owner: Indiana Department of Natural Resources. Remove asphalt surface, install 10 each 4" gate valves with boxes & 4" SCH 80 PVC riser pipes, Install 10" SCH 80 PVC between tanks #5 & #6 on east & west ponds, excavate & replace yard hydrant, backfill full depth trench, restore surface areas with 6" concrete pavement. $115,135 Year Completed: 2017 Description: New Buffalo Lighthouse Creek Drain 4298 — Owner: Berrien County Drain Commission. Open channel cleanout/channel clearing and shaping, plain & heavy slope & scour protection, boulder revetment, ledge Stone access Stairs, 12" ductile water main, 10" sanitary sewer main replacement, 16' RCP box culvert & wingwall/headwall. $1,273,288 Year Completed: 2017 Description: South Bend Western Avenue Corridor Improvements — Owner: City of South Bend Board of Public Works. Construction of a streetscape project including earthwork, pavement milling, concrete overlay, concrete pavement, asphalt pavement, permeable pavers, concrete curb, and sidewalks, landscaping, storm sewer, lighting, and pavement markings and other appurtenant work. $2,860,242 Year Completed: 2017 Description: Elkhart CR26 Biopad Force Main — Owner: City of Elkhart Board of Public Works. Install approximately 974 feet of 4" HDPE Force Main and restoration along County road 26. $62,785 Year Completed: 2017 Description: Mishawaka Linden Area LTCP Division A Phase II — Owner: City of Mishawaka Board of Public Works. Repair damaged section of sanitary sewer, CIPP lining in Brykit Ave, install storm sewer, manhole rehabilitation and sanitary laterals. $981,453 Year Completed: 2017 Description: Niles 2017 Water main Replacement Sassafras Ln Section A — Owner: City of Niles. Installation of a PC 350 DI/C900 PVC water main, multipleconnections to existing water mains, reconnection of existing water services, install valves & hydrants, relocate existing storm and sanitary sewers, disinfection and pressure testing of water main, landscape and pavement restoration. $319,218 Year Completed: 2017 Description: Cassopolis Wastewater Collection System Improvements — Owner: Village of Cassopolis. Lift Station #3, Spencer St Lift Station, Second St Lift Station, Sherman Ln Lift Station, Depot St Lift Station, Reed St. Lift Station, Rowland St Lift Station Rehabilitations and Grinder Station Rehabilitation. In Place Generator for Lift Station #3 and Reed St Lift Station. Remove and replace fencing and gates. Replace all control panels, outdoor lighting. 60 linear feet of 8" sanitary sewer and manholes, 165 linear feet of 2" forcemain. 230 square yards concrete pavement & sidewalk replacement. $1,316,160 Year Completed: 2017 Description: Elkhart ADA RR Depot Parking Lot Improvements — Owner: City of Elkhart. Creating section of the parking areas around the RR Depot to be accessible and ADA compliant by installing (1) curb ramp and 125 square yards of stamped concrete and 20 feet of retaining wall. $23,865 Year Completed: 2017 Description: Warsaw Osborn Stormwater Pump Station — Owner: City of Warsaw Board of Public Works/Safety. Perform upgrades to pump station per engineer's specifications. $197,240 Year Completed. 2017 Description: Lansing MSU/Spartan PV II Inovateus Solar Array Project — Owner: Spartan PV 1. Develop an approximately 13.8 MW-DC electric power generating facility using solar photovoltaic modules on five (5) parking lots located on the campus. $8,434,889 Year Completed: 2017 Description: Mishawaka Bodine Fish Hatchery — Owner: Indiana Department of Natural Resources. Installation of a small valve and inlet piping replacement on rearing ponds west 1, 2, 7 and 8 and east 2 and 7 ponds. $115,135 Year Completed: 2016 Description: Middlebury 2016 WTP Backwash Pump Station — Owner: Town of Middlebury. Installation