HomeMy WebLinkAbout03-10-06 Redevelopment Commission Minutes MinutesSOUTH BEND REDEVELOPMENT COMMISSION
RESCHEDULED REGULAR MEETING
March 10, 2006
10:00 a.m. 227 West Jefferson Boulevard
Presiding: Marcia I. Jones, President South Bend, Indiana
1. ROLL CALL
Members Present: Ms. Marcia Jones, President
Mr. Karl King, Vice President
Mr. Greg Downes, Secretary
Mr. Hardie B lake, Jr.
Mr. William Hojnacki
Legal Counsel: Ms. Cheryl Greene, Esq.
Mr. Shawn Peterson, Esq.
Redevelopment Staff: Mr. Don Inks, Director
Ms. Sharon T. Kendall, Executive Director
Mrs. Cheryl Phipps, Recording Secretary
Mr. Timothy Williams, Economic Development Specialist
Mr. Andrew Laurent, Economic Development Specialist
Ms. Jennifer Laurent, Economic Development Specialist
Mr. Nicholas Witwer, Economic Development Specialist
Others Present: Ms. Pam Paluszewski, Legal Dept.
Ms. Jamie Loo, South Bend Tribune
Mr. Paul Phair, Holladay Corporation
Mr. Andrew Nemeth
Mr. Dean Bergeman, Eco-Urban Collaborative
Mr. Michael Keen, Eco-Urban Collaborative
Mr. Donald Schefineyer
Mr. Tuck Langland, Fire Arts
Ms. Janice Langland, Fire Arts
Ms. Martha Lewis
Mr. King noted a Revised Agenda for the March 10,
2006 meeting. The Revised Agenda differs from the
original Agenda by the addition of Item 6.B.(2), a staff
report on the Rink Riverside site disposition, and the
acknowledgement under Item 8 that there will be a
special meeting on March 24.
Mr. King made a motion that the Revised Agenda be COMMISSION APPROVED THE REVISED
accepted and approved. Mr. Downes seconded the motion AGENDA DATED MARCH 10, 2006
and the Commission approved the Revised Agenda dated
March 10, 2006.
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
2. APPROVAL OF MINUTES
A. Approval of Minutes of the Regular Meeting of
Friday, March 3, 2006.
Upon a motion by Mr. King, seconded by
Mr. Hojnacki and unanimously carried, the
Commission approved the Minutes of the Regular
Meeting of Friday, March 3, 2006.
COMMISSION APPROVED THE MINUTES OF THE
REGULAR MEETING OF FRIDAY, MARCH 3,
2006
3. APPROVAL OF CLAIMS
Redevelopment Commission Claims submitted March 10, 2006 for approval.
420 FUND TIF DISTRICT-SBCDA
GENERAL
CB Richard Ellis
Nations Rent
DTSB
South Bend ~Uater Works
870.93
56.76
27,626.15
272.19
Upon a motion by Mr. Hojnacki, seconded by Mr.
Downes and unanimously carried, the Commission
approved the Claims submitted March 10, 2006, and
ordered checks to be released
28,826.03
COMMISSION APPROVED THE CLAIMS
SUBMITTED MARCH l O, 2006, AND ORDERED
THE CHECKS TO BE RELEASED
4. COMMUNICATIONS
There Were n0 CommunlcatlonS.
THERE WERE NO COMMUNICATIONS
5. OLD BUSINESS
There was no Old Business.
THERE WAS NO OLD BUSINESS
6. NEW BUSINESS
A. Receipt of Bids
(1) Receipt of Bids for the sale and
development of real estate and ground
2
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
A. Receipt of Bids
() continued...
rights as a parking and retail facility
supporting and subject to the use of the air
rights as 150-175 unit residential
condominium/hotel development,
including all necessary access and
supporting easements, all located at 121
South St. Joseph St.
Mr. Inks noted that no bids were received by
the 10:00 a.m. deadline.
Ms. Greene advised the Commission the
Commission has met its statutory obligation
for offering the property for sale through the
public bidding process as required by I.C. 36-
7-14-22. As such, in accordance with I.C.
36-7-14-22(h) the Commission is free to
entertain any private negotiations with
respect to this property; however, the
Commission may not dispose of the property
on different terms than those designated on
the Commission's offering sheet for a period
of thirty (30) days from date that the
Commission has designated as the date for
receiving bids. The thirty (30) day period
will end on April 9, 2006.
Upon a motion by Mr. King, seconded by NO BIDS WERE RECEIVED
Mr. Downes and unanimously carried, the
Commission acknowledged there were no
bids received by the 10:00 a.m. deadline.
