HomeMy WebLinkAbout6E (2)H I I' associates, Inc. October 17, 2011 Ms. Ann Kolata Senior Redevelopment Specialist City of South Bend Department of Community and Economic Development 227 West Jefferson Blvd., 12th floor South Bend, Indiana 46601 RE: Proposal to Conduct Off -Site Monitoring Well Installation and /or Groundwater Sampling in the Vicinity of the Oliver Industrial Park, South Bend, Indiana (the Site); S131066.400.0001. Dear Ms. Kolata: Hull & Associates, Inc. (Hull) is pleased to present the City of South Bend (Client) the following proposal to provide professional engineering services for the above referenced project. The purpose of this document is to establish the Scope of Work as we understand it and to provide a fee schedule for the project. The Site, known as the Oliver Industrial Park, and formerly known as the Oliver Plow Works facility, is enrolled in the Indiana Department of Environmental Management (IDEM) Voluntary Remediation Program (VRP). Additional off -site delineation of chemicals of concern (COCs) in groundwater is necessary prior to completion of a Remediation Work Plan, which is a necessary milestone of the VRP toward closure of the Site. Task 1 Monitoring Well Installation and Groundwater Sampling Event Hull will install monitoring wells and /or temporary groundwater sampling points at or in the vicinity of the sampling locations shown on Figure 1, as discussed below. Please note the location of historical sampling point CTW -3S /D on Figure 1, which is the basis for the sampling locations (both temporary and permanent) proposed herein. Sampling point CTW -3S /D is the location of the downgradient -most sampling point installed during a January 2003 sampling event; at this sampling location, IDEM VRP Tier II Residential and Nonresidential Cleanup Goals were exceeded, but have not been defined further downgradient. In general, our proposed approach entails defining the vertical extent of chlorinated volatile organic compounds (VOCs) downgradient of CTW -3S /D by installing temporary sampling points north and east of CTW -3S /D; submitting those samples to a laboratory and requesting 3 -day turnaround; installing permanent monitoring wells south and west of CTW -3S /D while laboratory analyses on the samples from the temporary points are completed; and installing permanent monitoring wells downgradient of CTW -3S /D at appropriate locations once the vertical extent is defined. As further explained below, this scope of work includes a contingency for an additional sampling event to install temporary sampling points to define the vertical extent of COCs in groundwater downgradient of sampling point CTW -3S /D, should it be necessary. 6435 Castleway West Drive, Suite 119 • Indianapolis, Indiana 46250 800.241.7173 fax 614.793.9070 www.hullinc.com Ms. Ann Kolata October 17, 2011 S131066.400.0001 Page 2 This task will begin with the advancement of temporary screens using direct -push technologies (e.g., a ST -15 Hydropunch) to a shallow depth (i.e., 26 to 30 feet below ground surface (bgs)) and a deeper depth of approximately 36 to 40 feet bgs at each of four (4) or five (5) locations, subject to approval of these locations from the Client's Board of Public Works (BPW). These four or five locations generally correspond to the locations northwest (i.e., near the intersection of Laurel and Thomas Streets); east (i.e., near the intersection of Scott and Wayne Streets); and north (i.e., along Colfax Avenue between LaPorte Avenue and William Street) of CTW -3S /D as shown on Figure 1. The locations may be adjusted slightly in the field based on field observations such as utility locations, etc. Hull will work with the drilling subcontractor and the appropriate City and St. Joseph County authorities to arrange for access for the work and to clear utilities and to prepare appropriate permits for drilling in the right -of -way. Drill cuttings and sample purge and decontamination water will be containerized and placed at a location designated by the City. At each location where groundwater sampling is to be conducted, the borehole will initially be advanced to the deeper depth (i.e., between approximately 36 and 40 feet bgs), at which point the outer casing of the sampling system will be withdrawn to expose a four foot long stainless steel wire wrapped screen. Once the screen is exposed, Hull will measure the static water level and lower a decontaminated Waterra foot -valve sampling pump or peristaltic pump to purge the equivalent of five well volumes of water to develop the aquifer surrounding the screen. Following