Loading...
HomeMy WebLinkAbout09/13/1922 Board of Public Works Minutes436., Wednesday September 13th.m 1922. Board meth in regular session at 7:19 P.M. all members Present. Hearing -had on resolution for the paving of alley Bast of St. Peter Street from Jefferson Blvd. to alley north of Jefferson Boulevard, under Improvement Resolution No. 1046. In the City of South Bend, Indiana. Upon said hearing Atty.,John Yeagley appeared and objected to improvement, representing Mr. J. 011ier and Attorney Barry Scanlon appeared for said improvement. Written remonstran ce filed was over -ruled by the $oard and being fully advised in the premises,.decides that the benefits to property liable to be assessed for said improvement°are equal to the estimated cost of the same, as reported by the City Civil Engineer ,,and thereupon -takes final action on said resolution as originally adopted, and the same is hereby in all things ratified, confirmed and approved. Resolved further, that notides be published on the 14t,h. day of September 1922 and on the 31st.0 day of September 1922 in the South Bend Tribune and News Times, mewspapera of general circulation in said City, stating that► this Board -will Deceive bids far the construction of said improvement up until September 29th., 192 . The Board reserves the right to reject any and all bids. Hearing had on resolution for Pavement on alley west of Lafayette Street from Maation Street to Madison Street, under Improvement Resolution No, 1056. In the City of South Barld, Indiana. Upon sadd-hearing no remwnstrators appeared and no written remon- strance was filed. The Board being fully advised in the promises, decides that the benefits to property liable to be assessed for said -improvement are equal to the estimated cost of the saute, as reported by the City Engineer, and there- upon takes final action on said resolution as originally adopted and the same are hereby in all things, ratified, confirmed and approved.`: Resolved further, that notibes be published on the loth, day of September 1922 and on the 21st., day of September 1922. in the South Bend Tribune and News Times, neilspapers of genral circulation in said.City, stating that this Board will getceive bids for the construction of said improvement up to 10:00 A.M Tuesday September 29th., 1922. The Board reserves the right to reject any and al all bids. Deferred hearing had on Vacation Resolution No. 63 for the Vacatin of alley lying between lets 183 and 184 in the Original Plat of South Bend, Indiana from Main Streette the first alley east of Main Street. Property owners abutting on said alley appeared and objected to vacation of this alley, the Board decided to defer all action on said alley until Wednesday September 20th., 1922 at 7:15 P.M. Deferred hearing had on Vacation Resolution No. 62 for the v40atin of Grace Street Ford Street and alleys East of Arnold Street, in the City of Souk South Bend, Indiana. The property owners appeared and hearing deferred until Wednesday September 27th., 1922 at 7:15 P.M. Heaaring had on assessment roll for grade, curb and walk on Robinson Street from Lincoln Way East to Ewing Avenue under Improvement Resolutia No. 926. In the City of South Bead, Indiana. In the above matter no remonstrators appeared and no written rema monstrance was filed. The Board therefore find that the 9seepesty assesseAnix assessment roll filed August 23rd., 1922 kh benefited in the amqunts of assess- etents us shORW ®a assessment roll and the Board further find that the assessment roil filed August 23rd., 1922 and the final estimate allowed August 23rd., 1922 should be and the same are hereby in all things, ratified, confirmed and approved. 43T Hearin had on assessment roll and final estimate for pavement ®n College Street from Line Way West, to Vassar Avenue under Improvement, Resolution No. 958. In the City of South Bend, 'Indiana. Upon said hearing no remonstrators appeared and no written remonstrance was filed. The Board therefore find that the property assessed in ,said roll filed August 23rd., 1922 is benefitted in the amount, of assessments as shown on said assess- ment roll, and the Board. ,further find that the assessment roll filed August 23rd.9 1922 and the final estimate allowed August, 23rd., 1922 should be and the same are hereby in all things ratified, confirmed and approved. Hearing had on assessment roll and final estimato for pipe;sewor on Marietta Street from Indiana Avenue to Dubail Avenue, under Improvement Resolution No. 978. In the City of South Bend, Indiana. Upon said hearing no written remonstrance was filed and no remonstra- tors