HomeMy WebLinkAboutOpening of Bids - JC Lauber Site Improvements Proj No 118-083B - Indiana Earth IncCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name
Project No.
For Bids Due
JC Lauber Site Improvements
118-083B
September 20, 2018
PART I
(Must be completed for all bids. Please type or print)
Date: ? Bidder (Firm): �,,
—
Address: / C u& in l 141,
City/State/Zip: OS(-'e //, 171)ht-,�- (- i Telephone N u m
s? 6� 6Ygl
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
x C
the City of South Bend, Indiana, in accord nce with plans and specifications prepared by:
} and dated % - p for the sum of (enter the Total Bid as shown on the Proposal)
i, rec h (E� Pus d, @..._ Gi n � Y1; n • � rt c �I1�,S...� "?,�.d �,��,i ��., ,� � + � .
(Enter sum of Total Base id Alternates shown on Proposal) Se ��, Xy �, } �„ (Numerical)
r(.f
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, t cost of units st be the same as that
shown in the original contract if accepted by the City of South P6nd. If the bid to be awarded on a unit
basis, the itemization of the units shall be shown on a separaJad attachment
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
By
(Printed Name
ACCEPTANCE
day of
S7J
I r J er'f '( IL�
on Signing)
20
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
James A. Mueller, Member Attest: Linda M. Martin, Clerk
Version 10/17/2017 Contractor's Bid for Public Works - 2
BID/PROPOSAL
Project Name JC Lauber Site Improvements
Project No. 118-083D
For Bids Due September 20, 2018
Item
No.
Description
Quantl!
Unit
Unit Price
Total Amount
1
MOBILIZATION/DEMOBILIZATION
1
LS
2
CONSTRUCTION ENGINEERING
-MAINTENANCE
1
LS
/w goc
OF TRAFFIC:
3
SIGNAGE, BARRICADES,
1
LS.
DETOUR, ETC. INCLUDING
(,
14,
PERMIT FEES
G
4
NILES AVE. PAVEMENT
169
SY
REMOVAL'
.
4A
NILES AVE. PAVEMENT
169
SY
REPLACEMENT
COMMERCIAL DRIVEWAY
37
SY
REMOVAL
, ;i',,
c Y
5A
COMMERCIAL DRIVEWAY
37
SY
REPLACEMENT
/ 70- of
6
STD, SIDEWALK REMOVAL
20
SY
`QD
6A
STD. SIDEWALK REPLACEMENT
20
SY
4
PERVIOUS CONCRETE
7
SIDEWALK REPLACEMENT (IF
100
SY
REQ'D)
A 3, 00
8
ON -SITE PAVEMENT REMOVAL
160
SY
a4 40
8A
ON -SITE PAVEMENT
REPLACEMENT
160
SY
.off
CUT EXISTING SANITARY
9
LATERAL & HOOK UP NEW
1
LS
LATERAL INCLUDING TAP FEES.
Rl _
u f C?
10
4" SANITARY LATERAL
20
LF
11
6" SANITARY LATERAL
90
LF
12
1,000 GAL. GREASE TRAP
1
LS
13
SEWER CLEAN -OUT
3
EA
(100, c�J
14
3" WATER TAP IN EXISTING
1
EA
MAIN, INCLUDING; TAP FEES
� � L)
� 7 `
15
6"' WATER TAP IN EXISTING
MAIN, INCLUDING TAP FEES
1
EA
�` �',
16
3" D.I.P.
110
LF
17
3" WATER SHUT-OFF VALVE
1
EA
� v-
Sbv
18
6" D.I.P.
65
LF
19
6" WATER SHUT-OFF VALVE
'I
EA
6" TAP INTO EXISTING STORM
20
SEWER FOR NEW LATERAL,
1
LS
INCLUDING TAP FEES
j
U
21
6" STORM SEWER
68
LF
22
ON -SITE WORK
1
LS
[::2:3:,l
EXCAVATION OF UNSUITABLE
SOILS
25
CYS
3c�.v�i
�_5C7,vJ
BASE BID TOTAL
$ 3 73, s nju
ALTERNATE #1
Item
No.