of new backwash holding tank influent lift station, various modifications to the existing backwash holding tank effluent pump station; installation of a new control panel to service both the existing backwash effluent pump station and new backwash influent lift station. $363,165 Year Completed: 2017 Description: New Carlisle Development Area I Sanitary and Water Improvements — Owner: St, Joseph County Board of Commissioners. Installation of approximately 14,000 linear feet of 16" and 12" water main extension and 12,000 linear feet Sanitary Sewer Extensions, 15"-30" along Walnut Rd., Smilax Rd., and US 20. Install new Water Main & Sanitary Sewer includes: approximately 1,100 feet oftrench] ess installation under railroad crossing and US 20, Roadway reconstruction, construction of a water pressure reducing valve vault, installation of approximately 20,000 linear feet fiber optic conduit and hand -holds, and other work. $4,655,327 Year Completed: 2017 Description: Village of Paw Paw 2016 SRF Lift Station & Force Main Contract #3 — Owner: Village of Paw Paw, Michigan. Rehabilitation and replacement of 4 Sanitary Lift Stations located within the Village of Paw Paw including installation of new grinder/debris auger, building improvements, and force main directional boring. $1,652,481 Year Completed: 2017 Description: North Webster Lakeland RSD Wastewater Collection "B" — Owner: Lakeland Regional Sewer District. Installed 988 each grinder pump stations, 390 each grinder pump flood protection kits, 74 each extended grinder pump stations 2 feet with rail, 25 each traffic rated grinder pump station covers, 988 each control/alarm panel installed, 69,980 linear feet force main, 29,300 linear feet service line, 90 linear feet casing pipe, 50 linear feet gravity sewer, 72 each flushing connection, 21 each air release valve & structure, 990 each curb stop assembly, 69 each isolation valves. $6,163,664.31 Year Completed: 2016 Description: Mishawaka Brick & Fir Road Water Main Improvements — Owner: City of Mishawaka. (7) trees removed, removed curb gutter and structures, temporary erosion and sediment control, 4 cubic yards river rocks, 1,050 cubic yards common excavation, 1,186 ton #53 compacted aggregate, 210 ton HMA type b for patching, 19 square yards for approaches, 3,606 square yards milling asphalt, 1,361 ton HMA type b, 6 ton asphalt for tack coat, 265 linear feet combined concrete for curb & gutter, 585 square yards PCCP approaches, 27 square yards concrete sidewalk, 11,850 square yards hydromulch, 8,238 linear feet ductile iron pipe, 27 each ductile iron tee, 15 each 45/90 degree ductile iron 12 each ductile iron MJ plug, 39 each gate valve with valve box, 86 linear feet water service piping, 16 fire hydrant assembly, 132 linear feet pipe, landscaping, $1,490,854.00 Year Completed: 2016 Description: Syracuse Turkey Creek RSD Buttermilk Force Main Improvements No. 2 — Owner: Turkey Creek Regional Sewer District. Cleanout (13) manholes, 15,540 linear feet of force main, 1,500 linear feet directional drill force main, (28) plug valves installed, 1,300 cubic yards special backfill, 2,200 square yards aggregate base for pavement, 200 cubic yards #53 aggregate base, 570 ton bituminous materials, 180 square yards concrete drive, Buttermilk, Marineland, Willow Grove pump station improvements, 25,000 square yards seed & mulch area. $1,218.351.00 Year Completed: 2016 Description: Goshen Wastewater Lift Station Controls Upgrade Ph I — Owner: City of Goshen. Brookside lift station, Showalter lift station, Clinton lift station, Berkey lift station, Carter lift station, Kercher lift station, Starcraft lift station, Parmley lift station, Maplecrest lift station, and CR 28 lift station control panel improvements. $641,406.00 Year Completed: 