Loading...
HomeMy WebLinkAboutNo. 2016 designating the NNDA, declaring the NNDA to be blighted, approving a development plan and conditions under which relocation payments will be made, and establishing an allocation area for purposes of TIFRESOLUTION NO. 2016 A RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION DESIGNATING THE NORTHEAST NEIGHBORHOOD DEVELOPMENT AREA, DECLARING THE NORTHEAST NEIGHBORHOOD DEVELOPMENT AREA TO BE BLIGHTED, APPROVING A DEVELOPMENT PLAN AND CONDITIONS UNDER WHICH RELOCATION PAYMENTS WILL BE MADE, AND ESTABLISHING AN ALLOCATION AREA FOR PURPOSES OF TAX INCREMENTAL FINANCING WHEREAS, the South Bend Redevelopment Commission ( "Commission") is the governing body of the South Bend, Indiana Department of Redevelopment ( "Department ") and exists and operates under the provisions of Indiana Code § 36- 7 -14 -1, et seq., as amended from time -to -time ( "Act "); and WHEREAS, the Department has conducted investigations, studies and surveys of various blighted and deteriorated areas within the City of South Bend, Indiana, and of the causes contributing to such blight and deterioration; and WHEREAS, such investigations, studies and surveys have been made in cooperation with the various departments and bodies of the City and have been directed toward determining the ILproper use of land and improvements thereon so as to best serve the interests of the City and its residents; and WHEREAS, the Department has investigated, studied and surveyed that area within the City of South Bend hereby designated as the "Northeast Neighborhood Development Area ", and which area is more particularly described in Exhibit "A" attached hereto and incorporated herein; and WHEREAS, the Area consists of approximately 616 acres and is contiguous and compact; and WHEREAS, as a result of its investigations, studies and surveys, the Commission has found that the Area heretofore described as the Northeast Neighborhood Development Area ( "Area ") is blighted and deteriorated. Specifically, the Area is blighted to an extent that such blighting conditions cannot be corrected by regulatory process or by the ordinary operations of private enterprise without resort to the provisions of the Act and that the public health and welfare would be benefitted by acquisition in and redevelopment of such Area under the provisions of the Act; and WHEREAS, the Commission has heretofore caused to be prepared maps and plats showing the boundaries of the Area, the location of various parcels of property, streets, alleys, and other features affecting the acquisition, clearance, replatting, replanning, rezoning or redevelopment of the Area, indicating that, at this time, no parcels of property in the Area will be acquired by the Commission, and the parts of the Area that are to be devoted to public ways, levees, sewerage, parks, playgrounds, and other public purposes under the redevelopment plan for the Area; and WHEREAS, lists have heretofore been prepared indicating that no parcels of property are proposed to be acquired within the Area, and therefore, that no appraisals have been made of the fair market value of any parcels in the Area at this time; and WHEREAS, there was presented to this meeting of the Commission for its consideration and approval, a copy of the development plan for the Area, dated November 17, 2003, which plan is entitled "Northeast Neighborhood Development Area Plan" ( "Plan") as proposed by this Declaratory Resolution dated November 17, 2003, consisting of 34 pages and 2 exhibits; and WHEREAS, the Commission has, in a meeting held this day and open to the public, heard evidence and reviewed the maps and plats presented at the meeting and considered same. NOW, THEREFORE, BE IT RESOLVED BY THE SOUTH BEND REDEVELOPMENT COMMISSION, AS FOLLOWS: 1. The Commission now declares the Northeast Neighborhood Development Area ( "Area ") which is described in the fourth WHEREAS clause above, as blighted and deteriorated and a menace to the social and economic interests of the City of South Bend and its inhabitants and that it will be of public utility and benefit to acquire real estate and improvements in the Area and to redevelop the Area under the Act. 2. The Northeast Neighborhood Development Area Plan ( "Plan ") proposed by this Declaratory Resolution of November 17, 2003 and as attached hereto and incorporated herein, is hereby approved subject to a Confirmatory Resolution after a duly called meeting. 3. The previously prepared maps and plat showing the boundaries of the Area, the location of the various parcels of property, streets, alleys, and other features affecting the acquisition, clearance, replattng, replanning, rezoning or redevelopment of the Area, indicating any parcels of property to be excluded from acquisition, and indicating the parts of the Area to be devoted to public ways, levees, sewerage, parks, playgrounds, and other public purposes under the Plan are hereby approved. 4. The previously prepared list indicating that there are no parcels of property within the Area to be acquired at the present time and is hereby approved. 5. The estimated cost of acquiring property in the Area, as determined by taking the average of two (2) separate appraisals made by independent appraisers, is $0.00, is hereby approved. 6. In determining the location and the extent of the Area proposed to be acquired for redevelopment, the Commission has given consideration to transitional and permanent provisions for adequate housing for residents of the Area who will be displaced by this redevelopment project, and the Commission hereby adopts the Northeast Neighborhood Relocation Policy as the policy by -2- A which the Commission will be guided in providing for such persons displaced by the action of the Commission. BE IT FURTHER RESOLVED that all proceedings related to the redevelopment of the herein described area shall be referred to as the Northeast Neighborhood Development Area. BE IT FURTHER RESOLVED that the redevelopment of the Area shall be in accordance with the Northeast Neighborhood Development Area Plan. BE IT ALSO RESOLVED, that the Commission proposes the following findings subject to confirmation after a duly called public meeting: i. Based upon evidence submitted to the Commission, the Cominission finds and determines that there is a substantial presence in the area designated as the Northeast Neighborhood Development Area ( "Area ") of excessive vacant land, abandoned or vacant buildings, old buildings, excessive vacancies, substandard structures, deteriorating infrastructure, and lack of infrastructure sufficient to support redevelopment of the Area. ii. The Commission further finds that the Area is blighted and constitutes a menace to the social and economic interest of the City of South Bend and its inhabitants, and it will be of public utility and benefit to acquire land within such Area and to redevelop it under the Act. iii. The assessed value of the real property of the Area when added to the assessed value of the real property located in all redevelopment areas does not exceed twenty percent (20 %) of the total assessed value of the real property located in the City of South Bend. iv. The Northeast Neighborhood Development Area Plan ( "Plan") for the Area will result in the demolition and /or selective demolition and reuse of blighted structures. Alleviating this blight and its blighting influence is projected to be a catalyst to ongoing and future development in the Area. V. The Plan for the Area delineates five (5) Sub -Areas to be known as (i) the Eddy Street Commercial Redevelopment Area (ii) the Georgiana - Talbot Residential Redevelopment Area; (iii) the Homeownership Preservation Area; (iv.) The St. Joseph Regional Medical Center Redevelopment Area; and (v) the Madison Center Campus Housing and Commercial Redevelopment Area. vi. The Plan for the Area cannot be achieved without the designation of the Area as a redevelopment area because of stagnated or depressed levels of private investment within the Area and because of the existence of blighted conditions as -3- defined at Ind. Code § 36- 7 -1 -3. vii. The Plan for the Area will allow for the master - planned development of multiple sites within the Area. The Area status will allow opportunities for the master planning of traffic circulation, infrastructure upgrades, residential conservation and redevelopment, commercial and open space development planning, landscaping and site design controls. ix. The Plan for the Area will complement public and private sector investment within the immediate neighborhood. X. The public health and welfare will be benefitted by the accomplishment of the Plan within the Area. xi. The Plan for the Area will provide the necessary redevelopment tools and facilitate the use of certain funding mechanisms to aid in the redevelopment of the area commonly known as Five Points, the junction of Corby Boulevard, Eddy Street and South Bend Avenue and the surrounding vicinity at the center of the Area. xii. The Plan for the Area will provide the necessary redevelopment tools and funding mechanisms to aid in the demolition and /or selective demolition and site preparation and, if necessary, remediation of certain existing residential and commercial sites within the Area. xiii. The Plan for the Area will allow for the expansion and upgrade of public facilities and utilities within the Area. xiv. The Plan for the Area will allow for the planned acquisition of parcels of real property related to the expansion of public roadways and utility structures. xv. The Plan for the Area conforms to other development and redevelopment plans for the City of South Bend and conforms to the comprehensive plan of the City of South Bend. xvi. The Plan is reasonable and appropriate when considered in relation to the purpose of Chapter 14, Article 7, Title 39 of the Indiana Code. xvii. The Plan is in all respects approved, and the Secretary is directed to file a certified copy of the Plan with the minutes of this meeting and to record a certified copy of the Plan in the Office of the Recorder of St. Joseph County, Indiana. BE IT FURTHER RESOLVED BY THE SOUTH BEND REDEVELOPMENT COMMISSION PURSUANT TO IND. CODE § 36- 7- 14 -39, AS AMENDED AND SUPPLEMENTED, CONCERNING THE ESTABLISHMENT OF AN ALLOCATION AREA ME A FOR PURPOSES OF TAX INCREMENTAL FINANCING, THAT: A. For purposes of the allocation provisions of the Act, as authorized by Ind. Code § 36- 7-14-39, and as used in this Resolution for the purposes of distribution of real property taxes, the "allocation area" of the Northeast Neighborhood Development Area, and which area is more more particularly described in Exhibit "A" attached hereto and incorporated herein; and B. Any real property taxes hereinafter levied by or for the benefit of any public body entitled to a distribution of property taxes on taxable property within the allocation area be allocated and distributed as follows: (1) Except as otherwise provided in this section, the proceeds of the taxes attributable to the lesser of: (A) the assessed value of the property for the assessment date with respect to which the allocation and distribution is made; or (B) the base assessed value; shall be allocated to and, when collected, paid into the funds of the respective taxing units. (2) Except as otherwise provided in this section, property tax proceeds in excess of those described in subdivision (1) shall be allocated to the redevelopment district and, when collected, paid into an allocation fund for that allocation area that may be used by the redevelopment district only to do one (1) or more of the following: (A) Pay the principal of and interest on any obligations payable solely from allocated tax proceeds which are incurred by the redevelopment district for the purpose of financing or refinancing the redevelopment of the allocation area; (B) Establish, augment, or restore the debt service reserve for bonds payable solely or in part from allocated tax proceeds in the allocation area; (C) Pay the principal of and interest on bonds payable from allocated tax proceeds in that allocation area and from the special tax levied under Ind. Code § 36- 7- 14 -27; (D) Pay the principal of and interest on bonds issued by the City of South Bend to pay for local public improvements in or serving the -5- (W allocation area; (E) Pay premiums on the redemption before maturity of bonds payable solely or in part from allocated tax proceeds in the allocation area; (F) Make payments on leases payable from allocated tax proceeds in the allocation area under Ind. Code § 36 -7 -14 -25.2; (G) Reimburse the City of South Bend for expenditures made by it for local public improvements which includes, but is not limited to, buildings, parking facilities, and other items described in Ind. Code § 36- 7- 14 -25. l(a) in or serving the allocation area; (H) Reimburse the City of South Bend for rentals paid by it for a building or parking facility in or serving the allocation area under any lease entered into under Ind. Code § 36 -1 -10; (I) Pay all or a portion of a property tax replacement credit to taxpayers in an allocation area as determined by the Commission by separate resolution; (J) Pay expenses incurred by the Commission for local public improvements that are in the allocation area or are serving the allocation area (which includes buildings, parking facilities or other items described in Ind. Code § 36-7-14-25. l(a)); (K) Reimburse public