Loading...
HomeMy WebLinkAbout6C (4)C7c(a� • UTN \�liilllj/ O Community & Economic Development 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission, Board of Public Works From: Bill Schalliol, Economic Development Planner Subject: Resolution 2918 and Addendum To Master Agency Agreement Regional Fire Training Center Project (Projects 1 -3) Date: September 19, 2011 Attached to this memorandum is Resolution 2918 and Addendum To Master Agency Agreement for the Regional Fire Training Center and three related sub - projects. The Regional Fire Training Center is a multi - disciplinary public safety project that has been in development for the past 10 years by the City of South Bend and in coordination with other local public safety agencies. The proposed facility will be located adjacent to the existing crash -fire- rescue airplane fuselage training area on the western end of the South Bend Regional Airport on land owned by the St. Joseph County Airport Authority. The center part of the training center project will be a five story tower with four distinct facade types (residential, commercial, industrial, and apartment) that will be used to train on exterior and interior fire fighting. A concept map of the site is attached for your review. The purpose of this Addendum is to provide predevelopment funds for the project to move it forward this calendar year. The Addendum has four sub - projects which relate to specific vendor contracts (Projects 1 -3)for site, infrastructure and facility design. Copies of the professional services proposals are located in Exhibits B -D of the Addendum. The total estimate of all work in this predevelopment phase is $206,900.00. Staff requests approval of Resolution 2918 and the Addendum To Master Agency Agreement for the Regional Fire Training Center Project. What We Do Today Makes A Difference! F t k• s s _ yy } ` Y T R " RESOLUTION NO. 2918 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN ADDENDUM TO THE MASTER AGENCY AGREEMENT (Regional Fire Training Center Project) 2918 -11 WHEREAS, effective January 1, 2011, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2011; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Regional Fire Training Center Project to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Addendum to Master Agency Agreement (Regional Fire Training Center Project) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on September 27, 2011, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana 46601. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission ADDENDUM TO MASTER AGENCY AGREEMENT (REGIONAL FIRE TRAINING CENTER PROJECT) 291 5 -11 Project 1 - R.W. Armstrong - Site Layout Project 2- Development Strategies Group - Facility Design Project 3- Ken Herceg & Associates - Infrastructure Design This Addendum to Master Agency Agreement (this "Addendum "), made and entered into as of the 26th day of September, 2011, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Regional Fire Training Center Project (the "Project ") WHEREAS, effective January 1, 2011, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2011; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Regional Fire Training Center Project to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being more specifically described in "Exhibit A ", attached hereto and made a part hereof. 2. All of the tenns and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Carl Littrell, Member Don Inks, Member ATTEST: Linda Martin, Clerk Exhibit "A" Regional Fire Training Center Project The City of South Bend is planning for the construction of a Regional Fire Training Center to be constructed on a site located west of the South Bend Regional Airport on land owned by the St. Joseph County Airport Authority. The purpose of this Addendum to the Master Agency Agreement is to allow the South Bend Redevelopment Commission to fund certain predevelopment activities to allow the project to move forward. Additionally, the Commission will be paying for the extension of certain infrastructure related to the construction of this project. The following four projects and related professional service proposal documentation are attached to this document as the following: Exhibit "B ": Project 1 - R.W. Armstrong - Site Layout Exhibit "C ": Project 2- Development Strategies Group - Facility Design Exhibit "D ": Project 3- Ken Herceg & Associates - Infrastructure Design Exhibit "B" Project 1 - R.W. Armstrong - Site Layout See attached proposal from R.W. Armstrong dated April 4, 2011, and attached Board of Public Works Approval dated April 25, 2011 Project Budget: $ 132,200.00 Paid To Date *: $ 13,200.00 Budget funded by TIF: $ 119,000.00 * From other sources 1316 COUNTY-C17 Y BUILDING; 227W JErrERSON BOULEVARD SOUTH BEND, INDIANA 46601 -1830 CITY OF SOUTH BEND STEPHEN J. LUECKE, 1M.AYOR BOARD OF PUBLIC VVIORKS April 25, 2011 Mr. Brian Arterberry R.W. Armstrong 1251 North Eddy Street, Suite 201 South Bend, Indiana 46617 PHONE 574 /235 -9251 FAx 574/235 -9171 RE: Professional Services Proposal — Training Center Site Development Phase 1 Project No. 109 -011 B Dear Mr. Arterberry: The Board of Public Works, at its meeting held on April 25, 2011, approved the above referenced Professional Services Proposal for ten percent (10 %) of the total contract in the amount of $13,200.00. Enclosed is a copy of the Professional Services Proposal for your records. If you have any questions, please contact me at (574) 235 -9251. Enclosure c: John Engstrom, Engineering Sincerely, Linda M. Martin, Clerk GARY A. GILOT, P. E. DONALD E. INKS CARL P. LITTRELL n_ ), A-- n MPKIACD AGREEMENT FOR CONSULTING SERVICES THIS AGREEMENT, made and entered into this Zit_ day of �� 2011, by and between the City of South Bend, Indiana, acting through its Board of Public Works (hereinafter referred to as the "OWNER "), and R. W. Armstrong & Assoc., Inc., an Indiana corporation with its principal office at 1251 N. Eddy Street, Suite 201, South Bend, Indiana, 46617 (hereinafter referred to as "CONSULTANT "). WITNESSETH THAT: WHEREAS, the OWNER requires the services of the CONSULTANT for providing engineering services defined in Article 1.1. WHEREAS, CONSULTANT has the ability to perform such tasks for the OWNER and is willing to do so upon the terms and conditions stated herein. NOW, THEREFORE, in consideration of the terms, conditions and covenants contained or incorporated herein, and the mutual promises hereinafter enumerated, the parties agree as follows: ARTICLE 1. CONSULTANT'S SERVICES 1.1 Nature of Services. CONSULTANT shall, upon OWNER's request and written authorization, perform consulting tasks and services which may include, but shall not be limited to, the following options: 1.1.1 Provide engineering and bid related services required to develop construction documents for a site plan for the new South Bend Emergency Response Center as further described in Exhibit "A" - Scope of Services. 1.2 Initiation of Tasks. In order to facilitate performance of services by CONSULTANT, the OWNER shall review requests and plan submittals. Upon approval, the OWNER shall authorize services for the next phase in accordance with the Scope of Work. 1.3 Notice to Proceed. The CONSULTANT will begin work upon receipt of the written Notice to Proceed or Purchase Order by the OWNER. The Notice to Proceed or Purchase Order will also include the phase of work description, the fee mutually agreed upon by the parties and an anticipated project completion date. 1.4 CONSULTANT's Additional Services. If authorized in writing by the OWNER, the CONSULTANT shall furnish additional services which will be paid for by the OWNER as indicated in Article 2. Page 1 of 6 ARTICLE 2. COMPENSATION 2.1 OWNER agrees to pay the CONSULTANT as compensation for services defined in Article 1.1 an hourly rate not to exceed amount of one hundred and thirty two thousand two hundred dollars ($132,200.00). 2.2 OWNER will reimburse the CONSULTANT for any application and /or permit fees paid for securing approval of authorities having jurisdiction over the project. OWNER will reimburse the CONSULTANT or directly pay for any unforeseen environmental services that may be required. 2.3 For additional services defined in Article 1.4 above, the OWNER will pay the CONSULTANT at a rate or fee mutually agreed upon by the parties prior to CONSULTANT's initiation of any additional service pursuant to this Agreement. 2.4 The OWNER will make a diligent effort to appropriate necessary funds to provide compensation to the CONSULTANT for the services provided under this Agreement. While the OWNER may seek funding assistance from other governmental agencies, it is acknowledged and understood that the compensation to the CONSULTANT as outlined in this Agreement is not contingent upon the receipt by the OWNER of such funds. 2.5 Once each month, the CONSULTANT may submit to the OWNER an invoice for services rendered. Each invoice shall provide a brief description of the specific work performed and shall represent the value of the partially completed work based on the proportion which its percentage bears to the total cost of the fully completed work. 2.6 Payment of all invoices shall become due no later than thirty (30) days after receipt, provided CONSULTANT submits all claims for compensation upon forms and in a manner approved by the OWNER. 2.7 No deduction shall be made from the CONSULTANT's compensation on account of penalty, liquidated damages, or other sums withheld from payments to owners. 2.8 If any work designed or specked by the CONSULTANT during any phase of service is abandoned in whole or in part, or suspended for a period exceeding three months, the CONSULTANT shall be paid by the OWNER for the services performed prior to receipt of written notice from the OWNER of such abandonment or suspension, together with reimbursements then due and any termination expense resulting from such abandonment or suspension as determined and agreed to by the CONSULTANT and the OWNER. ARTICLE 3. GENERAL TERMS 3.1 This Agreement shall become effective on the date hereof and remain in effect for the duration of the Project defined in Article 1.1. Page 2 of 6 3.2 Information available to the OWNER and required by the CONSULTANT shall be furnished at no cost to the CONSULTANT in an expeditious manner for the orderly progress of the work. The CONSULTANT shall be entitled to rely upon the accuracy thereof. 