2016 Description: South Bend Noble Americas Ethanol Plant — Owner: Noble Americas. Clearing and obstruction removal, relocate 6" fire protection water line, 18" WWR cross under 48" RCP. 8" water main crossover, 13, 800 cubic yards common excavation for detention basin, 100 cubic yards structure backfiil, 320 tons HMA Type b surface, 420 ton HMA type b intermediate, 1680 ton HMA type b base, bypass pumping for storm sewer improvements, cast in place concrete diversion structure, detention basin liner, 3005 linear feet of storm sewer piping, 14 manhole structures, pump station modifications, mulched seeding & topsoil. $1,818,02795 Year Completed: 2016 Description: Dowagiac Pokagon Band of Indians Rodgers Lake Wastewater Treatment Lagoon — Owner: Pokagon Band of Indians. Removal of debris, Erosion control, 300 cubic yards of earthwork, install (2) recirculation tanks & equipment, install (1) lift station & meter pit, install influent tank & equipment, install (5) treatment pods, install 430 linear feet of 3" force main, 350 linear feet 4" force main, directional drill 1,150 linear feet 1.5" water main, 150 cubic yards clean pond #3, 420 tons pea gravel in pond #3, restoration. $510,690.00 Year Completed: 2016 Description: Goshen Colonial Manor ADA — Owner: City of Goshen. 60 ton #53 compacted aggregate for base, 80 square yards concrete curb ramp, 120 square yards 4" concrete sidewalk, 50 linear feet roll curb & gutter, 100 square yards erosion control blanket, 200 square yards mulched seeding. $64,000.00 Year Completed: 2016 Description: South Bend UPV Noble Americas Ethanol Plant — Owner: Noble Americas. (1) Sanitary manhole, 125 linear feet 15" sanitary sewer, (1) 15" end section, 320 linear feet 10" underdrain, 3000 cubic yards common excavation, (1) manhole repair, pond liner. $161,100.00 Year Completed: 2016 Description: South Bend Noble Americas Ethanol Plant Sanitary Sewer Improvements --- Owner: Noble Americas. Clearing and obstruction removal, septic tank removal, temp erosion & sediment control, 50 cubic yards structural backfill, #53 compacted aggregate for base, #73 compacted aggregate for surface, asphalt for pavement restoration, concrete pavement patching, 519 linear feet HDPE DR I service laterals, 1,133 linear feet HDPE DR11 1 '/a force main, 1,589 linear feet HDPE DRI 1 2" force main, (6) grinder pump stations, (10) vacuum excavation for utility $365,881.00 Year Completed: Description: South Bend & Mishawaka Meijer Store Snow Plowing — Owner: DJ Landscaping, Inc. Provide snow removal to (2) South Bend Meijer stores and (1) Mishawaka store. $80,000.00 Year Completed: 2016 Description: LaGrange Dometic III North Area Improvements — Owner: Dometic. 216 square feet pavement with sealing, 960 square feet pavement. $96,694.00 Year Completed: 2016 Description: Niles 2016 Sewer Improvements — Owner: City of Niles. 15" sewer repair, 8" sewer repair, remove (7) 12" cross connection pipes, 12" flowable cross connection, replace manhole cover. $92,815.00 Year Completed: 2016 Description: Niles Township Manhole Repairs — Owner: Niles Township. Casting adjustments on 93 various manholes throughout the township. $62,590.00 Year Completed: 2016 Description: South Bend IN/Tek IN/Kote Sanitary Sewer Improvements — Owner: City of South Bend. Install 12" thick concrete base slab for storage tank & feed pumps, provide and install HD cross - linked polyethylene chemical storage tanks, install dual bellows type chemical metering pumps, suction pipes, discharge PVC piping to lift station wet well, install fill station & piping, provide 115 VAC electric service to each pump with 20 amp breaker within lift station, 8 hours training to staff. $167,850.00 Year Completed: 2016 Description: Elkhart Downtown Parking ADA Improvements — Owner: City of Elkhart. 