Loading...
HomeMy WebLinkAbout11-03-2011 Design Hearing Presentation of Northside Trail Construction 11/3/2011 rM . Carl Litteetl,P.E.-City of South Bend NorthsideTruilExtension . PirWeJExplanation of Public Hearing Slurried-Use I"ath Construction . Public Hearing Format Wedneolikv,November 2,2011 . Visit our sign-in table . Submitting public comments for hearings transcript pan.Presentution . Project display area Nuner Primary Center in South flend LFAVAVA LFA��'Ii • Sign in at attendance table to be added to project . Introduction of INDOT Project Officials mailing list .LaPorte fustria • A public hearing notice was mailed to known . Public Involvement property owners within project area . Design&Environmental • Legal notice of public hearing published in South . Lawson-Fisher Associates P.C. Bend Tribune on 10/15&10122 . City of South Bend . Miohiama Area Council of Governments(MACOG) . Recognition of Elected Public Officials a LFAVATA LFATATA • City of South Bead • Indiana Department of Transportation • Indiana Division Federal Highways Administration d0 C • Miehianu Area Council of Governments(MACOG) • Local communities(Mishawaka,St.Joseph County, s% others) • Elected Public Officials • Community residents and citizens • Commuters LFARO6 1 11/3/2011 . Development of document begins once puep�se and . Requirement of the National Environmental Policy need for the project has been clearly identified Act(NEPA) . Develop a number of possible alternatives including a • Requires South Bend to analyze and evaluate the "Do Nothing"alternative as a baseline for impacts of a proposed project to the natural and comparison socio-economic,environments , Screen alternatives to identify a preferred alternative • Impacts are described in environmental document . Solicit ppublic comment on environmental document . Environmental document was released for public and pro irninary design plan involvement September 2011 . Solicit,address,and fully consider public comments as part of decision making process LFAOTA LFATATA 1 . City of South Bend Engineering Department • Relocations 227 West Jefferson Boulevard • Community Impacs Air Qualit 1316 County-City Bulling • Wedandsaud Watemays South Bend,Indiana 46601 •• Noise Phone:(574)235-4251 • Ftoodplains . Lawson-Fisher Associates P.C. Farmland Threatened and Endangered Species 525 West Washington Avenue . Hazardous Materials South Bend,Indiana 46601 Histod/Archaeological Phone:(574)234-3167 LFATATA LFATATA • Project begins near 210 Street/Notthside Boulevard F. T .1 G T-intersection Fi �f i • Extends to east ending at Northside Boulevard/Logan ¢ M - - Street intersection(City Limits) 1111 � LFATATA LFATATA 2 11/3/2011 Elm • Connection between.South Bend's trail network acid . South.Bend 20-pear planning document—City Plans Mishawaka's trail system . Expressed desire for altema6ve forms of • Incorporate traffic calming measures along Nordiside transportation • Lack of alternative transportation routes . Additional recreational opportunities d4. AR9*, LFAVAVA LFAQ+SPA I � • Neighborhood Planning Meeting March 24,2010 Construction of concrete shared-use path . Two path alignments;participaniquestimmaire . 10 feet wide—21n to Ironwood(south side) • Focus Group Meeting August 19,2010 . 8 feet wide Ironwood to project terminus . home details • Focus Group Meeting October 27,2010 . Four alwmatives,alternative matrix,questionnaire • Preferred alternative selected November,2010 . City of South Bend websim am ommement LFATITI LFATITA . Roadway Closures . 