HomeMy WebLinkAboutAmendment to PSA - EPOCH Architecture - VPA Restroom Remodel Design Services5 PIJONil 574/235-9251
1316 COUNTY-Cri Y BUILDING $
227 W. hFFERSON BOULEVARD FAX 574/ 235-9171
Sol � 111 RFNI)I NDIANA 46601-1830
CITY OF Sourii BEND PE'rL BurncIEG, MAYOR
BOARD OF PUBLIC WORKS
August 28, 2018
Kyle Copelin
EPOCH Architecture
300 W Jefferson Blvd, #200
South Bend, fN 46601
RE: Amendment to Professional Services Agreement
Dear Mr. Copelin:
The Board of Public Works, at its meeting held on August 28, 2018, approved the above
referenced amendment for Venues, Parks, and Arts restroom remodeling design services in
the amount of $16,750 for a new total of $62,200.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 23,5-
9251.
Sincerely,
tA 14 *1 � I
1,inda M. Mai -tin, Clerk 11�
Enclosure
GARY A. Ga,oj- SUZANNA M. FRITZBER(i Ei,1ZABF i-j i A. MARAINK JAW's A. MUIL,,LLER THERESE'J. DORAU
This is EXHIBIT K, consisting of 2 pages, referred to in
and part of the Agreement between Owner and Engineer
for Professional Services dated May 8, 2018.
AMENDMENT TO OWNE, R-F NGINEI ER AGREEMENT
Amendment No. 1_
I . Background Data:
a. Effective Date of Owner -Engineer Agreement: May 8, 2018
b. Owner; Board of Public Works, City of South Bend
G. Engineer; Epoch Architecture + Planning
& project; Park Restrooms
2. Description of Modifications:
a. Engineer shall perform or furnish the following Additional Services;
1) Evaluate existing electrical facilities at each park restroom being renovated for the
addition of electrical hand dryers. Select appropriate products and produce
construction documents for the band dryer installations. Where existing electrical
panels are not able to be modified, either the panel will be noted to be replaced or an
extension panel will be added next to the panel to hold the new breakers for the
hand dryers, The installation of hand dryers relates to accessibility by eliminating
the need for loose trash cans in the restroom which could block access to fixtures or
the door of the restroom. The change will also reduce the maintenance staff time to
service the restrooms.
2) Design and produce construction documents for site accessibility improvements at
six (6) additional sites found to be out of compliance with ADA requirements:
Those parks are Potawatomi, Boelhln, Boland, Southeast Neighborhood, Rum
Village and Leeper Parks.
3) All items listed above will be incorporated into the project drawings that have been
developed under the original agreement and bid at the same time.
b. The schedule for rendering services is modified as follows; Additional one month will.
be added to the originally agreed upon schedule for Construction Documents and
approximately one month will be added to the expected construction period requiring
Architect observation.
Page I
(Exhibit IC— (Antendnient to Otwner-Ekigineer Agreentenl)— Attachment 1)
EJC➢C E-500 Agreement Betwecn Owner and Engin"r forProfessional Services,
Copydght O 2008 National Society of Yrofessionl Engineers for 1+:,1C1DC. All rights reserved.
c, For the Additional Services or the modifications to set -vices set forth above, Owner shall
I)ay Engineer the following additional or modified compensation: See Itern, 3 below.
3. Agreement Summary (Reference only)
a. Orighial Agreement amount:
b , Net change for prior amendments
c, This aniendtlient amount:
d. Adjusted Agreement al1101.1t1t:
$ 45 450M
$ 0.00
$ 62,200.00
The foregoing Agreement Summary is for reference only and does not alter the terns of the Agreement,
including those set forth in Exhibit C.
Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this
Amendment. All provisions of the Agreement not modified by this or previous Ainendryients remain in
effect, The Effective Date of this Amendment is ALIgUst 28"', 2018.
OWNE- ENGINEER:
.y
By: Aaron Perri By: KyleCo RA LRED-AP
Title: Executive Director SBVPA
() ae
Date Signed: z I_
A U 6
. ........
Title: Principal
Date Signed: 8/28/2018
Page I
(CONW—(Amendoxent to
FJCDC E-500 Agreement Betiveca Older and E ngincer for Professional Set -vices.
Copyright C) 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date August 20, 2018
Department Public Works
Name Scott Kreeger Division/Bureau Engineering
®
Agreement Amendment
❑ Contract ❑ Proposal U Addendum
❑
Professional Services
❑
Resolution
❑ Bid Opening
❑
Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
❑ Quote Award
❑ Change Order No.
❑ CIO & PCA No. ❑ PCA
❑
Ease/Encroach.
❑ Traffic Control:
I-1
Other:
Company or Vendor Name
New Vendor
MBEANBE Contractor
MBEIWBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
EPOCH
E] Yes ® No ❑ If Yes, Approved by
Purchasing
❑ MBE ❑ WBE
❑ No ❑ Yes Name of Company
VPA Restroom Remodeling
118-043
471-1138-452.42-01
Parks Bond 1
$16,750.00
Lump Sum for design services;
Evaluate existing electrical units at each park restroom for
possible renovation. Design specifications for hand dryers and
site accessibility improvements.
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %
Dispersal After Armroval
Copy Original
®
❑
Scott Kreeger, Project Engineer
®
❑
Kara Boyles, City Engineer, PE
®
❑
Patrick Sherman, VPA Project Manager