HomeMy WebLinkAbout11-03-2011 Design Hearing Presentation of Northside Trail Construction 11/3/2011
rM . Carl Litteetl,P.E.-City of South Bend
NorthsideTruilExtension . PirWeJExplanation of Public Hearing
Slurried-Use I"ath Construction . Public Hearing Format
Wedneolikv,November 2,2011 . Visit our sign-in table
. Submitting public comments for hearings transcript
pan.Presentution . Project display area
Nuner Primary Center in South flend
LFAVAVA LFA��'Ii
• Sign in at attendance table to be added to project . Introduction of INDOT Project Officials
mailing list .LaPorte fustria
• A public hearing notice was mailed to known . Public Involvement
property owners within project area . Design&Environmental
• Legal notice of public hearing published in South . Lawson-Fisher Associates P.C.
Bend Tribune on 10/15&10122 . City of South Bend
. Miohiama Area Council of Governments(MACOG)
. Recognition of Elected Public Officials
a
LFAVATA LFATATA
• City of South Bead
• Indiana Department of Transportation
• Indiana Division Federal Highways Administration d0 C
• Miehianu Area Council of Governments(MACOG)
• Local communities(Mishawaka,St.Joseph County, s%
others)
• Elected Public Officials
• Community residents and citizens
• Commuters
LFARO6
1
11/3/2011
. Development of document begins once puep�se and
. Requirement of the National Environmental Policy need for the project has been clearly identified
Act(NEPA) . Develop a number of possible alternatives including a
• Requires South Bend to analyze and evaluate the "Do Nothing"alternative as a baseline for
impacts of a proposed project to the natural and comparison
socio-economic,environments , Screen alternatives to identify a preferred alternative
• Impacts are described in environmental document
. Solicit ppublic comment on environmental document
. Environmental document was released for public and pro irninary design plan
involvement September 2011
. Solicit,address,and fully consider public comments
as part of decision making process
LFAOTA LFATATA
1
. City of South Bend Engineering Department
• Relocations 227 West Jefferson Boulevard
• Community Impacs
Air Qualit 1316 County-City Bulling
• Wedandsaud Watemays South Bend,Indiana 46601
•• Noise Phone:(574)235-4251
• Ftoodplains . Lawson-Fisher Associates P.C.
Farmland
Threatened and Endangered Species 525 West Washington Avenue
. Hazardous Materials South Bend,Indiana 46601
Histod/Archaeological Phone:(574)234-3167
LFATATA LFATATA
• Project begins near 210 Street/Notthside Boulevard
F. T .1 G
T-intersection
Fi �f i
• Extends to east ending at Northside Boulevard/Logan ¢ M - -
Street intersection(City Limits)
1111 �
LFATATA LFATATA
2
11/3/2011
Elm
• Connection between.South Bend's trail network acid . South.Bend 20-pear planning document—City Plans
Mishawaka's trail system . Expressed desire for altema6ve forms of
• Incorporate traffic calming measures along Nordiside transportation
• Lack of alternative transportation routes . Additional recreational opportunities
d4. AR9*,
LFAVAVA LFAQ+SPA
I �
• Neighborhood Planning Meeting March 24,2010 Construction of concrete shared-use path
. Two path alignments;participaniquestimmaire . 10 feet wide—21n to Ironwood(south side)
• Focus Group Meeting August 19,2010 . 8 feet wide Ironwood to project terminus
. home details
• Focus Group Meeting October 27,2010
. Four alwmatives,alternative matrix,questionnaire
• Preferred alternative selected November,2010
. City of South Bend websim am ommement
LFATITI LFATITA
. Roadway Closures . 4therproject Features
• 26w Street to 27' Street and 36o Street to Logan . Project constructed within existing roadway R-W
• Avoids physically impacting WPA Stone Wall . StormSewer(Noruside Boulevard—27ir Street to 350
. Northside Boulevard Reahgoment Street;new curb on south side)
• 2 8-foot wide pavement section,path offset,driveways . Decorative Lighting
• 290 Street to 32"Street
et
LFATITI LFATSTL
3
11/3/2011
ramnxr cx a
< n
wL Y (µ
F n fai � u S
4ww
I`I
Ul-
L LFAViti
I � ■
. 26'"Street
. Nortbside/Piemart-21l'to26' Street y
LFATAVA
R i
}
�® i L_FA•Ma
LFATiTi LFATiTi
. Northside Boulevard-20 to 29s'Street . Northside Boulevard—29`"to 32nd Street
ZP4a
I _
I A
LFATAn
m _
LFATpl
M
LFATOi q :., LFATiTi
4
11/3/2011
ILI
. Northside Boulevard—32"a to 35th Street • Northside Boulevard—350n to Logan Street
I
s
I
m--
"..�+,a LAM LFArr•U
LFAUTl LFATATA
. Three Major Phases
Advanced signage(Phase I)
. Detour for Northside Boulevard—between 26r^and
Logan(Phase B and III)
• All phases allow,emergency vehicle,postal service.
