HomeMy WebLinkAbout10-20-06 Redevelopment Commission MinutesSOUTH BEND REDEVELOPMENT COMMISSION
REGULAR MEETING
October 20, 2006
10:00 a.m. 227 West Jefferson Boulevard
Presiding: Karl G. King, Vice-President South Bend, Indiana
1. ROLL CALL
Members Present: Mr. Karl King, Vice President
Mr. Greg Downes, Secretary
Mr. Hardie B lake, Jr.
Members Absent: Ms. Marcia Jones, President
Mr. William Hojnacki
Legal Counsel: Ms. Cheryl Greene, Esq.
Mr. Shawn Peterson, Esq.
Redevelopment Staff: Mr. Don Inks, Director
Mrs. Cheryl Phipps, Recording Secretary
Mr. Bill Schalliol, Economic Development Specialist
Mr. Timothy Williams, Economic Development Specialist
Mr. Andrew Laurent, Economic Development Specialist
Ms. Jennifer Laurent, Economic Development Specialist
Mr. Nicholas Witwer, Economic Development Specialist
Others Present: Ms. Sharon Kendall, Executive Director
Ms. Catherine Fanello, Controller
Ms. Charlotte Pfeifer, South Bend Common Council
Ms. Pam Paluszewski, Legal Dept.
Ms. Jamie Loo, South Bend Tribune
Mr. George Adler, Community Development
Mr. Jerry Niezgodski
Mr. Marty Wolfson
Ms. Linda Wolfson
Mr. King noted a Revised Agenda for the October 20,
2006 meeting. The Revised Agenda differs from the
original Agenda by the addition of Item 6.C.(2),
authorization for access to Commission owned property
on Sycamore St.
Mr. Downes made a motion that the Revised Agenda be COMMISSION APPROVED THE REVISED
accepted and approved. Mr. Blake seconded the motion AGENDA DATED OCTOBER 20, 2006
and the Commission approved the Revised Agenda
dated October 20, 2006.
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
2. APPROVAL OF MINUTES
A. Approval of Minutes of the Regular Meeting of
Friday, August 25, 2006.
Upon a motion by Mr. Downes, seconded by Mr. COMMISSION APPROVED THE MINUTES of THE
King and unanimously carried, the Commission REGi1LAR MEETING of FRIDAY, AUGUST 25,
a roved the Minutes of the Re ular Meetin of 2006
pp g g
Friday, August 25, 2006.
B. Approval of Minutes of the Regular Meeting of
Friday, September 15, 2006.
Upon a motion by Mr. Downes, seconded by Mr. COMMISSION APPROVED THE MINUTES OF THE
King and unanimously carried, the Commission REGULAR MEETING OF FRIDAY,
a roved the Minutes of the Re ular Meetin of SEPTEMBER 15, 2006
pp g g
Friday, September 15, 2006.
C. Approval of Minutes of the Special Meeting of
Monday, October 2, 2006.
Upon a motion by Mr. Downes, seconded by Mr. COMMISSION APPROVED THE MINUTES of THE
King and unanimously carried, the Commission SPECIAL MEETING of MONDAY, OCTOBER 2,
a roved the Minutes of the S ecial Meetin of 2006
pp p g
Monday, October 2, 2006.
D. Approval of Minutes of the Regular Meeting of
Friday, October 6, 2006.
Upon a motion by Mr. Downes, seconded by Mr. COMMISSION APPROVED TIC MINUTES of THE
King and unanimously carried, the Commission REGi1LAR MEETING of FRIDAY, OCTOBER 6,
a roved the Minutes of the Re ular Meetin of 2006
pp g g
Friday, October 6, 2006.
3. APPROVAL OF CLAIMS
Redevelopment Commission Claims submitted October 20, 2006 for approval.
324 AIRPORT AEDA
H & G Services
Ken Herceg & Associates, Inc.
130,730.00
10,644.00
2
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
3. APPROVAL OF CLAIMS (CONT.)
420 FUND TIF DISTRICT-SBCDA GENERAL
Rose Pest Solutions 87.00
AEP 656.34
NIPSCO 58.24
KRC Roofing & Sheet Metal, Inc. 4,900.00
CB Richard Ellis 671.22
True Value 27.49
ConSpect Services, Inc. 457.63
428 FUND AIRPORT 2003 BOND
DLZ 18,250.65
619 FUND BLACKTHORN
Meadowbrook Golf Group Inc. 8,000.00
$ 174,482.57
Upon a motion by Mr. Downes, seconded by Mr. Blake
and unanimously carried, the Commission approved the
Claims submitted October 20, 2006, and ordered checks
to be released
4. COMMUNICATIONS
Mr. Inks noted that two Communications have been
received. The first is from Charlotte Pfeifer, Common
Council representative from the 2nd District. Mr. Inks
read the letter and noted the attached plan which is here
printed in its entirety.
October 20, 2006
Marcia Jones, President
Redevelopment Commission
12th Floor County-City Building
227 W. Jefferson Blvd.
South Bend, IN 46601
Dear Commissioners:
I am submitting an Economic Development Plan for the
COMMISSION APPROVED THE CLAIMS
SUBMITTED OCTOBER 2O, 2006, AND ORDERED
THE CHECKS TO BE RELEASED
3
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
4. COMMUNICATIONS (CONT.)
LaSalle Square Business Area that will be beneficial upon
inclusion in the Airport TIF District.
This plan was put together by the surrounding communities,
Faith Apostolic Church and other interested citizens with my
endorsement. The surrounding neighbors support this plan.
I offer this plan with the full support of the South Bend
Common Council.
Sincerely,
Charlotte D. Pfeifer
2"`~ District Councilmember
(Attachment)
CONCEPT PLAN
FOR REVITALIZATION OF LASALLE SQUARE AREA
GOAL: Promote economic development and revitalization
for the LaSalle Square area through:
• Improving the appearance of the area and its identity
making it attractive for new businesses, residents, and
visitors entering South Bend from the airport.
o Increasing business services and employment
opportunities for area residents.
o Restoring vitality, improving the tax base, and
increasing property values in the neighborhoods
surrounding LaSalle Square.