28 square yards ADA curb ramp, 25 square yards ADA sidewalk, 7 square yards 9" concrete, 40 linear feet concrete curb and gutter. $14,435.00 Year Completed.: 2016 Description: Elkhart Indiana Flight Center Apron Upgrades — Owner: Elkhart Municipal Airport. 539 cubic yards common excavation, 465 tons #53 recycled concrete, 1382 square yards 8" concrete pavement, restored area. $143,730.00 Year Completed: 2016 Description: Middlebury East Warren St. Sidewalk Improvements — Owner: Town of Middlebury. Clear area to be improved, 20 ton HMA for pavement patching, 2,010 square yards 4" sidewalk, 60 linear feet concrete curb & gutter, 134 square yards concrete ramps, 1,850 square yards mulched seeding on topsoil, site grading, accent lighting. $299,880.29 Year Completed: 2016 Description: South Bend St. Paul's Senior Center Parking Lot Improvements — Owner: Trinity Continuing Care Center. Slope reconstruction with 1200 square feet of erosion protection system with 100 cubic yards of structural backfill, 50 square yards of sod, 112 linear feet 15" ADS HP storm sewer, 195 linear feet 18" ADS HP storm sewer, (4) storm manholes, riprap on geotextile at pipe discharge, 90 linear feet of 6" concrete curb. $166,333.00 Year Completed: 2016 Description: Mishawaka Bodine Fish Hatchery — Owner: Bodine State Fish Hatchery. Remove existing asphalt surface, excavate pits for valve insertion and water main taps, install (2) 12" gate valves, install (6) 4" gate valves with box, install 40 ton 6" #53 aggregate base, restore surface areas with 100 square yards 6" concrete pavement. $100,970.00 Year Completed: 2016 Description: Precision Wall Systems Storm Sewer & Lot Upgrades. Owner: Precision Wall Systems. 825 linear feet of storm sewer, 6 each 30" catch basins, remove 40 linear feet of retaining wall, remove 350 square yards of pavement, 1,000 cubic yards of retention pond, 350 square yards concrete drive 6", 160 linear feet concrete curb, 80 Iinear feet concrete retaining wall, 1890 square yards grading for HAC and concrete areas, 1,540 square yards HAC pavement. $137,694.74 Year Completed: 2015 Description: South Bend Edison Rd LS Access Road Construction. Owner: City of South Bend Board of Public Works. 174 square yards aggregate #53 6" base depth, 175 square yards geosynthetic fabric, 175 square yards B borrow 12" depth, adjust casting to grade. $15,659.25 Year Completed: 2015 Description: South Bend Geyer Ditch LS Access Road Construction. Owner: City of South Bend Board of Public Works. Adjust casting to grade, concrete collar, 4,700 square yards compacted aggregate #53 at 6", 4,700 square yards Geosynthetic fabric. $72,410.00 Year Completed: 2015 Description: Cassopolis Lift Station #1 Renovation. Owner: Village of Cassopolis. Lift station #1 rehabilitation, restoration, masonry and concrete structure rem, chamfer removal, concrete surfacing 2", standby generator LS #1. $131,550.00 Year Completed: 2015 Description: Goshen 321 South 3r, Street Parking Lot. Owner: City of Goshen. Remove 270 square yards full depth concrete, remove 18 square yards concrete sidewalk, remove existing storm sewer structure, 115 ton #53 recycled concrete base, 40 linear feet 4" concrete sidewalk, 315 square yards 6" concrete, landscape restoration. $53,525.53 Year Completed: 2015 Description: Warsaw Central Park Storm Sewer Cleaning project. Owner City of Warsaw. Install & remove inflatable plug, clean & video 36" diameter storm sewer, install manhole over existing storm. sewer. $42,050.00 Year Completed: 2015 Description: South Bend 2015 Curb/Sidewalk Construction Div. B. Owner: City of South Bend Board of Public Works, IN. Remove 3,000 linear feet curb & 395 square yard sidewalk, 3,000 linear feet new curb & 395 square