and private entities for expenses incurred in training employees of industrial facilities that are located (i) within the allocation area; and (ii) on a parcel of real property that has been classified as industrial property under the rules of the state board of tax commissioners; (L) Reimburse the Commission for preliminary expenditures paid from Commission funds prior to the issuance of the bonds with bond proceeds, said expenditures to include legal, architectural, engineering, surveys, appraisals, and supervisory expenses related to the acquisition and redevelopment of property, the issuance of bonds and related costs; provided, however, that if future uses of property tax proceeds allocated to the allocation fund are authorized or permitted by amendment to the Act, including Ind. Code § 39- 7- 14 -39, after the effective date of this resolution, those uses shall also be authorized or permitted for property tax proceeds c, -6- allocated hereby; and further provided that the allocation fund may not be used for operating expenses of the Commission. C. When the funds are no longer needed for the purposes permitted in subsection B, above, moneys in the allocation fund in excess of that amount shall be paid to the respective taxing units in the manner prescribed in Ind. Code § 36- 7- 14- 39(b)(1). D. "Property taxes" and "property tax proceeds" as used in this resolution shall mean taxes imposed on real property under Ind. Code § 6 -1.1. E. This allocation provision shall expire no later than thirty (30) years after the date of this resolution. BE IT FURTHER RESOLVED that the Secretary is directed to file certified copies of this Resolution with the St. Joseph County Auditor and the Portage Township Assessor. BE IT FURTHER RESOLVED that the United States and HUD are assured of full compliance by the Commission and the Department with HUD regulations effecting Title VI of the Civil Rights Act of 1964, as amended. BE IT FURTHER RESOLVED that this Resolution, together with supporting data, shall be submitted to the Area Plan Commission of St. Joseph County and the Common Council of the City of South Bend, as provided by Ind. Code § 36- 7- 14 -16, for their approval fo the Resolution and Plan, and if approved by both parties, the Resolution and Plan shall be submitted to public hearing for the receiving and hearing of remonstrances and objections from persons interested in or affected by the proceedings as provided by Ind. Code § 36- 7- 14 -17, after public notice in accordance with Ind. Code § 36- 7 -14 -17 and Ind. Code § 5 -3 -1 and for the final determination of the public utility and benefit thereof. ADOPTED at a regular meeting of the South Bend Redevelopment Commission held on November 17, 2003, at Room 1308, County -City Building, 227 West Jefferson Boulevard, South Bend, Indiana 46601 SOUTH BEND REDEVELOPMENT COMMISSION By: Robert W. Hunt, President -PhilTi—p-T.- Facae___nff�, HAWPData\NE Neighborhood Dev Area \Resolutions \Res2016 -De lamto ,Conurussion.w d —7— rY P EXHIBIT "A" LEGAL DESCRIPTION Beginning at the intersection of the centerlines of the East Race and LaSalle Avenue; thence East along said centerline of LaSalle Avenue to a point 110 feet West of the West right -of -way line of Niles Avenue; thence North 159.25 feet; thence East 110 feet to the West right -of -way line of said Niles Avenue; thence Easterly to the Northwest corner of Lot 71 in the Original Town of Lowell; thence East along the North line of said Lot 71 to the centerline of the first North -South alley East of Niles Avenue; thence North along said centerline of said Alley to the centerline of Madison Street; thence East along said centerline to the centerline of Hill Street; thence South along said centerline to the centerline of LaSalle Avenue; thence East along said centerline to the centerline of Sunnyside Avenue; thence North along said centerline to the centerline of Rockne Drive; thence Northeasterly along said centerline to the East right -of -way line of Twyckenham Drive; thence North along said East right -of -way line to the Southwest corner of Lot 38 in Wooded Estates as shown in the Office of the Recorder of St. Joseph County, Indiana; thence Northeasterly along the Southeast lines of Lots 38, 37 and 36 to the Southwesterly right -of -way line of White Oak Drive; thence Northeasterly to the Southwesterly corner of Lot 35 in said Wooded Estates; thence Northeasterly along the Southeasterly lines of Lots 35, 34, 33, 32, 31 and 30 in said Wooded Estates to the Westerly right -of -way line of Black Oak Drive; thence Northeasterly to the Northwest corner of Lot 48 in said Wooded Estates; thence East along the North line of Lots 48, 51, 52, 53 and 54 to the centerline of Oak Ridge Drive; thence Northerly along said centerline to the centerline of Edison Road; thence West to the East line of Lot 5 Vacval and Davidson Subdivision projected South; thence North along said East line and its projection to the Northeast corner of said Lot 5; thence West to the East property line of a parcel of land owned by Patrick and Josephine Simeri; thence North to the Northeast corner of said Simeri parcel; thence West along the North line of Simeri parcel to the Northwest corner of said Simeri parcel; thence South along the West line of said Simeri parcel to a point 208.71 feet North of the South line of the Southeast Quarter of Section 31, Township 38 North, Range 3 East, St. Joseph County, Indiana; thence West parallel with said South line, a distance of 208.71 feet; thence North to the Northeast corner of the Jamison Inn Condominium; thence West along the North line of said Jamison Inn Condominium to the centerline of Ivy Road; thence South along said centerline to the South line of said Southeast Quarter of Section 31; thence West along said South line to the West right -of -way line of Vacated Ivy Road projected North; thence South along said vacated West right -of -way line projected North to the South right -of -way line of Edison Road; thence West along said South right -of -way line to the West right -of -way line of Twyckenham Drive as dedicated by the University of Notre Dame; thence Southerly and Southeasterly along said West right -of -way line to a point 200 feet measured at right angles to the Northwesterly right -of -way line of South Bend Avenue to a point on the existing Corp. Line; thence Southwesterly parallel with said South Bend Avenue along said Corp. Line; thence West along said Corp. Line to the centerline of Eddy Street; thence North along the said centerline to the centerline of Edison Road; thence Southwesterly and Westerly along said centerline and the centerline of Angela Boulevard to the West line of Lot 95 University Heights as shown in the Office H:\WPData\NE Neighborhood Dev Area\ Resolutions \Res2016Decluatory,Comn ission.wpd —i- of the Recorder of St. Joseph County, Indiana projected North; thence South along the West lines of Lots 95, 94, 93, 92, 33 and 32 to the Southwest corner of said Lot 32; thence West along the North lines of Lots 29 thru 6 in University Heights to the centerline of Lawrence Street; thence South along said centerline to the centerline of Napoleon Street; thence West along said centerline to the centerline of Niles Avenue; thence Southeasterly along said centerline to the centerline of Corby Street; thence East along said centerline to a point 120 feet West of the first North -South alley East of Niles Avenue projected North; thence South, to a point 150 feet South of the South right -of- way line of Corby Street; thence East parallel with said South right -of -way line to the West right -of- way line of said first North -South alley East of Niles Avenue; thence South along said West right -of- way line, a distance of 222 feet; thence Southwesterly, a distance of 260.82 feet; thence Northwesterly, a distance of 85 feet; thence Southwesterly, a distance of 222 feet to the Northeasterly right -of -way line of Niles Avenue; thence Northwesterly along said right -of -way line, a distance of 312 feet; thence Northeasterly, a distance of 199.95 feet; thence Northerly, a distance of 141.54 feet to a point 378.66 feet West of said first North -South alley East of Niles Avenue to a point on the South right -of -way line of Corby Street; thence West along said South right -of -way line and its projection West to the East shore of the St. Joseph River; thence Southerly along said East shore to the intersection with the centerline of the East Race; thence Southeasterly along said centerline to the place of beginning containing 616.0 acres more or less. „T, En ­4 D m -4 m ns M 0 a? � M m m c-a cn ti ro n C7=x W is M m m 4 ,. IM H: \WPData\NE Neighborhood Dev Area\ Resolutions\ Res2016Declmtory,Conunission.wpd —ll— W -< m W �! N M, 3> 3 "J Resolution 2016, Exhibit A 1z 83 1 858 RECORDED AS PRESENTED ON 09/29/2008 03:54:05PM TERRI J. REMAKE ST. JOSEPH COUNTY RECORDER REC FEE: $113.00 PAGES: $1 Northeast Neighborhood Development Area Plan South Bend Redevelopment Commission South Bend, Indiana Declaratory Resolution and Plan Presented to the South Bend Redevelopment Commission on November 17, 2003 Declaratory Resolution and Plan Presented to the St. Joseph County Area Plan Commission on November 18, 2003 Declaratory Resolution and Plan Presented to the South Bend Common Council on November 24, 2003 Confirming Resolution and Plan Presented to the South Bend Redevelopment Commission on December 19, 2003 Northeast Neighborhood Development Area Plan South Bend, Indiana TABLE OF CONTENTS I. Introduction ................................................................................... ..............................1 A. Purpose ................................................................................... ..............................1 B. Project Area Overview ........................................................... ..............................1 C. Sub -Area Overview ........................................................... ..............................2 1. Eddy Street Commercial Redevelopment Area ........... ..............................3 2. Georgiana- Talbot Residential Redevelopment Area .............................4 3. Homeownership Preservation Area .................................. ..............................5 4. St. Joseph Regional Medical Center Redevelopment Area .................5 5. Madison Center Campus Housing and Commercial Redevelopment Area.. 6 H. Project Area Description ....................................................................... ..............................6 A. History ................................................................................... ..............................6 B. Timeline ................................................................................... ..............................7 C. Boundaries ....................................................................... ..............................9 D. Land Use ................................................................................... .............................10 E. Zoning ................................................................................... .............................10 F. Circulation ....................................................................... .............................11 G. Demographics ....................................................................... .............................12 H. Public Institutions ........................................................... .............................13 I. Environmental Conditions ........................................................ ............................... 13 Ill. Project Area Strategy ....................................................................... .............................13 A. Planning Principles for Development ................................... .............................13 B. Objectives ................................................................................... .............................14 IV. Project Area Activities ....................................................................... .............................15 A. Introduction ....................................................................... .............................16 B. Activities ................................................................................... .............................16 V. Sub -Area Strategies and Goals ............................................................ .............................17 A. Eddy Street Commercial Redevelopment Area ........................ .............................18 B. Georgiana- Talbot Residential Redevelopment Area ............ .............................21 C. Homeownership Preservation Area .................................... .............................24 D. St. Joseph Regional Medical Center Redevelopment Site .............................25 E. Madison Center Campus Housing and Commercial Redevelopment Area ..............26 VI. Financial Action Plan ........................................................................ .............................28 A. Introduction ........................................................................ .............................28 B. Funding Plan ........................................................................ .............................29 VII. Design and Development Control ................................................ .............................30 A. Design Control Objectives ................................................ .............................30 1. Powers and Duties ................................................ .............................30 2. Development Control ................................................ .............................31 3. Permits ........................................................................ .............................31 4. Review ........................................................................ .............................31 B. Development Control ............................................................ .............................31 1. Land Acquisition ............................................................ .............................32 2. Property Rehabilitation ................................................ .............................32 3. Commission Disposition of Property ........................ .............................32 C. Project Planning Incentives ................................................ .............................33 VIII. Statutory Authority ........................................................................ .............................33 IX. Procedure for Amendment of the Approved Development Plan .............................33 X. List of Properties to be Acquired ................................................ .............................34 XI. Legal Description of Northeast Neighborhood Development Area .............................34 Exhibit A. List of Properties to be Acquired Exhibit B. Legal description of Northeast Neighborhood Development Area Table 1. Development Area Traffic Count Data (Source: MACOG 2002) Table 2. Development Area Census Data (Source: U.S. Census Bureau, 2000) MAP DIRECTORY Map 1: Northeast Neighborhood Development Area Map 2: Northeast Neighborhood Development Area Current Land Use Map 3: Northeast Neighborhood Development Area Projected Land Use Map 4: Northeast Neighborhood Development Area Current Zoning Map 5: Northeast Neighborhood Development Area Projected Zoning Map 6: Northeast Neighborhood Development Area Traffic Circulation Map 7: Northeast Neighborhood Development Area Census Tracts Map 8: Northeast Neighborhood Development Area Sub -areas Map 9: Sub -area A, Eddy Street Commercial Redevelopment Area Map 10: Sub -area B, Georgia na-Talbot Residential Redevelopment Area Map 11: Sub -area C, Homeownership Preservation Area Map 12: Sub Area D, St. Joseph Regional Medical Center Redevelopment Site Map 13: Sub -area E, Madison Center Campus Housing and Commercial Redevelopment Area I. INTRODUCTION A. Purpose The purpose of this general development plan is: To set forth an organizing vision, mission statement, strategy and action plan for the economic revitalization and physical redevelopment of the area of the city known as the Northeast Neighborhood; To designate a new development target area and tax increment allocation area within the City of South Bend; To establish a framework for an ongoing collaborative planning effort involving Northeast Neighborhood residents, business owners, civic associations, institutional partners and local government. B. Project Area Overview The Northeast Neighborhood is a large, heterogeneously - populated, predominantly residential area situated in the northeastern quadrant of South Bend, just north of downtown and east of the St. Joseph River. The geographic area of the Northeast Neighborhood Development Area covers 616 acres and serves as home to approximately 4,000 residents. The land uses present within the area include residential, commercial, light industrial, institutional, park and open space, vacant land and public right -of -way. For purposes of this Development Area Plan, a project area boundary has been determined that differs slightly from the traditional Northeast Neighborhood boundary, which some would consider to include Harter Heights to the northwest, or to extend further south to Colfax Street or east as far as Ironwood Drive. The Development Area is delineated by Napoleon Street and the existing university campus and corporate boundary of Notre Dame to the north, by the St. Joseph River on the west, by LaSalle Avenue to the south and by Twyckenham Drive to the east. "Northeast Neighborhood" herein will primarily refer to the target Development Area, with sensitivity to the fact that the proposed redevelopment activities will impact a larger population of residents and stakeholders who consider themselves a part of the Northeast Neighborhood. The industrial Midwest as a region, and the region's metropolitan areas in particular, have been struggling to maintain their population base and rates of employment over the past 15 years. South Bend's Northeast Neighborhood is an older, inner city neighborhood, and almost by definition has been vulnerable to negative economic and social forces beyond its control. Loss of middle -class families, slow job growth and concentrated pockets of poverty are some of the broad - ranging problems that have brought this and other urban residential areas like it into long periods of steady decline. The visible result is deterioration of the physical landscape, including insufficient home improvement investment, inadequate code compliance, increased renter occupancy, absentee landlordism and swaths of vacancy. The Development Area Plan proposes a comprehensive series of strategies intended to reverse the decline evidenced in the Northeast Neighborhood. Livability of the neighborhood's residential areas will be addressed in tandem with restoring economic viability to the commercial centers, as one will necessarily impact the other. Effective vehicular and pedestrian circulation patterns will be considered in all sub -area planning, and context - sensitive design concepts will guide all major development and redevelopment activity. The designation of the project area as both a Development Area and a tax increment financing allocation area ( "TIF district ") will provide the tools and funding mechanisms to achieve the goals of the Plan. The Plan divides the Development Area into several sub - areas, each with a clear geographic description in relationship to the neighborhood and a refinement of the redevelopment goals and strategies to be undertaken. The sub -area plans are not weighted or prioritized, as implementation will initially depend on private sector outlays and/or stakeholder organization activity. Sub -area plans are not necessarily interdependent, maximizing the potential for success even if some initiatives take longer to commence or if the commitment of private resources required cannot be realized. Yet sub -area plans should not be considered in isolation from one another, nor out of context of the overall goals of the Development Area Plan. It is likely that more detailed sub -area plans will be drawn from the goals and strategies outlined below as actual projects are defined by developers and investors. C. Sub -Area Overview The Development Area Plan is intended to set forth a realizable, cohesive direction for all anticipated growth and development within the neighborhood. Within the context of the Plan, sub -areas have been identified which warrant particular consideration, either in terms of the development challenges they pose or the opportunities they present. Institution- backed development plans for sub -areas that are broadly supported by neighborhood residents are included in the Development Area Plan. Through the 14 Northeast Neighborhood Revitalization Organization (NNRO), the formal partnership of Northeast Neighborhood institutions, residents and local government, Madison Center and Hospital has presented a plan for future growth and investment in the area. The University of Notre Dame, a major landowner in the Northeast Neighborhood, has announced plans to facilitate private investment in key redevelopment sites that will be critical to the long -term viability of the neighborhood. St. Joseph Regional Medical Center, another NNRO partner, has announced plans to vacate its site on LaSalle Avenue. St. Joseph's administrators remain committed to the neighborhood and its stakeholder organizations, and realize the eventual redevelopment of the hospital site will impact the entire community. Communication among these institutions and the neighborhood residents has been strengthened by the creation of the NNRO, and future neighborhood planning will benefit from the ongoing coordination of individual institutional development plans. The NNRO, whose funding members include Memorial Hospital and Health System, Madison Center and Hospital, the University of Notre Dame, St. Joseph Regional Medical Center and the City of South Bend, is itself a vehicle for major economic reinvestment in the Northeast Neighborhood. The successful housing rehabilitation and infill construction program begun on St. Louis, Hill, and Tumock Streets will continue to be a critical part of the revitalization and homeownership preservation strategies. It is anticipated that the NNRO, with the administrative and housing development technical assistance of South Bend Heritage Foundation staff, will lead organized housing redevelopment initiatives throughout the neighborhood in accordance with the goals of the Development Area Plan. Existing conditions within the sub -areas are described below, designated according to the primary land use supported in the Northeast Neighborhood Development Area Plan: 1. Eddy Street Commercial Redevelopment Area The Eddy Street Commercial Redevelopment Area sub -area is situated in the northern central section of the neighborhood. The sub -area covers approximately 31 acres and extends 1 -2 blocks east and west along Eddy Street between Edison Road and Campeau Street. North Eddy Street at the intersection of Edison Road is a relatively undeveloped area at the periphery of the Notre Dame campus. On the east side of Eddy Street immediately south of Edison Road is the Notre Dame Woods, a 30 -acre natural greenbelt around the southern portion of the University campus. On the southwest corner of Eddy Street and Edison 3 Road is Logan Center, a developmental rehabilitation and education center. Administrators have announced that Logan will soon relocate in order to expand its operations. Eddy Street is a major collector street running north -south through the core of the Northeast Neighborhood. Disparate commercial and residential uses line both sides of the street, many of which are showing signs of increasing disinvestment. High vehicular speeds and traffic volumes, coupled with inadequate setbacks and insufficient rights -of -way buffering pedestrians along the sidewalks, contribute to the sense of disorganized congestion and hazard. To the south, Eddy Street intersects the angled junction of State Road 23 (South Bend Avenue) and Corby Boulevard, known to residents as "Five Points," in the geographic center of the neighborhood. This is one of South Bend's most well- traveled intersections, and at peak times traffic circulation can easily become bottlenecked. Commercial uses in the Five Points area are a limited mix of retail stores and services. Light industrial and heavy commercial uses are also present in the area. Many of these businesses exhibit signs of economic disinvestment, and few meet residents' needs in terms of either convenience shopping or general consumer appeal. Additionally, three important institutions and gathering places for neighborhood residents are located at or near Five Points: Perley Elementary School, First A.M.E. Zion Church and the Robinson Community Learning Center. The area also includes some vacant and substandard buildings as well as underdeveloped or underutilized land. 2. Georgiana- Talbot Residential Redevelopment Area An area bounded by the west side of Georgiana Street on the west, Howard Street on the south, Fredrickson Park and the South Bend Housing Authority site on the east and Notre Dame Woods to the north will be designated as a housing redevelopment sub -area. This residential area in the northeastern section of the neighborhood exhibits extreme signs of blight, deferred maintenance and disinvestment. The area encompasses approximately 32 acres of single - family lots, a significant number of which are vacant. Of the lots with built structures, owner- occupancy rates are low. Many of the existing homes are in condition beyond rehabilitation or feasible repair. Much of the area also lacks basic infrastructure such as curbs and sidewalks. 4 Transversing this area, between Eddy Street and Twyckenham Drive, South Bend Avenue is intercepted as a segment of State Road 23. The road serves both local and regional traffic, as it is the most direct means to and from the South Bend Central Business District for the northeastern suburbs. Traffic engineers cite that the road is currently operating at a failed level of service, meaning it lacks the capacity to safely and efficiently carry the number of vehicles it does. I. Homeownership Preservation Area A homeownership preservation sub -area will be designated in the area roughly bounded by Eddy Street on the east, Napoleon Street on the north, Hill Street on the west and South Bend Avenue on the south. This is a 65- acre section of housing in the northwestern quadrant of the neighborhood, most of which conforms to single - family residential zoning. However, over time, many single - family dwellings have been converted to rental units. Pockets of properties evidencing deferred maintenance by absentee landlords and lack of basic upkeep by short-term renters have become prevalent. Neighborhood residents have expressed that the reversal of this trend is critical for protection of residential property values throughout the neighborhood. 