• Increasing the attractiveness of the area for new
investment by providing health and wellness
opportunities for employees of nearby businesses as well
as area residents.
INTRODUCTION
LaSalle Square is located on South Bendix Drive, just south
of the Lincoln Way West corridor, a gateway to the city from
the airport, and just north of Honeywell and Bosch. Its
development is central to improving both commercial growth
and the quality of life of the surrounding urban
4
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
4. COMMUNICATIONS (CONT.)
neighborhoods.
The LaSalle Square area is a hidden gem which boasts a
proud heritage, once home to the Bendix Corporation.
Bendix, formerly one of the largest employers in the City,
provided well paying manufacturing and white collar jobs for
several generations of working middle class families, many of
whom live din the single family owned homes that dominate
the neighborhoods surrounding LaSalle Square. However,
this economic climate has changed and the number of well-
paying manufacturing jobs providing generous benefits and
stable employment decreased significantly.
International corporations, Bosch and Honeywell, now
occupy the facility which formerly housed Bendix. LaSalle
Square, which once provided major retail opportunities for
west side residents, lost its anchor stores, Kroger and Target.
The Portage Avenue/Cleveland Road retail and commercial
development also contributed to loss of opportunities for the
LaSalle Square area. The new commercial development
benefited by being part of the airport TIF which provided
ample funds for infrastructure improvements to support the
increase in traffic and commercial activity.
The continued erosion of opportunities coupled with the
Portage Avenue/Cleveland Road retail development a few
miles north also contributed to a decision by the St. Joseph
County Library to announce to close its LaSalle Square
Branch and open a new facility located in the new
development area. Strong opposition from neighborhood
residents and concerned community members convinced the
library to maintain and even expand its current operations at
LaSalle Square.
In addition to above future expansion of the LaSalle Public
Library the other major positive development to LaSalle
Square occurred when The Faith Apostolic Church saw an
opportunity to restore life to LaSalle Square by purchasing,
refurbishing and occupying a large part of the vacated areas
while continuing to rent to small retail concerns which still
occupied space in the shopping area. This provided a
springboard for renewal. Another positive development is
the migration of young families into the area attracted by the
5
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
4. COMMUNICATIONS (CONT.)
affordable, well-maintained housing stock. This
demographic shift creates a nice mix of young and elderly
single neighborhoods. These positive changes have
encouraged local businesses in the area to reinvest by
upgrading their facilities. The airport expansion will provide
another boost to the area by creating over 400 jobs for cargo
handlers.
PROPOSED PROJECTS
The following infrastructure improvements would enhance
economic development by making the area more attractive to
business investment and improving employee productivity.
• Both LaSalle Square and the library would benefrt from
infrastructure improvements, including lighting, signage,
landscaping, and other streetscape improvements to
increase visual appeal and encourage further
development.
• A day care center, providing quality child care for
working parents, is currently located in LaSalle Square
and accessible to employees ofAirport TIF businesses,
Honeywell and Bosch. It would benefit from an enclosed
play area, with upgraded equipment and ground surfaces
and increased safety.
• A street realignment where Prast joins Ardmore Trail
and additional curb cuts as part of an enhanced entry
could facilitate development of the grass covered lot
located west of LaSalle Square.
• A Transpo hub, with a sheltered waiting area, could
enhance transportation opportunities for area residents
as well as serving as a transfer station for the Blackthorn
route. This would allow residents to seek employment at
businesses located throughout the airport economic
development area as far north as the Portage Prairie
development.
• The grassy areas and wooded hill to the west of LaSalle
Square could be incorporated into a pocket park system
complete with walking paths, exercise trails, and seating
areas. Both employees at Honeywell and Bosch and the
area residents would benefit from this opportunity.
• Infi°astructural improvements, including the removal of
gasoline storage tanks at currently vacant site next to the
animal hospital on LWW could provide a site appropriate
6
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
4. COMMUNICATIONS (CONT.)
for a small grocery and pharmacy. Improvements
including a sidewalk along the southern side of Lincoln
Way West would also increase access and improve
safety.
• Upgraded curbs, additional sidewalks, and possibly a
roundabout at the triangular commercial area located at
Bendix and LWYV could aid the flow of traffic, increase
safety for pedestrians, and encourage the stability of the
area.
OTHER CONCEPTS
1) Create pedestrian access over the railroad tracks to
LaSalle Park to connect the north and south sections of the
area.
2) Address drainage problems in the neighborhoods located
in the LaSalle Square area.
3) Make infrastructure improvements along Bendix Drive to
visually connect the LaSalle Square and Cleveland Road
developments.
4) Develop an interactive Science and Technology Center in
partnership with Bosch, Honeywell, the industries located in
the Airport TIF, and local universities. This center would be
designed to make area residents aware of science and
technology career paths, expose students to the skills needed
by industries in the area, and support the training needs of
area businesses.
Mr. Inks acknowledged receipt of the second letter
which was from Jerry Niezgodski, Chairman of the
Lincoln Way Nest Gateway Association.
Marcia I Jones, President
South Bend Redevelopment Commission
227 W. Jefferson, Suite 1200
South Bend, IN 46601
Madame President,
I am writing you on behalf of the neighbors of the Lincoln
Way West Gateway Association (LWWGA) living in the
7
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
4. COMMUNICATIONS (CONT.)
LaSalle Square area. As many of us have lived in the area
for decades we have seen the transformation of LaSalle
Square from a bustling retail center to an area dominated by
non profit and religious organizations with a sincere interest
in serving the needs of all residents. It is the opinion of
leaders of these organizations and the neighbors living
around LaSalle Square that the City of South Bend,
especially the Redevelopment Commission, should refocus
efforts to develop the LaSalle Square area to better serve the
community and most importantly, jump start the
revitalization of the Lincoln Way West Corridor's western
boundary.