Description
P
Quantity
unit
Emit Price
Iota! Amount
1
ORNAMENTAL FENCE AND GATES
1
LS
i� '3CXa u
, C
ALTERNATE #2 ALTERNATE TOTAL
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
CONCRETE PARKING LOT
1
LS8,
ALTERNATE #3 ALTERNATE TOTAL Sly, eWl , vb
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
ASPHALT PARKING LOT
1
LS
ALTERNATE TOTAL Co w, w
Bidder (Firm): T.-I
Address: 1 d 9 L1 _
CitylStatelZip: e u c�,� Telephone Number.
M
(Signature)
k�. )
(Printed Name of Person Signi g)
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF )
} COUNTY SS:
)
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1, Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation: has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -titre, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 10117/2017 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
F Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
E newly hired employees through the E Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
b. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of
South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBEAVBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-1 b-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 10/17/2017 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments..
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works .are true and correct.
Dated this ` day of V23 0
la
SEAL
Contractor idler (Firm)
7
S ,gna r� of ontr r/Bidder or Its Agent
Printed Name and Title 4�l�
Subscribed and sworn to before me this �,,,oav of - -(20
My Commission Expires � UZ l",
County of Residence
Version 10117/2017 Contractor's Bid for Public Works - 6
13,16 COUNTY-CiTy BUILDING PHONF 574/235-9251
227 W. JEFFFRSON BOULEVARD "P" FAX 574/ 235-9171
Sotn'Fi BEND, INDIANA 46601-1830 TDD 574/ 235-5567
CITY OF SOUTH BEND FETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date:
To:
From
Subject
Project Name:
Project No.:
September 18, 2018
All Planholders
Linda M. Martin, Clerk, Board of Public Works
Addendum Number: I
J.C. Lauber Site Improvements
118-083B
"14"[1111i 0 01
Date Received: q- /9-/S,
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signature:
Date:
B SI Document 31 ��' - 201 .
d"1?y Y
CONTRACTOR`
SURETY:
(Name, legal shirts and address)
(Neune, legal sialrrs mtd pi-hicipal ploee
Indiana Earth, Inc.
ofbttshiess)
10343 McKinley Highway
North American Specialty Insurance Compa p g
his dacumenl has Important legal
Osceola, IN 46561
650 Elm Street
Manchester, NH 03101
consequences. Consultation with
q
OWNER.,
an attorney is encouraged with
(Maine, legal stains and adelr ess)
respect to its completion or
City of South Bend
modification.
227 West Jefferson Boulevard
Any singular reference to
South Bend, IN 46601
Contractor, Surety, Owner or
BOND AMOUNT: ***FIVE PERCENT OF AMOUNT BID***
other party shalt.be considered
plural where applicable.
PROJECT:
(Name, location or address, and Pr•ojeci number, If anj)
J.C. Lauber Site Improvements Project #119-083B
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance ofsuch Contract
and far the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the
difference, not to exceed the amount of this Sand, betiveen the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aegregate beyond the time for
acceptance of bids specified in tine bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
ff this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or outer legal requirement shall be de,pKed incorporate50ierein. When so
furnished, the intent is that this Bond shall be construed as a statutory bondXhd not as a comry6n law bond.
Signed and sealed this 20th
day of September
Indiana
(seal)
North American Specialty Insurance Compan
. /ry
Thomas 0. Chambers, Attarne - mFaut�
ti O �' �..• -a
trait AIA document A3101A1— 2010. Copyrfrght ® 1963, 19T0 and 2010 by The American Institute of Architects. All rights reserved. WARNfi
Document is protected by U.S. Copyright Lase and International Treaties. Unauthorized reprodur[lon or distribution of this AIA"
any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
Purchasers are permitted to reproduce ten 110) copies of this document when completed. To report copyright violations of AIA Contract D.
The American institute of Architects' legal counsel, copyrght@aia.org.
