HomeMy WebLinkAbout02/07/1923 Board of Public Works Special Meeting Minutes669
Wednesday February nth., 1923
Board met in special session at 10=00 A. M. All members present.
Petitions on -file since 1922 and 1923 taken up and considered and
the following held up until later date.
Grade, curb and walk on Highland Blvd. from Prairie Avenue -to
Deleware Avenue and Sidewalk on Carlisle Street from Deleaware Avenue to Indiana
Avenue deferred until Plat is recorded.
Grade, curb and walk on Robinson Street from Lincoln Way East
to Randolph Street and Calvert Street, Deferred.
Pavement on Sunnyside Avenue from E. Washington Avenue to La Salle
Avenue. Deferred.
Chapin Street pavement from Prairie Avenue to Rum Village. Deferred.
Pavement on.Harriet Street from Jefferson Blvd. to Wash. Ave.
deferred,
Pavement on Marietta Street from Broadway and Indiana Avenue to
IDefeered.
Pavement on Tonti Avenue from Lafayette St. to Iroquois St.
Deferred.
The following petitions for improvements were approved by the Board
and resolutions ordered.
Pavement on Miner Street including intersection at St. Peter St.
from St. Peter Street to Notre Dame Av
Sewer on St. Peter Street from Cedar Street to Miner Street.
Pavement on Yukon Street from Portage Avenue to Riverside Drive.
Resurfacing of Hudson Avenue from Riverside Drive to Portage Ave.
Pavement on Ohio Street from Carroll Street.to High Street.
Pavement on East Wayne Street from St. Louis Blvd. to Eddy Street.
Pavement on Sadie Street from Washington Avenue to Linden Avenue.
Pipe sewer on Burns Street from South Bend Avenue to City Limits.
Grade, curb and walk on Turnock Street from South Bend Avenue to
Corby Street.
Sidewalk and curb on north side'of Kinyon Street from the end of
sidewalk east of Portage Avenue to Blaine Averve.
Grade, curb and walk on North Johnson Street from the north line of
Mayor's Michigan Avenue Addition to Elwood Avenue on the west side of street and from
Humboldt Street to Elwood Avenue on east sideof street.
Grade, curb and walk on Elwood Avenue from Wilber Street to
O'Brien Street.
Pavement on St. Peter Street from Cedar Street to Wayne Street.
asphalt or some other suitable material and narrow the street.to thirty four feet
from curb to .curb or two deet on each side.
Pavment on Randolph Street from Leer Street to Kline Street.
Attested:
G�
r
Clerk of the Board.
Presi en#►