At your August 25, 2006 meeting I urged you, on behalf of the
neighbors in the LYVYVGA, to extend the boundaries of the
Airport Tax Incremental Finance (TIF) district south to
include LaSalle Square and a portion of the surrounding
neighborhood. It is our belief inclusion in the TIF district is
essential to the development of the LaSalle Square area and
that continued neglect of this area by the Redevelopment
Commission and the City Administration is unacceptable.
By using TIF money to improve the infi^astructure, including
alleviating drainage problems along Ardmore Trail,
improving the appearance of the area and promoting the fact
the City does care about this area, we believe the
Redevelopment Commission will send a loud and clear signal
that the inner city does matter and does offer opportunities
for business and residents alike. We view this as a win-win
for the City and the neighborhood stakeholders.
Neighborhood residents have seen jobs leave from
Bendix/Honeyell and others over the years. While we may
not be able to impact some decisions by corporations we
must do all that we can to show those that are still here that
South Bend does actually care and appreciate their being
here by offering their employees a pleasing environment in
which to work, relax, shop, eat and visit when they are not
working. You never know. Perhaps by improving the
amenities the area has to offer we might influence both
Honeywell and Bosh to consider South Bend as an area to
expand in the future.
8
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
4. COMMUNICATIONS (CONT.)
The St. Joseph County Public Library recently announced
their plans to expand the LaSalle Branch Library in LaSalle
Square. We, as a city, should be building on this success
rather than ignoring it. There is plenty of land available just
waiting to be developed in LaSalle Square, on Bendix Drive
and Armore Trail. It is up to the Redevelopment Commission
and the City Administration to recognize all the possibilities
and the opportunities that developing the LaSalle Square
area offers. Whether it's retail, residential, manufacturing or
green space, the LaSalle Square are can accommodate them
all.
Partner with us. Make this happen. Show west side residents
that you have not abandoned them and that they do count.
The neighbors of the LWWGA thank the members of the
Community Forum for Economic Development for their
support and leadership on this issue and stand side by side
with them in urging you to add LaSalle Square and part of
the surrounding area to the Airport TIF.
I end this letter the same as my last letter to you. Simply
stated, the neighbors and business owners of the LWWGA
look forward to working with you to make South Bend's west
side an area of which we can all be proud.
Sincerely,
Jerry Niezgodski
Chairman
Lincoln Way West Gateway Association
Upon a motion by Mr. Downes, seconded by Mr. Blake
and unanimously carried, the Commission
acknowledged receipt of the Communications from
Charlotte Pfeifer and Jerry Niezgodski.
5. OLD BUSINESS
There was no Old Business.
COMMISSION ACKNOWLEDGED RECEIPT OF THE
COMMUNICATIONS FROM CHARLOTTE PFEIFER
AND JERRY NIEZGODSKI
THERE WAS NO OLD BUSINESS
9
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS
A. Receipt of Bids
(1) Receipt of Bids in connection with 1217 S.
Walnut St in the Sample-Ewing
Development Area.
There were no bids received by the RECEIPT OF BIDS (1217 S. WALNUT ST.
10:00 a.m. deadline.
B. Tax Abatements
(1) Commission approval requested for
Resolution No. 2273 approving an
application for personal property tax
deduction for property located at 2629
Foundation Drive in the Airport Economic
Development Area. (Value Production)
Mr. Schalliol gave the staff report on the
project. Value Production is a modern
production machining facility. They provide
one-stop shopping for design, prototypes, and
production, and is an ISO 9001:2000
certified company. Value Production was
established in October 2000. The company
manufactures tooling for use in the aero
space, automotive, medical, and commercial
markets. The company will purchase a new,
high-end mill and lathe for its custom
aerospace manufacturing needs. The
company will invest $500,000 in this new
equipment. The total taxes to be abated
during the five-year abatement period is
estimated at $30,462. The total taxes to be
paid during the five-year abatement period is
estimated at $15,852.
It is estimated that the project will create five
new, permanent full-time jobs in the first
year of production, representing a new
10
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
B. Tax Abatements
() continued...
annual payroll of $200,000. The project will
also maintain fourteen existing, permanent
full-time jobs representing an annual payroll
of $475,000.
Value Production has had two previous
personal property abatements. The CF-1
dated 9/5/06 shows it met the projected costs
of the project, but two jobs have been lost
instead of four projected to be gained. The
property is properly zoned for the proposed
use. The project is in the Airport Economic
Development Area; therefore the petition for
personal property tax deduction must first be
approved by the South Bend Redevelopment
Commission. The project is qualified for
five years of personal property tax deduction
under the tax abatement ordinance.
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved Resolution No. 2273
approving an application for personal
property tax deduction for property located at
2629 Foundation Drive in the Airport
Economic Development Area. (Value
Production)
(2) Commission approval requested for
Resolution No. 2274 approving an
application for personal property tax
deduction for property located at 3702
Progress Drive in the Airport Economic
Development Area. (Parrish/Meyer
Machine}
COMMISSION APPROVED RESOLUTION N0.2273
APPROVING AN APPLICATION FOR PERSONAL
PROPERTY TAX DEDUCTION FOR PROPERTY
LOCATED AT 2629 FOUNDATION DRIVE IN THE
AIRPORT ECONOMIC DEVELOPMENT AREA.
(VALUE PRODUCTION
11
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
B. Tax Abatements
continue ...
Mr. Schalliol gave the staff report on the
project. Parrish/Meyer Machine, Inc.
manufactures jigs, dies, fixtures, and special
high-precision parts. The addition of a new
Mori-Seiki NEIGHBORHOOD-5000/40
DCG machine will be used for production
machining. This machine will allow the
company to machine additional parts for its
clients, thereby growing the business and
employment opportunities. The company
will invest $400,000 in the new equipment.