yards new sidewalk, remove & replace 11 trees, grade/sod 998 square yards. $257,718 Year Completed: 2015 Description: Mishawaka Front St Roundabout Reconstruction. Owner: City of Mishawaka Board of Public Works, IN. 826 square yards QC/QA PCCP, 581 linear feet concrete curb, 14 square yards topsoil. $105,701.04 Year Completed: 2015 Description: LaGrange Dometic Corp Site Improvements Ph II.Owner: Dometic Corporation LaGrange, 1N. 3,739 square feet asphalt repairs, 4,029 square feet asphalt, 3,281 #53 gravel, 38,425 square feet concrete pavement. $29,218 Year Completed: 2015 Description: South Bend Chase Plastics Facility. Owner: City of South Bend Board of Public Works, IN. 2,043 linear feet of sanitary sewer, 200 cubic yards "B" borrow, 621 linear feet of storm sewer, 75 ton 453 compact aggregate, 188 square yards concrete sidewalk and approaches. $118,817.40 Year Completed: 2015 Description: Mishawaka 2015 CDBG ADA Infrastructure Improvements. Owner: City of Mishawaka, IN Clearning right of way, 3,240 square yards concrete sidewalk, ramp approaches, 2,000 linear feet concrete curb, 1,253 cubic yards excavation, borrow, topsoil, 88 ton HMA patching, 100 ton #53 compacted aggregate. Description: MDOT #123212A Cass County Gumwood Rd to Stateline. Owner: Michigan Department of Transportation / Cass County, MI.40 feet Culy, CIA 12", 240 ton aggregate for shared path, 1,231 square yards concrete for shared path, 1,100 feet grading, 1,500 square yards slope restoration. $74,889.41 Year Completed: 2015 Description: Goshen Theatre Sewer Repair. Owner: City of Goshen, IN. Clearing of right of way, 20 linear feet sanitary sewer pipe, 620 ton "B" borrow, 350 cubic yards soil stockpile, 175 square yards polyethylene sheeting, 30 linear feet concrete curb, 28 ton #53 compacted aggregate, 20 ton HMA base/surface, 17 ton #73 compacted aggregate, landscape. $30,339.21 Year Completed: 2015 Description: South Bend Demolition of Abandoned & Vacant Houses Division A. Owner: City of South Bend, IN. Demolition of 21 houses/garages/sheds/fences, including proper disposal of all asbestos materials. $396,064.00 Year Completed: 2015 Description: New Buffalo US 12 Booster Station Reconstruction. Owner: New Buffalo Twp, MI. Pumping, chlorine equipment, meter valves and piping, building structure, electrical, control system, entry drive & site work, (2) 4' dia leaching basin, spare chlorination equipment, HMA drive & parking $470,682.00 Year Completed: 2015 Description: Elkhart 2014 ADA Curb & Sidewalk Replacement program. Owner: City of Elkhart Engineering Department, IN. 2917 square yards concrete sidewalk & driveway improvements. $150,048.51 Year Completed: 2015 Description: Buchanan Bertrand Twp Foundation Dr. Owner: Saratore Co., Inc. Excavation, CIP Basin 32,000 cubic yards, excavation CIP building pad topsoil strip for embankment areas 5,500 cubic yards, Excavation, CIP, building pad drive & parking 2,000 cubic yards, excavation CIP road 2,540 cubic yards, berm & swale 625 linear feet, 2,837 ton #22A gravel base, 735 ton #23A compact aggregate, 210 ton #23A gravel for approaches, 4,570 linear feet sewer pipe, 3,650 linear feet concrete curb, gutter, and driveway; 2,082 linear feet water main, 2,865 cubic yards topsoil and subgrade treatment. $695,238.00 Year Completed: 2015 Description: Middlebury Water Treatment Plant Upgrades. Owner: Town of Middlebury, IN. 72 linear feet of 8" ductile iron pipe, Valve & flow meter relocation, 8", 12" butterfly valves $112,681.00 Year Completed: 2015 Description: Lagrange Dometic Corp Improvements Ph I. Owner: Dometic Corp, Lagrange, IN. Remove 4,325 square yards of asphalt, remove 1,035 square yards of concrete, 300 ton of #53 aggregate base, 225 ton asphalt patching, 3,428 square yards 8" PCCP, 3,715 