Board met in regular session at 9:00 A.M. All members present.
O • A 3
Mr. Horace Kemble and M.. Eaavaaanuagh representing the Studebaker
Corportion with D, C.-Layton Street Commissioner appeared before the Board and the
matter of plaeingg cinders on.E�ekman Street from Michigan Street. west was discussed
and it was agreed that anaagreement be drawn and presented to the Board for same.
Bids were areceived, opened and read as follows:-
P,TPE SEWER . ON EWING AVENUE.9 PROM 'MIAMI STREET TO CLYDE STREET.
Bid.' -of Staples, &' Acker x,
15 inch pipe
sewer
per
lin
ft.
$2.70
12 inch pipe'
sewer
per
lin
ft.
2.30
10 inch pipe
sewer
per
lin
ft.
1.90
8 inch pipe
sewer
per
lin
ft.
,go
b inch pipe
sewer
per
lin
ft,.
.1.00
Manholes per
eft.
8.00
Manholes, curbs
and covers,
each
18.00
Storm water
inlets,,
each
10.00
Check $100.00
Bid of George Pontare,11i
1,5 inch pipe
sewer
per
lin
ft.
3.15
12 inch pipe
sewer
per
lin
ft.
2.20
10 inch pipe
sewer
per
lin
ft.
2.10
,8 inch pipe
sewer
per
lin
ft.
.70
6 inch pipe,
sewer
per
lin
ft.
1.00
Manholes per
ft.
7.00
Manholes eurbs and covers,
each
18.00
Storm water
inlets, each
9.00
Check $100.00
Bid of L. H. Webster
°15 inch pipe sewer per lin ft.
3,m1
12 inch pipe sewer per lin ft.
2.80
-10 inch pipe sewer per lin ft.
2.66
8 inch pipe sewer per lin ft.
1.03
. 6 inch pipe sewer per lin ft.
1.09
,Manholes per ft. in depth
8.50
Manholes curbs and covers, each
17.50
Storm water inlets, each
10.00
Check
4100. 00
PIPE SEWER.ON UARPER COURT PAVEMENT.
Bid of Hoban & Roaeh, u
+ rading per cu. yd.
1,25
inch concrete pavement per sq.
yd.
2.75
8 inch conduit pipe per lin ft.
.80
Aterm water inlets, each
15.00
Reset inlets, each
3.50
Resetting manholes each
'Cheek
3.50
$100.00
Bid of Globe Constru6tion Company
Grading• per, cu. yd'. 1.15
Slkeet Asphalt Natural Lake Asp -halt per sq. yd 3.27
"" Texaco Asphalt, per-sq__lyd. 3.04
Asphaltic concrete Natural Lake Asphalt per sq. yd. 2.91
Asphaltic concrete Texaco asphalt per sq. yd. 2.92
Storm water inlets, each 15.00
Marginal curb per ikin, ft. .50
Resetting inlets, each 5.00
Resetting manholes curbs and covers, each 5.00
Cheek $100.00
742
Tdesday March 13th., 1923. Continued.
Bill of White Construction` Co.
Walk per sq. ft.
$.20
cement curb perlin ft.
' .50
Grading per 'cu. yd.
1.05 .
Sheet Asphalt Trinidad Lake per sq. yd.
3.18
nn nn Mexican asphalt per sq. yd.
2.98
Asphaltic concrete Mexican per sq. yd.
2.63
Asphaltic concrete Trinidad 'per sq. yd.
2.83
8ineh conduit pipe per lin ft.
1.00
Stoem water inlets$ each
U-00
Marginal curb per lin ft.
.40
Resetting inlets, each +°
3,.00
Resetting manholes curbs and covers, each
3.00
Cheek $100.00
Bid of Williston 'Construction Company.
Walk_ per sq. ;f&.
.20
Curb per lin ft.
.60
Grading per cu. yd.
1.00
i Asphalt Mexican per sq. yd.
2.82
Asphalt Trinidad lake per sq. yd.