Total taxes to be abated during the five-year
abatement period is estimated at $24,370.
Total taxes to be paid during the five-year
abatement period is estimated at $12,681.
It is estimated that the project will create two
new, permanent full-time jobs in the first
year of production, representing a new
annual payroll of $50,000. The project will
also maintain thirty-four existing, permanent
full-time jobs representing an annual payroll
of $701,486.
Parrish/Meyer Machine has not had any
previous tax abatements. The property is
properly zoned for the proposed use. The
project is in the Airport Economic
Development Area; therefore the petition for
personal property tax deduction must first be
approved by the South Bend Redevelopment
Commission. The project is qualified for
five years of personal property tax deduction
under the tax abatement ordinance.
12
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
B. Tax Abatements
continue ...
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved Resolution No. 2274
approving an application for personal
property tax deduction for property located at
3702 Progress Drive in the Airport Economic
Development Area. (Parrish/Meyer Machine)
(3) Commission approval requested for
Resolution No. 2275 approving an
application for real property tax deduction
for property located at 901 N. Notre Dame
Avenue in the Northeast Neighborhood
Development Area. (Marc & Jeanette
Burdell)
Mr. Schalliol gave the staff report on the
project. Marc and Jeanette Burdell plan to
construct asingle-family residence of
approximately 2,400 square feet, with three
bedrooms, three bathrooms, four common
rooms and atwo-car garage, situated on a 66
x 122 ft lot. The estimated cost of the project
will be $330,000. Total taxes to be abated
during the five-year abatement period is
estimated at $10,262. Total taxes to be paid
during the five-year abatement period is
estimated at $24,342.
The Burdells have not had any previous tax
abatements. The property is properly zoned
for the proposed use. The project is in the
Northeast Neighborhood Development Area;
therefore the petition for residential property
tax deduction must first be approved by the
South Bend Redevelopment Commission.
COMMISSION APPROVED RESOLUTION N0.2274
APPROVING AN APPLICATION FOR PERSONAL
PROPERTY TAX DEDUCTION FOR PROPERTY
LOCATED AT 372 PROGRESS DRIVE IN THE
AIRPORT ECONOMIC DEVELOPMENT AREA.
~PARRISHIMEYER MACHINE)
13
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
B. Tax Abatements
continue ...
The project is qualified for five years of real
property tax deduction under the tax
abatement ordinance.
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved Resolution No. 2275
approving an application for real property tax
deduction for property located at 901 N.
Notre Dame Avenue in the Northeast
Neighborhood Development Area. (Marc &
Jeanette Burdell)
C. South Bend Central Development Area
(1) Commission approval requested for
Authorization for Entry Upon Public
Property. (School Corporation/Wayne
Street Garage)
Ms. Greene noted that the Commission took
action at its October 6 meeting to approve a
First Amendment to Agreement with the
School Corporation with respect to installing
some gates at the upper level of the Wayne
Street parking garage to restrict access to the
upper level and to protect the use of the
lower level for the general public. If School
Corporation employees haven't parked in the
gated area, they won't be able to exit the
garage without paying. This Access
agreement allows the School Corporation's
contractors access to the garage to install the
gates. We've asked that they coordinate with
Greg Frankhouser of Ampco in order to
make sure that things get properly installed.
COMMISSION APPROVED RESOLUTION N0.2275
APPROVING AN APPLICATION FOR REAL
PROPERTY TAX DEDUCTION FOR PROPERTY
LOCATED AT 9O I N. NOTRE DAME AVENUE IN
THE NORTHEAST NEIGHBORHOOD
DEVELOPMENT AREA. (MARC & JEANETTE
BURDELL)
14
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
C. South Bend Central Development Area
() continued...
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved the Authorization for
Entry Upon Public Property. (School
Corporation/Wayne Street Garage)
(2) Commission approval requested for
Authorization for Entry Upon and the
Temporary Use of Public Property
Located Within the South Bend Central
Development Area. (Sycamore St.)
Ms. Greene noted that this is a request for
access to property the Commission owns
near the Commerce Center. The nearby
parking garage is being demolished. The
contractors would like to use the
Commission's small parking lot and small
piece of vacant land as a staging area for the
demolition. This Access Agreement
authorizes the contractor to enter the
Commission's property subject to providing
proof of insurance and indemnifying the
Commission. It sets a date certain when the
Commission's permission to use the sites
terminates. Should the Commission have an
opportunity to dispose of the property before
that date certain, written notice may be sent
to terminate the access right. The document
before the Commission contains some blank
spaces for the legal name of the contractor
and the dates to be added. It will be finalized
and brought to the Commissioners for their
signature upon completion.
COMMISSION APPROVED THE AUTHORIZATION
FOR ENTRY UPON PUBLIC PROPERTY. (SCHOOL
CORPORATIONIWAYNE STREET GARAGE)
15
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
C. South Bend Central Development Area
continue ...
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved the Authorization for
Entry Upon and the Temporary Use of Public
Property Located Within the South Bend
Central Development Area. (Sycamore St.)
D. Sample-Ewing Development Area
(1) Commission approval requested for
Access Agreement with Lock Joint Tube
for access to 1217 South Walnut Street.
(former Kokoku Wire site)
Mr. Schalliol explained that on
September 14, 2006 the Commission
acquired the former Kokoku Wire property
from the Industrial Revolving Fund. Prior to
that time Lock Joint Tube had an access
agreement with the Industrial Revolving
Fund. Since the Commission now owns the
property we need a new access agreement.
The agreement allows Lock Joint Tube and
its agents to be on the site, do some basic
environmental and site testing in preparation
for its eventual purchase of the site. It also
allows Lock Joint Tube to store some items
at the site.