and trash service access
• Residents and businesses given 3 days notice prior to
access restrictions
Y
- LFA.TATA LFATITA
. Phase I—21a Street to 261h Street(Northside and . Phase 11—26o`Street to 291h Street
Pleasant) . Pathcommuctron
• Path construction • Pavement removal(16",Street to 27e Street)
• New curb west ofIronwood Drive . Repair ofWPA Stone Wall
• New surface for Northside west oflronwood(flogger . Sm.sewer and matall construction
operations) . Coordination with Nurser School for student pick-up and
• Select tree removal drop-off
d�yr.h`
5 !-
LFATATA - LFAVATAli
5
11/3/2011
9q I
. Phase IIla—291'Street to 31st Street and 36o'Street to . Phase Ulb—310 Street to 33rd Street
Logan . Path construction
• Pathirentuction . Storm sewer construction
• Storm sewer construction . Northside Boulevard realignment and pavement
• Northside Boulevard pavement removal(cast of 36P Street) replacement(31i1 Street to 32°s Street)
• NorlhsideBoulevazd realignment and pavement . Coordination for handicapped parking at 3120
replaeement(2ch to 31°x) Nortbside Boulevard
LFATATA LFATATA
}IQP�I�SI�I!!RlII�'�ill�R�l�
. Phase Me—33rd Sheet to 36o`Street River Park Historic District and WPA Stone Wall
• Path construction . Finding of Adverse Effect
• Storm sewer construction . Memorandum of Agreement(MOA)
• Entered between FHWA,Indiana SHFO,INDOT and
South Bead
• Interpretive Signage
• Inficem iional Brochure
• Project Letting—January 2012 . Concrete Path $225200
• Construction—Spring 2012 . Storm Sewer $267,900
• Completion—Summer 2012 Lighting $167,600
. Traffic Maintenance ........_._......_.._ $131 000
. Total Estimated Construction Cost $1,860,000
LFATATA LFATAM
6
11/3/2011
• Construction(estimated) $1,860,000 . Talk with project team members
• Right-of--W'ay $0 . Comment sheet
• Engineering $148,700 . E-mail or Mail comments to South Bend or LEA
• Craton rates, $185900 ejeterr(rjlawson-fishercom
• Projeet'Totai $2,194,600 . Sign-in sheetto be added to project mailing list
. Visit 11QDOT website at w vin goy/indot/2366.htm
`Public InvolvemenP`page
. All comments are very much appreciated and will be
given full consideration by project team
LFATATO LFATATA
1
• Submit public comments using the options descoludbelow
. Publln Commant FOmt
• viaeical . Please visit with project officials following the
. Participating during➢ubOC commrn[neasiov cis micropbooe public comment session
Verbal commenu reconed and naouxIDed for indvaion intu public
hnaring,u..,ip, . Project Open House
• South Bend respectfully requests comments be submitted
by Monday,November 21,2011 . Project maps,displays,project officials,
• All comments submitted will become part of public record, infernal Q&A
entered into transcript,reviewed evaluated and given full . Thank you for your attendance this evening
consideration during decision making process
LFATITA LFATATAk
7