.2.98
Asphaltic concrete Mexican per sq. yd.
2.52
Asphaltic concrete Trinidad per sq. yd.
2.68
8 inch conduit, pipe per lin ft.
.95
Storm water inlets, each
14.50
Manholes pxxxR:tx reset each
3.00
' Resetting inlets, eaeh
3.00
Mrginal curb per lin ft.
.40
4 Cheek $100.00
PAVEMENT ON POLAND STREET.
Bid of Hoban & Roach A
Grading per cu. yd. 1.50
7 inch conduit ,pipe per lin ft,. 2.75
8 inch conduit.pipe per lin ft. .80
Storm water inlets, each 15.00
Resetting inlets, each 3.50
Resetting manhole each 3.50
$166.00
Bid of Globe Construction Co:
Grading per cu. yd. 1.15
Asphalt Nat. Lake Asphalt p or sq. yd. 3.27
Asphalt Texicao Asphalt, per sq. yd. 3.o4
Asphaltic cone. Trinidad.per sq. yd. 2.91
Asphaltic concrete Texica• per sq. yd. 2.72
8 inch conduit pipe per lin ft. 1.25
Manhole covers reset, each
5.00
Resetting'inl6ts, each.
5.00
e Marginal curb per lin ft.
.50
$166.00
Bid of the Pikb Construction Company.
Grading per cu. yd.
1.05
Sheet asphalt Trinidad Lake per sq. yd.
3.13
Sheet asphalt Mtandard Mex. per sq. yd.
2.89
' Asphaltic concrete Trinidad pr•sq. yd.
2.80
Asphaltic concrete Standard Mexican, per
sq. yd $2.60
Margihal curb per lin ft.
.35
Resetting inlets, each
3.00
' $ese'ttiag.manhole covers, each
3.00
Cheek $166.00
Bid of White Construction Company
Walk per sq. ft.
$.20
" Curb per lin ft.
.50
Grading per cu. yd.
1.05
Sheet Asphalt Trinidad per sq. yd.
3..18
Sheet Asohalt Mexican per sq, yd.
2.98
Asphaltic conere a Mexican per sq. yd.
2.63
Asphaltic concrete Trinidad per sq. yd.
2.83
8 inch conduit pipe per lin ft. £
1.00
" 5�0'rm'water inlets, each
13.00
° MarginAl "curb per lin ft.
.40
' Resetting inlets, each
3.00
Resetting manholes coverit each
3.00
" cheek S166.00
Bid of Williston Construction Co.
Walk per sq. ft.
.20
Curb per lin ft.
.60
Grading per cu. yd.
1.00
Sheet Asphalt Mexicaan. Asphalt pr sq. yd.
2.82
y Sheet asphalt Trinidad asphalt per sq. yd.2.98
" ophaltie "concrete Mexican per -sq. yd.
2.52
" Asphaltic concrete Trinidad per sq. yq.
2.68
8 ,ineh conduit pipe per lin ft.
.95
" Storm water inlets, each
14.50
Marginal curb pr lin ft.
.40
Resetting 'inlets,. each.
3.00
Resetting manhole covers, each
3.00
Cheek $166.00
PAVEMENT ON ALLEY WEST OF PRANKLIN STREET.
Bid of Hoban & Roach
7 inch concrete pavement per sq. yd.
$2.79
grading per cu. yd.
1.50
" Chuck 4100.00
Bid of H. N. Barnes '
Grading per cu. yd.
1.50
Concrete pavement per sq. yd.
2.80
_ Cheek $100.00
PAVEMENT ON GOLDEN AVENUE.
Bid of Hoban & Roach.
Grading per cu. •yd.
7 inch condrdie per sq. yd.
8- inch conduit pipe -per lin ft.
Storm water inlets, each
Resetting inlets, each
Resetting manholes covers, each
Bid of Globe Construction Company
F
Cheek $193.00
Grading per cu. yd.
Asphalt Trinidad per sq. yd.