4. St. Joseph Regional Medical Center Redevelopment Site St. Joseph's Hospital has occupied the same site on LaSalle Avenue in South Bend since opening its doors in 1882. The hospital has since expanded to three campuses in the region, and today the original South Bend hospital site is known as St. Joseph Regional Medical Center. However, in 2002, administrators announced that the South Bend installation would close, and its operations would be consolidated with those of St. Joseph Community Hospital in a new facility to be built in Mishawaka. The departure presents a significant loss to the city as well as to the Northeast Neighborhood. Not only have generations relied on the medical care at St. Joseph, the hospital is one of South Bend's largest employers and economic drivers. The 37 -acre site of the St. Joseph health complex consists of nine buildings totaling approximately 800,000 sq ft. The site presents a considerable challenge for redevelopment as well as a unique opportunity for significant reinvestment in the Northeast Neighborhood. 5 5. Madison Center Campus Housing and Commercial Redevelopment Area The Madison Center and Hospital behavioral health complex currently occupies approximately 23 acres on the east bank of the St. Joseph River. The Madison facilities offer residential, inpatient (hospital) and outpatient services and occupy six buildings (Madison Center, Madison Hospital, Madison Apartments, Madison Center for Children, Riverside Hospital and Providence House) along Niles Avenue, totaling approximately 300,000 square feet of clinical space. The campus has previously been contained within the boundary of the South Bend Central Development Area, but will be included in the Northeast Neighborhood Redevelopment Area for the benefit of coordinating the institution's plans for future growth with the redevelopment goals and strategies of the surrounding neighborhood. A 53 -acre sub -area will be designated for housing and commercial redevelopment in the area, which will include existing and proposed Madison Center facilities. II. PROJECT AREA DESCRIPTION A. Project Area History South Bend's first commerce and civic development originated in the northeastern quadrant of the City. In the Northeast Neighborhood, historic street names honor the City's founders and first leaders who first built homes and enterprises in the area in the early to mid- 1800's, including Alexis and Frances Coquillard, Colonel Norman Eddy and Judge Thomas Stanfield. Trading posts and mills were sited along the St. Joseph River, as were the City's first factories, which harnessed waterpower for production needs. Many of the industries that started along the river out of necessity relocated after the introduction of electrical power, allowing the northeast to develop as a primarily residential area. The early social history of the Northeast Neighborhood is tied to the establishment and influence of the University of Notre Dame. Many who worked on the first railroads in the area during the 1850's were Irish Catholics, and Father Sorin, the University's founder, felt that their spiritual needs could best be met if they moved within the shadow of Notre Dame. Both the Irish and the French Canadians who immigrated here in the following years were encouraged to settle in an area around the newly established St. Joseph's Parish, bounded by Niles Avenue, LaSalle Avenue, Eddy Street and Napoleon Street. The religious at Notre Dame purchased as much land in the northeast section as possible, planning for future expansion. Some of this land, roughly between Corby Street and 2 LaSalle Street, was used to build housing for the Irish and French, who arrived in the late 1870's to help construct the campus's monumental academic buildings. As other South Bend neighborhoods were, the Northeast Neighborhood was affected by economic conditions generated by the growth and eventual decline of industry and manufacturing in the twentieth century. Much of the currently - existing housing stock of the Northeast Neighborhood was built during the 1920's and 1930's. However, population shifts occurred with the gradual closure of South Bend's major manufacturing facilities, as income levels diverged and new housing developments appeared in other areas of the city. For those who remained, a tradition of grassroots civic leadership grew out of the need to address safety and welfare concerns voiced by residents. The primary vehicle of neighborhood organization, the Northeast Neighborhood Council (NENC), was founded in 1966, and the associated Northeast Neighborhood Center opened on Notre Dame Avenue in 1968, originally funded by the Federal Office of Economic Opportunity (OEO) as a "War on Poverty" initiative. Today the NENC remains an active neighborhood alliance whose members work in various capacities to improve the quality and livability of the neighborhood. The group also interfaces with the wider South Bend community on behalf of residents. For example, the organization has a permanent committee which works with local government on planning and policy issues, and another which promotes positive relations with the administration and off - campus student residents of the University of Notre Dame. This Development Area Plan references recommendations put forth in the 1998 Northeast Neighborhood Strategic Revitalization Plan, an initiative sponsored jointly by the NENC and Neighborhood Housing Services (NHS). The development of the 1998 Plan included a strong research phase in which focus groups, public meetings and surveys were used to identify the concerns and priorities of residents and stakeholders regarding a potential revitalization process. Seven areas of concern emerged and were addressed in the plan: urban design and transportation; housing development; Five Points development; institutional partnerships, code enforcement; parks, open space and community programming; and the Eddy Street corridor. Significant findings of the plan are incorporated herein. B. Project Area Timeline 1842 University of Notre Dame (ND) is founded by Rev. Edward Sorin and the Brothers of the Holy Cross. The area south of campus housing students, faculty and religious becomes known as "Sorinsville" 7 1882 St. Joseph's Hospital founded 1894 Memorial Hospital founded 1901 Perley School opens 1907 Taylor's Chapel, to become First A.M.E. Zion Church, dedicated on current Eddy Street site 1914 Coquillard Park opens 1966 Northeast Neighborhood Council (NENC) formed 1968 Northeast Neighborhood Center opens, funded by the Federal Office of Economic Opportunity (OEO) as a "War on Poverty" initiative Logan Center, founded by parents in 1950 as an education and independence program for disabled children, opens facility on the corner of Edison Road and Eddy Street 1977 Mental Health Center of St. Joseph County, the present day Madison Center, moves into facility on East Madison Street 1984 City purchases former landfill site off South Bend Avenue for proposed Fredrickson Park; environmental assessments show lead and methane contamination and project halted 1992 NENC presents Northeast Neighborhood Plan 1993 Northeast Neighborhood Partnership Center, the City's first, opens on Corby Boulevard to provide services and programs for residents, youth and seniors 1995 NENC service center, housed in historic Notre Dame Avenue fire station, undergoes renovation 1998 Aldi's Grocery Store and Goodwill Store on North Eddy Street close; buildings are acquired by ND Neighborhood Housing Services (NHS) and NENC present Strategic Revitalization Plan by Development Concepts, Inc. and HNTB, Inc. 1999 Indiana Department of Transportation (INDOT) unveils plans to widen State Road 23 between Eddy Street and Twyckenham Avenue; the design is protested by neighborhood residents and INDOT agrees to rework plans 2000 Northeast Neighborhood Revitalization Organization (NNRO) created The Holladay Group presents Northeast Neighborhood Development Plan 2001 Renelda M. Robinson Community Learning Center, named for longtime neighborhood activist, opens in the former Aldi's /Goodwill site NNRO conducts Northeast Neighborhood Resident Survey NNRO presents Northeast Neighborhood Plan by Teska Associates Volunteers create Quigley Park at the corner of South Bend Avenue and Notre Dame Avenue, honoring the late Arthur Quigley, former president of the NENC 2002 NNRO contracts with South Bend Heritage Foundation, a local Community Development Corporation, for administrative, neighborhood planning and housing development assistance Construction completed on the first of several homes south of the ND campus as part of an incentive program to encourage faculty and staff homeownership in the Northeast Neighborhood St. Joseph Regional Medical Center announces plans to vacate its South Bend campus, consolidating with St. Joseph Community Hospital in a new facility in Mishawaka by 2006 2003 ND presents Northeast Neighborhood Concept Plan by Camiros Associates Environmental remediation and landscape construction begins for Fredrickson Park Environmental Educational Center South Bend Redevelopment Commission initiates process to designate the Northeast Neighborhood as a Development Area C. Boundaries The legal description of the Northeast Neighborhood Development Area is attached as Exhibit B and is represented by Map 1. In general, the Development 9 E. Area is bounded by the St. Joseph River to the west, LaSalle Avenue to the south, Twyckenham Drive to the east, and Napoleon Street and the city's corporate boundary north of Napoleon to the north. The total acreage of the area is 616 acres. Land Use Land uses within the area include residential, commercial, light industrial, institutional, park and open space and vacant land. Map 2 illustrates the current land uses within the Development Area. In descending order by acreage, the following breakout applies: Land Use Acreage Percent Residential 397.9 64.5% Commercial 114.3 18.6% Vacant Land 52.9 8.6% Parks & Recreation 38.8 6.3% Industrial 12.1 2.0% Map 3 presents an overview of projected land uses supported by the Northeast Neighborhood Development Area Plan. Broad categories of land use have been identified. As a more detailed plan is developed for the area, additional maps and supplemental information will be added to this Development Area Plan. Zoning Map 4 illustrates the location of current zoning districts within the Northeast Neighborhood. Within the 616 acres of the Development Area, the following zoning classifications are represented: A Residential A3 Residential B Residential C, C1 Commercial O Office LI Light Industrial primarily single - family mixed use, multifamily /commercial multi - family retail and services business offices range of non - noxious industrial uses Acreage per classification is estimated below: 10 C Commercial 31.68 5.12 C 1 Limited Commercial 1.19 0.19 O Office 0.44 0.04 Total Commercial D Light Industrial 33.31 13.40 5.35 2.16 Total Industrial Roads and Alleys 13.40 157.97 2.16 25.53 Total Roads and Alleys 157.97 25.53 Total 618.75 100.00 Map 5 presents proposed new zoning classifications supported for the Northeast Neighborhood by the St. Joseph County Area Plan Commission staff, to be included subject to Common Council approval in the revised City of South Bend zoning ordinance. F. Circulation Map 6 illustrates the major vehicular circulation routes that serve and define the boundary of the Development Area. Traffic count averages for each of the arterial and major collector streets that serve and define the Development Area are presented in Table 1. 1. South Bend Avenue (State Road 23) is one of several diagonal corridors radiating from the city's center. South Bend Avenue originates at Hill Street to the southwest and terminates at Cleveland Road in Mishawaka. Within the project area, South Bend Avenue coincides with a length of State Road 23 from Eddy Street to Twyckenham Drive. This section of South Bend Avenue functions as a principal arterial, carrying an average of 15,500 cars per day. West of Eddy Street, South Bend Avenue carries an average of 10,010 cars per day. 2. Angela Boulevard/Edison Road is a principal east -west arterial that carries an average of 19,863 cars per day. Angela Boulevard, which originates on the west bank of the St. Joseph River, changes in name to Edison Road at Notre Dame Avenue. East of U.S. 31, Angela Boulevard and Edison Road front the southern edge of the University of Notre Dame campus and delineate much of the City's northern corporate boundary against that of Notre Dame. 11 of 15,500 cars per day. West of Eddy Street, South Bend Avenue carries an average of 10,010 cars per day. 2. Angela Boulevard /Edison Road is a principal east -west arterial that carries an average of 19,863 cars per day. Angela Boulevard, which originates on the west bank of the St. Joseph River, changes in name to Edison Road at Notre Dame Avenue. East of U.S. 31, Angela Boulevard and Edison Road front the southern edge of the University of Notre Dame campus and delineate much of the City's northern corporate boundary against that of Notre Dame. 3. Eddy Street (State Road 23) is an important interior axis for the Northeast Neighborhood. North of Corby Boulevard, Eddy Street functions as a wide north -south collector street carrying approximately 7,452 cars per day. Eddy Street is intercepted as a length of State Road 23 south of South Bend Avenue, and this arterial carries an average of 14,596 cars per day. Eddy Street extends southward out of the project area to split at Mishawaka Avenue and the Cooper Bridge on the St. Joseph River. 