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved the Access Agreement
with Lock Joint Tube for access to 1217
South Walnut Street. (former Kokoku Wire
site)
COMMISSION APPROVED THE AUTHORIZATION
FOR ENTRY UPON AND THE TEMPORARY USE OF
PUBLIC PROPERTY LOCATED WITHIN THE
SOUTH BEND CENTRAL DEVELOPMENT AREA.
(SYCAMORE ST.)
COMMISSION APPROVED THE ACCESS
AGREEMENT WITH LOCK JOINT TUBE FOR
ACCESS TO 121 SOUTH WALNUT STREET.
(FORMER KOKOKU WIRE SITE)
16
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
(1) Commission approval requested for
professional services in the Airport
Economic Development Area.
(Survey/engineering)
Mr. Witwer noted that staff has solicited and
received a proposal from Wightman Petrie
for the relocation of a crosscut on Cleveland
Road at the PEI Genesis site. The crosscut is
being relocated as part of an effort to retain
PEI Genesis in South Bend. It will allow the
company to build a facility that is twice as
large as its current facility which will be
expandable to over 400,000 sft. PEI Genesis
will also be creating over 150 new positions
over the next six years. The crosscut will
also provide Water Works with improved
access to its well field. The amount of the
proposal is $17,500. Staff recommends
accepting the proposal.
Upon a motion by Mr. Downes, seconded by
Mr. Blake and unanimously carried, the
Commission approved the request for
proposal for professional services and
accepted the proposal from Wightman Petrie
for survey and engineering services in the
Airport Economic Development Area.
(2) Staff report on Airport Economic
Development Area Expansion
Investigation (LaSalle Square)
Mr. Inks noted that the Commission asked
staff to perform an investigation of the
feasibility of expanding the Airport
Economic Development Area TIF to include
LaSalle Square and using AEDA TIF to
COMMISSION APPROVED THE REQUEST FOR
PROPOSAL FOR PROFESSIONAL SERVICES AND
ACCEPTED THE PROPOSAL FROM WIGHTMAN
PETRIE FOR SURVEY AND ENGINEERING
SERVICES IN THE AIRPORT ECONOMIC
DEVELOPMENT AREA
17
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
make improvements to the LaSalle Square
Shopping Plaza and five other properties.
Staff is prepared at this time to present the
results of its investigation.
Mr. VVitwer summarized the findings. The
area asked to be included into the Airport
Economic Development Area is comprised of
three not for profit organizations making up
about 90% of the land area. There are four
for-profit businesses in the study area, and
one vacant building.
In talking with former retailers from LaSalle
Square, and to local retailers, it was found
that shifts in retail markets to the Portage
Cleveland area and to Western Avenue and
further south were the cause of businesses
locating out of the area. This, along with
other factors, is an indication that retail uses
will be hard to bring back.
In 2001 the City paid a consultant to do a
study on the LaSalle Square area. That
report's analysis and recommendations are
consistent with what the staff determined
caused the shift in development that has
occurred in the area.
The three non-profit organizations in LaSalle
Square are all part of the community, and
have chosen this location as a home for their
operations.
The Airport Economic Development Area
could be expanded to include LaSalle Square,
18
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
providing funding from the TIF area to be
used in accordance with Indiana statute.
Or a new redevelopment area could be
established, including other properties that
could potentially be assessed at a higher
value in the future to capture more increment
and more benefit.
Staff recommends that property owners and
interested groups present an acceptable plan
to the Redevelopment Commission to
determine which alternative is the most
effective action to complete the goals of that
plan.
Mr. King thanked the staff for its
investigation and preparation of the
subsequent report. He noted that the staff
and the Commission are asking the
neighborhood group to help develop a plan
for the area.
Mr. VUitwer added that the neighborhood
group will also help staff decide which
alternative would be the best one.
Mr. King noted that this has been a progress
report on the investigation the Commission
asked the staff to perform, so it's not a public
hearing and there won't be formal action
taken to expand the area or create a new
development area today. However, he
opened the floor to anyone present who has
an interest in the project and wished to speak
19
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
Ms. Greene noted that there will be no final
action taken today. The Commission will
simply accept the information presented.
Should the Commission decide to expand the
development area or create a new
redevelopment area, it would have a series of
public hearings on the project.
COUNCIL MEMBER PFEIFER:
Representing the 2nd District on the South
Bend Common Council. It really is an honor
and pleasure to be here this morning. I really
thank both Nick and Shawn, and especially
Karl King and Marcia for meeting with us
and following up on our request. This is
something that isn't any kind of "spur of the
moment" or isn't...again, I have to be
conscious of the things that are written and
said. I want you to know that this is not
anything that I'm ramming down anyone's
throat. It really is an opportunity for the
whole city to take a look at economic
development in the inner city. These
discussions have gone on for years, quite
frankly. The Council is looking for any
opportunity it can find to spur economic
development in the inner city, and, at the
same time, continuing to support the
development on the edge of the city. And, of
course, we support development in the
county and in Mishawaka. We know that
any time something new comes into our
community, we all benefit. I wanted to make
that really clear.
20
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
As a South Bend Common Council member,
particularly in the 2nd District, my
responsibility to my constituents is to look at
what is happening in the 2nd District. You all
know LaSalle Square was once quite a
thriving commercial center where we had
Target, Krogers and all kinds of things
neighbors could just walk to. I live close
enough that that's where I did most of my,
quite frankly. It was very sad that as
businesses left that area, as it's sad any time
anything leaves South Bendwe all kind of
grieve. So all we're trying to do is take a
look at supporting the Administration,
supporting Redevelopment, supporting any
entity that's trying to do something to spur
and stimulate economic development in the
city. We just see this as an opportunity to
make this additional use of what's happening
at Blackthorn and the airport, which we think
is wonderful. It's great. We want to just
expand it inside to include LaSalle Square
because we think this would be a good use of
those funds for economic development.