Asphalt, lexies
Asphaltic concrete Mexician
Asphaltic concrete Trinidad
8 inch -conduit pipe per lin ft.
Marginal curb per lin ft.
Resetting inlets, each
Resetting manhole covers, each
Cheek 4193.00
1.30
2.75
.80
15.00
3.50
3.50
1.15
3.27
3.04
2.91
2.72
1.25
.50
5.00
5.00
ism
Bid of White Construction Company
Walk per sq. ft. S.20
Curb per lin ft. .50
w Grading per cu. yd. 1.05
Asphal-b Trinidad per sq. yd 3.18
Asphalt Mexican per sq, yd. 2.78
Asphaltic concrete Trini elid per sq.. yd. 2.83
Asphayltio 'conerete Mexican. per sq. `yd. 2.63
8 inch conduit pipe per lin ft. 1.00
Storm water inlets,'each 13.00
Marginal curb per lin ft. .40
Resetting inlets, each 3.00
Resetting manhole eovers, each 3.00
Check $19�.00
Bid of Williston% Construction Company
walk per sq. ft.
.20
Curbing per lin ft,
.60
° Grading per cu, yd.
1.00
S.° Asphalt Mexican per sq, yd.
2.82
S. Asphalt Trinidad per sq. yd.
2.98
Asphaltic concrete Mexican per sq. yd.
2.52
Asphaltic concrete Trinidad per sq. yd.
2.68
6 inch conduit pipe perlin ft.
.95
' Storm water inlets, each
14.50
' Marginal curb per lin ft.
.40'
Resenting inlets, each
3.00
Resettinig manhole covers, each
3.00
Check $193.00
PAVEMENT ON HARRISON AVENUE.
Bid of Glebe'Construetion Cc.
Grading per cu.'yd. 1.15
S. Asphalt Trinidad per sq. yd. 3.27
S. Asphalt Texice oil asphalt per sq. yd. 3.04
Asphaltic concrete Trinidad per sq. yd. 2.91
Asphaltic concrete Toxic* asphalt per sq. yd 2.72
8 inch conduit pipe per lin ft. .50
Resetting inlets, each 5.00
Resenting manhole curbs and covers, each 5.00
Cheek $711.00
Bid of the Pike Construction Company
Grading per cu. yd.
.95
. Asphalt Tri �dc1aa gg r, sq. ° yd..
3.10
S. Asphalt; 1IM98 Akkrgd.
2.86
Asphaltip concrete Mexican per sq. yd.
2.57
Asphaltic concrete Trinidad per sq. yd.
2.77
8 inch conduit pipe per lin ft.
Marginal curb per lin ft.
.35
Resetting inlets, each
3.00
Resetting manhole covers, each
3-POO
Cheek $711..
Bid of the While Construction Coo
Walk per sq. Ltd.
.20
. Curb per lin ft.
.50
Gradiner cu. yd.
1.05
S. Asp9a t Trinidad per sq. yd.
3.18
S. Asphalt 11exiekn oil per sq. yd.
2.98
Asphaltic concrete Mexican oil per sq. yd.
2.63
Asphaltic concrete Trinidad per sq. yd.
2.83
8 inch conduit pipe per lin ft.
1.00
Storwater inlets, each
13.00
.Storm. Margina curb per lin ft.
.40
Resetting islets, each
3.00
Resetting manholes curbs and covers, each
3.00
Check $711.00
745
Tuescle,y March 13th., 1923. Continued.
Bid of the Wulliston Construction Co. °
Walk per sq. ft. °
' Curb per"Yin°ft.
' Grading per cu. yd. "
° S. Asphalt Mexican per sq. yd.
S. Asphalt Trinidad per sq. yd,
8sphaltie concrete Mexican per sq. yd.
Asphaltic concrete Trinidad per sq. yd.
8 inch conduit•pipe'per lin fl..
Storm water inlets, each
Marginal curb per lin ft.
Resetting islets, each
Resetting manholes per each
° Check $711.00
PAVEMENT ON CARROLL STREET.