4. T"ckenham Drive is a north -south collector street that forms the easternmost boundary of the Redevelopment Area. The road carries an average of 5327 cars per day. Twyckenham Drive extends from the northern edge of the city to the South Side residential area of Twyckenham Hills. 5. Notre Dame Avenue is a north -south neighborhood collector, the north end of which functions as the entrance to the University of Notre Dame campus. The wide, residential street carries an average of 2,845 cars per day. 6. LaSalle Avenue is a principal arterial and a busy commercial thoroughfare that functions as the southern boundary of the project area. The street carries an average of 20,258 cars per day. LaSalle Avenue runs east -west from the City Cemetery through the Central Business District, bridging the St. Joseph River, fronting St. Joseph Regional Medical Center on the East Bank and terminating at Greenlawn. G. Demographics Table 2 outlines demographic statistics for the Development Area. For the purposes of a demographic profile, data is included for those areas easily defined by census block groups. The small number of blocks within the Development Area and outside of these block groups are similar and do not skew the overall neighborhood statistics. Most of the population and land area of the Northeast 12 Neighborhood Development Area is represented in Census Tract 10, along with one block group from Census Tract 9. (See Map 7.) Within the Northeast Neighborhood are pockets of stable populations and owner - occupied single - family homes in proximity to pockets of unemployment and distressed housing conditions. The median income of the area is well below that of the City of South Bend. Overall, the Northeast Neighborhood has lost nearly 30% of its population between 1970 and 2000. Population loss, coupled with the lowered relative incomes of the residual population, has resulted in a decreased housing inventory in both grade and number of housing options. H. Public Institutions, Facilities and Recreational Areas Within the boundary of the Northeast Neighborhood Development Area are one public school (Perley Elementary) and two public recreational areas (Coquillard Park and Kelly Park). Fredrickson Park is an additional site owned by the City that will be developed as an Environmental Education Center. The total land area of these facilities is approximately 38 acres and accounts for approximately 6.2 % of the total land area of the Development Area. I. Environmental Conditions Within the Northeast Neighborhood, between Howard Street and South Bend Avenue, is a 15.7 acre former landfill site that the City acquired in 1984 with the intention of constructing a neighborhood park. Subsequent environmental assessment of the site, already called Fredrickson Park after a benefactor, revealed unsafe methane gas levels and lead contamination from the dumping of paints and gasoline. As a result, the site lay dormant for many years. In 2000, planning began for Fredrickson Park to become an Environmental Education Center. Environmental remediation work has been funded through an Environmental Protection Agency (EPA) Brownfields Cleanup Revolving Loan to the City of South Bend, with assistance from both state and local governmental agencies. The project will include site clearance; grading and contouring of the site to maximize drainage; consolidation of the solid waste in a compact area; installing underground methane control systems; capping the waste with impervious material to reduce water infiltration; introduction of shallow- rooted vegetative cover to minimize erosion; and ongoing monitoring of groundwater for impacts. Once environmental remediation work has been completed, construction will begin on trails, educational classrooms and other improvements to the site. 13 III: PROJECT AREA STRATEGY A. Planning Principles for Development The planning principles for the Development Area are: In implementing the Development Area Plan, the public sector's actions must be catalytic in nature in order to stimulate and leverage private sector investment and reinvestment. Public sector investment must be generated from variety of funding sources, as over - dependence on one public funding source will discount the potential scope of redevelopment activities over time. In implementing the Development Area Plan, the public sector's actions must be holistic in approach — physical redevelopment and revitalization activities must be integrated into a broader social, economic and organizational agenda for the long -term stability of the Area. In implementing the Development Area Plan, the public sector's actions must be based on effectual partnerships among stakeholder corporations, financial institutions, philanthropic foundations, neighborhood organizations and community and civic groups. The Plan must be guided by a strategy that empowers leadership among these partners. The recommendations of the Development Area Plan are meant to build upon the City's existing homeownership programs and to create more opportunities for individuals at all income levels. In consistency with federal guidelines discouraging concentration of poverty, development activities should strengthen the balance of market rate to affordable homeowner and rental properties within the area. The recommendations of the Development Area Plan are meant to improve economic conditions in the Area. If the Development Area Plan is successful in achieving the goals it sets forth, higher property values in the neighborhood may result. Improvements should benefit both current and new residents and should not create new hardships for existing low - income residents. B. Goals The goals of the Development Area Plan are: to ensure neighborhood stability and sustainability for the benefit of current and future residents and business owners; 14 • to protect and increase the property tax base of the area; • to introduce a variety of retail services to serve current residents and support residential growth; • to create employment opportunities through new retail and commercial development; • to encourage housing options for a diversity of household types, age groups, and income levels; • to improve conditions that determine the overall livability of the Northeast Neighborhood, including its physical environment, social capacities, economic viability, public safety concerns and connections with the wider community. C. Objectives The objectives of the Development Area Plan are: • to stimulate private sector investment within the neighborhood, including new construction, rehabilitation, and the reuse of vacant or underutilized land, buildings and facilities; • to coordinate and guide existing economic revitalization strategies, physical redevelopment programs and human and social service programs of private sector stakeholder organizations and public and non - profit agencies within a comprehensive Development Plan; • to implement the most current land use and zoning recommendations of the Area Plan Commission of St. Joseph County and the South Bend Common Council, which encourage urban residential density and mixed - use development, where appropriate; • to promote design standards that respect and conserve the architectural and social fabric of the neighborhood; • to minimize the intrusion of negative impacts of commercial development on the adjacent residential areas, such as vehicular traffic, noise, trash and other nuisances; • to improve vehicular traffic circulation patterns in the area for the public safety benefit of all South Bend residents and visitors; 15 to encourage a balanced transportation system within the area that provides for and accommodates multiple forms of transportation, including automobile, bus, bicycle and pedestrian traffic. IV. PROJECT AREA ACTIVITIES A. Introduction The Northeast Neighborhood benefits from having a cohesive historic identity, with a neighborhood name understood by most South Bend residents and relatively well - defined boundaries. However, because it is geographically large, the neighborhood contains a diverse population of residents with a diversity of housing needs, and a housing stock that ranges from excellent to substandard. There are commercial structures within the area that are desirable and economically viable, and others that are either physically deteriorated or represent economic decline. The strategies outlined in this Development Plan will be targeted to maximize the impact of the anticipated public and private investment in the area, and will be applied according to the guidelines set forth below: Redevelopment is recommended for areas exhibiting major deterioration or decline and that are situated in areas that would be better served by a higher public use. Acquisition, relocation, clearance, site assemblage, public works projects and/or new development activities may be part of implementing a redevelopment strategy. Revitalization will be appropriate in areas where significant deterioration or decline is evidenced, but some foundation exists upon which to reconstruct physical structures and to anticipate renewal. Tools of revitalization may include code enforcement, small -scale public works projects, organization- building and property beautification programs. Improvement will utilize the same methods as the Revitalization strategy, but will be indicated for areas that are less blighted or deteriorated. A smaller investment of public resources will be required. Preservation is necessitated in relatively stable areas near or adjacent to deteriorating or declining areas. Spot code enforcement, zoning enforcement, some rehabilitation activities and minor public works 16 projects will be used to proactively address blighting influences. The decision to apply a Redevelopment, Rehabilitation, Improvement or Preservation strategy in any area will be determined by a measure of the severity of deterioration or decline, as well as the associated amount of public resources, regulatory actions and/or incentives that must be applied to meet the goals and objectives established for the area. B. Activities Realization of the stated goals and objectives will be accomplished with a combination of public and private actions. These actions may include the following: pre - development activities, including, but not limited to, engineering, architectural, planning, traffic analysis, market area analysis, marketing, program development, title, survey, appraisal, legal, environmental assessment and testing; 2. acquisition of property, both privately and publicly owned; 3. relocation of individuals, households or businesses; 4. vacation and dedication of public right -of -way; 5. assemblage of properties for the siting of new development; 6. clearance of built structures; 7. rehabilitation of structures for reuse; 8. disposition of assembled cleared sites, rehabilitated structures and other properties; 9. provision for public facilities; 10. provision for public works improvements to infrastructure, including, but not limited to, streets and roads, sidewalks, curbs, water mains, storm drains, sewers and other utilities, lighting, traffic controls, and landscaping of public spaces and right -of -ways; 11. environmental study and remediation of properties as well as other activities pertaining to planning and implementing this 17 Development Plan. V. SUB -AREA GOALS AND STRATEGIES The delineation of sub -areas is useful as a means of directing attention to an area's particular challenges, unique opportunities or to highlight the need for further inquiry and collaborative planning. In general, goals for each sub -area will refine the overall goals of the Development Area Plan within appropriate, geographically- identified target areas. Sub -area boundaries are represented in Map 8. A. Eddy Street Commercial Redevelopment Area The Eddy Street Commercial Redevelopment Area sub -area is situated in the northern central section of the neighborhood. The sub -area extends 1 -2 blocks east and west along Eddy Street between Edison Road and Campeau Street. (See Map 9.) The Northeast Neighborhood, though primarily residential in character, will benefit from the introduction of appropriately- sited, neighborhood- scaled commercial uses. Neighborhood input into the 1998 Strategic Revitalization Plan, as well as the Northeast Neighborhood Resident Survey conducted by the NNRO in 2001, revealed a critical need for convenient, cost - competitive retail and services. Residents have also urged that visual improvements to the Eddy Street corridor are essential to improving the perception of the neighborhood in general. The creation of a target commercial redevelopment sub -area in this location will address both of these concerns. Siting new mixed use development and improving the existing streetscape will be the primary goals of this sub -area, with attention to encouraging compatibility at the interfacing of commercial and residential