HomeMy WebLinkAboutChange Order No 1 - Mishawaka Avenue Roto Rooter Jetter Removal Proj No 118-069R - Selge Construction Co Inc1316 COUNTY-Crry BUILDNG
227 WJEFFERSON Boi ILEVARD
SOUTH 1IFNI). ININANA 46601-1930
CITY OF SOUTH BEND PETE. BUTTIGIEG, MAYOR
1130ARD OF PUBLIC WORKS
September 11, 2018
Robert Kuhns
Selge Construction Co., Inc.
2833 S I I'll Street
Niles, MI 49120
PHONE 574/235-9251
FAX 574/ 235-9171
RE: Change Order No. I - Mishawaka Avenue Roto Rooter .letter Removal — Project No,
11 8-069R
Dear Mr. Kuhns:
The Board of Public Works, at its meeting held on September 11, 2018, approved the above
referenced Change Order for an increase of $19,507, bringing the current contract amount to
$72,307.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251,
Sincerely,
AAt.-k
Linda M. Martin, Clerk
Enclosure
GARY A. Gjw'r SUZANNA M. Ru-17131-IR(i EUZAW3 :'ni A. MARADIK. JANfl-'s A. MUELLER T111,,R1]'S[,J. DoRAU
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER 1865
DATE:
9/11/2018
PROJECT NO:
11 8-069R
PROJECT NAME:
Mishawaka Avenue - Roto-Rooter Jetter Removal (Division 2)
CONTRACT DATE:
7/10/2018
CHANGE ORDER NO:
I (Final)
SUBJECT OF CHANGE ORDER:
PCR #1 -Re-Pipe Catch Basins
All items completed substantially as planned.
See attached Comparison of Estimate for overruns and underruns.
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CQ—NTRACTOR
Contractor Signature
L-er P. d�' 11,3'. P"C"
Printed Name and' Title
Selge Construction Co., Inc.
Company Name
2833 S. '11 th St.
Address
Niles, MI, 49120
City, State, Zip
® increased
F] Decreased $
10/31/2018
0 days
0 days
10/31/2018
i 11• 1 11IM11
72,307.,00
36.95 %
36.95 %
R9CQMMENDED FOR APPROVAL
CONSTROCTION MANAGER
BOARD OF PUBLIC WDRKS
Approved Date:
Gary A. Gilot, President
aradik, Member
Therese JI. Doau, Member
James A. Mueller, Member
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Linda M. Martin, Clerk
Board of Public Works
FROM: Sue Ellen Doudrick
SUBJECT: Division 2 Change Order for Project No. 118-069 exceeding 20%
Project Name: Mishawaka Avenue — Rota Rooter Jetter Removal
DATE: September 5, 2018
This project had two Divisions; Division 1: Mishawaka Avenue and Division 2: North Shore Drive.
Unfortunately, the project title is a bit misleading for the entire scope of work. This memo was
prepared for Division 2: North Shore Drive only.
Division 2 work is completed. The scope of work included: removal and replacement of eight (8)
catch basins and inlets on North Shore Drive (between Michigan and Niles Avenue). During
construction, unforeseen issues arose. The Contractor, Selge Construction, performed necessary
additional work on the North Shore Drive (Division 2) Project ##118-069R which added $19,507.00
(36.95%) to the original project ($52,800.00). Total cost is now $72,307.00.
Description of work:
When the Contractor opened up two (2) of the eight (8) catch basin (CB) structures and began
the removal process, damaged or blocked storm leads were discovered. The Contractor notified
the Construction Inspector and an investigation by the City's Sewer Department was required at
one location to pinpoint the issue. A description of the two locations where additional work was
required are as follows:
9. SE Corner of Michigan & North Shore Drive. Installing new storm sewer pipe from the CB
to storm manhole located between Leeper Avenue and Michigan on North Shore Drive.
The existing lead pipe had a sandy debris blockage several feet into the lead pipe. This
blockage created backups within the CB which lead to excessive puddling at the
intersection's southeast corner during rain events. This new pipe installation will alleviate
the flooding issue and was an opportunity for creating a storm separation from the
combined sewer along North Shore. Alternative relocation of lead presented major utility
conflicts or trenching across Michigan and North Shore Drive.
2. NW Corner of Niles Avenue & North Shore Drive. Installing new storm sewer pipe from
the CB to the nearest manhole in Niles and North Shore. The existing pipe was clogged
with concrete debris and soils, and one of the joints was offset. These issues create
puddling at the northwest corner and sent excess water to CBS farther downhill. This new
pipe installation will alleviate flooding and provide additional capacity and hydraulic
efficiencies. Notice pictures below of debris found within CB and within lead pipe.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 09/04/2018
Name Toy Villa _,,,<1 Department Engineering
BPS/ Date 09/11/2018 Phone Extension 5920
. .... ..... . .. .... . ....
Legal F1 Attorney Name
Controller El Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑ Michael Schmidt
H Agreement
LJ Contract H Proposal LJ Addendum
F1 Professional Services
F-1 Resolution
F-1 Bid Opening
F-1 Bid Award F-1 Req. to Advertise ❑ Title Sheet
F1 Quote Opening
F-1 Quote Award
Z Change Order No. I
El C/O & PCA No. ❑ PICA
F-1 Ease/Encroach.
El Traffic Control
F- Other:
Company or Vendor Name Selge Construction Co., Inc.
New Vendor El Yes F-1 No El If Yes, Approved by Purchasing
MBEANBE Contractor [:] MBE [J WBE
MBENVBE Contractor Requested [:] No [:] Yes Name of Company
Mishawaka Avenue — Roto Rooter Jetter Removal and-No-rth-Sbofe
Project Name _Dr4ve-lrn,p°roveffients
Project Number 118-069R
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Amount of
Sewer Capital
641.0621.792.63.35
Additional modifications with replacing catch basins and inlets on
North Shore Drive
n Required Contractor's Certification Form Attached (Non -
Collusion. Non-DIis,cri:m i nation, Non -Debarment. E-Verlfv. Iran, etc.
Increase $19,507.00
Decrease $
Previous Amount
Current Percent of Change
New Amount
Total Percent of Change:
Copy
Original
F-1
F-1
1:1,
11
$ 52,800.100
36,95%
72,307.00 1 --
36.95%
M - of 0 .