Rid of Globe Construction Ce.
Grading per cu., yd.
S. Asphalt Trinidad per sq. yd.
9-;'Asphalt Sexiao oil per sq. yd.
" Asphaltic" concrete Trinidad per sq. yd.
Asphaltic concrete. Texice oil per sq.. yd.
8 inch conduit, pipe per lin-ft.
• Storm water inlets, each
• Margi _jeurb per lin ft.
Resetting' inlets, each
Resetting manholes curbs and covers, each
Y Cheek $105.00
Bid of White Construction Co,
Walk per sq. ft.
' Curb per lin ft. a
Grading per cu. yd.
' S. Asphalt Trinidad per sq. yd.
S. Asphalt Mexican per sq. yd.
Asphaltic concrete Mexican per sq. yd.
Asphalti.e concrete Trinidad per sq. yd.
8 inch conduit pipe per lin ft.
" Storm water inlets, each
Marginal curb per lin ft.
Resetting inlets, each
Reseeting manhole covers, each
Check $105.00
Bid of Williston Construction Company
Walk per sq. ft.
Curb per lin ft.
Grading-per.cu. yd.
S. Asphalt Mexican per sq, yd.
S. Asphalt Trinidad per sq. yd.
Asphaltic concrete Mexican per sq. yd.
PAVEMENT ON MARINE STREET.
Bid of Globe Constr. Co.
0.20
.6o
1.00
2.82
2.98
2.52
2.68
.95
14.50
.40
3.00
3.00
1.15
3.27
3.04.
2.91
2.7.2
1.25
15.00
.50
5.00
5.00
.20
.50
1.05
3.18
2.63
2.83
1.00
13.00
.40
3.00
3.00
.20
.6o
1.00
2.82
2.98
2.52
Grading per cu. yd. 1.15
S. Asphalt Trinidad p r sq. yd. 3.27
S. Asphalt Taxies per sq. yd. 3.04
Asphaltic concrete Trinidad per sq. yd. 2.91
Asphaltic concrete Taxies per sq. yd. . 2.72
Conduit pipe per lin ft. 1.25
Storm water inlets, each 15.00
Marginal curb per lin ft. .50
Resetting inlets, each 5.00
Resetting manholes curbs and covers, each 5.00
Check $410.00
Bid of Pike Construction Co.
Grading per cu. yd.
$1.00
S. Asphalt Trinidad per'sq.`yd.
3.13
S. Asphalt Mexican per sq. YD.
2.89
Asphaltic,conerete Mexican per sq. yd.
2.60
Asphaltiq concrete Trinidad per sq. yd.
2.80
8, inch conduit pipe per lin ft.,
.38
Stomp water inlets each
10.00
u Marginal,eurb per lin ft.
.35
Resetting inlets, each
3.00
v Resetting manhole covers, each
3.00
Certified e;}Iteek 0410.00
Bid of White Construction Co,
WalW per sq. ft
.20
curb per lin ft.
.50
• grading per ca. yd.
1.05
S. Asphalt Trinidad per sq. yd.
3.18
S. Asphalt Mexican per sq,. yd.
2.98
• Asphaltio. conerete Mexican per seg yd,
2.63
Asphaltic concrete Trinidad per sq. yd,.
2.83
8ain,eh conduit pipe per lin ft.
1.00
Stox water .inlets, each
13.00
Marginal curb per lin ft.
.40
Resetting inlets, each
3.00
Resetting manhole covers, each_
3.00
Cheek 0410.00
Bid of Williston Construction Company
Walk per sq. ft.
.20
Curb per lin ft.
,60
Grading per cu. yd.
1.00
S. Asphalt Mexican per sq. yd.
2.82
S. Asphalt Trinidad per sq. yd.
2.98
Asphaltic per sq. yd. Mex.
2_.52
,coierete
Asphaltic eonerete Trinidad per sq. yd.
2.68
8 inch conduit pipe -.per lin ft.
.95
Stow water inlets, each
14.50
Marginal curb per lin ft.