uses. Proposed development and construction currently in progress adjacent along Edison Road and on the southern edge of the University of Notre Dame campus will conceivably impact how the Eddy Street corridor might develop, and should be considered in terms of how best to use existing momentum to further the goals of the Development Area Plan. A southward realignment of Edison Road is planned to mitigate the hazard of the sharply curved connection with Angela Boulevard and to create clearance for a Commons greenspace in front of the DeBartolo Performing Arts Facility, currently under construction. The intent of locating both the Performing Arts Facility and the landscaped Commons area at the campus edge is to create a semi - public space that will serve to connect the university, the neighborhood and the wider community. Also under construction along Edison Road, one block west at Notre Dame Avenue, is Indiana University's South Bend Center for Medical Education, a 66,000 sq. ft. research facility housing both the local branch of N's medical school and the University of V Notre Dame's Keck Center for Transgene Research. The potential of these projects to foster pedestrian activity and connectivity between student - oriented and neighborhood- oriented uses south of the university campus is significant. The creation of a commercial node along both sides of Eddy Street, from Edison Road south to Napoleon Street, would both support and benefit from this new investment at the northern perimeter of the neighborhood. Small -scale commercial and mixed use developments will be supported in this area, with ground -level retail and second -story offices, residential apartments or commercial space particularly encouraged. The 1998 Strategic Revitalization Plan identified the potential for "Five Points," the junction of South Bend Avenue, Eddy Street and Corby Boulevard, to be reconfigured as the commercial and social center of the neighborhood. The 1998 Plan also recognized that the physical and programmatic redevelopment of this highly visible location would likely be an important catalyst for revitalization efforts within the neighborhood more broadly. The advantages of this area for siting new development include opportunities for site assemblage, high traffic volumes, centrality within the Northeast Neighborhood and centrality among downtown South Bend, the Notre Dame campus and eastern suburbs. South Bend Avenue and Eddy Street are coexistent with State Road 23 through the Northeast Neighborhood. Five Points, in reality a six -spoke intersection, is currently being evaluated by City and State traffic engineers to determine whether a reconfiguration of the intersection is necessary and feasible to minimize accidents and improve traffic flow. City traffic engineers have proposed a plan replacing this intersection with a standardized, four -point 90 degree intersection north of the current location in a diagonal junction of Corby Boulevard and Howard Street. This design would require selective acquisition of parcels to facilitate design improvements at the junction. If this plan is ultimately supported by the Indiana Department of Transportation (INDOT), peripheral site assemblage would be recommended to create large development pads in the immediate area for commercial and civic uses. Creating a vibrant, destination - oriented commercial node in this location will necessitate a detailed development plan. Such a plan should recognize the spatial requirements of a range of community- oriented retail offerings, allow for a compatible mix of civic and commercial uses, address open space needs, and provide adequate and balanced transportation access. Design standards that confirm the urban setting and reinforce the streetwall will be encouraged. Two - and three -story mixed use development, in particular, ground -level retail with offices, residential apartments or commercial space above, will be supported. Retaining and attracting retailers that will serve neighborhood residents with the 19 goods and services they desire, offer employment opportunities, complement adjoining uses and otherwise further the goals of the Development Area Plan will be a critical component of a successful redevelopment strategy in this area. Likewise, preserving civic and religious institutions important to the Northeast Neighborhood within the neighborhood center will ensure that the area will continue to reflect its historic identity for longtime residents. A shared parking strategy is recommended to reduce the number of parking spaces needed and to encourage pedestrian activity among destinations within the neighborhood retail corridor. Shared parking could be implemented within a new mixed -use development through simple agreements between adjacent uses, or through a parking management district if the scale of development so warrants. Well- landscaped, pedestrian- and bicycle - friendly paths and walkways will help reinforce the desirability of a shared parking scheme. The redevelopment of the Eddy Street corridor as a commercial district would ultimately benefit from the implementation of a coordinated signage plan and collaborative marketing efforts among businesses. The creation of a strategic partnership or Business Improvement District is recommended as sufficient development occurs. While commercial redevelopment is the primary goal of the sub -area, residential uses are integrated within the mixed use scheme and surround the sub - area's perimeter. In accordance with the City's goals to increase the diversity of housing options available to home buyers, the introduction of urban-scale rowhouses and townhomes will be supported in this sub -area as well. One favorable development model sites owner- occupied multi - family residential development of this type along both sides of Eddy Street, from Napoleon Street south toward the Five Points intersection. Rowhouses and townhomes consume only a moderate amount of land per household and constitute a housing density that supports increased levels of transit service and neighborhood retailing. Design standards that confirm the urban setting (i.e., minimal setbacks, inclusion of front stoops and streetscaping elements) should be applied to all new multi - family residential development within the sub -area. Sub -area goals: Support the southward realignment of Edison Road at Angela Boulevard to facilitate development opportunities and mitigate the "racecourse" effect of the existing curve; Correct traffic hazard presented by confluence of South Bend Avenue, Eddy Street and Corby Boulevard; 20 • Facilitate consolidation of parcels and replatting to create optimally -sized commercial and multi - family residential development sites; • Generate more economical or civic use. out of underutilized real estate, particularly land that can be more effectively developed within updated zoning classifications; • Retain, expand and improve locally owned and operated businesses; • Attract unique and cost - competitive national caliber and regional retailers, particularly those with urban shopfront appeal and that would serve the day -to -day needs of the neighborhood and community; • Support small scale, mixed -use developments with residential, retail and light commercial components; • Create a pedestrian- friendly focal point and gathering place at the center of the neighborhood featuring a mix of commercial, civic, institutional and recreational uses; • Introduce vehicular circulation patterns designed to maximize accessibility and visibility of destination points; • Implement a shared urban parking scheme adequate to meet the needs of the district's commercial, civic, institutional, recreational and residential uses; • Encourage design standards that confirm the urban setting (i.e., retaining the street wall, siting off - street parking behind storefronts); • Encourage design elements that provide visual identification clues for a sense of place or destination (i.e., coordinated signage, lighting, street furnishings and pavement systems); • Consider creating a Business Improvement District to provide daily maintenance, improved safety, District -wide marketing and business support. B. Georgiana - Talbot Residential Redevelopment Area An area bounded by the west side of Georgiana Street on the west, Howard Street on the south, Fredrickson Park and the South Bend Housing Authority site on the east and the Notre Dame Woods to the north will be designated as a housing redevelopment sub -area. (See Map 10.) This northeastern residential section of 21 the neighborhood evidences signs of severe blight and physical deterioration. Many lots and housing units within the sub -area are vacant or abandoned. Of those with built structures, a relatively high percentage are renter - occupied. Illegal dumping and code violations are a particular problem with these properties, and deferred maintenance and disinvestment have reduced much of the housing stock beyond the scope of rehabilitation. A comprehensive redevelopment strategy is recommended for this area, as called for in the 1998 Strategic Revitalization Plan. Site assemblage, clearance and new housing construction is recommended for as much land as is practicable within the sub -area. A coordinated program led by the NNRO and South Bend Heritage staff will identify which blighted properties should be given consideration for acquisition. The City, through its Redevelopment Commission and the State statutes governing displacement for redevelopment purposes, will oversee all necessitated relocation procedures. It is the stated goal of the NNRO to ensure that no undue hardship be caused to displaced residents. A comprehensive replat of the area will facilitate new housing construction of a suitable urban density, and design guidelines that articulate the urban setting and respect the character of the surrounding neighborhood will be encouraged. It will be desirable to introduce a modest, though varied housing stock that will attract both market rate purchase as well as subsidy - eligible low- to- moderate income homebuyers. Land parcels along South Bend Avenue will be reserved to accommodate existing or future commercial development. The Indiana Department of Transportation (INDOT) has planned for improvements to State Road 23 (South Bend Avenue) between Twyckenham Drive and Eddy Street, with final design specifications pending the input of neighborhood residents and City officials. It has been determined that the two - lane thoroughfare is inadequate to meet the traffic demand as it currently exists. Integral to planning for increased commercial activities at the core of the neighborhood is consideration of the impact of increased traffic on residents. The need for a more controlled, aesthetic solution to even the current level of vehicular commuting traffic has prompted City engineers and neighborhood residents to support the expansion of this length of State Road 23 to a context - sensitive, four - lane boulevard with a landscaped median. This plan would ultimately require the relocation of some houses and businesses along the expanded right of way. Final design considerations for State Road 23 should include elements that improve its safety and attractiveness for pedestrians and cyclists, including pedestrian- oriented lighting, signalized crosswalks and street furnishings. The sizable public investment in new infrastructure associated with State Road 23 will further the goals of the Development Area Plan by improving vehicular access to destination points both within and outside the Area. Connectivity of this 22 sub -area to the surrounding neighborhood should also be addressed by improving traffic flow among local streets. For instance, an extension of Napoleon Street east to Duey Street is recommended to allow circulation to increase safely and efficiently to the northwest. Redevelopment of the area will require investment in other public works infrastructure that is currently lacking or inadequate, including curbs, sidewalks, lighting and street paving. In geographic proximity to this sub -area, though not contained within the sub -area boundary, are two public parks which will benefit from significant revitalization efforts and investment in 2004. Fredrickson Park (described in Section II [I], Environmental) situated between Howard Street and South Bend Avenue, is a 15.7 acre former landfill site that the City has begun remediating for environmental hazard. A unique partnership among Federal and State environmental agencies, the City of South Bend Public Works, Parks and Recreation and Economic Development Divisions, The University of Notre Dame School of Architecture and the South Bend School Corporation has resulted in plans for the renewal of the site as an Environmental Education Center, complete with constructed wetlands, landscaped trails, amphitheater, and an indoor "hands - on" learning facility. Coquillard Park, known to some neighborhood residents as Perley Park, is located between Chalfant and Campeau Streets behind Perley Elementary School. In recent years the NNRO has devoted advocacy, collaborative planning efforts and resources toward the restoration of Coquillard Park. Project plans finalized in the Fall of 2003 include the construction of a trail system, picnic shelter, water spray play area, and play structure. The South Bend Parks & Recreation Department has committed to providing labor and equipment in kind, including