Al u
{
t, orp
'"A, I `N .. , t6
y "I if I. I I ,I, -
SWISS RE CORPORATE SOLUTIONS
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS; THAT North American Specialty Insurance Company, a corporation July organized and existing under
laws of the State of New Hampshire, and having its principal office in the City of Overland Park, Kansas, and Washington International Insurance
Company, a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Overland
Park, Kansas, each does hereby make, constitute and appoint:
THOMAS O. CHAMBERS, TODD SC14AAP
and KIMBERLY S. RASCH
JOINTLY OR SEVERALLY
Its true and lawful Attorneys) -in -Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalfof each of said Companies, as surety, on contracts of suretyship as are or maybe required or permitted by
lose, regulation, contract or otherwise, provided dial no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of: FIFTY MILLION (S50,000,06D.00) DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington Intemational Insurance Company at meetings duly called and held
on the 9ih of May, 2012:
"RESOLVED, that any live of the Presidents, any Managing Director, any Senior Vice President, any Vice President, any Assistant Vice President,
the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying llte attorney named
in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts ofsurcty, and that each or any of them
hereby Is authorized to attest to the execution of any such Power ofAttorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached;"
10 tRutr�J�i,,i
3�y4.•� �•iiiiif.G$y 19.X j
si. t 4 fl:.'Pi• 2 By tcJ"�of�a+Ri�G
M SFJQI• 3 Steam P. Andcrson,&nler Vice Praldeat of Waabingm international tmuraner company Z�1• $,Q��`?ye
4 senior Vice Praldmt.rNcrth Aentrinn specfaltyfnsorsace Company ��t rmf
NO 10 By
M1ffehnelA.lie, nneST9tnPr�fn'deo or ivilsaineIar, memalono osoranrl c�mpsoy'
& senior, vie. rretldent arNat7h Americah spactalfy fnaunar. Company
IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 1 Ith day of April , 2018 ,
North American Specialty Insurance Company
WaAington International Insurance Company
State of Illinois
County of Cook ss:
On this 1lth day of April 201. 8 , before me, a Notary Public personally appeared Steven P. Anderson , Senior Vice President of
Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Michacl A. ito .
Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance
Company, personally known to me, who being by me duly sworn, acknowlcdged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to be the voluntary act and deed of their respective companies.
OFF€CIALSEAL
ILL KENNY •`J��"'� `�
Notary Public • stale of arn.'a -
Alyc—afarei. pim M. Kcnny, Notary Public
I, Jeffrey Goldberg . the duly elected Assistant SecretalEy of North American Specialty Insurance Company and Washington
International Insurance Company, do hereby certify ghat the above and foregoing is a true and correct copy ofa Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals oflhe Companies this 20th day of September , 2018
,4
lefrmy Goldberg, Vice Prctldcm da Acsinant secoamy or
Warhingt.a livemadonal ImurmmCaapmy S Noak America, 59c6Ay ronlranco Company
STATE OF WISCONSIN )
COUNTY OF Kenosha }
ON TI-IIS 20th day of September , 2018 ,
before me, a notary public, Within and for said County and State, personally appeared
Thomas O. Chambers to the personally known, who being duly sworn,
upon oath did say that he is the Attorney-itt-Fact of and for the
North American Specialty Insurance Company , a corporation
of New Hampshire T , created, organized and existing under and
by virtue of the laws of the State of New Hampshire that the corporate seal
affixed to the foregoing within instrument is the seal of the said Company; that the seal
was affixed and the said instrument was executed by authority of its Board of Directors;
and the said Thomas 0. Chambers did acknowledge that he/she
executed the said instrument as the free act and deed of said Company.
Notary Public, Kf
My Commission
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name JC Lauber Site Improvements
Project No. 118-083B
For Bids Due September 20, 2018
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBEIWBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
% met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
Form [MWBE-2.1].
Acknowledge Receipt of # I Addendum(s) included with the bid.
✓ All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
—'y printed or typed underneath signature.
✓ This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: _L„ �'nu
By Authorized Representative:
Signature:
!1
Print Name & Title: I'
e.
Version 10/17/2017 Contractor's Bid for Public Works - 1
Date:
CM/_' C f r, '7`An t c-e,
PART II
.(For projects of $100,000 or more— IC 36-1-124)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 10/17/2017 Contractor's Bid for Public Works - 3
IL PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowled menu:
(i} By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _� By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachment
(i) _.7
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) P.