.40
Resetting inlets, each
3.00
Resetting manholes curb sna deovers,
3.00
Cheek $ 410.00
PAVEMENTON LEER STREET.
Bid of Globe Construction Company.
Grading per cu. yd. .
$1.15
S. Asphalt Trinidad.per.sq. yd.
3.27
S. Asohalt Texicao per sq. yd,
3.Q4
Asphaltic concrete Triniad per sq. y4.
2.91
• Asphaltic concrete Texicie Oil per sq. yd.2.72
8 inch conduit per lin ft.
1.25
Storm water inlets, each
15.00
Marginal curt per lin ft.
.50
Resetting inlets, each
5.00
Resetting manholes curbs and covers, eaeh 5.00
Check $485.00
Bid of Pike Construeion Company.
Grading per cu, yd.
.98
S. Asphalt Triniad per sq. yd.
3.07
S. Asphalt Standard Mexican per sq. yd.
2.83
Asphaltic concrete Trinidad per sq. yd.
2.74
Asphaltic eonerete Standard Mex. per sq.
2.54
8 inch conduit per lin ft,
.88
Storm waterinlets, each
10.00
,Marginal curb per lin ft.
.35
Resetting inlets, each
3.00
Resetting manhole covers, each
3.00
Cheek $485.00
Tuesday March 13hh.9 1923. Continued.
Bid of White Construction Co. '
walk per sq. ft. $.20
Ourb per lin ft. .50
Grading per cu. yd. 1.05
S. Asphalt Trinldad' per sq. yd. 3.1.8
S. asphalt Mexlean'per sq. yd. 2.98
Asphaltic ebnerete Triniad per sq. yd. 2.63
Asphaltic concrete Mexican per sq..yd. 2.63
s
8 inch conduit pipe per lin.ft. 1.00
Storm water inlets, each 13.00
Marginal curb per lin ft. .40
Resetting mnholes each 3.00
Resetting inlets, each 3.00
Check $485.00
Bid of Williston Construction Co.
Walk per sq - ft.
.20
Curb per lin ft.
.6o
Grading per cu. yd.
1.00
S. Asphalt Mex. per sq. yd.
2.82
S. Asphaltic Trinidad per sq. yd.
2.98
Asphaltic concrete Mex. per sq. yd.
2.52
Asphalts€ concrete Trinidad per sq. yd.
2.68
8 inch conduit pipe per lin ft.
.95
Storm wester inlets, each
14.50
Marginal curb per lin ft.
.4o
Resetting inlets, each
3.00
Resetting manhole covers, each
3.00
Check $485.00
Pavement on Fassnacht Avenue.
Bid of Globe Construction Co.
Grading per cu, yd. 1.15
Si Asphalt Trinidad per sq yd'. 3.27
S. Asphalt Texiee per 'sq. yd. 3.04.
'Asphaltic eonerete'Trinidad per sq. yd. 2.91
"Asphaltic concrete Texicc per sq. yd. 2.72
"8 inch conduit pipe per lin ft. 1.25
'Storm water inlets, each 15.00
Marginal curb per li'n ft. .50
Resetting inlets, .each 5.00
Resetting manhole covers, each 5.00
Check $748.00
Bid of Pike Construction Company
Grading par 'cu. yd.
.98
S. Asphalt Trinidad per sq. yd.
3.11
S. Asphalt Standard Mexican pr sq. yd.
2.87
Asphaltic concrete Triniad per sq. yd..
2.78
Asphaltic concrete Mexican Standard per
yd.2.58
8 inch conduit pipe per lin ft.
.88
Storm water inlets, each
10.00
Marginal curb per lin ft.
.35
Resetting inlets, each
3.00 -
Resetting manhole curbs and covers, each
3.00
Check $748:00
Bif of the White Construction Co.
walk per sq. ft.
y
.20
Curb per lin ft.
.50
Grading per cu, yd.