3.3 The OWNER, pursuant to Article 1.2 hereof, shall have complete authority to transmit instructions to and receive information from the CONSULTANT. 3.4 The CONSULTANT is responsible for the professional quality, technical accuracy, timely completion and coordination of all designs, drawings, specifications, reports, and other services furnished by the CONSULTANT under this Agreement consistent with reasonable, prudent and professional skill and care as is ordinarily exercised by consultants in similar circumstances and locations. The CONSULTANT shall, without additional compensation, correct or revise any errors, omissions or other deficiencies in its design, drawings, specifications reports and other services; provided, that in the case of an omission, CONSULTANT shall be responsible only for the additional cost, if any, compared with what the cost of work would have been, had it been included in the initial product of services. 3.5 Both parties agree that for the purpose of this Agreement, the CONSULTANT shall be an independent contractor and not the employee of the OWNER. 3.6 The CONSULTANT shall not have control over and shall not be responsible for the acts or omissions of any contractor, engineer, consultant or other person engaged separately and directly by the OWNER. ARTICLE 4. ASSURANCES 41 Non - Discrimination. The CONSULTANT, with regard to the work performed by it during this Agreement, shall not discriminate on the grounds of sex, race, color, national origin, handicap or veteran status in the selection and retention of sub- contractors, including procurement of materials and leases of equipment. This Agreement incorporates by reference the equal opportunity clause set forth in Section 202 of Executive Order 11246. 4.2 Solicitations for Sub - Contracts. Including Procurements of Materials and Equipment. In all solicitations, either by competitive bidding or negotiation, made by the CONSULTANT for work to be performed under a sub - contract including procurement of materials or lease of equipment, each potential subcontractor or supplier shall be notified by the CONSULTANT of its obligations under this Agreement and the regulations relative to non- discrimination on the grounds of sex, race, color, national origin, handicap or veteran status. 4.3 Ownership and Reuse of Documents. The drawings and specifications are instruments of service; and as such, the documents, tracings, and field notes originating with the CONSULTANT are and remain the property of the CONSULTANT whether the work for which they were prepared is executed or Page 3 of 6 not. Copies of the aforementioned documents shall be made available to the OWNER, at the OWNER's request, upon project completion or in accordance with Article 5. All documents, including Drawings and Specifications prepared by CONSULTANT pursuant to this Agreement, are instruments of service in respect of the Project. They are not intended or represented to be suitable for reuse by OWNER or others on extensions of the project or on any other project. Any reuse without written verification or adaptation by CONSULTANT for the specific purpose intended will be at OWNER's sole risk and without liability or legal exposure to CONSULTANT, and OWNER shall indemnify and hold harmless CONSULTANT from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation by the CONSULTANT will entitle CONSULTANT to further compensation at rates to be agreed upon by OWNER and CONSULTANT. CONSULTANT may use reproductions of the documents without restriction or limitation on their use. For documentation purposes, the original CADD diskette will be retained by the CONSULTANT. A diskette containing the project drawings shall be made available to the OWNER, at the OWNER's request, upon project completion or in accordance with Article 5. Due to the potential that the information set forth on the computer diskettes and /or magnetic tapes can be modified by the OWNER, unintentionally or otherwise, the CONSULTANT reserves the right to remove all indicia of its ownership and /or involvement from each electronic display. Any such use or reuse by the OWNER and others, without written verification or CADD adaptation by the CONSULTANT for the specific purpose intended will be at the OWNER's sole risk and without liability or legal exposure to the CONSULTANT. Furthermore, OWNER shall, to the fullest extent permitted by law, indemnify and hold harmless the CONSULTANT from all claims, damages, losses and expenses, including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle the CONSULTANT to further compensation at rates to be mutually agreed upon by the OWNER and the CONSULTANT. ARTICLE 5. TERMINATION This Agreement may be terminated by either party upon seven (7) days' written notice to the other party as follows: 5.1 The OWNER may, by written notice, terminate this agreement in whole or in part at any time for the OWNER's convenience and either party may terminate this Agreement should the other party fail substantially to perform in accordance with the terms hereof through no fault of the party initiating such termination. Upon receipt of such notice, services shall be: (1) immediately discontinued (unless the notice directs otherwise), and (2) all data, drawings, specifications, reports, estimates, summaries and such other information and materials as may have Page 4 of 6 been accumulated in performing this Agreement where completed or in process delivered to the OWNER. If such information has not been finalized by the CONSULTANT, CONSULTANT shall not be responsible for its accuracy. 5.2 If the termination is for the convenience of the OWNER, CONSULTANT shall be compensated for services performed prior to termination, together with reimbursable expenses then due and other normal business expenses directly attributable to termination for which the CONSULTANT is not otherwise compensated. 5.3 If, after notice of termination for failure to fulfill Agreement obligations, it is determined that the CONSULTANT had not so failed, the termination shall be deemed to have been effected for the convenience of the OWNER. In such event, CONSULTANT shall be compensated as provided in Paragraph 5.2 of this clause. 5.4 The rights and remedies of the OWNER provided in this clause are in addition to any other rights and remedies provided by law or under this Agreement. ARTICLE 6. SPECIAL PROVISIONS AND ATTACHMENTS 6.1 Attachments. The following Attachment(s) are attached to and made a part of this Agreement: 6. 1.1 Exhibit "A ", Design Services Scope of Work, Schedule and Compensation 6.1.2 Exhibit "B ", Site Map 6.2 Schedule of Work. The CONSULTANT will be prepared to begin the work under this agreement immediately after a letter of notification to proceed is received from the OWNER. This Agreement (consisting of pages 1 to 6, inclusive) together with the Attachment(s) identified above, constitutes the entire agreement between CONSULTANT and OWNER, and supersedes all prior written or oral understandings. This Agreement and said Attachment(s) may only be amended, supplemented, modified or canceled by a duly executed written instrument. Page 5 of 6 IN WITNESS WHEREOF, the parties hereto have executed this Contract as of the day and year first written above. CONSULTANT: R. W. ARMSTRONG & ASSOC., INC. By: Scott Hornsby, PE Vice President DATED: Axon'! 41, zc, ADDRESS FOR GIVING NOTICE: R. W. Armstrong & Associates, Inc. 1251 North Eddy Street, Suite 201 South Bend, Indiana 46617 OWNER: CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS By: Gary A. ilot, P.E. 4Preident By: Inks Member By: Cr� Carl P. Littrell, P.E. Member DATE D: l� ADDRESS FOR GIVING NOTICE: City of South Bend Board of Public Works 1316 County -City Building 227 W. Jefferson Boulevard South Bend, Indiana 46601 Page 6 of 6 Exhibit "A" Resign Services Scope Q Arks Schedule and Compensation 1. Project Description A. The project generally includes topographic survey, geotechnical investigation, preliminary site layout, site design, building design (architectural, structural, mechanical, electrical and plumbing) and construction documents, bidding services and construction administration for a new Fire Training Tower /Emergency Response Center for the OWNER. The project will be located on property owned by the St. Joseph Regional Airport Authority (Airport), as depicted in the attached Exhibit "B ". B. The Fire Training Tower /Emergency Response Center will include the following: i. 5 -story Training Tower (approximately 4,400 sq. feet). ii. 2 -story Residential Class "A" Burn Building (approximately 2,100 sq. feet). iii. Outdoor Classroom for Briefing, Debriefing and Breaks (including Storage Area and Rest Room). iv. Access to the site from either Lincolnway West or Blackthorn Golf Club. C. The OWNER anticipates contracting directly with Development Strategies Group (DSG) for certain aspects of this project. 2. Scope of Work A. The CONSULTANT will provide a full topographic survey of the area depicted on Exhibit "B ", which is approximately 57 acres of land area. The topographic survey shall include: 1. The location and elevation of all visible features, including buildings, paved and gravel surfaces, fences, guardrail, shrubs, signs, poles, manholes, valves and meters, and utility locations marked by others, and all individual trees, except limits only of heavily wooded areas. 2. Ground shots on a 50 -foot by 50 -foot grid along with all elevation breaklines. 3. The topographic survey will include one -foot contours. 4. Coordinate system for the project shall be Indiana State Plane coordinates. 