I just want to make sure that Karl and
Marcia, the whole Commission, and these
young men in particular, I really appreciate
it. Of course we're going to continue to
work on this and tweak. Thanks, Don Inks.
We're all in this together.
Today I did go ahead and submit a plan that
was put together as requested. We're all so
busy, I didn't want it to get lost somewhere.
So, it's in there now. We'll continue
21
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
working on it for the best interest of the city
as a whole and the 2nd District and LaSalle
Square in particular.
MR. KING: Charlotte, the plan that you
submitted, it represents a consensus of your
and your neighbors and residents that you've
been working with?
COUNCIL MEMBER PFEIFER: Yes.
That's in my cover letter. It's there and we
can continue working on it.
MR. KING: Thank you for your interest and
your leadership.
MS. GREENE: That letter and the plan that
was submitted with it will be incorporated by
reference into the entire minutes. So they
will be part of the public record.
MR. NIEZGODSKI: Lincolnway West
Gateway Association. I believe I submitted a
letter. You should have it. Again, to echo
Charlotte's words. Thank you for
considering this action. We thank the city
officials who have worked so far on this.
Just to touch on a few things. As far as a
retail segment. If there is to be a retail
component at some point, I would suggest
possibly interviewing some of the entities
that used to be there and finding out the true
reason why they left. In some discussions
we've had with some of the stakeholders
there, some of the retail that was there was
very successful. Extremely successful. So it
22
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
tells me that there is a population there that
will support retail that goes in there. If it's
jobs, this area has a lot of... We like to see it
as a glass half full. We think this is a great
opportunity to jump start the redevelopment
of the Lincoln Way West corridor on the
western boundaries and work our way back
in. The city's already started here, close to
town around the Chapin St. area and they are
doing a great job. We look at this as an
opportunity to start at the other end, and
hopefully we can meet in the middle like a
great railroad of many years ago.
Also, we believe that anything we can do to
develop this area can only be a benefit to
South Bend. We are constantly reading of
businesses leaving downtown and other areas
for Mishawaka. We believe if we pay
attention to the stakeholders who are already
there, especially the businesses that are
already there (Honeywell and Bosch) and all
those other businesses in the Airport
Industrial Park, if we can do anything to
make that area more appealing to them, it's
going to be in our best interest. It might be
the difference between gaining jobs and
losing jobs. So, we look forward to working
with you on this. We thank all of you
who've been in touch with us so far. We
look forward to somehow bringing this to a
great resolution for all those interested.
MR. WOLFSON: Citizen representative to
the Common Council's Community &
Economic Development Committee and
23
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
professor of Economics at Indiana
University. I support the initiative from
Charlotte Pfeifer and the residents from the
LaSalle Square area. It's exactly what a
number of us had proposed at an earlier
Redevelopment Commission, that, if the
Commission were going to incorporate
Portage Prairie into the Airport Economic
Development Area, then at the same time it
should also look at incorporating the LaSalle
Square into the same district. So, I think it's
a very positive development. We support it.
The organization I'm working with,
Community Forum for Economic
Development, sees as a key priority the
economic development of the inner city areas
and the downtown. We need to pay special
attention to that to make sure that everyone
benefits in the economic development of our
city.
MR. KING: I want to thank everyone here
today, and the larger group that attended our
earlier meeting. Often the Redevelopment
Commission, and the Common Council too,
do a lot of work and try real hard on things
and you wonder if anyone cares. So, it's a
joyful event when we have the public show
up and take an active interest in the things
that we're doing and encouraging us to do
things that will, in fact, better the
community. Thanks to all who are here
today and to your co lle ague s who were here
before.
24
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
Shawn, I was also going to ask you if you
would step through for everyone here what
the process is for moving this forward.
MR. PETERSON: With the comments as far
as expanding the Airport Economic
Development Area, expanding that into or
creating a redevelopment area or a different
economic development area, what you are
really doing is creating an allocation area to
take advantage of tax increment financing.
What the report has shown is that this could
be an area that would benefit if we did it at
the right time with the right type of use or
project that we could take advantage of a tax
increment financing district to be able to
finance improvements and maybe assist in
some sort of development project. All of
what we're doing here is, it's a tool to be
used to help a development, to help
something move forward. The proposal was
to expand the Airport Economic
Development Area. That may be the best
proposal, but we don't know yet because
we're not sure yet what the project is or what
the timeline is. Currently the Airport
Economic Development Area has
obligations, bonds, etc. outstanding to where
a different option may be more beneficial,
depending on what the project is, since there
would be no obligations on a new allocation
area. There are a lot of things that will come
into play as to the process. Because it's a
tool, the first thing is to get the input from the
community on what they would like to see
there. The second thing is to finalize that
25
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
proposal and look for a type of development
and get a development partner or other
bodies to figure out what public
improvements, what other improvements and
incentives are necessary to get a development
there or to accomplish that. And then, it
would be starting the process of declaring or
expanding the area to affect the designation
of that area as an allocation area and to make
it available to use for tax increment funds.
So, we are beginning the process of going
down that road. I think as we look at the plan
and what they want, what the proposal is to
have, then we can look to finalizing that and
looking for a development and then we look
for actually making it a part of either the
airport area or its own, or maybe a merger of
the two, to be able to affect development as
proposed there. So, the actual action of
designating the LaSalle Square area is not
advisable until we know the exact project or
goal we want to affect there and there is a
development there ready. Because, once you
do that you only have thirty years for it to be
an allocation area. If you start that too
quickly and you don't have the available
stream of revenues necessary to create
funding to affect what you want to have
done. So it really depends upon the project
and it depends upon what the neighborhood
wants to see there, which is where we are at
now. That is the whole process as we move
forward. We will continue along that once all
the pieces are pulled together.