1.05
S. Asphalt Trinidad per sq.
yd.3.18
S. Asphalt Mexican per sq. yd.
2. 98
Asphaltic concrete Mex. oil
per sq. yd.
2.63
Asphaltic concrete Trinidad
per sq. yd.
2.,83
8 inch conduit pipe per lin
ft.
1.00
Storm water inlets, each
13.00
Marginal curb per lin ft.
.40
Resetting inlets, each
3.00
Resetting manholescurbs and
covers, each
3.00
Check $748.00
74S
Bid of the Williston Construction Company.
Walk per sq. ft.
S.20
' Curb per lin ft,
.6o
';Grading per cu. yd.
1.00
S. Asphalt Mexican per sq .' yd. '
2,82
' S. Asphalt Trinidad per sq. yd,
2.98
Asphaltic conerthte.-Mex.per sq. yd.
2.52
'Asphaltic eonorete Trinidad per sq. yd.
2.68
' 8 inch conduit ptr lin ft.
.95
Storm water inlets, each
14.50
Marginal curb per lin ft,
.40
Resetting inlets each.
3.00
Resetting manhole covers, each
3.00
Check $748.00
Bid of Nike Consi,ru tion Company of Galdeni�AV6wot paavement.
Grading per cu, yd.
.98
S. Asphalt Trinidad per sq. yd.
�.15
S. Asphalt Moxic#,n per sq, yd.
2..91
Asphaltic poncrete Trinidad per sq. yd.
2.82
Asphaltie pnnerete Mexican per sq, yd.
2.62
Storm water 1n).ets, each
10.00
. 8 inch conduit pipe per lin ft.
.88
Marginal curb per lip ft.
3.00
Resetting inlets, each
3.00
Check 193.00
Bid of the Williston Construction Company of Carrell Street Pavement,
Walk per sq. ft.
.20
Curb per lin ft.
.60
Grading per cu. yd.
1.00
' S. Asphalt Mex'. per sq. yd.
- 2.82
' S. Asphalt Trini"dad Per sq.
yd.
' 2.98
' Asphal'tic Eonerete Mex. per
sq. yd.
2.52
4 Asphaltic coherete Trinidad
per sq. yd.
2.68
' 8 inch conduit; pipe- per lin
ft.
.95
' Marginal curb per lin ft.
.40
Resetting.inlets, ea'eh
a.00
' Resetting manhole covers, each
3.00
Storm water inlets, each
14.50
Cheek $105.00
All of the above bids were referred to the City Civil
Engineer For tabluation to: be reported on Wednesday March 14t1i.9 1923
at 7:15 P.M. u +
PetiT ions filed and resolutions ordered on following
improvements: -
Walk curb and pavemnt on Seeberger Drive from Michigan
Street to Erski :e 21raztBlvd. '
Grade, curb and walk on Vassar. Avenue from Brookfield
Street to College Street.
Grade, curb and walk on Chalfant Street from Eddy Street
to East end of Coquillard Park. .
Sewer on Chalfant Street from Eddy Street .to East end
of Coquillard Park.
Macadam pavement on Tonti Avenue fro m Lafayette Street
to Iroqois Street,,
Pavement on Pulaski Street from Division Street to
Ford Street.
Asst. Inspector of pole and wires reported that
pole at 1622 Caroline Street should be moved south to property line..
Excavation of Knox Plumbing Co. approved.
Tuesday March 13th,1923.CVptinued.
The following estimated costs were filed by the City Civil
Engineer on,improvements.
Gradep
curb and
walk
on
Otsego Street
on
Dayton Street
on
Randolph Street
on
Brd'okfield Street
on
College Street -
on
Bowman Street
on
Turnock Street
Cement
walk on
Medors Street.
Grading alley
south
of
Monroe Street
$2.330-00
2,472.00
29530-00
79 452.00
7712.00
3:670-00
39760.00
350.00
509.00
Inspector reported on petition for light at cornr of Calvert
Street and Main Street and recommended a 100 C. P. Light on southwest eorner
of Calvert and Main Street.