5. Three horizontal and vertical control points will be established on the site. B. The CONSULTANT will provide the services of a qualified geotechnical Subconsultant for a geotechnical investigation required for the appropriate design of the site facilities, as defined in item 1.13 of this Exhibit "A ". C. The CONSULTANT will provide the following services: 1. The CONSULTANT will prepare a preliminary site plan layout (one initial layout plus up to two revisions) for the Fire Training Tower /Emergency A -i Response Center. This plan will include locations of the Training Tower along with site access and future facilities that are determined necessary by the City of South Bend and the South Bend Fire Department. The plan will also include location of vehicle and fire truck parking, sidewalks, fire hydrants, and other site necessities. 2. The CONSULTANT will coordinate the site layout plan with the OWNER, DSG, South Bend Fire Department and INDOT. i. Upon approval of the overall site layout, the CONSULTANT will prepare the following: a. Locations, materials and elevations of the site drive access and access roadway to the Fire Training Tower. b. Overall Site Grading Plan for the project. C, Locations, materials and elevations of a 240 -foot by 240 - foot concrete pad that will be the drive /approach to the Fire Training Tower. d. Locations, materials and elevations of potable water and sanitary sewer lines to serve the site. The OWNER, under a separate contract, is constructing potable water and sewer lines to the southeast corner of the site, as shown in Exhibit "B ". e. Prepare an erosion control plan for the site and Rule 5 submissions to the local Soil and Water Conservation District and IDEM. f. The CONSULTANT will coordinate with utilities such as natural gas, electric, telephone regarding access to the site and potential locations for those utilities to locate on the site. The CONSULTANT will not provide actual design services for these types of utilities. 3. The Schematic Design Phase will be performed by DSG. DSG will produce floor plans for each building. DSG will produce the exterior design concept for each building along with exterior building elevations showing material types, roof profile, building style and colors. DSG will also prepare a "Basis of Design" narrative and an index of specifications to be utilized on the project along with a Preliminary Cost Estimate for the project. The CONSULTANT will attend one schematic design phase meeting with DSG and the OWNER. Schematic design phase meeting will be held in South Bend, Indiana. 4. The CONSULTANT will assist DSG with preparation of the Design Development Phase. Design at this stage will be further refined, including additional drawing detail and draft text of major specifications items. The CONSULTANT will provide Design Development Drawings for civil, architectural, structural, mechanical, electrical and plumbing. The CONSULTANT will attend one design development meeting with DSG A -2 and the OWNER. Design development meeting will be held in South Bend, Indiana. 5. The CONSULTANT will prepare the required construction documents in accordance with the current accepted International Building Codes with issued Amendments, as incorporated by City of South Bend, and their applicable local codes. Design will be completed with contract drawings and specifications for the project suitable for public bidding and submittal to state and local agencies will be provided. The CONSULTANT will attend one construction document review meeting with DSG and the OWNER. Construction document review meeting will be held in South Bend, Indiana. 6. The CONSULTANT will perform the following services in regard to bidding the project: i. Assist the OWNER in advertising for and obtaining bid proposals for a prime contractor for construction, materials, equipment and services; and, where applicable, attend a pre -bid conference. ii. Issue addenda as appropriate to interpret, clarify or expand the Bidding Documents that are not directly related to an error or omission from the CONSULTANT. iii. Attend the bid opening, prepare bid tabulation sheets and assist the OWNER in evaluating the bids or proposals and in assembling and awarding contracts for construction, materials, equipment and services. iv. The CONSULTANT will be responsible for attending the Pre - Construction Meeting. 7. During construction of the project, the CONSULTANT will provide the following services: ii. Review shop drawings. iii. Answer contractor RFI's. iv. Perform site observations of each facility as required to meet minimum code requirements. Additional site visits can be provided at RW Armstrong's standard hourly rates. V. Assist the OWNER and DSG in developing a punch -list of items not meeting the intent of the project plans and specifications, which require remediation. 3. Schedule A. All work for this project will be completed so that the OWNER can bid the project in July of 2011. 4. Payment A. The CONSULTANT shall receive as payment for the work performed under this agreement a maximum not to exceed fee of $132,200.00, unless a Supplemental Agreement is approved in writing by the OWNER. A -3 B. The CONSULTANT will be paid for the work performed under this Agreement on in accordance with the following schedule; C. The OWNER for and in consideration of the rendering of the engineering services provided for in Exhibit "A ", agrees to pay the CONSULTANT for rendering such services the fee established above upon completion of the work thereunder and acceptance thereof by the OWNER. D. For those services performed by the CONSULTANT which are included in the itemized costs, as an "Hourly Rate Not to Exceed ", the CONSULTANT will be paid on the basis of an Hourly Rate in accordance with the following Rate Schedule. Classification Hourly Rates Senior Project Manager Description Amount a. Topographic Survey $15,200.00 b. Geotechnical Investigation $8,000.00 C. Preliminary Site Layout and Coordination $11,000.00 d. Civil /Site Design $25,000.00 d. Design and Construction Documents (Architectural, Structural, Electrical, Mechanical, Plumbing) $58,000.00 e. Bidding Services $5,000.00 f. Construction Administration $10,000.00 Registered Land Surveyor Total $132,200.00 C. The OWNER for and in consideration of the rendering of the engineering services provided for in Exhibit "A ", agrees to pay the CONSULTANT for rendering such services the fee established above upon completion of the work thereunder and acceptance thereof by the OWNER. D. For those services performed by the CONSULTANT which are included in the itemized costs, as an "Hourly Rate Not to Exceed ", the CONSULTANT will be paid on the basis of an Hourly Rate in accordance with the following Rate Schedule. Classification Hourly Rates Senior Project Manager $165.00 Project Manager $140.00 Senior Engineer $125.00 Project Engineer $95.00 Designer $90.00 CADD Manager $80.00 CADD Technician $60.00 Chief Inspector $115.00 Senior Inspector $95.00 Inspector $80.00 Clerical $55.00 2 -Man Survey Crew $155.00 Registered Land Surveyor $120.00 A -4 E. If design changes are required during construction due to design errors in the final plans or specifications, the CONSULTANT will make such necessary design changes without additional cost to the OWNER. However, if design changes are required during construction which are occasioned by changed conditions or conditions which could not have been reasonably foreseen by the CONSULTANT prior to construction, the CONSULTANT will be paid for such modifications on the basis of actual hours of work performed by essential personnel exclusively on this contract at the employee hourly rate in accordance with the CONSULTANT's standard fee structure. 5. The following items shall be provided by the OWNER or by DSG: A. Schematic Design Drawings including all floor plans, exterior design concepts and exterior building elevations, styles and colors. B. Written outline Performance Specifications describing the engineered systems anticipated to be used for the project. C. Project Literature and Information, including but not limited to live fire training props, smoke systems, sound systems, and high temperature lining materials. D. Preliminary Cost Estimate at Schematic Design Phase. E. Design Development (DD) Drawings at 95% Completion level for the proposed Buildings, internal equipment layout, overall shell building Structural system design concepts and Site improvements. F. Complete Specifications Sections for Training Related elements, including but not limited to Light Systems, Smoke Systems, Computer Controlled Live Fire Props, Ventilation Systems, High Temperature Thermal Lining, G. Mechanical, Electric & Plumbing System Design Criteria and Guidelines, including product literature, cut sheet information and performance design H. Appropriate vendor facility interface drawings, which depict installation requirements for computer controlled live fire props. I. Final construction cost estimate including actual vendor costs and estimates. 