26
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
MS. GREENE: I would just like to remind
the Commission, that it has created two new
redevelopment areas in the last three to five
years, one of those being the Southside
Development Area, the other being the
Northeast Development Area. It took a great
deal of time before you got to the point of
declaring both of those development areas.
And they both were, as Shawn said,
somewhat project driven. It is key at the
point in time that you actually declare the
area with respect to how you are going to
have that revenue stream over time. It is a
long process sometimes, but you have to start
somewhere.
MR. KING: Well, it seems to me, that we
have a good start at the next report and
Council Member Pfeiffer has submitted
initial plans that we have to work on. Nick,
did you have anything further? You are
asking us today to authorize further work on
an analysis of the plans submitted by the
neighborhood.
MR. VUITVUER: That is correct.
MR. KING: Commissioners, any comments
or questions?
MR. BLAKE: I have a question. You say
`redevelopment area' and I need to
understand better what `redevelopment area'
and `economic development area' are. It
isn't a redevelopment area now?
27
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
MS. GREENE: No, this is not in a
redevelopment area or an economic
development area, and again, one of the
reasons that you look at the entire area, you
look at the project, and how does it fit. A
redevelopment area provides you with one
other tool, primarily, that you don't have in
an economic development area: the power to
use eminent domain if necessary. You don't
have that in an economic development area.
As you look to either expand the existing
Airport Economic Development Area, among
other things, not only are you looking at the
financial impact of adding that area,
expanding the existing area, but you are also
looking at, whether there is an additional tool
that you are going to need in your tool kit in
order to accomplish a development plan that
you come up with for that area. If you see
that there is the potential that you would need
to use eminent domain in order to accomplish
a development plan then you want to look
more toward a redevelopment area rather
than to expand an existing area or to create a
new economic development area.
MR. BLAKE: You don't have one that
would be both an economic development
area and a redevelopment area?
MS. GREENE: We looked before if we
could STIF a TIF, but I don't think we ever
determined that we could redevelop an
economic development area.
28
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
MR. PETERSON: One other aspect. In a
redevelopment area there is potential to
access federal and state grants that you may
not be able to use in an economic
development area. So, it is project driven
because you look at it and say, here is a
project, maybe it is a mixed-use project, with
retail and some housing, that allows us to
take advantage of some tax credits that the
federal government allows us to have in this
area. That may be applicable to this area, so
we don't want to get too hasty and say, "let's
do this." Again, the goal is not to make it an
area, but to have development there. How the
area is designated is the tool to help develop
it. The goal is to define the development and
utilize all the tools we have, including,
designating an area, whether it is economic
or redevelopment or expansion of another.
That will be the tool used to bring in that
development.
MR. DOWNES: If in fact it is determined
that the best alternative is to expand the
Airport Economic Development Area, is
there any requirement that it has to be
contiguous?
MR. PETERSON: It would need to be
contiguous, and it would be possible to make
it contiguous. It is a matter of, is it the best
decision. We won't know that until after we
look at the allocations, the effects of the 2%
circuit breaker, and there are a lot of things
that we look to bring into this development
that will dictate which tool we use.
29
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
MR. KING: And the plan we use.
MR. PETERSON: Exactly.
MR. BLAKE: I read over the plan the other
night, and I like what is there. I would like to
see something in addition to redevelopment
and economic development. I would like to
see wealth creation because like the
campaign that says, "enough is enough." If
"enough is enough" is true then "not enough
is not enough" is also true. I don't think that
redevelopment and economic development
will be enough to eliminate poverty. You
need more than just poverty elimination you
need wealth creation. One of the ways to get
rid of poverty is increase the wealth. I don't
know exactly how the city does that, or
whether the city has even considered doing
it, as far as the concept of wealth creation.
Perhaps the City should look at it. Private
businesses, of course, look at wealth creation,
that is the purpose of corporations. Bringing
poor people into the mix of wealth creation,
then you can bring them into the whole
process and they begin to participate in a
different way with a different attitude, with a
different perspective. When we begin to talk
about wealth creation we get into a real
transformation within those pocket areas. So,
I think in addition to economic or
redevelopment, we also consider wealth
creation and the elimination of poverty in
those same areas. This takes us to a different
level, a different process of thinking, a
different approach.
30
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
MS. GREENE: When you are talking about
an economic development area or a
redevelopment area, one of the findings that
the Commission makes, with respect to either
one, is that you are doing something that is
going to benefit the welfare of the
community. To the extent that you are
talking actual wealth creation, perhaps that's
a component of it. That's part of your
findings as you go forward. Is what is
proposed to the Commission as a project,
will it be a viable project that will ultimately
result in a benefit to human welfare.
MR. BLAKE: Welfare tends to relate to a
`hand out' rather than a `hand up,' so if we
leave people at the same level, and this is
what I am thinking we need to do, is to go
beyond poverty and just beyond welfare but
self care. We need to bring them up to a
different level. That needs to be intentional.
If it is not intentional, just like the intentional
things like redevelopment, intentional in
regard to economic development, I am
saying, intentional regarding self care and
civil welfare, `hand up' instead of `hand out.'
The process, the thinking, the focus, and
again, I don't how the city will do that, how
the city participates in this. It may not be
able, but if these things that it is doing, the
thinking process needs to go beyond that
because it doesn't seem to have resolved the
problems over the multitude of years. The
process that has been taking place, and then
poverty gets worse rather than better, that
means somehow, somewhere, we have to
31
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
E. Airport Economic Development Area
continue ...
change the process. You have to add
something or take away something. You have
to mix it up somehow. I am not sure the City
is used to talking about wealth creation and
poverty innovation in that sense, but I think
we should.
MR. KING: Does that mean you want to
move to work with Councilwoman Pfeiffer
and the other neighbors to analyze this plan
and move the process forward?
MR. BLAKE: Oh, yes. And, I would like to
work on the process of wealth creation, as
well.
