Loading...
HomeMy WebLinkAbout6C (4)& To Redevelopment Commission From Geri Hathaway, Ignition Park Director Subject Ignition Park - Circle Building Concept Design Date December 13, 2011 The central focal point of Ignition Park's Master Plan is a circle with basin for storm water retention, gathering green space with solar trees, wind spire that defines the hub of the park and a building or buildings that enhance the most significant location within the Park. Definition of design requirements for these structures is imperative if we are to control the look of the most important and visible elements within the Park. It is prudent that we initiate the definition of these structures at this time in order to be prepared to respond to the tenants Ignition Park will attract. Otherwise, haste under pressure will drive us to an unintended solution with a facility that is less than it can be and a lost opportunity for Ignition Park. We have an obligation to this community to be better stewards. Economic Development asks for your approval of BSA LifeStructures proposal for the definition of this building(s) concept design in the amount of $45,000 including reimbursables. 06 December 2011 Geri Hathaway c/o Innovation Park at Notre Dame 1400 E. Angela Blvd. South Bend, IN 46697 Re: Ignition Park - Accelerator Building Visioning and Imagery Development South Bend, IN Dear Geri: It is a pleasure for BSA LifeStructures to submit a proposal to lead a visioning and building imagery development process for the Accelerator building in Ignition Park. The goal of this process will be to explore the potential uses for the building, site options for the building and aesthetic options for the building. The desired outcome of this process is an understanding of the scope of the building and an idea of the imagery that can be utilized to support further development of the project. Further stated, this Visioning process is now more paramount than ever given the following: • the north access point into the Park is in alignment with the pond on the north side of the center circle, placing this potential building in a location of greater presence • this building, by its nature and location, could likely end up being the most dynamic and expressive building in the park; an icon • if and when data centers become a marketing component of the parks business plan, this building will help to lure potential data center clients because of the way it will elevate, but complement the design of the existing data center • due to the low cost development options for data center tenants, having this building designed and in the cue would put pressure on these tenants and developers to live up to a higher standard of design • it shows a commitment by the City to the aesthetic direction of the Park • it shows a commitment from the City to the Park which is key to local small businesses and graduate business who want a stable environment in which to grow • this design exercise will offer the City an advantage over other technology park venues when competing for clients and tenants Geri Hathaway 06 December 2011 Page 2 of 3 For this process, BSA LifeStructures would propose the following fee: Visioning and Imagery Development $ 40,000 Reimbursable Allowance (travel and other standard reimbursables)* 5,000 Total fee (maximum) $45,000 *Reimbursables will be billed as part of the base fee up to the $5, 000 maximum. The schedule for this project has yet to be determined, but should align with the development of the remainder of the site. The goal would be to complete this process prior to the end of Ql, 2012. If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require approval of the proposal in order to begin work. We would like to thank you for th opportunity to assist your organization in igniting life sciences growth in downtown South Bend and look forward to working with you in the future. Thanks again. Sincerely, CO— Chris W. Lake, AIA, LEED AP Principal -in- Charge Geri Hathaway 06 December 2011 Page 3 of 3 PROJECT AUTHORIZATION: Ignition Park — Accelerator Building Visioning and Imagery Development Contract Amount: $45,000 (Lump Sum for Visioning and Imagery Development Services) Client's Authorizing Signature: Signature Name (Printed) Organization /Company Date