appeared. The Board therefore find that the -property assessed in said roll filed August 9th., 1922 is benefitted in the amount of assessments as shown on said assessment roll and the Board further finds that the assessment roll filed August 9th.9.1922 a d the final estimatod allowed August 9th.9 1922 should be and the same are hereby in all things, ratifiedm conf-irmed and approved. , Deferred hearing had on assessment roll and final estimate for mde, curb and walk on Indiana Avenue from Walnut Streit to Olive Street, under provement Resolution No. In the above matter the Board deferred said hearing until 'Wednesday September 26th.9 1922 at 7:15 P.M. Prgperty owners residing on Harper Court appeared before the Board in regard to pavement resolution adopted August 2nd.9 1922, and stated that they were unable to obtain asnough, signatures for waiver and requestod that resoluieon be advertised. Board resolved that notice be published on the 16th. day of September 1922 and on the 23rd. day of September 1922 in the South Bend News Times and Tribuno, newspapers of general circulation in said City, stating that this Board will give a hear on said resolution in thd.ae office in the City Hall on the 4th'. day of October 1922 at 7:15 P.M. Contracts were awarddd as followss- Water connections on Marine Street from,Indiana Avenue to Ca-tvert, Street to Philip Cohn at.........,.......;... 475.00 Pipe sewer. on Calvert and Kendall Street from Chpain Street to Ewing Avenue to Geo.-A. Harrep at..........'r..S6,809.00 , BidihOre received for pipe sewer on'Ber`trand Street from Olive Street, to Johnson Street were ever estimate of City Engineer, and the Board resolved that these bids be rejected and bids for the pipe sewer on Bertrand Street, from Olive Street to John Street,;also Campau Street*From, alley east of Walsh Street to east end of.Campau Street be published on the 15th. day of September 1922 and on the 22nd. day of September 1922 izi the South Bend Tribute and News, Tinos, stating that this Beard will receive bids for the construction of said improvement up to 10:00 A.M. Tuesday October 3rd., 1922. Thi Board reserves the right to reejeet any and all bids, Conearning the imprevemont► +of the ro4dway of I yr on-�i Street 'front iie`St,reet 't® =Leer Street, under Improvement -Resolution No. •1021 witht., asphaltic concrete_, bitulithic, concrete or brick, thlsNbaing= 4, ddate ` sbt far-" =� the making of the preliminary order designating the kind of pavement, the Board at 10:00 A.M. TUesday September 2?th., 1922 publicly opened, read and considered all bids and continued this meeting until Wednesday September 13th.9 1922 at 7:15 PiM. Now on last named date the Board designated Concrete as the kind of pavement with which said street is to be improved and fixes the 26th. dim of Sept,.,, 1922 as the -time when petitions for changing the kind of pavmenet must be ..filed,, -and the Board hereby continues this matter until the 27th. day of September 1922 at IM100 P.M A.M. .on the above named day the Board will either pass on petitions let said contract or reject all bids. BOARD OF PUBLIC WORKS. A B. SLAUGHTER ALBERT F. HONER. Attested: - Veronica C. Sweeney Clerk of the Board, Dated this 29th. day of Sept.s 1922. &dada y September l t%�_22.Co . Petition filed fhr the paring of alley west of William Street from Wayne Street -to ist;° :�ile�r hr'` e,reet. Resolution ordered. The following 0O mtunication read and approved. received from City Engineer, > September 1.R,1922. Board of Public Works, South Bend, Ind, Gwntlemex:- I herewith recommend IA&t they money still due Harry D. Barnes on the contract for grade, curb and walk on Huey Street, and held by the Comptroller —at the.,order of the Board of Public Works, be paid to Mr. Barnes, This money was withheld to corar the cash, of imperfections in the grading whick have since been corrected. APPROVED Yours very truly, 'SEPT. 1391922. FREDERICK'J., ANDERSON BOARD OF PUBLIC WORKS. City Engineer, BY L. B. SLAUGHTER President. The following claims were -approved by the Board. Payroll 8 signed. Salaries Dept., $62 50 iAe lano6us Dept., Myscellane®us - 40.pp 12.55 City Hall 130.00, ' 130.00, Building Dept., W. A. Slick i,810.92 W: A. Slick 52i.60 W A. Henry 30.00 ° Edmund La Fortune 95.00 Ind. & Mich. Eloe. Co. 69176.66 Jacobson -Peterson Pel to & Kaufer 3.60 F. C. Reimmold Co. 16.90 W. H. Burke G. E. Moyer & Sea 4.64 G, E. Moyer & Sea 1,31 C. F. Pease Co. 6.66 Wm. Cleghora ,.>......