List identifying all former business names.
(iii) NA
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) _V
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures 1 have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) t�
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
/
under all applicable state and federal laws and local ordinances.
(vi) V
Evidence of participation in apprenticeship and training programs, applicable to the
work to be performed on the project, which are approved by and registered with
the United States Department of Labor's Office of Apprenticeship, or its successor
Jorganization.
(vii)
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 4/1712015 General Conditions - 9
(ix) KA- Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) List of projects of similar size and scope of wort: performed in all areas, including
the State of Indiana, within. three (3) years prior to the date on which the bid is due.
kc: e- rv-4j
r
(Print Name Here) (J
a
(Name of Company)
to 3 y ^-ki /e fir~
(Address of Company)
VSc e ct✓a
(City)
-77tj
(State)
sp��
(Telephone Number)
Version 4/17/2015 General Conditions -10
BUSINESS INFORMATION
CONNIE LAWSON
INDIANA SECRETARY OF STATE
09/20/2018 07:33 AM
L
Business Name: INDIANA EARTH, INC. Business ID: 1990031137
Entity Type: Domestic For -Profit Corporation Business Status: Active
Creation Date; 03/22/1990
Inactive Date:
Principal Office Address: 10343 MCKINLEY HWY., OSCEOLA, IN, Expiration Date: Perpetual
46561 - 9756, USA
Jurisdiction of Formation: Indiana Business Entity Report Due 03/31/2020
Date:
Years Due:
111
Title Name Address
President MARK L OSLER 10343 McKinley Hwy,, Osceola, IN, 46561, USA
Egg ggg�
Type: Individual
Name: MARK OSLER
Address: 10343 MCKINLEY HWY., OSCEOLA, IN, 46561 - 9756, USA
J.C. Lauber Building Pre -qualification, checklist items:
w Indiana Earth has the crew and staff to complete this project.
• Those that work on this project will he employees of Indiana Earth or of a hired subcontractor
which are under all applicable state and federal laws and local' ordinances.
• Apprentice programs are managed through operator and labor unions that wveare signatory
vv/mm.
• Drug testing |maccomplished through the unions ofoperators, laborers and teamsters, for our
employees.
• Indiana Earths surety company isapproved.
• Projects similar tothis one.
o Indiana Department of Corrections
o County Road 3B
o Nappanee Waste Water Treatment Plant
o StMan/sCollege
n Northwood High Schmo,|
o Warsaw High School
o Laporte Intermediate School
u Concord High school
u Penn High School
o Portage, |MPolice Station
o Discount Tire ofWarsaw
u P|eetonSchoo[
o Bell Tire ufSouth Bend
o Bell Tire VfMishawaka
n B and Bmanufacturing
o Central Park in Mishawaka
CITY OF SOUTH BEND
�...c,"
os`
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
y/E dY
FORM MWBE-2.0'LY
EVIDENCE OF GOOD FAITH EFFORTS"
This completed form should be included as part of the Bids documents related to City of South Send Public
Works Projects requiring Good Faith' Efforts to obtain MBEIWBE participation. It is the bidder's ' sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 118-083B Date: /` f ?"r2?
Project Name:
Bidder:
Contact Person:
JC Lauber Site Im
Address: 10 3' (4,A
City: 01 L c�lc
Telephone: S' 7y — 6 764_y?,?
State: Zip:
Email: W. c_ 0 An! 1
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
' T '
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
L.
opportunities, and allow MBE/WBEs reasonable time to respond.
3 Perform any and all necessary steps to written in
provide notice a manner reasonably calculated
to inform MBEIWBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
J
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your Initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 10/17/2017 Contractor's Bid for Public Works - 11
F�
W
W
U)
R
a13
(aw0
IL
0 z
N Lu
U.
Om0.
00
z
Q
O
z
2
c !)