The following resolutions were adopted by the Board.
SIDEWALK IMPROVEMENT RESOLUTION NO. 1123.
.Resolved by the Board of Public Works of City of South
Bend, St. Joseph County, State of Indiana, That it deemed necessary to improve
Johnson StreetfromHumboldt Street to Elwood Avenue as follows, otpiwt:-
Said street shall be graded from property line to property
line to the established grade, and cement sidewalk and cement curb shall be constructed -
on both sides of said street. All as is more particularly shown and all in accrdance
with the plans, profiles, detail drawings and specifieation�son file in the office
of the Department of Public Worksofthe City of South Bend, Indiana.
-!-�i i. F, o ;(,ox,dance with the . Mans, profiles , detail drawings and specif icatioiis
r-sent of the,B
:f,` 1- le, in the. office of the Dera t Board. of Public Works of said b
City; j:nd. frach improvement ip, now orde,3?e(3-
`0i.e cont of sal.d. irmurcvement it
cludlng the cost of street and alley
:ihall be aoc-essed U-oon the real estate abutting on said
............... jolmselt stp&&j ................... — ........... 000
..................... .......................................
ing -i;o the p-_rovided for in an Act of the Gt n-
Ej 1 --�A, i ap _t.itl
of �J)J_y c,,f the S -te em "An Act Conce-cuing Nfiiniicirca?
U "Lc q."� appro 1905, and in accordance ,itb. and or, r.,s, to
V 'I s �L 0aq of al) al r rend supplemental acts theeto, pa,sood by the
Getw,ral Assembly of the State of Indiana. Assessments, if deferred, arse to be
paid in ten equal annual installments, with interest at the rate of Six per
cent per annum. A bond or bonds shall be issued to the contractor in payment
of such work, unless, the property awners pay said assessment bef.'ore 9,9-Ad. bond.
or bonds are issued.- Under no c4�rcur .11 Bend.., r0 e
--- stances shall the Cit-V of Soy--Ith -_ ., b
or be hold responsible for any sum or sums, due from said prope-rty oviner or
owners fov aaid.wo-ek or for t'he collection of the sa-ne, or for the payment of -
bond, bonds, certi.f i na3? te� 0ce-rLt
4 -P! castes, iSs.,:Led to said cc -,tractor in
went- forum sh werkt except for ouch moneys as shall have been actually ro
vaivoa by th _0 Q� ty from the assessments for such imPrOv8mOntp or such moneyal
io fiaid, City is by maid above entitled Act required to pay. All pi-oceedings
h4a, 'ali-ja wore k aor.o In the making of said improvement, assessment of pr�,,erty,
of asGosswerits and issuance of bonds therefor, shall be as pi-ovided
1.:n, rav,i d nbovo ontitled Act and. thereto.
.4tj%juu or, this resolution shall b-3 pi:,,b' irked ed, on the... . ...... day of
,Mairohs, 1923wti @ and on the. 21S.0 ...... (9 �Y c f ... March-1923. . . . . . 9, v
4,o!itth nand Dai1yTr;LbUjje&New8.T.j0" This Bcai?d will give a hearing on
q 4� ( , 11j, I n e
jult)L1 Jon J,n its office in the City H-a -1 o the day of
t - 190006t at 7:15 P. M.
doptod ... day of...... Uftroh .1923
L,.,B. SLAUGHTER
®OAS Off' PUB0 *0=:1 P. HARDY.,
ALBERT F. HONER
Attestean 7, el ey
t-P" fai, ftmtabl
Tuesday Mareh 13th., 1923. Continued.
SI DEC1I,.LK IMPROVEMENT
Resolved by the Board of
County 'qf S . Joseph, State of Indiana,
O'Brien, Street from Prast Street to the
Additioit as.follows, towwit
RESOLUTION NO. 1124.