the removal of tennis courts deemed obsolete, tree planting and maintenance. The Georgiana- Talbot Residential Redevelopment sub -area lies between these two parks, and therefore the strategies and activities undertaken within the sub- area stand to be beneficially reinforced by the planned improvements to the park facilities. Connectivity to Fredrickson Park and Coquillard Park, which will in fact be assets for the entire neighborhood, should be emphasized in this as well as other sub -area planning. Sub -area goals: Facilitate acquisition, resident relocation and clearance of existing housing stock; Replat area to create optimally- sized, marketable tracts for new housing development; 23 • Encourage opportunities to introduce a mix of market -rate, market -rate subsidized and affordable housing to increase homeownership options across income brackets; • Encourage housing design that confirms the urban setting and relates to the vernacular architectural styles present in the neighborhood; • Create and implement a plan for public works infrastructure upgrades, including new curbs, sidewalks, street lights and paving; • Support the expansion of State Road 23 from Eddy Street to Twyckenham Drive to an increased capacity, four -lane landscaped boulevard; • Bury or relocate existing overhead utility lines along State Road 23, as appropriate; • Introduce design considerations that will increase the safety and attractiveness of State Road 23 for pedestrians and cyclists, such as lighting scale and ambient quality, signalized crosswalks and street furnishings; • Consider extending Napoleon Street from Eddy Street to Duey Street for improved traffic circulation and connectivity; • Emphasize access and connectivity to Fredrickson Park and Coquillard Park in sub -area redevelopment design concepts. C. Homeownership Preservation Area Homeownership preservation is a key strategy of the Development Area Plan and will be applied within all areas of the neighborhood to encourage long -term residency and pride of investment. Homeownership counseling, technical and downpayment assistance programs sponsored by local governmental and non- profit organizations are recommended to help long -term renters and first -time homeowners purchase homes in the Northeast Neighborhood. Additionally, a distinct homeownership preservation sub -area will be designated in the blocks bounded by Eddy Street on the east, Napoleon Street on the north, Hill Street on the west and South Bend Avenue on the south. (See Map 11.) This is a large section of housing in the northwestern quadrant of the neighborhood, most of which conforms to single - family residential zoning. However, over time, many single - family dwellings have been converted to rental units. Properties evidencing deferred maintenance by absentee landlords and lack of basic upkeep by short-term renters have become prevalent. Neighborhood residents have 24 expressed that the reversal of this trend is critical for protection of residential property values throughout the neighborhood. A substantial number of vacant parcels are scattered within the preservation area. New infill housing construction is recommended for the majority of vacant lots, with replatting as required for optimally- sized, developable parcels. New construction and rehabilitation efforts should be aimed at shoring the property values of existing homes in the neighborhood and helping to restore the population density lost in recent years. The NNRO has begun a successful housing rehabilitation and infill construction program targeted to certain blocks within this sub -area, maximizing the impact of the organization's reinvestment. Twelve vacant lots within this area have been purchased to date by the NNRO. Eight of these are concentrated between Turnock Street and St. Peter Street, and will be replatted as six parcels for new construction. Two lots have sold and new homes have been built, and several properties have been acquired for rehabilitation. The NNRO has also purchased four substandard housing units that will be demolished and the sites prepared for new single - family development. In the near term and to its capacity, it is anticipated that the NNRO will continue this revitalization strategy within the sub -area. Within the homeownership preservation sub -area, the University of Notre Dame has instituted a single - family infill construction and rehabilitation program for housing redevelopment along Notre Dame Avenue, from Napoleon Street south to Corby Street. The program is designed to encourage local homeownership among faculty and staff while investing in the long -term stability of the surrounding neighborhood. Four new above - market rate homes have been privately built by faculty members that pattern the massing and elevations of the best examples of traditional area housing. In the near term, the university plans to continue facilitating investment in this area with similar - quality new construction and rehabilitation at a pace of at least two or three homes per year. Sub -area goals: Apply strategic preservation approaches in pockets of disinvestment, including spot code enforcement, zoning enforcement, rehabilitation activity and small public works projects; Facilitate acquisition and replatting of vacant parcels for new infill housing construction; Encourage design standards that confirm the urban setting and relate to the vernacular architectural styles present in the neighborhood; 25 Work with state and local officials to dedicate a portion of funds from existing homeownership programs to the Area; Encourage the creation and expansion of homeownership incentive programs among area institutions and large employers. D. St. Joseph Regional Medical Center Administrators of St. Joseph Regional Medical Center announced in 2002 that the 35 -acre hospital site on LaSalle Avenue in South Bend would close, and its operations would be consolidated with those of St. Joseph Community Hospital in a new facility to be built in Mishawaka. The nine buildings of the existing St. Joseph health complex cover an area totaling approximately 800,000 sq ft. (See Map 12.) The University of Notre Dame has an option to purchase the land and is currently studying the feasibility of several possible plans for its redevelopment. It is anticipated that should the university elect to purchase the site, university administrators will lead an effort to bring a desirable use or mix of uses to the site that will further the goals and objectives of the Development Area Plan. Though the relocation of St. Joseph Regional Medical Center is a loss for both the City and the Northeast Neighborhood, the relatively large size of the infill site does present a unique opportunity for potential new development and investment in the neighborhood. In making determinations about what the private market will bear and which uses will be most compatible with the surrounding area, the proposed activities and strategies for other sub -areas within the Northeast Neighborhood Development Area should be carefully considered. The proximity of the site to LaSalle Avenue and the South Bend Central Development Area also suggests the need for coordination of project planning with the South Bend Central Development Area Plan. Sub -area goals: Coordinate a collaborative planning process that will involve neighborhood and city residents, stakeholders and local government in determining the redevelopment potential for the St. Joseph Medical Center site; Anticipate environmental remediation, infrastructure upgrades, sensitivity to contextual historic structures and other development challenges that may be presented by the site; 26 Align plans for redevelopment of the site with the goals and objectives of the Northeast Neighborhood Development Area Plan as well as the South Bend Central Development Area Plan, which addresses the adjacent East Bank and nearby Central Business District. E. Madison Center Campus Housing and Commercial Redevelopment Area Madison Center and Hospital has completed a Master Plan for a ten -year phased expansion of its urban campus along Niles Avenue and Hill Street. New institutional uses will be introduced, as well as professional office space and commercial space for lease. The Northeast Neighborhood Development Area Plan incorporates the long -range development plan as a sub -area (see Map 13). in order to support the growth of Madison Center and guide a land use strategy emphasizing residential compatibility at the campus edge. The addition of new facilities and additional square footage is necessitated by an expanded clinical care mission and the opportunity to assume new research capacities. The long range plan will nearly double the space Madison Center currently has available, with the addition of several three -story office structures. The scale and character of the new construction will replicate that of the existing facilities, which exhibit desirable massing and materials and complement the residential character of the surrounding area. Madison Center and Hospital administrators have also initiated a housing rehabilitation program to encourage staff homeownership in the Northeast Neighborhood. Madison Center has acquired several single - family homes concentrated on the 700 and 800 blocks of Hill Street that will be rehabilitated and marketed for sale to employees. In coordination with the NNRO and South Bend Heritage program staff, income - eligible employees will receive downpayment and mortgage assistance. Hill Street has the potential to become a significant demonstration block for the neighborhood, as the revitalization strategy introduces the desirable option of living and working in close proximity. Memorial Hospital has also implemented an employer - assisted housing incentive program that targets the Northeast Neighborhood, though not exclusively. Such programs originating in the private sector are an asset to the neighborhood, and should be supported by and integrated into the development strategies and activities of the Northeast Neighborhood Development Area Plan. Sub -area goals: Support the managed growth of the Madison Center campus north of LaSalle Street and west of Hill Street; 27 • Encourage design standards that pattern the existing Madison Center campus architecture style, scale and materials, which confirm the urban setting and relate to surrounding residential uses; • Encourage dedication of ground floor space to retail uses, to the extent possible in providing appropriately sized and configured office space; • Attract unique and cost - competitive national caliber and regional retailers, particularly those with urban shopfront appeal and that would offer convenience shopping and services to the neighborhood and community; • Support and replicate employer- assisted housing initiatives that target the Northeast Neighborhood. VI. FINANCIAL ACTION PLAN A. Funding Mechanisms 1. TIF The primary funding mechanism recommended to facilitate the goals and objectives of the Northeast Neighborhood Development Area Plan is the designation of a tax increment finance allocation area, or TIF district. A TIF district that shares the same boundary as the Development Area will be designated with the base assessment year 2003 Pay 2004. The initial tax increment will necessarily reflect any decreases in assessment as properties are demolished or devalued in order to assemble larger developable sites and reconfigure critical rights -of -way. TIF revenues, when generated, will be used to finance public works infrastructure improvements, some targeted acquisition and site assemblage for redevelopment, and other redevelopment activities outlined in Section IV (B). 2. Other sources It is anticipated that the City of South Bend, through its Redevelopment Commission and its Department of Public Works, will provide resources to stimulate development and private investment in the Development Area. Additionally, critical programmatic activities directly and indirectly related to the long -term success of the project area will be undertaken by other private and public agencies and will be funded through a variety of Federal, State and Local sources. Examples of these activities include 28 homeownership financial and technical assistance, including tax abatement on new residential construction, forgivable grants and loans for first -time homebuyers, downpayment and rehabilitation assistance, as well as financial assistance for small business in the form of gap financing loans. Funding sources of these activities include the HOME program, the LEND program, the Community Development Block Grant program, Community Homebuyers Corporation, Small Business Assistance and the Business Development Corporation, among others. 