Loading...
HomeMy WebLinkAbout6E (1)(�, IF ( 1) To Redevelopment Commission From Geri Hathaway, Ignition Park Director Subject Ignition Park - Accelerator / Prototyping Building(s) Pre - Design Date October 25, 2011 The central focal point of Ignition Park's Master Plan is a circle with basin for storm water retention, gathering green space with solar trees, wind spire that defines the hub of the park and a building or buildings that enhance the most significant location within the Park. Definition of design requirements for these structures is imperative if we are to control the look of the most important and visible elements within the Park. There have been discussions about the need for a multi - function building(s) that would provide for businesses that have graduated beyond incubation to acceleration, for product prototyping and for existing regional companies that are expanding into new areas of business through innovation. In an effort to respond with flexibility to the market the schematic design may result in one building that can be accomplished in phases or two buildings that will look not just like cooperative neighbors, but rather like two parts of a single element. To be prepared to respond to the tenants Ignition Park will attract it is prudent that we initiate the definition of these structures at this time. Otherwise, haste under pressure will drive us to an unintended solution with a facility that is less than it can be and a lost opportunity for Ignition Park. We have an obligation to this community to be better stewards. Economic Development asks for your approval of BSA LifeStructures proposal for the definition of the architectural and engineering pre- design for these buildings in the amount of $115,000. 20 October 2011 Geri Hathaway c/o Innovation Park at Notre Dame 1400 E. Angela Blvd. South Bend, IN 46697 Re: Ignition Park - Accelerator Building Pre - Design South Bend, IN Dear Geri: It is a pleasure for BSA LifeStructures to submit a proposal for the architectural and engineering pre- design services for two Accelerator facilities within the Urban Forest Plaza at the center of Ignition Park. The goal of this pre- design process will be to narrow down the program and thus the cost for these facilities prior to moving on with full design services. BSA LifeStructures is confident that this process will not only better prepare the City moving forward with design but will raise the comfort level of all stake holders involved as to the form and function of the facilities. For the pre - design phase of these two 40,000 SF buildings (current assumed SF for the purpose of this proposal), as it is currently outlined in the master plan, BSA LifeStructures would propose the following fee: Pre- Design Services (Architectural and Engineering) $110,000 Reimbursable Allowance (travel and other standard reimbursables)* 5,000 Total Fee (maximum) $115,000 Veimbursables will be billed as part of the base fee up to the $5, 000 maximum. The schedule for this project has yet to be determined, but should align with the development of the remainder of the site. The goal would be to complete the pre- design prior to the end of the calendar year. If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require an executed agreement which will be sent out after all parties agree to the scope and fee. We would like to thank you for this opportunity to assist your organization in igniting life sciences growth in downtown South Bend and look forward to working with you in the future. Thanks again. Geri Hathaway 20 October 2011 Page 2 of 2 Sincerely, _ Chris W. Lake, AIA, LEED AP Principal -in- Charge PROJECT AUTHORIZATION: Ignition Park — Accelerator Building Pre - Design Contract Amount: $115,000 (Lump Sum for Pre - Design Services) Client's Authorizing Signature: Signature Name (Printed) Organization /Company Date i 20 October 2011 Geri Hathaway c/o Innovation Park at Notre Dame 1400 E. Angela Blvd. South Bend, IN 46697 Re: Ignition Park - Accelerator Building Pre - Design South Bend, IN Dear Geri: It is a pleasure for BSA LifeStructures to submit a proposal for the architectural and engineering pre- design services for two Accelerator facilities within the Urban Forest Plaza at the center of Ignition Park. The goal of this pre- design process will be to narrow down the program and thus the cost for these facilities prior to moving on with full design services. BSA LifeStructures is confident that this process will not only better prepare the City moving forward with design but will raise the comfort level of all stake holders involved as to the form and function of the facilities. For the pre- design phase of these two 40,000 SF buildings (current assumed SF for the purpose of this proposal), as it is currently outlined in the master plan, BSA LifeStructures would propose the following fee: Pre- Design Services (Architectural and Engineering) $110,000 Reimbursable Allowance (travel and other standard reimbursables)* 5,000 Total Fee (maximum) $115,000 Veimbursables will be billed as part of the base fee up to the $5, 000 maximum. The schedule for this project has yet to be determined, but should align with the development of the remainder of the site. The goal would be to complete the pre - design prior to the end of the calendar year. If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require an executed agreement which will be sent out after all parties agree to the scope and fee. We would like to thank you for this opportunity to assist your organization in igniting life sciences growth in downtown South Bend and look forward to working with you in the future. Thanks again. Geri Hathaway 20 October 2011 Page 2 of 2 Sincerely, Chris W. Lake, AIA, LEED AP Principal -in- Charge PROJECT AUTHORIZATION: Ignition Park — Accelerator Building Pre - Design Contract Amount: $115,000 (Lump Sum for Pre - Design Services) Client's Authorizing Signature: Signature Name (Printed) Organization /Company Date