C. O
m O
a
m'
m �
O
� C
0
O a'w
> R
C
d �
17"
To
a
Y rN+
E
IU
.CZ C
9
a
m �
p
03
o`
o
O
2 E
c �
a
CL
N M
40 �
mr
CL
3
3
m�
d�
0
7 CL
O N
O N
U) N
fA
Q. fA
Ewa
U
f/1 n c
h ''-' O
m
i" 9
co
O
co
c
0
E
Q
O
ro
O
W o 2�
o
as
� o
b O
U
u!
0
Q
o
w
Q
N
N
C
'p ,P
.p
41 m
a- N
C
O T
O N
41)
U 4
� U
r
N
m ,43)
T
+mod
c
o a
r
EZ
m
V
c�
ti
f
Ar
a
E
C
d
as
7
0
n
0
N
r
0
O
CITY OF SOUTH BEND;Sou_
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEIWBE CONTACTED"
This completed form should be supplied with Bids that pertain to City_of;South Bend Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the ,bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE OF
Project Number: 11B-083B
Project Name: JC Lauber Site Improvements
MBEIWBE Participation Goal
Bidder:
(Si ure)
itle) (Date)
MBEANBE Firm Vt-k r%Puc1K,'n
Owner or Contact at MBE/WBE Firm �g,
Telephone: S JY_d,3�. Idrv� Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Email:
( ry k J
RESULTS OF CONTACT THE M/BEIWBE FIRM:
+WITH
�e- C i' ftI ti � d �J'
MBEMBE Firm
Owner or Contact at MBE/WBE Firm
Telephone: Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Email:
—
RESULTS OF CONTACT WITH THE MBE/VIBE FIRM:
e— G r` -e—k e A y is _[
Version 10/17/2017 Contractor's Bid for Public Works - 12
INDIANA EARTH, INC.
10343 MCKINLEY HWY
OSCEOLA, IN 46561
Section 1
Public Projects completed:
1) Excavation & Utility —St Marys College, South Bend, IN $900,000 Fall 2017
2) Northwood High School Phase B — Nappanee, IN $168,900 Fall 2017
3) Excavation & Utility CR 38 — City of Goshen, IN $2,491,277 Spring 2018
4) Utility— Nappanee WWTP, Nappanee, IN $519,020 Summer 2017
Public Works in Process:
1)
Northwood High School Athletic Center, Nappanee, IN
$1,233,500 Fall 2018
2)
Excavation and Utility— Laporte Intermediate School
$1,531,400 Fail 2017
3)
Excavation and Utility -- Concord High School
$451,100 Summer 2018
4)
Excavation and Utility — Warsaw High School
$612,400 Summer 2018
5)
Excavation and Utility— Penn High School
$219,400 Summer 2018
Completed all work awarded to our firm.
References of Private Firms
1)
Rieth Riley Construction
574-288-8321
2)
Gibson Lewis LLC
574-259-8581
3)
Larson Danielson
219-362-2127
4)
Holladay Group
574-234-2073
5)
Robert Henry Const.
574-232-2091
Section 2
Plan of proposed work
1) Pre -construction meeting
2) Mobilization
3) Strip topsoil
4) Removals
5) Place barricades
6) Install underground utilitys
7) Earthwork
8) Place curbs
9) Place stone
10) Place pavement
11) Place sidewalks and pavers
12) Landscaping
13) Pavement markings
Subcontractors Utilized on Past Projects
1) Hydroseed — Osceola, IN, Hydro seeding
2) HydroTek — Nappanee, IN, Hydra seeding
3) Weaver Boos South Bend, IN, Compaction Testing
4) Bob's Landscaping —Granger, IN, Sodding
5) JPR —South Bend, IN, Surveying
6) Rieth Riley —Goshen, IN, Paving
Subcontractors to Utilize on this Project — Possible subs listed, will determine prior to contract approval
1) JPR--Surveying
2) Rieth Riley
3) Furbringer Landscaping
4) Al striping
5) Ziolkowski Construction
List of our Equipment Owned:
1) 13 Excavators
2) 4 Dozers
3) 3 Dump Trucks
4) 2 Semi Trucks with dump trailers
5) 2 Rollers
6) 5 Loaders
i) 2 Skidsteers
We have received pricing for services and materials by potential subcontractors.