Upon a motion by Mr. Blake, seconded by
Mr. Downes and unanimously carried, the
Commission acknowledged receipt of the
staff's report on the potential Airport
Economic Development Area expansion and
to authorized staff to analyze the plan
submitted by Councilwoman Pfeiffer and
work with Councilwoman Pfeiffer and other
representatives ofthe neighborhood to move
forward the process of analyzing the future
action with respect to either expansion of the
AEDA or creating of a new redevelopment
area, which ever best serves the purposes of
the plan.
Mr. King again thanked those present
representing the neighborhood for the work
they did and for coming today. The
Commission looks forward to working with
them as we move this process forward.
COMMISSION ACKNOWLEDGED RECEIPT OF THE
STAFF' S REPORT ON THE POTENTIAL AIRPORT
ECONOMIC DEVELOPMENT AREA EXPANSION
AND TO AUTHORIZED STAFF TO ANALYZE THE
PLAN SUBMITTED BY COUNCILWOMAN PFEIFFER
AND WORK WITH COUNCILWOMAN PFEIFFER
AND OTHER REPRESENTATIVES OF THE
NEIGHBORHOOD TO MOVE FORWARD THE
PROCESS OF ANALYZING THE FUTURE ACTION
WITH RESPECT TO EITHER EXPANSION OF THE
AEDA OR CREATING OF A NEW
REDEVELOPMENT AREA, WHICH EVER BEST
SERVES THE PURPOSES OF THE PLAN
32
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
6. NEW BUSINESS (CONT.)
F. South Bend Medical Services District
There was no business in the South Bend Medical
Services District.
G. West Washington-Chapin Development Area
There was no business in the West-Washington
Chapin Development Area.
H. South Side Development Area
(1) Staff report on acquisition of property in
the South Side Development Area.
Item 6.H. (1) was tabled. ITEM 6.H.(1) was TaBLED
I. Northeast Neighborhood Development Area
There was no business in the Northeast
Neighborhood Development Area.
J. Douglas Road Economic Development Area
There was no business in the Douglas Road
Economic Development Area.
K. Other
(1) Commission approval requested for
Community Development Program
Contract for Section 108 Loan Funds.
(3/2/06 -12/31/06)
Item 6.K. (1) was tabled. ITEM 6.K.(1) was TaBLED
7. PROGRESS REPORTS
Mr. Witwer noted that the Commission has three PROGRESS REPORTS
projects going on right now in the Airport Area. The
33
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
7. PROGRESS REPORTS (CONT.)
first is an extension of Voorde Drive from Sheridan west
into the airport to increase access to the airport. The
project is on schedule and may be finished this year or
in the spring. The extension of Voorde will also open
some development sites that have been land locked. The
second project is the repaving of Bendix and Lathrop.
All o f the existing pavement was removed. It should be
completed about November 6. The third project, Dylan
Drive in the Portage Prairie Airport Expansion Area,
should be finished in the spring. Excavation ran into an
underground river.
Mr. Schalliol noted that there have been three
development areas created in the last five years. The
Douglas Road Development Area is 34 acres. Holladay
Corporation is doing a major construction project on the
north side of the State Road 23. There is also small
development on the southeast side and a third one that
really makes up the 34 acre development area. There
have been $3.5 million dollars in permits for the sites,
not counting prep work or land acquisition costs.
51,000 sft of development space has been created in the
area. The original intention of the designation of the
Douglas Road Economic Development Area was to
make improvements to Douglas Road. we hope to move
forward with that construction in the next year or so.
The investment in the development area will average
about $101,000 per acre..
Mr. Schalliol also gave the progress report on Erskine
Commons. Lowe's will officially open Tuesday
morning at 6:00 a.m. VUalmart should be open late
winter or early spring. The third development site is for
Gates Toyota. After six years and a lot of work, this area
is really moving ahead. VUe were to have the Ireland
Road improvements completed by October 31 across the
front of the project site. Next Thursday the road will be
opened and the traffic signals activated, ahead of
schedule. There are 388,000 feet of commercial space
on the site to date, and $16.6 million in investment in
34
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
7. PROGRESS REPORTS (CONT.)
just the two buildings. Chick-Fil-A will be opening the
summer of 2007. Ms. Greene said TJ Maxx will open in
Erskine Village on Sunday.
8. NEXT COMMISSION MEETING
The next meeting of the Redevelopment Commission is
scheduled for Friday, November 3, 2006 at 10:00 a.m.
9. ADJOURNMENT
There being no further business to come before the
Redevelopment Commission, Mr. Downes made a
motion that the meeting be adjourned. Mr. Blake
seconded the motion and the meeting was adjourned at
10:59 a.m.
Donald E. Inks, Director
NEXT COMMISSION MEETING
ADJOURNMENT
Marcia I. Jones, President
35
South Bend Redevelopment Commission
Regular Meeting -October 20, 2006
EXECUTIVE SESSION
October 20, 2006
The South Bend Redevelopment Commission met in Executive Session on Friday,
October 20, 2006 at 8:45 a.m. The meeting was held in Room 1200 County-City Building, 227
West Jefferson, South Bend, Indiana, for the purposes specified in I.C. 5-14-1.5-6.1(b)(2)(D).
Commissioner's Present: Karl King, Vice President; Greg Downes, Secretary; Hardie Blake.
Others Present: Sharon Kendall, Executive Director, Community & Economic Development,
Don Inks, Director, Economic Development, Attorney Cheryl Greene, Pam Paluszewski, Shawn
Peterson, Bill Schalliol, Jennifer Laurent, Tim Williams, Nick Witwer, Bob Mathia, Andy
Laurent and Catherine Fanello. The Commission certifies that no topic was discussed other than
the subject matter specified in the Public Notice. The Executive Session was adjourned at 10:00
a.m.
CITY OF SOUTH BEND,
DEPARTMENT OF REDEVELOPMENT
Signature
Printed Name and Title
South Bend Redevelopment Commission
36