>. >8.10 W. H. Burke 76,08. The Tuttle Corporation 2.00 Utility Breen Co. 8.09 United States .Tire Co. 1.19 Indiana Bell Tel. Co. 3.50 J. C. Barrett 1.75 Schuyler Rose 19.34 • • Avenue Shoeing Shop 1.50 S%AM Bend Tribune 90.89> D. A..Rowe 1.75 C, F. Pease Co. 43,10 > Hagedern & Webster 12.65 F. ,C. Reimold Co. 20 3.20 Thomas Rubber Ce, 1. 439' r . ci%44zda Se p1,e > r .13 �h . , �.�'�iaua . GUARANTEE BOND KNQW ALL MEN BY 'THESE PRESENT' that _____ " ,. Y�I►C. Wei--COAs�,�u��i��-C�i��e►___ -------------------- - ---- --- - ----- as principal and ------- ---------`--- ., - - '---------- ----= --. -- --- °----- r � l�l Ca � � C� :• as sureties are held :and firmly bound to the City of South Bend,. Indiana in' -the sum .of -- _____ =_ ----__ _ io ow w _ tour _ i��'ed s e_ve x1►_y-_s_ix_ D o l la rs_ a »I_ F iPby Amur AR5 for the payment of,'which, well and truly .to be made, they bind themselves, their -heirs, executors, administrators and assigns by these -presents, The conditions of the above obligation are such that, whereas the above bound ______ _________ r ------------- h- `- s. - has completed the work under the contract for the construction of _____________ _________________ ----------------- ViF Tea4v lloo Vassar Avesue , ----------- ---------------------------------------------------- ------------------------------•------------------------------=-------=-=----------- under Improvement Resolution No.-__95_ 0_________ adopted by the Board of Public Works of :said City on the --- day of ----------- _____and whereas, the contractor, principal herein, warrants his workmanship•and all materials .used in the work and agrees that during the guarantee period specified:he will at his own expense make all repairs which may become necessary by reason of improper workmanship =or defective materials. .Such maintenance, however; shall not include any damage to the pavement or to the foundation there- of or to any of the other items of work embraced by this contract resulting from any forces or circuinstances be .yond the control of the contractor, nor is it intended that the contractor shall, become a guarantor of the plans 'and specifications furnished by the city. In case such repairs become necessary the city shall give written notice to the contractor to make the; same, and in case of failure of the contractor to commence such repairs within thirty (30) days after such notice is re- ceived,.the city may make such repairs either by its own employes or by independent contract, and may thereupon recove#"from the contractor and his sureties the reasonable cost of the repairs so made, together with the, cost of the supervision and inspection thereof. The city shall have sixty (60) days after the expiration of said guarantee period. in which to notify the contractor of any such repairs necessary on the date of such expiration. Wheifever (in the case of pavement) the repairs necessary to be made at the expiration of the guarantee period shall amount to more than fifiy per cent. (50%) of the surface of any one block, the entire pavement of that block shall be taken tip and relaid in accordance with the original specifications. Now if the above bound_________hi1e--C-3sS-C-®m�S�jt--Of'_]>��_fi�E� shall for a period of 3__________years from date, maintain such r`W*s4-Ve-V&sftvL-A4e-?sue-* ------------------ and during such time make all repairs, as provided by the foregoing guarantee that may be necessary from any rotting, crumbling or disintegration of materials, or which are made necessary by any imperfection in workman- ship, and shall strictly observe and abide by sections ------ 4-0 ----------- to ------- ----------- inclusive, of the General Specifications, hereto attached and. adopted by the Board of Public Works of said City and shall fulfill all the conditions and stipulations relative to maintainance, therein contained, this obligation shall be void, otherwise to remain in full force and effect. The principal and sureties herein, each for themselves hereby represent that they have examined the plans and specifications furnished by said City for said improvement, and they each hereby waive any and all claims that they now or hereafter may have that any repairs necessary during the guarantee period are due to defects or in- suffiicient requirements in said plans or specifications, anything in said contract or the foregoing guarantee to the contrary notwithstanding. ` Witness out hand and seals this___8"___day PRINCIPAL ________-------- _C TSEICT10-JaSh M. E. W$ITE Pros . & Treas.. APPR OM SURETY--- --------- - - ----------C=--M------- --- ;.M�RYLA$ND ClA�Sie U�AIL]T�Y SEY.. 13 91�2 SURETY--- - :-IM-M------------ BOARD3,�� � _ Oi�CPUBLIC A{�WOR R------ _-_ ,5BY L. B. PUGH ER ,