3. New Markets Tax Credits Despite the significant retail purchasing power of residents, it is a fact that many urban neighborhoods are underserved by retail and commercial enterprise. Lack of access to capital and technical expertise are the reasons more businesses are not started in these areas, not lack of market potential. To address the apparent market failure, the New Markets Tax Credit (NMTC) program was created as part of the Community Renewal Tax Relief Act of 2000 to encourage investment in low- income communities. The federal program is designed to generate $15 billion in new private sector investments in low- income communities across the country. The NMTC program permits tax - paying entities to receive a credit against federal income taxes for making equity investments in designated community development entities. The equity investments are then used to revitalize distressed areas through various community and economic development strategies, examples of which include financing for needed community facilities; commercial loans and investments to start or expand small businesses; or financial services needed by low- income households and local businesses. Qualifying low- income areas are determined by census tract. Nearly all land area within the Northeast Neighborhood Development Area will qualify for investment opportunities utilizing New Markets Tax Credits as incentives to investors and developers. Partnering with financial institutions and community development entities that seek development projects in NMTC - eligible areas will be advantageous in structuring financially feasible redevelopment project activities. B. Funding Plan A Development Area Plan is an outline of both near- and long -term development goals, objectives, strategies and activities that will, over time, positively impact an 29 economically distressed area. The Northeast Neighborhood Development Area Plan sets forth an ambitious set of goals and strategies designed to bring about both economic growth and quality of life improvements through reinvestment for the resident population. The goals of the Development Area Plan include strengthening commercial uses and creating new employment opportunities, particularly at the center of the neighborhood. However, much of the new investment proposed for the Development Area is to be directed toward significant residential redevelopment and revitalization activity. The majority of land uses within the Northeast Neighborhood will remain residential. Tax increment financing allocation amounts are currently calculated only on commercial uses, thereby making TIF projections relatively weak in relationship to the goals outlined for the Area. The development program will require a long term, multi -year commitment by the Redevelopment Commission, the supporting neighborhood organizations and institutional partners. Tax increment financing allocation amounts will depend, in the early years, on the capacity of the Redevelopment Commission, neighborhood organizations, stakeholder institutions, major landowners and involved not -for- profits to leverage existing resources to encourage outside private investment. Realizing the constraints inherent in the lack of dedicated funding sources, the City, the NNRO and its member institutions, and the NENC have in fact committed to work in partnership and in an entrepreneurial spirit to locate funding sources, public and private, for projects and activities proposed in the Development Area Plan. Aspects of many of the redevelopment and revitalization strategies outlined in the Plan as well as aspects of the funding plan are contingent on the actions of other governing bodies, both regulatory and legislative. In order to facilitate initiating the proposed infrastructure improvements earlier in the term of the Development Area, tax abatements as an economic incentive for commercial development will not be encouraged or supported within the area. VII. DESIGN AND DEVELOPMENT CONTROL A. Design Control Objectives The new zoning ordinance that will be implemented for the City of South Bend by the Area Plan Commission of St. Joseph County will eliminate the site plan approval process, introduce stronger building standards and establish new classifications sensitive to neighborhood preservation. In order to achieve high quality design, construction, rehabilitation and site development, a more detailed design/development review process will ultimately be established for the Development Area. Design Review Guidelines for the Northeast Neighborhood, 30 or parts thereof, will be put forward after an early phase of Plan implementation. It is anticipated that all design and development review will be monitored and controlled through a special area zoning classification provision in the South Bend Municipal Code that is specific to the Development Area. The Area Plan Commission, the Board of Zoning Appeals, the Common Council and the Building Department will be responsible for all design controls within the Area. The Redevelopment Commission, through its staff, will serve in an advisory capacity for the Development Area. Powers and Duties The Design Review Administrator will be responsible for reviewing the plans and specifications for all projects located within the area that involve new construction, exterior renovation or site work. This review will include design, site planning, open space and other applicable considerations pertaining to compliance with the standards set forth in the zoning control ordinance. 2. Development Control The Area Plan Commission and the Common Council shall, by Ordinance, adopt a special zoning classification provision to be incorporated within the South Bend Municipal Code for use by developers on all projects within the area. The Design Review Administrator will base approval of plans on how well the proposals have followed these guidelines. The staff of the Redevelopment Commission will serve as advisory members to the review process within this Development Area. The special zoning control ordinance may be reviewed and revised as necessary by Redevelopment Commission action. 3. Permits No permit shall be issued for construction, reconstruction, alteration or rehabilitation of any building in the Development Area until the plans and specifications for the building have been approved by the Design Review Administrator. 4. Review All proposals filed with the Design Review Administrator for review and approval shall be accompanied by architectural plans and/or engineering drawings and specifications for the work involved. Such plans shall be reviewed for compliance with the standards and objectives of the Plan and the zoning control ordinance. Upon receipt of the plans the Administrator 31 will review them and either approve the plans as submitted, ask for additional information, approve the plans as modified or reject the plans. The developer will be notified in writing of modifications to plans or specifications that are necessary to receive approval. Approval by the Administrator does not constitute approval of any federal, state or local building, zoning or other requirements, but solely pertains to the zoning control ordinance over which the Administrator has advisory jurisdiction for the Commission. The Administrator shall have the right to waive the review process for any project. B. Development Control 1. Land Acquisition The Land Acquisition Plan and List of Property to be Acquired indicating real property to be acquired for redevelopment purposes are attached as Exhibit A. The List of Property to be Acquired sets forth parcel ownership and key numbers for such land. Following acquisition, the City of South Bend Department of Redevelopment intends to: a. Demolish the structure or structures thereon, if any, and dispose of the land for redevelopment at its fair market value, excepting those cases when land is sold or leased to another public body, pursuant to Indiana Code 36- 7- 14 -22, for uses in accordance with the Development Plan; or b. Sell or lease the property to a purchaser or lessee at its fair market value, excepting those cases when property is sold or leased to another public body pursuant to Indiana Code 36- 7- 14 -22, for uses in accordance with the Plan, subject to its being rehabilitated in conformance with the approved zoning control ordinance. 2. Property Rehabilitation All properties in the area shall comply with the standards set forth in all applicable statutes, codes and ordinances, as amended from time to time, relating to the use, maintenance, facilities and occupancy of existing property including, but not limited to, Chapters 6, 8, 9 and 21 of the South Bend Municipal Code. All properties within the Area shall be maintained so that the appearance 32 of the premises and all buildings thereon shall reflect a level of maintenance in keeping with the standards of the Area and the requirements of the South Bend Municipal Code. 3. Commission Disposition of Property In the event that land is acquired by the Redevelopment Commission it will be disposed of subject to an Agreement between the Commission and the Developer. The Developer will be required by the Agreement to observe the land use and building requirements and objectives of this Plan and to carry out all development within an agreed time period. In addition, the following provisions, plus other appropriate provisions, will be included in the Agreement: a. The approved plan for the project and a time schedule for start and completion of the project; b. That the purchase of the land is for the purpose of redevelopment and not for speculation. Purchase contracts will provide that the Developer agree that purchase of the property is for redevelopment and not for land speculation. Prior to the completion of the redevelopment project, the Developer may not sell, lease or otherwise transfer such land (or improvements) without the prior consent of the South Bend Redevelopment Commission; C. That the land will be built upon and improved in conformity with the objectives and provisions of the Plan; d. That the building of improvements will be commenced and completed within a specified period of time; e. That the Developers, their successors or assigns, agree that there will be no discrimination against any person or group of persons on account of race, creed, color, sex, age, transfer, use, occupancy, tenure or enjoyment of the premises therein conveyed or improvements erected or to be erected thereon, nor will the Developer or any person claiming under or through the Developer establish or permit any such practice or practices of discrimination or segregation with reference to the selection, or vendees in the premises therein conveyed, or improvements erected or to be erected thereon. C. Project Planning Incentives 33 Any project planning incentives will be defined as part of a plan amendment in the future. VIII. STATUTORY AUTHORITY The controls, regulations and land use restrictions contained in this Plan are for the specific purpose of implementing the Northeast Neighborhood Development Area Plan pursuant to Indiana Code 36- 7- 14 -1 -et. seq. IX. PROCEDURE FOR AMENDMENT OF THE APPROVED DEVELOPMENT PLAN The Northeast Neighborhood Development Area Plan may be amended by resolution of the South Bend Redevelopment Commission. Any change affecting any property or contractual right can be effectuated only in accordance with applicable state and local law. X. LIST OF PROPERTIES TO BE ACQUIRED No properties are to be acquired as a component of this plan. Properties planned for acquisition in the future must be added to Exhibit A: List of Property to Be Acquired and the Plan must be amended to include those properties in the manner described in Section IX, Procedure for Amendment of the Approved Development Plan of the Northeast Neighborhood Development Area Plan. XI. LEGAL DESCRIPTION OF NORTHEAST NEIGHBORHOOD DEVELOPMENT AREA Attached as Exhibit B. 34 Northeast Neighborhood Development Area Boundary as of Resolution No. 2312, 02/16/07 la Salle L U 7 L U CO Prepared by: South Bend Department of Community & Economic Development 7/21/06 Mc Q South Bend City Limits Res 2312—NE—boundary N f k ` y Y: 1 1 y3 i . 1 - fR la Salle L U 7 L U CO Prepared by: South Bend Department of Community & Economic Development 7/21/06 Mc Q South Bend City Limits Res 2312—NE—boundary N L Q �F+ E C. _O ma O O L O .0 ME Im ■E Z i O Z to r. O WOMEN V L_ SIMON V V t m L IMMMM 34do NO VI V L V L a A/+ W 0 Ma O O L O Z O z <1Z m O iy 8 N N 0 V+ Am W L Q .i.i CO ^m W L Q E a _C O O L O m Z m t O Z o 0. m 0i <1Z H ,r, 1�r 1 I= a 6� TT�e i"'� .41E d i } ,, -- LL { LT ;!li Cf1LL a; l 4 l{ 1 T W m oLL 0 N 0 W L Q f+ E a _O L E E O V L f+ co W Q t0 CD L Q co Q <1Z m OuL N �n $� 81 N O• 4w 0 �a _ CL O C� @ m > tv � a� RHO f f 2 z Y On a1 l Ci O m W L Q E a O O O L O Z m O Z N CL m 2 J L L AS, C ---�Z Z OLL O O O O 0 Projected Land Use Plan City of South Bend Boundary = Existing Multi Family Development to Remain = Parks Development Area Boundary Hospital Reuse Site Single Family Home Ownership Preservation Land Uses Schools) ✓��/, /,, z; -; Institutional Single Family Home Redevelopment \ \ \\ Worship Mixed Use Development South Bend Housing Authority University of Notre Dame Redeveloped RetaiUOffice Urban Townhomes/Villas - Phase I Urban Townhomes/Villas - Phase It N Feet 0 375 750 19500 2,250 3,000 D O 0 �w O� Q =Z �w W� za j¢w 'moo I0 z Map 5: Northeast Neighborhood Development Area Proposed Zoning ' A A ire .f� 1 0 O X 9 U O C e C y d O uu��� dgH14 e u 3 yy YID L A E C T'a 4 C d >,04 E 7 W 3 L L. 7 .C. C L O.C.. m a rn-5 IS bOu c�Y CO5 yin=iw x0 0LUiuou?IL i i 1 CU 4 i °uuv0i o i - ounu i m. ®� ■� IK llillllll0 .____ i 11 020 Qc ,?_Qw Wpm LLJ aN49 � O.o N cc 21-1 � I 11 V- U- 2 FR wee u rT Ii tl a� m 4) 0 m 4) (1) 4) L. IL CL 4) 0 CD E 0 m 0 co 0 0 --l—Z F I L............ kLL z om of of .......... . o sm CL 4) CL (1) 0.0 n 4) > m 4) LM CN TOM CL . . . . .... .... I...--.— St. Louis ..... . ...... . .. . . . . . .... ...................... T-LL �z oLL F n C, q 0-1 of .91 N 0. C7 N � L �•+ V � L E �••+ O V > O C� .y w/ L W E E L 0 QV CO M = <1Z 0 a 0 N O