Loading...
HomeMy WebLinkAbout6E (5)l t ('J • r a n • u m your118 �A,,1: Fro F� • �%i 4 Community & Economic Development 1865 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: South Bend Redevelopment Commission From: Jitin Kain, Senior CED Specialist Subject: Ignition Park Phase 1A Infrastructure Scope Update Date: October 18, 2011 On July 26, 2011 the Redevelopment Commission approved a proposal from BSA LifeStructures, Inc. to initiate site infrastructure design work required for Phase 1A of the Ignition Park Master Plan. The total fee for design services was approved at $128,000. Also attached to this proposal was an estimate of construction costs for Phase 1A in the amount of $2,774,663.00. Just prior to the July 26, 2011 Commission meeting, the scope of services was revised to include design work for Cotter St, extending it to the circular drive. This revision did not change the design service fee or the construction estimate amount. Unfortunately, an older version of the scope of work and estimate were included in the Commission packet. The revised scope and estimate are attached with this memo. Staff requests Commission approval to update the scope and construction estimate in the BSA proposal approved on July 26, 2011. What We Do Today Makes A Difference! CITY OF SOUTH BEND ECONOMIC DEVELOPMENT 06 October 2011 South Bend, Indiana Ignition Park Master Planning BSA LifeStructures #15350002 Page 1 IGNITION PARK Phase I —Scope of Work: Intent of this work is to provide access from Lafayette Boulevard to the Data Realty Site and provide utility support for the building. SITE IMPROVEMENTS A. Stull Street boulevard from Franklin Street to Circle Drive (Boulevard will be four lane width utilizing half the boulevard for access in Phase 1 A). B. Circle Drive from Stull Street to Cotter Street (Drive will be constructed to full width). C. Cotter Street to Circle Drive (Drive will match existing Cotter Street width). D. South Drive from Circle Drive to Data Realty West access point (drive will be full width). E. Temporarily seed all disturbed lawn areas. F. Sidewalks and street landscaping will not be included. G. Perimeter landscaping will be provided around the Ignition Park 80 acres. SITE UTILITIES • Communication: 2" conduit from Sample Street south to Stull Street west along South Circle Drive to Prairie Avenue with handholes at 300ft intervals. • Electric: Ductbank from west side of Studebaker Station south along Lafayette Street to Stull Street west to Data Realty site. • Gas: Extend gas main to east property line of Data Realty from Prairie Avenue along Cotter Street. • Sanitary: Extend sanitary sewer from east Data Realty property line to Prairie Avenue combined sewer (sewer is sized for full park (10" sewer). • Storm: Storm water will drain to a temporary detention basin and BMP along east side of Data Realty site. • Water: Water main to be extended from Lafayette Boulevard main to Prairie Avenue main (waterline is sized for full park (12" pipe) with appropriate F.H. N "O N c o u co c a d H � Z c a LD v°i m o t O O O O O ° c M w O S O O O S O O O O O O O O N N V1 Vf ✓! Vf N O N J O O O O O Y H ° S ° S °• ° ON O O N O O N M O O > N ` S O !rf O Vl n O O V1 .N-I N V V1 N N l0 Vf � V? N VN1 VT V/ O S O O O S O O O O O O O O N N V1 Vf ✓! Vf N O N J r-M O O O O O O O O O V 0 O O O N N N N M O O > N ` C C O O S O V n ~ O1 Q O tN4 VNl N ° ba C N 00 �N M V1 f0 0O O O N N N N 00 V1 N N M N N VT vl O O v1 O .ti .ti N a O a O m N a O N r-M O O O S S S O O O O O O V1 N VT V1 V1 N O O S S S S 0 o vi vi ° ° O O ° O ° O O °o O ° O C O W y O . C5 > N ` C C O O S S n ~ O1 Q O 0 C ° ba C N 00 �N M - m W c 0O O O N N N N 00 V1 N N M N N VT O O O S S S O O O O O O V1 N VT V1 V1 N O O S S S S 0 o vi vi o 0 V1 N V1 VT S O C O W y N N O O O O O 00 0 00 0 O I� °N y C O y 0 � C N c m C x ° 3 y C O y 0 � C N c m x ° 3 c C O W y a Q 3 > N ` d 0! d n V vl N Y � c y ii n c 3 io c u O Q n V vl N 0 C ° ba C = C 0 - m W c O O C 00 N V/ S 0 N J d m M O N N