6. The following items shall be considered Additional Services and are not included in the scope of work: A. Design of private utility lines (electric, natural gas, telecommunications). B. Design of off -site sanitary sewer or water lines. C. Design of any pumping systems for either storm water or sanitary sewage. D. 3D fly- through or other computer animated materials. E. Wetland mitigation and /or wetland permitting. F. Retaining wall design. G. Full -time on -site construction inspection. A -5 EXHIBIT "B" �y 7 � 9 r' C • • y • � r ifs BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date _ April 15, 2011 Department Engineering BPW Date April 251, 2011 Phone 235 -5933 Name John Engstrom Requir Legal Attorney Name ,,,gky� -- e Controller n Controller review is required for all Contracts $5,000.00 or more Prior and greater than one year in length per the City Purchasing to Polic u mi Other Appropriate Reviewers i G ttal to I Check the Appropriate Item T e — Required forA# Submissions V-A reement L Contract Pro osal I Addendum n Claim n Bid Opening I Bid Award n R_eq._t_o_A__d_v_,e—rt­is--e-1 n Title Sheet iJ Quote Opening n Quote Award G Chg Order No. r C/O & PCA No. C, PCA L. Ease. /Encroach. G Traffic Control U Resolution IJ Other: Required Information Company or Vendor Name R.W. Armstrong New Vendor L Yes 19 No G If Yes, Approved by Purchasin Project Name Training Center Site Development Phase 1 Project Number 109 -011 B Funding Source EMS Capital Fund Account No. E.M.S.C.I.P. #288000 - 341 -03 -00 Amount $ 132,200 Terms of Contract Purpose /Description Engineering services to Dreoare plans and cnacifir•� +�,,.,� �.,. +w.. Training Center Phase 1 Construction For Chanoe Orders nniv Amount of u Increase $ I_- Decrease $ Previous Amount $ Current Percent of Chan e: % New Amount $ Total Percent of Change: % PO No. niSnarc=1 Qfior Annrnvnl Copy Original - U L 0 G Exhibit "C" Project 2- Development Strategies Group - Facility Design See attached proposal from Development Strategies Group dated April 18, 2011, and attached Board of Public Works Approval dated April 25, 2011 Project Budget: $ 81,000.00 Paid To Date *: $ 8,100.00 Budget funded by TIF: $ 72,900.00 * From other sources 1316 COUNTY -CITY BUILDING 227 W JEFFERSON BOULEVARD SOUTH BEND, INDIAN 46601 -1830 CPl'Y OF SOUTH BEND STEPHFN J. LUEcKE, MAYOR B oARD OF PUBLIC WORKS April 25, 2011 Mr. Terry Haymond Development Strategies Group 37 Southampton Court Newport Beach, California 92660 PHONE 574/235 -9251 FAX 574/235 -9171 RE: Professional Services Agreement — Training Center Site Development Phase 1 Project No. 109 -011 B Dear Mr. Haymond: The Board of Public Works, at its meeting held on April 25, 2011, approved the above referenced Professional Services Agreement for ten percent (10 %) of the total contract in the amount of $8,100.00. Enclosed is a copy of the Professional Services Agreement for your records. If you have any questions, please contact me at (574) 235 -9251. Sincerely, ' Linda M. Martin, Clerk Enclosure c: John Engstrom, Engineering GARY A. GILOT, P. E. DONALD E. INKS CARL P LITTRELL PRESIDENT MEMBER MEMBER AGREEMENT FOR CONSULTING SERVICES THIS AGREEMENT, made and entered into this L -) day of 2011, by and between the City of South Bend, Indiana, acting through is Board of Public Works (hereinafter referred to as the "OWNER "), and Development Strategies Group with its principal office at 37 Southampton Court, Newport Beach, California 92660 (hereinafter referred to as "CONSULTANT "). WITNESSETH THAT: WHEREAS, the OWNER requires the services of the CONSULTANT for providing engineering services defined in Article 1.1. WHEREAS, CONSULTANT has the ability to perform such tasks for the OWNER and is willing to do so upon the terms and conditions stated herein NOW, THEREFORE, in consideration of the terms, conditions and covenants contained or incorporated herein, and the mutual promises hereinafter enumerated, the parties agree as follows: ARTICLE 1. CONSULTANT'S SERVICES 1.1 Nature of Services. CONSULTANT shall, upon OWNER's request and written authorization, perform consulting tasks and services which may include, but shall not be limited to, the following options: 1.1.1 Provide engineering support services required to develop construction documents for the new South Bend Fire Department Training Center as further described in Exhibit "A" • Scope of Services and Exhibit `B" Mechanical, Electrical and Plumbing Requirements 1.2 Initiation of Tasks. In order to facilitate performance of services by CONSULTANT, the OWNER shall review requests and plan submittals. Upon approval, the OWNER shall authorize services for the next phase in accordance with the Scope of Work. 1.3 Notice to Proceed. The CONSULTANT will begin work upon receipt of the written Notice to Proceed or Purchase Order by the OWNER. The Notice to Proceed or Purchase Order will also include the phase of work description, the fee mutually agreed upon by the parties and an anticipated project completion date. 1.4 CONSULTANT's Additional Services. If authorized in writing by the OWNER, the CONSULTANT shall furnish additional services which will be paid for by the OWNER as indicated in Article 2. Page 1 of 7 ARTICLE 2. COMPENSATION 2.1 OWNER agrees to pay the CONSULTANT as compensation for services defined in Article 1.1 a lump sum amount not to exceed fee of Seventy Five Thousand Dollars ($75,000.00) plus Six Thousand Dollars ($6,000) for travel expenses that include airfare, hotel costs, rental car/ local transportation, parking, and per diem for two (2) CONSULTANTS for a total three (3) trips to South Bend Indiana. 2.2 OWNER will reimburse the CONSULTANT for any application and /or permit fees paid for securing approval of authorities having jurisdiction over the project. OWNER will reimburse the CONSULTANT or directly pay for any unforeseen environmental services that may be required. 2.3 For additional services defined in Article 1.4 above, the OWNER will pay the CONSULTANT at a rate or fee mutually agreed upon by the parties prior to CONSULTANT's initiation of any additional service pursuant to this Agreement. 2.4 The OWNER will make a diligent effort to appropriate necessary funds to provide compensation to the CONSULTANT for the services provided under this Agreement. While the OWNER may seek funding assistance from other governmental agencies, it is acknowledged and understood that the compensation to the CONSULTANT as outlined in this Agreement is not contingent upon the receipt by the OWNER of such funds. 2.5 Once.each month, the CONSULTANT may submit to the OWNER an invoice for services rendered. Each invoice shall provide a brief description of the specific work performed and shall represent the value of the partially completed work based on the proportion which its percentage bears to the total cost of the fully completed work. 2.6 Payment of all invoices shall become due no later than thirty (30) das after receipt, provided CONSULTANT submits all claims for compensation upon forms and in a manner approved by the OWNER. The payment of Six Thousand Dollars ($6,000.00) will be forwarded with signed contract in order to purchase airfare travel in advance (six airline tickets) along with payment for hotel costs, rental car / local transportation, parking, and per diem for two (2) CONSULTANTS for a total three (3) trips to South Bend, Indiana 2.7 No deduction shall be made from the CONSULTANTSs compensation on account of penalty, liquidated damages, or other sums withheld from payments to owners. 2.8 If any work designed or specified by the CONSULTANT during any phase of service is abandoned in whole or in part, or suspended for a period exceeding three months, the CONSULTANT shall be paid by the OWNER for the services performed prior to receipt of written notice from the OWNER of such abandonment or suspension, together with reimbursements then due and any termination expense resulting from such abandonment or suspension as determined and agreed to by the CONSULTANT and the OWNER. Page 2 of 7 ARTICLE 3. GENERAL TERMS 31 This Agreement shall become effective on the date hereof and remain in effect for the duration of the Project defined in Article 1.1. 3.2 Information available to the OWNER and required by the CONSULTANT shall be furnished at no cost to the CONSULTANT in an expeditious manner for the orderly progress of the work. The CONSULTANT shall be entitled to rely upon the accuracy thereof. 3.3 The OWNER, pursuant to Article 1.2 hereof, shall have complete authority to transmit instructions to and receive information from the CONSULTANT. 3.4 The CONSULTANT is responsible for the professional quality, technical accuracy, timely completion and coordination of all designs, drawings, specifications, reports, and other services furnished by the CONSULTANT under this Agreement consistent with reasonable, prudent and professional skill and care as is ordinarily exercised by consultants in similar circumstances and locations. The CONSULTANT shall, without additional compensation, correct or revise any errors, omissions or other deficiencies in its design, drawings, specifications reports and other services; provided, that in the case of an omission, CONSULTANT shall be responsible only for the additional cost, if any, compared with what the cost of work would have been, had it been included in the initial product of services. 3.5 Both parties agree that for the purpose of this Agreement, the CONSULTANT shall be an independent contractor and not the employee of the OWNER. 3.6 The CONSULTANT shall not have control over and shall not be responsible for the acts or omissions of any contractor, engineer, consultant or other person engaged separately and directly by the OWNER. ARTICLE 4. ASSURANCES 4.1 Non - Discrimination. The CONSULTANT, with regard to the work performed by it during this Agreement, shall not discriminate on the grounds of sex, race, color, national origin, handicap or veteran status in the selection and retention of sub- contractors, including procurement of materials and leases of equipment. This Agreement incorporates by reference the equal opportunity clause set forth in Section 202 of Executive Order 11246. 