square yards l 0" PCCP. $29,218.70 Year Completed: 2015 Description: Mishawaka Ave Improvements Phase I.Owner: City of Mishawaka, fN, Board of Public Works. Clearing right of way, 6,239 ton hot mix asphalt, 5,266 linear feet concrete curb & gutter, 4,608 square yards concrete sidewalk, 3,273 linear feet storm sewer pipe, 780 linear feet water main pipe, 7,483 linear feet CIPP sanitary sewer pipe, 710 linear feet 8" SDR 35 sanitary sewer. $4,128,388.84 Year Completed 2015 Description: Winona Main Wastewater Pumping Station Replacement, Owner: Town of Winona, IN. Clearing right of way, 17 linear feet of 8" D.I. force main, 101 linear feet 18" PVC sanitary sewer, 900 GPM Triplex lift station, 210 cubic yards structural backfill. $546,689.00 Year Completed: 2015 Description Cassopolis Peavine St. Lift Station Improvement., Owner Village of Cassopolis, Cassopolis, MI. Renovation of the Peavine Street lift Station, 12" extension for 72" wet well, plugging leaks, Chamfer removal, new floor in wet well. $45,815.00 Year Completed: 2015 Description: INDOT R36481A Twin BranchNistula Dr. Sidewalk Improvements. Owner IN Dept of Transportation., Mishawaka, IN. Sidewalk improvements along Vistula Rd and Elder Street at the Twin Branch Elementary School. $285,393.12 Year Completed: 2015 Description: INDOT R33572A, Gumwood Ph 1Q Added Travel Lanes, Bike, and Pedestrian Facilities. Owner IN Dept of Transportation., Mishawaka, IN. Added travel lanes, bike, and pedestrian facilities on Gumwood Rd from Brick Rd to Michigan State Line. Concrete curb, driveways, and sidewalk/bike paths, retention pond basin, storm sewer, 1 round about at Gumwood & Adams Rds, streetscapes and landscaping. $4,463,899.63 Year Completed: 2015 Description: INDOT R30291A, Gumwood Ph I Added Travel Lanes. Owner IN Dept of Transportation., Mishawaka IN. Added travel lanes from Mishawaka Corp limits to Candy Lane, Completed clearing of right of way, 39,203 cubic yards. 31,996 square yards of subgrade treatment, 1,686 ton of compacted aggregate no. 73, 27,572 ton QC/QA HMA, 260 square yards PCCP, 10,153 square yards concrete sidewalk, 15,207 linear feet concrete curb & gutter, 726 square yards PCCP, 25,391 linear feet of sanitary/water main pipe, retention pond basin, water main, 1 round- about at Gumwood & Brick Rds, strectscapes and landscaping $3,819,947.67 Year Completed: 2015 Description: INDOT R34218A, 1211 St. Added Travel Lanes. Owner IN Dept of Transportation, Mishawaka, IN. Added travel lanes on 121h St from Capital Avenue to Blackberry Road. Completed clearing of right away, 23,366 cubic yards, 4,001 tons of compacted aggregate no. 53, 4,389 square yards of concrete sidewalk, 197 square yards of concrete curb ramp, 11,115 linear feet of concrete curb & gutter, 1,174 square yards of PCCP for approaches, 16,938 linear feet of storm pipe $3,707,799.63 Year Completed: 2015 Description: Fort Wayne Leo Cedarville `11)" RSD. Owner Leo Cedarville Regional Sewer District, Fort Wayne, IN. Replacement of the existing pump station with new wet wells, valve vaults, pumps, piping and control panels. $360,427.69 Year Completed: 2015 Description: Howard Township Lift Station Upgrade Project. Owner: Howard Township, Niles, MI, Installed 6 Lift Stations, 10 Arborvitae and various appurtances, $130,415.00 Year Completed: 2014. Description: Jefferson Boulevard Streetscape / Main to Eddy Streets. Owner: City of South Bend, Indiana Department of Public Works. Construction of Streetscape project, including approximately 5500 SY of asphalt, 2300 LF concrete curb, 2650 SY concrete sidewalk, 470 SY pervious pavers,. Storm sewer structures and 2250 LF storm sewer. Install and replace light pole assemblies, trees and various plants and signage. $1,603,688.00. Year Completed: 2014.