extraction of each well volume, Hull will measure pH, temperature and conductivity to demonstrate that representative groundwater is being sampled. In addition, Hull's representative will note if there is a visible sheen on the extracted water. After development, the temporary well will be allowed rest for approximately 20 minutes prior to sample collection. Following purging, Hull will collect groundwater samples that will be pumped through the Waterra or bladder pump tubing at a flow rate of less than 100 ml /min. Samples will be transferred directly into laboratory- preserved sample containers and placed on ice in a cooler. Following collection of each sample, Hull will retrieve and decontaminate the Waterra foot -valve pump by washing it with Alconox and water and rinsing it with deionized water. In addition, the sample tubing will be replaced between each sampling interval. The groundwater sample in the upper portion of the aquifer (i.e., between approximately 26 and 30 feet bgs) will be collected by withdrawing the screen to the appropriate depth and purging and collecting a groundwater sample as described above. The process for purging and collecting the more shallow groundwater sample will then be completed as described above. Between each of the sampling locations, the drilling rods and well screen will be decontaminated by washing with Alconox and water solution and rinsing with deionized water. Up to 10 groundwater samples (two samples at variable depths per borehole) plus six duplicates, collected from the temporary boreholes using direct -push technologies, will be analyzed for VOCs. Two field blanks and two trip blanks will also be analyzed for VOCs. Results for the laboratory analyses will be requested to be reported by the laboratory within three business days. Pending laboratory results from the temporary sampling points, three monitoring wells will be installed at locations between CTW -3S /D and the Oliver Industrial Park (i.e., along Western Ms. Ann Kolata October 17, 2011 S131066.400.0001 Page 3 Avenue and along Chapin Street at the locations shown on Figure 1). Soil borings associated with the proposed monitoring wells will be drilled using 4.25 -in., inside - diameter hollow -stem augers and continuously sampled using 24 -in. split -spoon samplers to the appropriate depth (i.e., either 30 feet bgs or 45 feet bgs). As with the direct -push sampling locations, the monitoring well locations may be modified based on field observations. Monitoring wells will be constructed of Schedule 40 PVC slotted screens and risers. Once the targeted depth has been reached, the well column will be slowly lowered to the base of the borehole. A clean silica quartz sand filter pack will be placed around the screen and will extend no more than two feet above the top of the screen. Sodium bentonite chips or pellets will then be placed on top of the sand pack. Above the chips or pellets, a thick bentonite slurry will be pumped into the annular space using a tremie pipe to a depth of approximately three feet below ground surface. The remaining three feet will be filled with concrete to anchor a flush -mount manhole. Monitoring wells will be developed following installation to remove fines that may have entered the well screen or filter pack during installation. Well development activities will continue until pH, temperature, and conductivity have stabilized for three consecutive well volumes, or until five well volumes have beer} removed, whichever is greater. Development waters will be collected and stored in a DOT approved 55- gallon drum. Following installation of the monitoring wells between CTW -3S /D and the Oliver Industrial Park, laboratory results from the temporary boreholes north and east of CTW -3S /D will have been received, and will determine whether additional downgradient temporary sampling point installation is necessary, or whether permanent monitoring wells may be installed in the vicinity of the previous temporary sampling points. This estimate provides a contingency for additional temporary sampling point installation should it be deemed necessary. Ultimately, permanent monitoring wells will be installed downgradient of CTW -3S /D as part of this scope of work; the costs for installation of all permanent well locations are included. We have included an additional mobilization and demobilization cost for the driller to install permanent wells in two stages should the second temporary sampling event be required. If this charge is not incurred, the Client will not be billed. Groundwater samples will be collected from