Loading...
HomeMy WebLinkAboutChange Order No 1 - Hibberd Plaza Improvements Proj No 117-063R - R Yoder Construction Inc1.316 COUNTY -CITY BUIL.IAN4 rracE ., 227 W EF I RSON BowlVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUT1-1 BEND P1 TE B1.1TTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 11, 2018 Brad Yoder R. Yoder Construction, Inc. PCB Box 69 Nappanee, IN 46550 PHONE :574/ 235-9251 FAX 574/ 235-9171 RE: Change Order No. 1 - I-Iibberd. Plaza Improvements — Project No. 117-063R Dear Mr. Yoder: The Board of Public Works, at its meeting held on September It, 2018, approved the above referenced Change Order for an increase of $'6,798.54, bringing the current contract amount to $451,874.54. Enclosed is a copy of the Change Order for your records. If you have any farther questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure C ARYA. Git.,o'I' SUZANNA M, FRII'1BERG EI.,IZAI31�;1'IIA. VIARADIK. JAMEs A. MUELL.rR TifERESEs" J. IJORAIJ panamum Ulm-=1102. a ApIrill PROJECTNAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 8/31/2018 117-063R Hibberd Plaza Improvements (Base Bid and Alternates..3, 4, & 9) I PCR #1 -Change in Line Item Descriptions & Quantities Due to Changes in the Sewer. Added Line ltems for Electrical & Unsuitable Material. See Change Order #1 Attachment. The original contract sum $ 445,0716,00 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 445,076.00 By this Change Order, the project amount is increased Decreased $ 6,798.54 The new contract sum including this change order $ 451,874.54 This Change Order represents, a total change of 1.53 % Total change for entire project 1.53 % Original contracted completion date/time 9/21/2018 Extension of date/time by previous change orders 0 days Date/time extension by this -change order 0 days New completion date/ ir6e' 9/21/2018 CO TRAPZTOR RECOMMENDED FOR APPROVAL Contractor -Y7 nah CONSTR�510N MANAGER 'd Printed Name &nd Title R. Yoder Construction, lnc. Company Name Address Nappanee, IN 46550 City, State, Zip CITY OF SOUTH BEND BOARD OFPUBLIC '7' Approved Date: ,;;20 W'' - 'Gary A. Gillet, President. uizabeth A. maram, member Therese J. Do au, Member James A. Mueller, Member Change Order #1 ATTACHMENT Description Change Item No. Description 50 Domestic Water Line, Class 52, 4" 6" DIP 51 Fire Protection Water Line 4" 6" DIP Description & Quantity Change Item No. Description Quantity Change Unit Unit Price Total Amount Change 22 Sanitary Sewer, PVC SDR 35, 4" 6" 153 LF $165,711 $25,353.63 Quantity Change Item No. Description Quantity Change Unit Unit Price Total Amount Change 18 Underdrain, Socked, 4" 35 LF $46.90 $1,641.50 21 Storm Sewer Pipe (drain to pavers & connect at lateral), 6" 211 LF $44.50 $9,389.50 23 Clean -out Tee (Sanitary & Roof Drains) 1 EA $348.17 $348.17 24 fGas +fte -17 LF $170.71 -$2,902A0 36 Wigatiert -1 LS $11,120.00 -$11,120.00 38 Gone te, 8" -48 SYS $130.26 -$6,252.48 39 -1 LS $13,842.00 -$13,842.00 40 Ele6tFie Line Geigneeth a -25 LS $69.64 -$1,741.00 41 Telephone Line Connection -30 LS $46.40 -$1,392.00 42 Asphalt Payemne Clatsl.i.... -1 LS $4,062.00 -$4,062.00 49 -38 LF $459.00 -$17,442.00 57 Gen Fete ADA Rafflp -14 SYS $103.21 -$1,445.00 58 -15 LF $61.87 -$928,00 Added Line Items 63 00#1 - Exploratory Digging for Sewer Laterals 1 LSUM $1,000.00 $1,000.00 64 CO#1 - 3/" PVC Conduit and Wiring 400 LF $18.05 $7,220.00 65 CO#1 - 2" Conduit Stub for METRONET 37 LF $21.65 $801.05 66 CO#1 - Unsuitable Soils to Landfill 132.1 TON $54.73 $7,229.17 67 CO#1 - Unsuitable Material & Rubble Removed 96 CY $22.83 $2,191.20 68 CO#1 - Borrow CIP 36 CY $26.13 $940.50 69 C0#1 - Salon South ADA Door 1 LSUM $6,768.30 $6,768.30 70 CO#1 - Intermediate Asphalt 7 TON $350.00 $2,450.00 71 CO#1 - Flowable Backfill 32 CY $81.00 $2,592.00 C0#1 Total Change $6,798.54 BOAM) OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST' FORM Toy Villa Department Division/Bureau Public Works Engineering BPW Date 9/11/2018 Phone, Extension 5920 Required Prior to Submittal to Board Legal ❑ Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000,00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Michael' Schmidt " Agreement LJ Contract H Proposal H Addendum El Professional Services n Resolution n Bid Opening n Bid Award El Req. to Advertise El Title Sheet F-1 Quote Opening F-1 Quote Award Z Change Order No. 1 El C/O & PCA No. E] PCA ❑ Ease/Encroach. El Traffic Control. - Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBEANBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of E increase El Decrease Previous Amount Current Percent of Change New Amount Total Percent of Change: Copy Original F-1 F-1 F-1 El R. Yoder Construction. Inc. Hibberd Plaza Improvements 117-063R RWDA TIF 324-1050-460-42.01 Apioroval' of C.O. #1 F-1 Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verifv, Iran. etc. M U611M I $ 445,076.00 1.53% $ 451,874.54 1.53%