Loading...
HomeMy WebLinkAbout6C (5)( C C�-) pUTH Community & Economic Development 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission From: David Relos, Economic Development Planner Subject: Professional Services Agreement — ADG Bosch site study Date: December 13, 2011 The attached summary from Architecture Design Group (ADG) is for work done to study the existing Bosch buildings and real estate. This work was requested because of a possible reuse of the building by an interested party. The Commission previously approved $5,000 for ADG to initially study the Bosch property. As talks continued with the interested party, ADG spent much time with department staff, Cressy Everett, Bosch personnel, and the interested party to determine the feasibility of a possible move. The time frame for which this work needed to be done was short, to meet deadlines for a decision to be made, which is still ongoing. The work completed by ADG helps the department understand the Bosch's buildings possibilities, and will be of value under any scenario. Staff requests approval of ADG's Summary of Completed Architectural Services in the amount of $23,825.60, for the vast amount of time spent and drawings completed on this one of a kind building and property. What We Do Today Makes A Difference! ARCHITECTURE: DESIGN GROUP November 30, 2011 Donald E. Inks Director City of South Bend Community and Economic Development 227 West Jefferson Boulevard, Suite 1200S South Bend, IN 46601 -1830 RE: RELOCATION PROJECT BOSCH SITE 401 North Bendix Drive, South Bend SUMMARY OF COMPLETED ARCHITECTURAL SERVICES Dear Don: This letter summarizes the architectural services completed by Architecture Design Group, Inc. (ADG) on behalf of the City of South Bend (Owner) for a Relocation Prospect to the BOSCH Site located at 401 North Bendix Drive, South Bend. UNDERSTANDING OF SERVICES PROVIDED On behalf of the City of South Bend, ADG worked with representatives of the Relocation Prospect to determine the potential for their relocation to the BOSCH Site. ADG was asked to provide conceptual design laL and projected construction cost analysis for the following components: 1. Demolition — Selective removal of interior partitions and all related items, and exterior demolition of the brick masonry Honeywell utility buildings. 2. Building Addition(s) — New pre- engineered metal building with 28'high eave, 200'x400' option and 200'x200' option. 3. Site Development — New paved roadway, truck yards with recessed dock parking, lighting, landscaping, storm drainage. 4. Truck Docks — New docks with overhead doors, dock seals, and dock levelers; Eleven (11) total. 5. Northwest Truck Entrance — New 30' wide entry apron off of Bendix Drive. ADG services began on October 19, 2011 (initial meeting) and were completed on November 23, 2011. ADG SUMMARY OF COMPLETED SERVICES 1. Met with designated City of South Bend and Relocation Prospect's representatives; Initial meeting at BOSCH, October 19, 2011; Reviewed the specific objectives, schedule and budget limitations to ascertain the requirements of the Proposed Relocation Project and the suitability of the existing BOSCH building /site. 922 E. Wayne Street. South Bend, IN 46617 tel 574.288.6626 fax 574.288.6624 Relocation Project Summary of Completed Services Page 2 2. Met with BOSCH facility representatives; October 19 -21, 2011; Discussed the use of existing BOSCH "As- Built "site and building documentation; Coordinated schedule for future on -site visits. 3. Prepared drawing documentation; Prepared computer - generated building floor plans and site plans of the existing conditions; coordinated site plan information from City GIS files. 4. Toured Relocation Prospect's facility; October 25, 2011, November 16, 2011; Met at Prospect's current location with facility representatives to observe their current operations, and discuss layout and planning ideas for the BOSCH site. 5. Toured BOSCH facility; November 3, 9, 10, 11, 2011; Met at Bendix Drive location with BOSCH and Relocation Prospect's facility representatives; met with cost estimating consultants to review scope of proposed work; tours included both BOSCH buildings. 6. Prepared conceptual floor plans and site plans; Prepared four (4) floor plan concepts, Plan —A, Plan -B, Plan -C.1, Plan -C.2 and two (2) site plan concepts. 7. Prepared cost estimating submittal; Included site plans, floor plans, interior and exterior photographs, and outline information for estimating the prescribed components (see Understanding of Services Provided). 8. Prepared Projected Construction Cost Summary; Prepared four (4) summaries based on the four (4) planning approaches. 9. Met with Relocation Prospect's representatives; Meetings at ADG offices on November 10, 14, l7, 2011. 10. Prepared presentation exhibits for Relocation Prospect; Prepared drawing exhibits mounted on foam core for planning meetings (all documents were copied to the City of South Bend). 11. Met with City of South Bend and Grubb & Ellis representatives; Meetings at City Economic Development offices on November 14, 15, 2011. BASIS OF COMPENSATION ADG totaled 216 hours of billable time towards the services completed; the following hourly rates for our services were applied: Principal Architect $135/Hour Project Architect $115 /Hour Engineer $1 15 /Hour Cost Estimating Consultant $1 l5 /Hour CADD Technician $ 90 /Hour Clerical $ 45 /Hour TOTAL = $23,500.00 Relocation Project Summary of Completed Services Page 3 REIMBURSABLE EXPENSES Expenses incurred by ADG and our consultants in the interest of the Project included in -house prints, plotted reproductions, and mounted foam -core board exhibits. TOTAL = $325.60 Please contact me should you have any questions. Respectfully submitted, ARCHITECTURE DESIGN GROUP, INC. kVt1 I t* F, LT W-' William R. Lamie RA, AIA Principal