4therproject Features • 26w Street to 27' Street and 36o Street to Logan . Project constructed within existing roadway R-W • Avoids physically impacting WPA Stone Wall . StormSewer(Noruside Boulevard—27ir Street to 350 . Northside Boulevard Reahgoment Street;new curb on south side) • 2 8-foot wide pavement section,path offset,driveways . Decorative Lighting • 290 Street to 32"Street et LFATITI LFATSTL 3 11/3/2011 ramnxr cx a < n wL Y (µ F n fai � u S 4ww I`I Ul- L LFAViti I � ■ . 26'"Street . Nortbside/Piemart-21l'to26' Street y LFATAVA R i } �® i L_FA•Ma LFATiTi LFATiTi . Northside Boulevard-20 to 29s'Street . Northside Boulevard—29`"to 32nd Street ZP4a I _ I A LFATAn m _ LFATpl M LFATOi q :., LFATiTi 4 11/3/2011 ILI . Northside Boulevard—32"a to 35th Street • Northside Boulevard—350n to Logan Street I s I m-- "..�+,a LAM LFArr•U LFAUTl LFATATA . Three Major Phases Advanced signage(Phase I) . Detour for Northside Boulevard—between 26r^and Logan(Phase B and III) • All phases allow,emergency vehicle,postal service. and trash service access • Residents and businesses given 3 days notice prior to access restrictions Y - LFA.TATA LFATITA . Phase I—21a Street to 261h Street(Northside and . Phase 11—26o`Street to 291h Street Pleasant) . Pathcommuctron • Path construction • Pavement removal(16",Street to 27e Street) • New curb west ofIronwood Drive . Repair ofWPA Stone Wall • New surface for Northside west oflronwood(flogger . Sm.sewer and matall construction operations) . Coordination with Nurser School for student pick-up and • Select tree removal drop-off d�yr.h` 5 !- LFATATA - LFAVATAli 5 11/3/2011 9q I . Phase IIla—291'Street to 31st Street and 36o'Street to . Phase Ulb—310 Street to 33rd Street Logan . Path construction • Pathirentuction . Storm sewer construction • Storm sewer construction . Northside Boulevard realignment and pavement • Northside Boulevard pavement removal(cast of 36P Street) replacement(31i1 Street to 32°s Street) • NorlhsideBoulevazd realignment and pavement . Coordination for handicapped parking at 3120 replaeement(2ch to 31°x) Nortbside Boulevard LFATATA LFATATA }IQP�I�SI�I!!RlII�'�ill�R�l� . Phase Me—33rd Sheet to 36o`Street River Park Historic District and WPA Stone Wall • Path construction . Finding of Adverse Effect • Storm sewer construction . Memorandum of Agreement(MOA) • Entered between FHWA,Indiana SHFO,INDOT and South Bead • Interpretive Signage • Inficem iional Brochure • Project Letting—January 2012 . Concrete Path $225200 • Construction—Spring 2012 . Storm Sewer $267,900 • Completion—Summer 2012 Lighting $167,600 . Traffic Maintenance ........_._......_.._ $131 000 . Total Estimated Construction Cost $1,860,000 LFATATA LFATAM 6 11/3/2011 • Construction(estimated) $1,860,000 . Talk with project team members • Right-of--W'ay $0 . Comment sheet • Engineering $148,700 . E-mail or Mail comments to South Bend or LEA • Craton rates, $185900 ejeterr(rjlawson-fishercom • Projeet'Totai $2,194,600 . Sign-in sheetto be added to project mailing list . Visit 11QDOT website at w vin goy/indot/2366.htm `Public InvolvemenP`page . All comments are very much appreciated and will be given full consideration by project team LFATATO LFATATA 1 • Submit public comments using the options descoludbelow . Publln Commant FOmt • viaeical . Please visit with project officials following the . Participating during➢ubOC commrn[neasiov cis micropbooe public comment session Verbal commenu reconed and naouxIDed for indvaion intu public hnaring,u..,ip, . Project Open House • South Bend respectfully requests comments be submitted by Monday,November 21,2011 . Project maps,displays,project officials, • All comments submitted will become part of public record, infernal Q&A entered into transcript,reviewed evaluated and given full . Thank you for your attendance this evening consideration during decision making process LFATITA LFATATAk 7