all newly installed monitoring wells and submitted to the laboratory for VOC analysis using U.S. EPA Method 8260 and lead and arsenic analyses (because of historical detections of these metals in off -Site groundwater) in accordance with U.S. EPA Method 846 6010. Samples for lead and arsenic analyses will be submitted to the laboratory in both filtered and unfiltered form to allow for analysis of total and dissolved metals concentrations. Prior to sampling, the monitoring wells will be purged until pH, temperature, and conductivity measurements have stabilized, or until three well volumes have been removed, whichever is greater. Following purging, groundwater will be collected using low -flow methods and transferred to laboratory- preserved sample containers at rate of less than 100 ml /min and placed on ice in a cooler. Duplicate samples will be collected at randomly selected monitoring well locations. Field /equipment blanks will also be collected and submitted along with a trip blank for analysis as part of QA/QC of field procedures. Purge and decontamination waters will be collected and Ms. Ann Kolata October 17, 2011 S131066.400.0001 Page 4 stored in U.S. DOT - approved 55- gallon drums. As described above, drill cuttings, excess samples, purge water and decontamination water will be drummed and staged at a location acceptable to the Client. Costs to remove, transport, and dispose of approximately 45 55- gallon drums of containerized groundwater and drill cuttings (which are presumed to be non - hazardous) are included in this task. Task 2 Prepare a Remediation Work Plan The RWP that was submitted to City in April 2004 will be revised to include additional narratives that describe all past environmental sampling programs completed since 1989 at the Site. In addition, this revised RWP will include a description and analytical results of the impacted soil areas discovered during demolition activities at Area C. Furthermore, references to groundwater (previously removed when groundwater was to be remediated through a separate VRP number in conjunction with other areas within the City) will be reincorporated into the RWP. To the extent possible, the revised RWP will include copies of analytical reports, summary tables, and location plans for historical soils investigations. Note that there may be inaccuracies in historical sampling locations, as presented on the maps, due to a lack of survey data and /or detailed historical site plans. Hull envisions that multiple figures will need to be prepared to clearly show the previous sampling locations and analytical summaries. Hull will revisit and update as necessary the draft health and safety plans, quality assurance project plans and the community relations plans that were submitted in April 2003 into a single set of project documents that will be inclusive of all anticipated activities associated with the general remediation approaches for soil and groundwater. Four hard copies and four electronic (PDF on compact disc) copies of the final deliverables will be prepared and submitted to the City. SCHEDULE Hull has tentatively scheduled the groundwater sampling event to begin on October 27 and 28, 2011, subject to your approval of this proposal. Permanent monitoring well installation is scheduled to begin October 31, 2011. Assuming the second contingent temporary sampling point installation portion of this scope of work is necessary, with permanent monitoring well installation to be completed within one week thereafter, we anticipate all drilling and sampling activities will be completed by November 18, 2011. This schedule will allow for completion of the RWP by mid- to late December in accordance with the schedule you have proposed to Mr. Corey Webb of IDEM. COMPENSATION A breakdown of costs is attached as Table 1. The fees have been developed based on our estimate of hours for each labor category expected to be involved in the project. The project will be billed on a four -week basis with payment due to Hull within thirty days after receipt of an invoice. Ms. Ann Kolata October 17, 2011 S61066.400.0001 Page 5 ADDITIONAL WORK Additional work beyond the Scope of Work defined herein shall not be performed until such time as an amendment to this proposal, including the scope of the additional work and associated costs, has been prepared in writing to address the additional work and said amendment has been approved by the Client in writing. Specific items not within the Scope of Work on this project include, but are not limited to the following: collection of more than 72 groundwater samples (including QA/QC samples) to be analyzed for VOCs in accordance with U.S. EPA Method 8260; 2. collection of more than 36 groundwater samples (including QA/QC samples) to be analyzed for total and dissolved arsenic and lead concentrations in accordance with U.S. EPA Method 6010; 3. disposal of groundwater that is determined to be hazardous; 4. submittal of soil samples for laboratory analyses; and 5. communication with regulatory agencies regarding the Site. No amendment to this proposal shall be required in situations where additional work may be necessary, as a result of unanticipated or unidentified conditions including, but not limited to, the presence of unidentified or mislocated buried utilities, structures, or objects and unanticipated hazardous materials and /or hazardous or dangerous circumstances, to complete previously identified tasks. Hull shall be compensated for the actual time spent performing this additional work and other direct expenses and subcontractor fees at the billing rates outlined in Table 2. STANDARD OF CARE AND LIMITATIONS Hull shall perform its services using that degree of care and skill ordinarily exercised under similar conditions by reputable members of its profession practicing in the same or similar locality at the time of service. No other warranty, expressed or implied, is made or intended by our proposal or by our oral or written reports. The work will not attempt to evaluate past or present compliance with federal, state, or local environmental or land use laws or regulations. Conclusions presented by Hull regarding the Site to be investigated shall be consistent with the Scope of Work, level of effort specified, and investigative techniques employed. Reports, opinions, letters and other documents will not evaluate the presence or absence of any compound or parameter not specifically analyzed and reported. The presence of radiation, radon, lead, electromagnetic fields, and indoor air pollution will not be investigated, unless specifically stated in the scope of work. Hull makes no guarantees regarding the completeness or accuracy of any information obtained from public or private files or information provided by subcontractors. Again, thank you for the opportunity to conduct additional Phase II ESA activities off -site of the Oliver Industrial Park. Please call me at (800) 241 -7173 if you have any questions. If you Ms. Ann Kolata October 17, 2011 S131066.400.0001 Page 6 approve of this proposal, please sign the attached Task Order form and return it to my attention. incerely, Douglas G. Stuart, CHMM Senior Project Manager ct: File _ �'�2! �wlwv r• Task 1 Temporary Sampling Point Installation Labor Subcontractor Costs (including markup) Equipment Supplies Miscellaneous Costs Monitoring Well Installation Labor Subcontractor Costs (including markup) Equipment Supplies Miscellaneous Costs Additional Temporary Sampling Points (Contingent) Labor Subcontractor Costs (including markup) Equipment Supplies Miscellaneous Costs Task 2 RWP Preparation Labor Miscellaneous Costs HULL & ASSOCIATES, INC. INDIANAPOLIS, INDIANA Estimated Cost $ 5,020 $ 6,342 $ 570 $ 660 $ 375 Subtotal $ 12,966 $ 8,100 $ 36,960 $ 1,125 $ 675 $ 1,200 Subtotal $ 48,060 $ 3,655 $ 6,342 $ 570 $ 190 $ 300 Subtotal $ 11,056 $ 10,900 $ 325 Subtotal $ 11,225 TOTAL PROJECT BUDGET $ 83,308 SBI066.400.0001.XLS OCTOBER 2011 HVII inc. Table 2 2011 BILLING RATE SCHEDULE Management Principal Staff $150.00 -$200.00- Senior Project Manager $130.00 - $175.00 Project Manager $100.00 - $140.00 Government & Community Relations $ 80.00 - $150.00 Engineer Senior En ineer $110.00 - $140.00 Project Engineer $ 90.00 - $120.00 Engineer 2 $ 70.00 - $100.00 Engineer 1 $ 65.00 - $ 85.00 Senior Designer $ 80.00 - $100.00 Desi ner $ 70.00 - $ 90.00 Hydrogeologist Senior H dro eolo ist $110.00 - $140.00 Project H dr eolo ist $ 90.00 - $120.00 H dr eolo ist 2 $ 70.00 - $100.00 H dr eolo ist 1 $ 65.00 - $ 85.00 Table 2 2011 BILLING RATE SCHEDULE NOTES: 1. Hourly billing rates for personnel apply to actual time spent in meetings concerning the project, preparing for such meetings, project coordination time, design activities, field and office investigations, and travel time when job - related. 2. Hourly billing rates reflect the range of salaries for each job classification. Rates are typically reviewed and adjusted periodically to account for salary increases and other changes. 