Public Works of the City of South Bend,
That, it is deemed necessary ti improve
south line of Frederickson's Melrose
Said street shall be graded from property line to
property line to the established, grade and cement sidewalk and cement curb
shall be constructed along both sideq of said street from Prast Street to South
line ofaFredericksen's Melrose Add. All as is more particularly shown and all
in accordance with the plans, profiles, detail drawings am an file in the
Office of. the Board of Public Works of the City of South Bend, Indiana.
a a:svccr .nce with th, u , p.zofi�! es , detail drawings and speoif-ioatione.
_: file In the n ff. ice y the Derax�tre-at of the Board of Pub1'io .forks :of said
City; and Ruch Zt Prove -,ellt is now ordered.
The co t of said. z _p over, ent - injoluding the cost of street and alley
�tersectiono, c'�a.. be �,s=rased anon the real estate.abutting on said
0 Brien Str��.t....•..............•,,.....,..._...
. • a • • • +• • • • • • • • • • • • e • e r • •• • • • • • e • • • • • .a
),IT according t�o the metho( anq. m�-in,er Provided for in an Avt of the Geri-
e�ra.l Assembly of the S�-?:t.e of I"-d-ian^., e-,-t-i t7 ed ` `An Act, Concerning �Qunicix�al
Corporations, e' appro z�. l!f e� .":,: 1905z and in accordamce with and purs-ol.nt to
the provision^. of a17 a_-, o»�.+e_ and supplemental acts thereto, passed by the
General .Assembly of the Ste-te of Indiana. Assessments, if deferred, are to be
paid in ,ten equal annual installments, with interest at the rate of Six per
cent per annum. A bond or -bonds shall be issued to the contractor in,payme t
of such Work, unless the property owners pay said assessment before said bond
-
or bonds are issued: Under no ci.roum,;tonce s shall the City of South Bend,. be
or be held responsible for any Sum or sums, due from -said property owner or
owners for said work or for the collection of the same, or for the payment of
bond.., bonds, certificate or certificates, issued to said contractor in pas,
meat ,for such work, excopt for such monoye as shall have been 4etually Vow .F
peived bythe City from the assoripaAants for suo'h improVement.r or such -me eyf
as said City i's by sa.xcl above ®ntit'Led Act. reouired to pays Ali. p�asedingil
had and work done in the ma%ing of said brp:rovement, assessment of pr 3yerty,
c41oction of a,ssevi-3monts and a.-s�uance of bonds therefor, shall: bo as pl,avi.doaL
for in said above entitled Act a.r.d P ^r"irAs ^.+.$ thereto.
Notice of this resolution shall_ b� pub'I ,seed on the • . e .141tt•. •.:..day of'
.,..thb,a . • • . �� no • ... d- y Cf ...... fi 9?3....
ih the South' end Daily.
ribose. WejrMinetb.; s Board -will give a hearing on
tbit-1 reeolu- tion in its office in the City Hall on the .... 11tk.. 0 ...da,y of
1._....a ►i1.192j5- ••,., 1.9 ,.., at-*76.15 P- me
Adopted this . Aay of ..... Marreb.1, 03.. e . , 1.9 .. a W
•••••!•06 s 4 a.0 cLof Bfo ►LoA1/t41MR'C `.} ? 3-di
som . Or PUBLIC WoRm, • . f f E E . - . _ . < . , L, . P . Ht'�DY
ALBERT F. HONER
Att®ate _ Veronica C. 3we��e�
.� Orl o•`f board.,. f
SIDEWALK IMPROVMENT RESOLUTION NO. 1125.
Resolved by the Board of Public Works of -the City of South
Bead, St. Joseph County, State of Indiana, That it is deemed necessary to impro
improve Prast Street from Johnson Street to O'Brien Street as follows, to-wit:-
Sa"id street shall be graded a from property line to
property line to ,the.established grade, and cement sidewalk and cement curb
shall be construei,ed. on the south side of said street. All as is more parti-
cularly shown, and sl,1 in accordance with the plans, pforiles detail drawings
and specifications on file in the Office of the Deparment of Public Works of th
the City of South Bend, _I.rldiana.