4.2 Solicitations for Sub - Contracts. Including Procurements of Materials and Equipment. In all solicitations, either by competitive bidding or negotiation, made by the CONSULTANT for work to be performed under a sub - contract including procurement of materials or lease of equipment, each potential subcontractor or supplier shall be notified by the CONSULTANT of its obligations under this Agreement and the regulations relative to non - discrimination on the grounds of sex, race, color, national origin, handicap or veteran status. Page 3 of 7 4.3 Ownership and Reuse of Documents. The drawings and specifications are instruments of service; and as such, the documents, tracings, and field notes originating with the CONSULTANT are and remain the property of the CONSULTANT whether the work for which they were prepared is executed or not. Copies of the aforementioned documents shall be made available to the OWNER, at the OWNER's request, upon project completion or in accordance with Article 5. All documents, including Drawings and Specifications prepared by CONSULTANT pursuant to this Agreement, are instruments of service in respect of the Project. They are not intended or represented to be suitable for reuse by OWNER or others on extensions of the project or on any other project. Any reuse without written verification or adaptation by CONSULTANT for the specific purpose intended will be at OWNER's sole risk and without liability or legal exposure to CONSULTANT, and OWNER shall indemnify and hold harmless CONSULTANT from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation by the CONSULTANT will entitle CONSULTANT to further compensation at rates to be agreed upon by OWNER and CONSULTANT. CONSULTANT may use reproductions of the documents without restriction or limitation on their use. For documentation purposes, the original CADD diskette will be retained by the CONSULTANT. A diskette containing the project drawings shall be made available to the OWNER, at the OWNER's request, upon project completion or in accordance with Article 5. Due to the potential that the information set forth on the computer diskettes and /or magnetic tapes can be modified by the OWNER, unintentionally or otherwise, the CONSULTANT reserves the right to remove all indicia of its ownership and /or involvement from each electronic display. Any such use or reuse by the OWNER and others, without written verification or CADD adaptation by the CONSULTANT for the specific purpose intended will be at the OWNER's sole risk and without liability or legal exposure to the CONSULTANT. Furthermore, OWNER shall, to the fullest extent permitted by law, indemnify and hold harmless the CONSULTANT from all claims, damages, losses and expenses, including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle the CONSULTANT to further compensation at rates to be mutually agreed upon by the OWNER and the CONSULTANT. Page 4 of 7 ARTICLE 5. TERMINATION This Agreement may be terminated by either party upon seven (7) days' written notice to the other party as follows: 5.1 The OWNER may, by written notice, terminate this agreement in whole or in part at any time for the OWNER's convenience and either party may terminate this Agreement should the other party fail substantially to perform in accordance with the terms hereof through no fault of the party initiating such termination. Upon receipt of such notice, services shall be: (1) immediately discontinued (unless the notice directs otherwise), and (2) all data, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated in performing this Agreement where completed or in process delivered to the OWNER. If such information has not been finalized by the CONSULTANT, CONSULTANT shall not be responsible for its accuracy. 5.2 If the termination is for the convenience of the OWNER, CONSULTANT shall be compensated for services performed prior to termination, together with reimbursable expenses then due and other normal business expenses directly attributable to termination for which the CONSULTANT is not otherwise compensated. 5.3 If, after notice of termination for failure to fulfill Agreement obligations, it is determined that the CONSULTANT had not so failed, the termination shall be deemed to have been effected for the convenience of the OWNER. In such event, CONSULTANT shall be compensated as provided in Paragraph 5.2 of this clause. 5.4 The rights and remedies of the OWNER provided in this clause are in addition to any other rights and remedies provided by law or under this Agreement. ARTICLE 6. DISPUTE PROVISION 6.1 In an effort to resolve any conflicts that arise during the design and construction of the Project or following the completion of the Project, the OWNER and the CONSULTANT agree that all disputes between them arising out of or relating to this Agreement or the Project shall be submitted to nonbinding mediation unless the parties mutually agree otherwise. The OWNER and the CONSULTANT further agree to include a similar mediation provision in all agreements with independent contractors and consultants retained for the Project and to require all independent contractors and consultants also to include a similar mediation provision in all agreements with their subcontractors, sub - consultants, suppliers and fabricators, thereby providing for mediation as the primary method for dispute resolution between the parties to all those agreements. Page 5 of 7 ARTICLE 7. SPECIAL PROVISIONS AND ATTACHMENTS 7.1 Attachments. The following Attachment(s) are attached to and made a part of this Agreement; 7.1.1 Exhibit "A" Design Services Scope of Work, Schedule and Compensation 7.1.2 Exhibit "B" Mechanical, Electrical and Plumbing Requirements 7.2 Schedule of Work. The CONSULTANT will be prepared to begin the work under this agreement immediately after a letter of notification to proceed is received from the OWNER. Page 6 of 7 This Agreement (consisting of pages 1 to 7, inclusive) together with the Attachment(s) identified above, constitutes the entire agreement between CONSULTANT and OWNER, and supersedes all prior written or oral understandings. This Agreement and said Attachment(s) may only be amended, supplemented, modified or canceled by a duly executed written instrument. IN WITNESS WHEREOF, the parties hereto have executed this Contract as of the day and year first written above. CONSULTANT: DEVELOPMENT STRATEGIES GROUP By: Terry Hfiyrno-lid, MA P. ihcipal DATED: !lam 2v ADDRESS FOR GIVING NOTICE: Development Strategies Group 37 Southampton Court Newport Beach CA 92660 OWNER: CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS By: _ Gary A. Gilot President By: F G �--- jonoa�ld Inks Member By: Carl P. Littreil Member DATED: ADDRESS FOR GIVING NOTICE: City of South Bend Board of Public Works 1316 County -City Building 227 W. Jefferson Boulevard South Bend, Indiana 46601 Page 7 of 7 r/. tra elopment roup tegies g City of South Bend Fire Department Scope & Fee Proposal Exhibit "A" Design Services Scope of Work Schedule and Compensation TASK 1: PROJECT DESIGN AND DOCUMENTATION: The purpose of this task is to develop and prepare the project construction documents through a systematic step -by -step process. This task seeks to utilize all of Development Strategies Group's (DSG) experience to incorporate into the development of the project's construction document package with R. W. Armstrong for the solicitation of construction bids. R. W. Armstrong, a local Project Architect TEAM (providing architectural, mechanical, electrical, plumbing, civil, landscape and structural services) will be engaged by the City of South Bend. This document outlines the roles and responsibilities of DSG (the fire training design consultant) and R. W. ARMSTRONG (the Project Architect -of- Record and Engineer -of- Record) for each discipline and the necessary coordination efforts for a complete and integrated set of construction documents and project specifications. TASK 1 -1 Site and Building Schematic Design The DSG Team will develop and refine the Owner's program and produce a site layout that reflects the primary arrangements for: 5 -story Training Tower 0 2 -story Residential Class "A" Burn Building v Outdoor Classroom for Briefing, Debriefing and Breaks (rehab) • Roof with limited side walls • Typical Classroom Lighting, White Boards, Benches, Rest Rooms Storage Area (approximately 2,000 SF) attached to back of the Outdoor Classroom with slide up doors Following direction on the site layout, DSG will produce one (1) floor plan layout for each building. Based on decisions from the floor plan review, one (1) exterior design concept will be presented for review for each building. The exterior building elevations will show proposed material types, roof profiles, building style, and colors. A working meeting with the project committee by will be set to refine the Site and Building Schematic Design utilizing WebEx Deliverables: • Schematic Design: Site Plan layout of training buildings and outdoor classroom • Schematic Design: Building floor plans and elevations by DSG 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 r, Development II �tegieS JI g p City of South Bend Fire Department Scope &Fee Proposal • Written outline Performance Specifications briefly describing the DSG engineered systems anticipated to be used for the project by • R.W. Armstrong will provide the civil plan for the proposed systems for water, sewage, storm drainage, off -site connection requirements, construction storm water pollution prevention plan (as required) and utilities • Project Literature and Information by DSG, including but not limited to live fire training props, smoke systems, sound systems, and high temperature lining materials • Preliminary Cost Estimate by DSG: Rough Order of Magnitude (ROM) TASK 1 -2 Design Development The primary intent of this phase is to expound upon the Schematic Phase submittal to a point where the entire project is identified as it relates to each of the disciplines including but not limited to proposed architectural, structural, mechanical, plumbing and site civil & utility requirements. Meetings: o DSG will attend One (1) Working meeting to discuss Design Development Plans with Owner and Project Architect TEAM in South Bend, Indiana Deliverables: o DSG will provide Design Development (DD) Drawings at 95% Completion level for the proposed Buildings, internal equipment layout, overall shell building Structural system design concepts and Site improvements o DSG will provide complete Specifications Sections for Training Related elements, including but not limited to Light Systems, Smoke Systems, Computer Controlled Live Fire Props, Ventilation Systems, High Temperature Thermal Lining o DSG will provide Mechanical, Electric & Plumbing System Design Criteria and Guidelines, including product literature, cut sheet information and performance design o DSG will provide the appropriate vendor facility interface drawings which depict installation requirements for computer controlled live fire props o DSG will provide a 3D fly through of the South Bend Fire Department Training Center. o R. W. ARMSTRONG will provide (DD) drawings for civil, structural, mechanical, electrical, plumbing, and landscaping, coordinating with architectural for this phase. A more detailed 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683.7110 development group City of South Bend Fire Department Scope &Fee Proposal scope for mechanical, electrical and plumbing requirements is listed in Exhibit "B" attached to this document. • R. W. ARMSTRONG electrical drawings shall delineate all power, conduit and circuits for design intent review by DSG. • R. W. ARMSTRONG will provide for electrical service to be brought to the site via transformer. The training buildings should be supplied with standard panels within the interior, extended from the main service TASK 1 -3 Construction Documentation This task is to complete the construction documentation for the project including drawings, specifications, structural and energy calculations. R. W. ARMSTRONG's TEAM will prepare all of the required documents in accordance with the current accepted International Building Codes with issued Amendments, as incorporated by City of South Bend, and their applicable local codes. DSG will provide support for this process with cooperation in clarifying the Design Development drawings and specifications for implementation into the final project documents. Meetings: o DSG will attend One (1) Working meeting to review final Construction Documents with owner and Project Architect TEAM in South Bend, Indiana Deliverables: DSG & R.W. Armstrong will work together to provide the: • Electronic AutoCAD files for training element details. • Electronic 100% Product Specifications • Redline drawing review comments • Final construction cost estimate input including actual vendor costs and estimates through coordinated work of both DSG and R. W. Armstrong TEAM TASK 1 -4 Project TEAM Coordination This task is the interactive coordination efforts between the Project Architect's team of sub - consultants. These would include civil, structural, electrical, mechanical, plumbing, landscape, etc. o Project Architect TEAM Kick -Off Meeting concurrent with Design Development DSG will meet with R. W. ARMSTRONG and its sub - consultants to coordinate the project design concepts. The goals of the meeting are to openly discuss the project and the peculiar elements that comprise a training facility. Also to be discussed are the roles and responsibilities of each discipline and the 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 r, 5 tewPment II �. grow City of South Bend Fire Department Scope & Fee Proposal necessary coordination efforts for a complete and integrated set of construction documents and project specifications. o Coordination and Specific Requirement Plans DSG will prepare plans and coordination documents to be distributed by R. W. ARMSTRONG to each of the disciplines for their use in engineering and preparing of the construction documents. These plans address the various elements for training such as live fire props, sound systems, training lighting controls, etc. o Coordination and Requirement Meeting & Communication Together with R. W. ARMSTRONG, DSG will meet with the respective discipline sub - consultants and discuss the prepared coordination and requirement plans. As with all projects, DSG will maintain communication via telephone and electronic media with the Project Architect and its consultants as it relates to the training structures and elements. o Discipline Plan Review and Coordination At various established project milestones, DSG will review and "red -line" consultant drawings for coordination and corrections. These comments will be submitted to R. W. ARMSTRONG for discussion and incorporation. o Final Plan Review Prior to the final release of the construction documents, DSG will perform a final review of the prepared documents and provide comments for coordination and implementation. TASK 2: CIVIL ENGINEERING & LANDSCAPING It is the understanding that the Project Civil Engineering and the Landscape Development Plans for the proposed project will be designed and provided by R. W. ARMSTRONG, South Bend, Indiana. TASK 3: AGENCY SUBMITTAL & REVIEW PROCESS: The purpose of this task is the submittal of the construction documents to each of the regulatory agencies as required for their review and approval. 37 Southampton CT — Newport Beach CA 92660 Telephone 9491683.7110 r *elo es •J rou $ P City of South Bend Fire Department Scope & Fee Proposal TASK 3 -1 Submittal Process DSG will review the RWA permit submittal package prior to submittal in order to identify potential deficiencies and advise RWA of such. TASK 3 -2 Correction Process Upon release of the Agency review comments and correction requirements, DSG will assist the Project Architect with any issues that may affect or impact the project objectives or the project established budget. TASK 4: CONSTRUCTION ADMINISTRATION: The purpose of this task is to assist the client and the Project Architect in the administration process of the construction. This task requires actions by the Project Architect TEAM and DSG from the initial project construction kick -off to the contractor's punch list preparation. TASK 4 -1 Construction Assistance DSG will assist the Project Architect TEAM and City /Construction Manager during the construction phase by reviewing and responding to Contractor submittals and requests for additional information, reviewing and responding to requests by the City or Contractor for changes in as it pertains to the training buildings and equipment. TASK 4 -2 Construction Punch List Upon completion of construction, DSG will assist the Project Architect TEAM in the preparation of a detailed list of items for the contractor to address in accordance with the contract documents. Meetings: o DSG will attend One (1) Site Construction Meeting in South Bend, Indiana as part of our Base Contract Scope of Services. Additional requested meeting attendance will be performed in accordance with the contract agreement for additional services. Deliverables: o DSG will provide assistance in the Review and Comments for Submitted Construction Correspondence including but not limited to: Requests for Information (RFIs), Shop Drawings, Clarifications, Punch List, Etc. SCHEDULE: DSG will begin work on May 2, 2011 and finish all tasks by July 01, 2011 for a total of 45 work days including travel time 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 F�5� t ��' group City of South Bend Fire Department Scope & Fee Proposal FEE SCHEDULE TASK SERVICES COSTS I PROJECT DESIGN & DOCUMENTATION 1.1 1.2 Site & Building Schematic Design Design Development $20,000 $26,000 1.3 Construction Documentation $10,000 1.4 2 Project TEAM Coordination CIVIL ENGINEERING & LANDSCAPING 0,000 3 AGENCY SUBMITTAL & REVIEW PROCES 3.1 Submittal Process W$2,5001 ,000 3.2 Correction Process ,000 4 CONSTRUCTION ADMINISTRATION 4.1 Construction Assistance 4.2 Construction Punch List — $2,500 TASK TRAVEL EXPENSES ONLY — 3 TRIPS FOR 2 PEOPLE EACH TRIP $6,000 1.1 SITE & BUILDING SCHEMATIC DESIGN MEETINGS Web conferencing for detail discussions & drawing review through WebEx 1.2 DESIGN DEVELOPMENT MEETING DSG will attend One (1) Project TEAM Coordination Workshop in South Bend, Indiana with the City of South Bend & R. W. Armstrong to discuss Design Development drawings Two 2 DSG attendees 1.3 1 CONSTRUCTION DOCUMENTATION MEETING DSG will attend One (1) Working meeting to review final Construction Documents with Client and Project Architect TEAM Two 2 DSG attendees 1.4 CONSTRUCTION ADMINISTRATION MEETINGS DSG will attend One (1) Site Construction Meetings as part of our Base Contract Scope of Services. Two 2 DSG attendees 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 r'S .,went group City of South Bead Fire Department Scope &Fee Proposal PAYMENT SCHEDULE: o Progress Payment for Travel Expenses — Six Thousand Dollars ($6,000.00) forwarded with signed contract — Purchase airfare travel in advance (six airline tickets) allows for a savings of approximately twenty percent (20 %). o TASK 1.1 Site & Building Schematic Design — Invoiced at completion $20,000 o TASK 1.2 Design Development — Invoiced at completion of all task $26,000 o TASK 1.3 Construction Documentation - Invoiced at completion of all task $10,000 o TASK 1.4 Project TEAM Coordination - Invoiced at completion of all task $10,000 c TASK 3.1 Submittal Process & TASK 3.2 Correction Process - Invoiced at completion of all task $4,000 o TASK 4.1 Construction Assistance &TASK 4.2 Construction Punch List - Invoiced at completion of all task $5,000 ADDITIONAL SERVICES: In the event that the City of South Bend requires services beyond those outlined in this proposal, DSG will provide those services on an hourly basis at the rate, plus the cost of expenses, including airfare, hotel and meals while traveling to the Client's designated destination. o Principal - $200.00 per hour o Architect - $150.00 per hour o Drafting - $80.00 per hour o 3D Rendering - $100.00 per hour 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683.7110 r' 'Id 'a ,emsent PUP City of South Bend Fire Department Scope -& Fee Proposal EXHIBIT "B" Mechanical, Electrical and Plumbing Requirements 5 -story Training Tower (approximately 4,400 sf) 2 -story Residential Class "A" Bum Building (approximately 2,100 sf) Cityscape Night Lighting - 5 -story Training Tower & 2 -story Residential Training Building o Six (6) Outdoor pole lights Interior Electrical Lighting Requirements 5 -story Training Tower • Stairwell lights - 5 floors ruggedized penal style lights • Hallway lights — 2 floors ruggedized penal style lights 2 -story Residential Training Building o 1St Floor - one (1) ruggedized penal style light 0 2nd Floor - one (1) ruggedized penal style light Live Fire Trainers — Gas Fueled / Computer Controlled Requirements 5 -story Training Tower - 1St Floor - One Trainer & 2nd Floor One Trainer Electrical Requirements • Provide Electrical Service to 5 -story Training Tower • Electrical control and interconnect conduit to bum building equipment room located on 1St and 2nd Floor • Electrical disconnect boxes in fire simulator equipment rooms • Final power available in equipment areas Plumbing - Natural Gas Fueled or Propane Fueled • Provide natural gas or propane tank (2,000 gallon tank) • Supply and installation of first stage regulator • Natural Gas or Propane stub -ups (capped and pressure