HomeMy WebLinkAbout06/30/1922 Board of Public Works Minutes246
a
th., 1922.
Board met in regular session at 10:00 A.M. All emmbers present.
Bids were received -on the following improvements.
Pavement on.Hine Street .
Bid of Hoban& Roach. '
Grading per cu. yd. ,
7 inc:i concrete pavement per sq. yd.
8 incb. conduit pipe per lin ft.
Storm water inlets, each
Resetting inlets, each
Resetting manhole covers and curbs per each
Check 100.00
Bid of Williston Construction Company
Curb per lin ft.
Grading per cu. yd.
Asphalt using Mexican Asphalt pr sq. yd.
-'-Asphalt
using Trinidad asphalt per dq. yd.
Lampholes reset each
Concrete.pavement per sq. yd.
Asphaltic cone. using Mexican per sq. yd.
Asphalt cinc. usng Trinidad per sq. yd.
8 inch conduit pipe per lin ft.
Storm water inlets, each
Marginal curb per lin ft.
Resetting inlets, each
Resetting manhole covers and curbs each
Check 100.00
Bid of White Construction Company,
walk per sq. ft.
curb per lin ft.
Grading per cu, d.
Sheet asphalt Triinidad er sq. yd.
Sheet asphalt Mexican per sq. yd.
For Lampholes each
Manholes curbs P, dcovers, each
Asphaltic concrete Mexican per sq.-ya.
asphaltic concrete Trinidad per sq. yd.
8 inch conduit pipe perlin ft.
Storm water inlets, each
Marginal curb per lin ft.
Resetting inlets, each
BOWMAN STREETPAVEIVEENT.
Bid of Williston Construction Company.
Cement curb per lin ft.
Grading per cu. yd.
Asphalt pavement Mexican per sq. yd
As halt. pavement Trinidad per sq. yA.
Maholes per ft.
Asphalt concrete Mexican per sq. yd.
Asphaltic concrete Trinidad per sq. yd.
8 inch conduit pipe per lin ft.
Manholes tops and covers, each
Storm water inlets, each
Marginal curb Aer lin ft.
Resetting inlets, each
Resetting manhole covers, each
Check $100.00
Bid of Bowman street pavement
Bid of the White Constuction Company.
walk per sq. ft.
curb per lin ft.
Grading per cu. yd.
Sheet asphalt Trinidad per sq. yd.
Sheet asphalt Mexican per sq. vd.
Concrete pavement
Lin. feet of manholes per lin ft.
Manholes curbsna, covers, each
Asphaltic ocncrete Mexican per sq. yd.
Asphaltic concrete Trinidad per sq. yd.
Storm we tmr inlets, each
8 inch conduit pipe per lin ft.
Marginal curb per lin ft.
Resetting inlets, each
Resetting manhole covers and curbs pereach
$1.15
2035
10:,00
3.00
3.00
.6o
2. 0 .
3.07.
10.00
2.10
2.45
2.65
14.?0
.40
3.00
.20
.50
.T0
5
2.85
15.00
18.00
2.50
2.70
1.00
12.50
.40
3.00
.60
1.10
233. �44q
10.50.
2.49
2.9?
19.00
14.50
.40
3.00
3.00
.20
.50
.95
3.10
2.85
10.00
18.00
2.50
2.70
12.50
1.00 .:
.40
.00 3
tinued.
Pa vement on Main Street.
Bid of Williston Construction Companyo
walk per.sq. ft.
curb' per lin ft. .
° Grac ing per cu. yd.
Asphalt panment' using Mexican pper sq. yd.
Asphalt pavement using Trinidad per sq. yd.
Manholes per ft.
Manholes tops end covers, each
Asphaltic concrete Mexican per sq. yd..
Asphaltic concrete Trini"d Davement per sq. yd.
8 inch conduit pipe per lin ft.
Storm water unlets, each
Marginal curb per lin ft.
Resetting inlets, each
Resetting manhole covers, each
Check
Bid of The White Construction Co.
walk per sq. ft.
to be reported
curb per lin ft.
Grading per cu. yd.
Sheet asphalt Yrinidad per . sq. yd.
aheet.asphalt '°-exican per sq. yd.
Lin. feet of manholes per lin ft.
Manhols curbs and covers, each
Asphaltic concrete Mexican per sq. yd.
Asphaltic concrete Trinidad per•sq. yd. °
8 inch conduit'pipe per lin ft.
Storm water inlets, each
Marginal curb per lin ft.
Resetting inlets, each
Resetting manhole ;covers, each
All -of -the above bids were referred to the
on Wednesday .July 5th., 1922 at 9:00 A.M.
060
3.070
10.50
18.400
2. 7
.95.
14.50
..40
3.00
3.00 ^
.20
.50
.95
3.10
2.85
10.00
18.00
2.50
2.70
1.00
12.50
.40.
.00
3.00
City Engineer for tab _uation
D C. La ton, Street Commission r re uPsted permission to purchase
Ford. Runabout for the ftreet Department at Price of480.00 Same granted by the Board.
Engineers filed esttmated costs of improcerlents as foilowings:
Estimted cost of Widening and avina of La Salle .Avenue from
St. Joseph River to Vilest line of Main Street at.........15,292.00
Estimated cost of Pavement on East Madison Street from
-Eddy S r et to E. Line of Judie's Addition at.....&*$24,234.,00
Estimated cost, of pavementon alley Dying between Riverside
Drive -and Woodward Avenue from Golden Avenue to Vassar Avenue at .... $2,g09.00
Pole and Wire inspector reports it not.necessary to place
light at corner of Anthony Street and Ford Stte6t. petition 'filed.
Petition filed for concrete pavement on the first alley
west of Lafayette Street from Marion Street to I dison Street. Resalution ordered.
Remonstrance filed �gainst grade, curb and walk on Randolph
Street from Marine Street to Leer Street. Same filed.
Estimated cost of Grade, curb and walk on Fourth Street from
Mishawaka Ave7mue to the first-alleu south of Vine Street at ..... $4,093.00
Claims were approved'as follows: -
Building Dept., p475.00
Engineering Dept., 843.32
Geo. A. Davis 30.00
F. J. Anderson 60.00
s
Preside of Board.