3. If personal vehicles are utilized, travel mileage is billed at the federal mileage reimbursement rate. If company -owned vehicles are utilized, rental rates of $75 /day, $300/week, or $1,000 /month are used in lieu of travel mileage. If rental vehicles are utilized, the actual cost of the rental and gasoline will be billed directly with no mark -up. 4. Air transportation fees are billed directly with no mark -up. Travel time is typically billed only for that time actually spent flying to /from the project location and does not include layovers, delays, etc. 5. Project reimbursable expenses such as reproduction by vendors, overnight shipping, meals, and lodging associated with travel or extended field activities, etc. are billed directly with no mark -up. 6. Field equipment rented from outside vendors is billed directly with no mark -up. Field equipment owned by Hull, including individual equipment items or groupings of equipment such as sampling kits, are billed at competitive market - equivalent rates for daily or weekly rental. 7. Subcontractors' fees are billed to the Client at a rate equal to the subcontractor fee multiplied by 1.1 to recover Hull's contractual liability risk and associated operational expense. HULL & ASSOCIATES, INC. INDIANAPOLIS, INDIANA Scientist Senior Scientist $110.00 - $140.00 Project Scientist $ 90.00 - $120.00 Scientist 2 $ 70.00 - $100.00 Scientist 1 $ 65.00 - $ 85.00 Support Staff GIS Mana er $ 80.00 - $120.00 GIS Specialist $ 50.00-$ 80.00 CAD Operator $ 50.00-$ 70.00 Senior Technician $ 60.00-$ 80.00 Technician 2 $ 45.00-$ 65.00 Technician 1 $ 35.00-$ 55.00 Project Manager Assistant $ 40.00-$ 55.00 Clerical $ 30.00-$ 45.00 NOTES: 1. Hourly billing rates for personnel apply to actual time spent in meetings concerning the project, preparing for such meetings, project coordination time, design activities, field and office investigations, and travel time when job - related. 2. Hourly billing rates reflect the range of salaries for each job classification. Rates are typically reviewed and adjusted periodically to account for salary increases and other changes. 3. If personal vehicles are utilized, travel mileage is billed at the federal mileage reimbursement rate. If company -owned vehicles are utilized, rental rates of $75 /day, $300/week, or $1,000 /month are used in lieu of travel mileage. If rental vehicles are utilized, the actual cost of the rental and gasoline will be billed directly with no mark -up. 4. Air transportation fees are billed directly with no mark -up. Travel time is typically billed only for that time actually spent flying to /from the project location and does not include layovers, delays, etc. 5. Project reimbursable expenses such as reproduction by vendors, overnight shipping, meals, and lodging associated with travel or extended field activities, etc. are billed directly with no mark -up. 6. Field equipment rented from outside vendors is billed directly with no mark -up. Field equipment owned by Hull, including individual equipment items or groupings of equipment such as sampling kits, are billed at competitive market - equivalent rates for daily or weekly rental. 7. Subcontractors' fees are billed to the Client at a rate equal to the subcontractor fee multiplied by 1.1 to recover Hull's contractual liability risk and associated operational expense. HULL & ASSOCIATES, INC. INDIANAPOLIS, INDIANA TASK ORDER FORM TASK ORDER TO PROPOSAL FOR PROFESSIONAL SERVICES HULL & ASSOCIATES, INC. TASK ORDER NO: 01 HULL PROJECT CODE: SB1066 PROPOSAL NUMBER: S61066.400.0001 Subject to the terms and conditions of the above referenced Contract, the Consultant agrees to perform the following Scope of Work as follows: Conduct additional groundwater sampling to delineate the off -Site plume from the Oliver Industrial Park Property located near Chapin Street and Oliver Plow Court, South Bend, Indiana, as further described in Hull document number S131066.400.0001 dated October 17, 2011. Task 1: Temporary Sampling Point Installation $12,966 Monitoring Well Installation $48,060 AddT Temp. Sampling Points (Contingent) $11,056 Task 2: RWP Preparation $11,225 Subtotal $83,308 NUMBER OF COPIES OF DELIVERABLE: 4 hard copies, 4 electronic copies ESTIMATED TOTAL COST: $83,308 HULL & ASSOCIATES, INC. PROJECT CONTACT: Doug Stuart CLIENT PROJECT CONTACT: Ms. Ann Kolata CLIENT AUTHORIZATION: DATE: (Please return one signed original to Hull & Associates, Inc.'s Project Contact and retain one signed original for Client's records). \/ 2 §? e : ^ a . �t ��■ | � |® � | §a/ ;n)Wsfm§ :4 § } {ƒ o § � �j ■ »m /;0■% CL �o -r��o . \[( .a X22\ ® �2 §- A - >,�, !- E(.&2° E3� % ° 2 ] o or ° a0 !! -0 '00 ■ Jf 'P k�ko f Kw \ \j • ^` ■ ■ E # [ % .� o k � -� g J i ] 0 0 £- \ \ g_ � \ _ E [k ¥% , k |� ƒ0 � � f �■ ` 2