tested) near fire simulator equipment rooms Mechanical • Capped and Pressure Tested Gas Distribution Piping in Each Equipment Area • Intake Air Louvers Installed in Equipment Areas and Bum Rooms • Exhaust Air Duct and Louvers Installed in All Bum Rooms • Thermal Lining Material Installed in Bum Rooms • Wall Penetration Installed Between Each Equipment Area and Burn Room • Roof curbs for Ventilation fans in place 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 raDevelopment y strategies I group City of South Bend Fire Department Scope & Fee Proposal 2 -story Residential Class "A" Burn Building - 1 sc Floor & 2nd Floor will include Class "A" Fire Deflector Crib Prop Electrical Requirements o Provide Electrical Service to 2 -story Residential Class "A" Burn Building Mechanical o Thermal Lining Material Installed in Burn Rooms SMOKE GENERATOR with DMX CONTROLLERS and SIMULATED FIRE AMBER LIGHT with LIGHT CONTROLS 5 -story Training Tower — 4 smoke system, controllers and lights • Four (4) Smoke systems with DMX Controllers and Simulated Fire Amber Lights • DMX Controller — 1 controller per Smoke Generator located in 1 s' Floor Equipment Room • Light Switch Controller — 1 per Simulated Fire Amber Light located On Floors 1, 2, 3 and 4 Electrical Requirements • Electrical Conduit / Pull Boxes • Final Power Available to all Smoke Generation Equipment and Simulated Fire Amber Lights in training rooms • Connection of Smoke Generator DMX Controller in Equipment Room • Connection Simulated Fire Amber Lights in Training Rooms to Pilot Light Controller on Floors 1, 2, 3 and 4 2 -story Residential Class "A" Burn Building — Electrical Requirements • Electrical Conduit / Pull Boxes • Final Power Available to ruggedized penal style light on 1s' Floor & 2 "d Floor 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 tez en t grow City of South Bend Fire Department Scope & Fee Proposal Based on the Exhibit "A" Design Services Scope of Work, Schedule and Compensation and Exhibit "B" Mechanical, Electrical and Plumbing Requirements, this constitutes the complete and entire Statement of Work between the parties, Development Strategies Group, "CONSULTANT", and the City of South Bend Indiana, "OWNER ". No other Scope of Work shall exist except as contained in this document, which can only be amended by written agreement between the parties. The undersigned represent that they are authorized to execute the terms of this Scope of Work on behalf of the agencies represented Development Strategies Group Terry Haymond Signature Da e On behalf of the City of South Bend, 'Indiana Name Signature Date Principal AP'PROM Title Bvard of PU lic Purl;e- APR 952 37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 I"lopment :tr�ce�tes � City of South Bend Fire Department Scope & Fee Proposal April 11, 2011 John C. Engstrom, P.E. Assistant City Engineer City of South Bend 1316 County -City Building 227 West Jefferson Blvd. South Bend, IN 46601 r APR Subject: South Bend Fire Department Training Center Attachment: Exhibit "A" Design Services Scope of Work, Schedule and Compensation Exhibit "B" Mechanical, Electrical and Plumbing Requirements Dear John: Development Strategies Group (DSG) is pleased to submit this proposal for services to provide for the design and development of the South Bend Fire Department Training Center. DSG understands your vision to create a comprehensive and integrated Fire Training Complex that not only addresses the basic training elements for young fire fighters but also challenges the experienced veteran fire firefighters. It is our collaborative approach with the City of South Bend Fire Department personnel to: Provide various training environments and scenarios to First Responders that address real issues and events within their service region. ■ Provide structures that incorporate multiple features that allow the trainer to continually change and augment training evolutions Provide elements with the fire training structures that can be utilized by all branches within the fire service such as; USAR, HAZMAT, EMS and Fire Prevention. ■ Provide innovative and advanced training elements unseen in existing basic "Burn Buildings ". ■ Provide multiple interactive features that enhance the training environment. Integrate training structures and elements in such away that multiple agencies could train and work together. Our passion and desire is to design a complete Fire Training Complex that would meet and exceed your expectations. Our only business for the past twenty years has been the design and development of Fire Training Centers. The facility would be designed to fulfill your needs for today and for the future. We look forward to working together. Sincerely, TeFry'Haymond Principal 37 Southampton CT - Newport Beach CA 92660 Telephone 949/683 -7110 (4/14/2011) Jennifer Corle - Agenda Request Form- DSG.doc BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date April 14, 2011 Department Engineering BPW Date April 25, 2011 Phone 235 -5933 Name John Engstrom Requir Legal ❑ Attorney Name ed Controller ❑ Controller review is required for all Contracts $5,000.00 or more Prior and greater than one year in length per the City Purchasing to Policy Submi Other Appropriate Reviewers I i ttal to Board ChPCk the Annrnnriatp Ifpm Tvna _ Rnrndmrl fnr All U Agreement U Contract ❑ Pro osal F Addendum ❑ Claim Project Name Training Center Site Development Phase 1 G Bid Opening ❑ Bid Award ❑ Reg. to Advertise Ti Title Sheet n Quote Opening ❑ Quote Award Account No. U Chg Order No. n C/O & PCA No. U PCA Ease. /Encroach. ❑ Traffic Control 0 Resolution C Other: Training Center Phase 1 Construction Fk(=ie 1111 Cao n Company or Vendor Name I Development Strategies Group New Vendor u Yes ❑ No E If Yes, Approved by Purchasing Project Name Training Center Site Development Phase 1 Project Number 109 -011 B Funding Source EMS Capital Fund Account No. E.M.S.C.I.P. #288000 - 341 -03 -00 Amount 1$81,000 PO No. Terms of Contract Purpose /Description Engineering services to prepare plans and specifications for the Training Center Phase 1 Construction For ChaneP Orders nniv Amount of C t� I Increase Decrease $ $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % PO No. ulspersai Aner Approval Copy Original n n L u Page -1 Exhibit "D" Project 3- Ken Herceg & Associates - Infrastructure Design See attached proposal from Ken Herceg & Associates dated April 6, 2011, and attached Board of Public Works Approval dated April 25, 2011 Project Budget: $ 15,000.00 Paid To Date *: $ 0.00 Budget funded by TIF: $ 15,000.00 * From other sources 1316 COUNTY -Cm, BUnDING 227 W. JEFFERSON Boua,.,ARD SOUTH BEND, INDIANA 46601 -1830 CITY OF SOUTH BEND STEPHFN J. LUECKE, MAYOR BOARD OF PUBLIC WORKS April 25, 2011 Mr. Ken Herceg Ken Herceg & Associates, Inc. 211 West Washington Street, Suite 2100 South Bend, Indiana 46601 PHONE 574/ 235 -9251 FAx 574/ 235 -9171 RE: Professional Services Proposal Fire Training Center - Sanitary Sewer & Water Service — Engineering Services Project 109 -011A Dear Mr. Herceg: The Board of Public Works, at its meeting held on April 25, 2011, approved the above referenced Professional Services Proposal for ten percent (10 %) of the total contract in an amount not to exceed $1,500.00. Enclosed is a copy of the Professional Services Proposal for your records. If you have any questions, please contact me at (574) 235 -9251. Sincerely, Linda M. Martin, Clerk Enclosure c: John Engstrom, Engineering GARY A. GILOT, P.L. DONALD E. Ir.KS CARL P. LITTRELL CH E K EN HERCEG & ASSOCIATES INC. RA E G , ENGINEERS, ARCHITECTS & LAND SURVEYORS April 6, 2011 Mr. Carl Littrell City Engineer City of South Bend 1316 County /City Building 227 West Jefferson Blvd. South Bend, IN 46601 PROPOSAL Kenneth P. Herceg, P.E., L.S. Nitin V. Timble, P.E., L.S. Timothy J. Wall, AIA, LEED AP John E. DeLee, P.E. Brian W. W. Thomasen, P.E. CITY OF SOUTH BEND ENGINEERING SERVICE FOR THE UPDATE OF DESIGN OF CITY OF SOUTH BEND PROJECT NUMBER 109 -011A SANITARY SEWER SERVICE AND POTABLE WATER SERVICE TO THE PROPOSED EMERGENCY SERVICE TRAINING FACILITY AT THE SOUTH BEND REGIONAL AIRPORT CITY OF SOUTH BEND, INDIANA In response Mr. John Engstrom's request April 5, 2011, Ken Herceg & Associates, Inc., (HERCEG) offers professional engineering services to the City of South Bend (CITY) in its effort to update the project plans and specifications for the above titled project originally designed by HERCEG in 2007 for bidding and construction purposes; and to reapply for IDEM water, sanitary sewer and Rule 5 permits for the same project. We offer to perform the following: PART I. SCOPE OF SERVICES: A. The original engineering plans and specifications for the City of South Bend Project Number 109 -011A for water and sewer service upgrades (as completely described in contract dated February 16, 2007 between CITY and HERCEG) are to be brought up to current standards and made ready for bids to be received by CITY. B. Erosion and Sediment Control permit upgrade 1. The project is anticipated to disturb more than 1 acre of land. A new Rule 5 Permit is anticipated. 2. Erosion and sediment control is to be updateded using best management practices (BMP). 3. Preparation of a one Rule 5 Permit will be updated but will be submitted by the CITY. 4. Preparation of a Storm Water Pollution Prevention Plan (SWPPP) will be updated and will be submitted by the CITY. 211 W. Washington Street, Suite 2100 Page 1 of 3 P.O. Box 547 South Bend, Indiana 46601 Niles, Michiaan4 Mr. Carl Littrell Page 2 of 3 PROPOSAL: ENGINEERING SERVICE FOR THE April 6, 2011 UPDATE OF DESIGN OF CITY OF SOUTH BEND PROJECT NUMBER 109 -011A PART II. TERMS & CONDITIONS: A. SCHEDULE The contract time for providing the above - described work upon receipt of a signed contract shall be as follows: 1. SWPPP /Rule 5 ......................... ............................... on or before May 16, 2011 2. 100% Design ............................ ............................... on or before May 16, 2011 Total Estimated Time for Completion ...................... .............................23 days Contract dates and days are based on an approved agreement on or before May 2, 2011 and are exclusive of delays due to review time by Client or other agencies. B. The fee for the above described work shall be a Lump Sum Fee Of ........... $15,000.00 C. It is understood that CITY shall allow HERCEG access to all plans and /or records in its possession and at its disposal pertaining to this work. D. Payment will be made from invoices billed monthly based on percent complete. E. It is agreed that the CITY will apply for and provide the Prevailing Wage Rates from the Wage and Hour Division of the State of Indiana. It is further agreed that the CITY will assume all responsibility for the administration of (including the collection of, certification of, review of, or any other handling of) the wage determinations and wage rate hourly certifications from the contractor on this project. The CITY releases HERCEG of all responsibility in the matter of Prevailing Wage. F. If additional engineering, architectural or surveying services are required which are outside of the scope of this agreement, those out of scope services shall be negotiated according to the billing schedule attached to this document as Exhibit A. G. It is understood that this proposal shall remain open through May 30, 2011. After that time HERCEG reserves the right to renegotiate the terms of this proposal. Mr. Carl Littrell Page 3 of 3 PROPOSAL: ENGINEERING SERVICE FOR THE April 6, 2011 UPDATE OF DESIGN OF CITY OF SOUTH BEND PROJECT NUMBER 109 -011A I. Exhibit B of this proposal is a list of items to be provided by the CITY. If this proposal is acceptable, please execute this document as a contract and deliver one signed copy to this office for immediate action. PROPOSED AND AGREED TO THIS 6TH DAY OF APRIL, 2011 BY KEN HERCEG & ASSOCIATES, INC. KPH /kh THE TERMS AND CONDITIONS OF THIS PROPOSAL ARE ACCEPTED AS A CONTRACT THIS Z 101-n DAY OF 2011. APPROVED 8Q. -Te- of p6ua TCHM r 'P' 21 5 0� ITS ,Ire Enclosures cc: File K:1 20071101 1Accounting\Supplement\Update Contract 2007 101A final.doc EXHIBIT "A" BILLING SCHEDULE Effective January 7, 2011 KEN HERCEG & ASSQ CIATES NC. ENGINEERS, ARCHITECTS & LAND SURVEYORS DESIGNATION MAXIMUM RATE ENGINEER (PRINCIPAL) $229.00/HR. ENGINEER VIII $209.00 /HR. ENGINEER VII $180.00 /HR. CHIEF ARCHITECT $160.00 /HR. ENGINEER VI $152.00/1-IR. SENIOR ARCHITECT $107.00 /HR. ARCHITECT GRAD $74.00 /HR. ENGINEER V $128.00/HR. ENGINEER IV $111.00/HR. ENGINEER III $96.00 /HR. ENGINEER II $85.00 /HR. ENGINEER I $80.00 /HR. SURVEY — THREE PERSON CREW $216.00/HR. SURVEY — TWO PERSON CREW $140.00/HR. SURVEY— ONE PERSON CREW $92.00 /HR. SURVEY— RLS $137.00/HR. TECHNICIAN V . $81.00 /HR. TECHNICIAN IV $73.00 /HR. TECHNICIAN III $66.00 /HR. TECHNICIAN II $55.00 /HR. TECHNICIAN I $45.00 /HR. PROJECT ANALYST $69.00 /1-IR. STENO $55.00 /HR. OVERTIME PREMIUM:* OVERTIME RATES SHALL BE AS FOLLOWS: OVER 40 HOURS/WEEK = 1.2 TIMES THE ABOVE RATES EXPERT TESTIMONY = 2 TIMES THE ABOVE RATES * OVERTIME RATES SHALL NOT BE CHARGED WITHOUT PRIOR AUTHORIZATION REIMBURSABLE EXPENSES: MILEAGE OUTSIDE PROF. SERVICES COPY TRAFFIC COUNTER RENTAL (EACH) DIRECT EXPENSES PRINTING & PHOTO EXPENSE LONG DISTANCE TELEPHONE CLIENT MEETINGS OFF -SITE REQUIRED SPECIAL ITEMS $ 0.40/M I. Invoice X 1.20 Invoice X 1.15 $90.00/WK. Invoice X 1.15 RECEIPT RECEIPT RECEIPT RECEIPT G: 1Marketing iProposaMExhibit\ExhibitA - 01 07 2011.doc 1/7/11 EXHIBIT B INFORMATION AND SERVICES TO BE FURNISHED BY CITY 1. The CITY shall designate one person as the CITY's representative. This person shall be the sole contact for HERCEG on this project. 2. The CITY will provide soil borings and geotechnical report necessary for the project. Locations of soil borings will be coordinated between the CITY and HERCEG through the designated CITY representative. 3. The CITY will furnish GIS Electronic Mapping in (3- Dimensional, 2005 AutoCAD) DWG format with layering and in Indiana State Plane Coordinate System. The GIS Mapping should contain topography with contours, parcel lines with ownership, soil mapping, wetland, hazard waste and underground storage tank (UST) locations, and flood plain information. 4. It is agreed that the CITY will apply for and provide the Prevailing Wage Rates from the Wage and Hour Division of the State of Indiana. It is further agreed that the CITY will assume all responsibility for the administration of (including the collection of, certification of, review of, or any other handling of) the wage determinations and wage rate hourly certifications from the contractor on this project. The CITY releases HERCEG of all responsibility in the matter of Prevailing Wage. 5. It is understood that CITY shall allow HERCEG access to all plans and /or records in its possession and at its disposal pertaining to this work. 6. It is understood that CITY will provide any necessary wetland designation, location and mitigation. 7. Right -of -way or Property boundary survey, if necessary, will be by the CITY. City of South Bend, Indiana Department of Public Works Project: Regional Training Center -Project #109 -011A Cost Estimate 04/06/2011 TOTAL = 566,584.88 Page 1 of 1 Item No. Description p Spec. Section Quantity Unit Unit Price Extension 1 MOBILIZATION /DEMOBILIZATION 110 1 LSUM 1 $16,266.00 $16,266.00 2 1CONSTRUCTION ENGINEERING 105 1 LSUM $8,133.00 $8,133.00 3 JPRV AND FLOW METER AND RELOCATION 1 LSUM $14,300.00 $14,300.00 4 JASPHALT PAVEMENT REMOVAL 202 777 SYS $7.20 $5,594.40 5 CONCRETE REMOVAL 202 75 SYS $23.30 $1,747.50 6 REMOVE EXISTING STRUCTURES 202 1 LSUM $5,000.00 $5,000.00 7 PIPE, REMOVAL 202 59 LFT $12.30 $725.70 8 COMMON EXCAVATION 203 4133 CYS $5.00 $20,665.00 9 "B" BORROW 203 2069 CYS $3.40 $7,034.60 10 HMA PATCHING FOR ASPHALT PAVEMENT 305 254 TON $103.20 $26,212.80 11 PAVEMENT 310 75 SYS $155.80 $11,685.00 12 FENCE, CHAINLINK, 120 IN., RESET 603 78 LFT $18.20 $1,419.60 13 FENCE, CHAINLINK, 72 IN., RESET 603 526 LFT $18.20 $9,573.20 14 FENCE GATE, CHAINLINK, 481N. X 6 FT. 603 1 EACH $989.00 $989.00 15 RIPRAP, CLASS 2 616 3 CYS $49.70 $149.10 16 GEOTEXTILES 616 9 SYS $5.20 $46.80 17 SEED MIXTURE, U 621 573 LB $4.80 $2,750.40 18 MULCHING MATERIAL 621 7.64 TON $362.00 $2,765.68 19 FERTILIZER 621 1.528 TON $900.00 $1,375.20 20 MOBILIZATION & DEMOBILIZATION FOR SEEDING 1 621 1 EACH $490.00 $490.00 21 PIPE, SANITARY SEWER, 10 IN. 715 35 LFT $60.10 $2 103.50 22 PIPE, CURROGATED METAL, 12 IN. 715 139 LFT $36.10 $5,017.90 23 PIPE, PVC, 12 IN. 715 2703 LFT $44.80 $121,094.40 24 WATER MAIN, DUCTILE IRON, 10 IN. 715 2791 LFT $49.20 $137,317.20 25 10" RESILIENT WEDGE GATE VALVE W/ BOX 715 1 EACH $2,500.00 $2,500.00 26 AIR RELEASE VALVE 1 715 4 EACH $2,500.00 $10,000.00 27 10"x 10" TAPPING SLEEVE 715 1 EACH $3,500.00 $3,500.00 28 10" TAPPING VALVE 715 1 EACH $3,000.00 $3,000.00 29 PIPE, PVC, 15 IN. 715 1571 LFT $41.50 $65,196.50 30 PIPE, PVC, 4 IN. 715 62 LFT $41.20 $2,554.40 31 PIPE, PVC, 81N. 715 20 LFT $32.80 $656.00 32 MANHOLE, C4 720 14 EACH $3,331.00 $46,634.00 33 FIRE HYDRANT ASSEMBLY 720 1 EACH $4,588.00 $4,588.00 34 FIRE HYDRANT ASSEMBLY, RESET 720 1 EACH $1,500.00 $1,500.00 35 MAINTENANCE OF TRAFFIC 801 1 LSUM $13,000.00 $13,000.00 36 MATERIAL TESTING 801 1 LSUM $11,000.00 $11.000.00 TOTAL = 566,584.88 Page 1 of 1 ER C Cgi KEN HERCEG & ASSOCIATES, INC. ENGINEERS, ARCHITECTS & LAND SURVEYORS Kenneth P. Herceg, P.E., L.S. Nitin V. Timble, P.E., L.S. Timothy J. Wall, AIA, LEED AP John E. DeLee, P.E. Brian W. W. Thomasen, P.E. April 6, 2011 Mr. Carl Littrell, PE City Engineer City of South Bend 1316 County /City Building 227 West Jefferson Blvd. South Bend, IN 46601 RE: PROPOSAL: ENGINEERING SERVICE FOR THE UPDATE OF DESIGN OF CITY OF SOUTH BEND PROJECT NUMBER 109 -011A SANITARY SEWER SERVICE AND POTABLE WATER SERVICE TO THE PROPOSED EMERGENCY SERVICE TRAINING FACILITY AT THE SOUTH BEND REGIONAL AIRPORT Dear Carl: As requested by Mr. John Engstrom, P.E. on April 5, 2011, please find two signed copies of the proposal for the updating of the plans referenced above. These plans and specifications were originally designed by Ken Herceg & Associates, Inc. in 2007. The cost to update these plans and prepare them for bidding in 2011 shall be $15,000.00. The need for the referenced project is necessary because of: 1. Restarting the project and updating the plans and specifications from 2007 2. Re application for IDEM permits for Water, Sanitary Sewer and Rule 5 If you have any additional questions please contact our office at your convenience. Sincerely, Kenneth'P. Herceg, Pte'; President KPH /kh Encl.: File: K:12007\101wdmillContreas \Cover Letter Contract 04062011.doc 211 W. Washington Street, Suite 2100 South Bend, Indiana 46607 s M Box 547 _ _ _ . _ _ _ _ __ ,_ _ _ _ _ _ _ Niles, ichioan 414120 4/14 11 Jenni er orle - Agenda Request Form- Herceg.doc - Wage 11 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Aril 14, 2011 Department Engineering BP Date April 25, 2011 Phone 235 -5933 Name John Engstrom Requirj Legal 1Z Attorney Name ed Controller 7 Controller review is required for all Contracts $5,000.00 or more Prior and greater than one year in length per the City Purchasing to Policv 5ubmi I Other Appropriate Reviewers ttal to Board Check the A propriate Item Type - Required for All Submissions A reement DI-Contract IXPro osal 17 Addendum E Claim 0 Bid Opening u Bid Award 1? Reg. to Advertise I n Title Sheet u Quote Opening -1-1 Quote Award L Chg Order No. u C/O & PCA No. 17 PCA L Ease. /Encroach. 11 Traffic Control 17 Resolution rl Other: Required Information Company or Vendor Name Ken Herceg & Associates /Revised from last meeting New Vendor []Yes 19 No 0 If Yes, Approved by Purchasing Pro'ect Name Training Center Sewer & Water Extensiont Proiect Number 109 -011A Funding Source EMS Capital Fund Account No. E.M.S.C.I.P. #288000- 341 -03 -00 Amount $ 15,000 Terms of Contract Purpose /Description Engineering services to extend sewer and water to the southeastern corner of the proposed Training Center For Chanae Orders Only Amount of L Increase $ U Decrease $ Previous Amount $ Current Percent of % Change: New Amount $ Total Percent of Change: I % PO No. Dispersal After Approval -- Copy Original - n I� L L