3
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(1) Commission approval requested for
Contract for Sale of Land with South
Bend Chocolate Company, Inc. in the
South Bend Central Development Area.
(Former Osco's site)
Ms. Laurent noted that on December 16,
2005 the Commission received a proposal
from South Bend Chocolate Company for the
purchase and redevelopment of the former
Osco Drug site at 128 South Michigan St.
On January 3 staff made its report to the
Commission and, as directed by the
Commission, presented evidence and
proposed findings to the Commission on
January 17, 2006 in support of the purchase
price offered in the Developer's proposal, as
well as an analysis of the Developer's
intended uses for the property. The
Commission adopted said findings at the
January 17, 2006 meeting.
South Bend Chocolate Company plans to
expand the space of its current tenant,
Nicholas J. Spa, and the South Bend
Chocolate Company would become a
flagship store, expanding with a card,
convenience and candy store. Staff believes
this is a phenomenal project for downtown
South Bend.
Before the Commission today is a signed
Contract for Sale of Land which
memorializes the terms of the sale which
terms had been previously agreed to by the
Commission. South Bend Chocolate
Company would like to close on the real
estate transaction within the next week or
4
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
two. A kick-off of construction is planned on
March 30.Ms. Greene requested that the
Commission approve not only the Contract
for Sale of Land but also execution of any
other documents necessary for closing,
including a Quit Claim Deed, subject to
review and approval by Legal Counsel.
Upon a motion by Mr. Hojnacki, seconded
by Mr. Downes and unanimously carried, the
Commission approved the Contract for Sale
of Land with South Bend Chocolate
Company, Inc. and authorized execution of
any documents necessary for closing.
Mr. King asked that Item 6.B.(2) be moved to the end of
New Business. There was no objection and the item
was so moved.
(2) Staff report on disposition of property in
the South Bend Central Development
Area. (Rink Riverside site)
C. Sample-Ewing Development Area
(1) Commission approval requested for
Contract for Sale of Land with Habitat for
Humanity of St. Joseph County in the
Sample-Ewing Development Area. (SW
corner Sample & Fellows)
Ms. Greene noted that Habitat for Humanity
initially approached the staff in May 2004
with a proposal for purchase and
development of this property. Habitat has
met with staff several times over the past few
COMMISSION APPROVED THE CONTRACT FOR
SALE OF LAND WITH SOUTH BEND CHOCOLATE
COMPANY, INC. AND AUTHORIZED EXECUTION
OF ANY DOCUMENTS NECESSARY FOR CLOSING
ITEM 6.B.(2) WAS MOVED TO THE END OF NEW
BUSINESS
5
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
C. Sample-Ewing Development Area
() continued...
years in order to revise its proposal. The
final proposal was approved October 7, 2005
We have been waiting for Habitat to
assemble other property in connection with
its proposal. That acquisition is now
complete and the Contract for Sale of Land
to Habitat for Humanity has been prepared
according to the proposal that was accepted
October 7.
Upon a motion by Mr. King, seconded by
Mr. Downes and unanimously carried the
Commission approved the Contract for Sale
of Land with Habitat for Humanity of St.
Joseph County in the Sample-Ewing
Development Area. (SW corner Sample &
Fellows)
D. Airport Economic Development Area
(1) Commission approval requested for
Resolution No. 2230 appointing the Board
of Public Works of South Bend, as limited
agent for utility improvements.
Mr. Peterson noted that staff has been
working with the developer for the hotel
project in Blackthorn Corporate Park. Sewer
and water lines need to be relocated. The
Board of Public Works will bid out the work
on behalf of the Commission.
Upon a motion by Mr. Downes, seconded by
Mr. Hojnacki and unanimously carried, the
Commission approved Resolution No. 2230
COMMISSION APPROVED THE CONTRACT FOR
SALE OF LAND WITH HABITAT FOR HUMANITY
OF ST. JOSEPH COUNTY IN THE SAMPLE-SWING
DEVELOPMENT AREA. (SW CORNER SAMPLE c~L
FELLOWS)
COMMISSION APPROVED RESOLUTION N0.2230
APPOINTING THE BOARD OF PUBLIC WORKS OF
SOUTH BEND, AS LIMITED AGENT FOR UTILITY
IMPROVEMENTS
6
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
D. Sample-Ewing Development Area
() continued...
appointing the Board of Public Works of
South Bend, as limited agent for utility
improvements.
E. South Bend Medical Services District
There was no business in the South Bend Medical
Services District.
F. West Washington-Chapin Development Area
There was no business in the West Washington-
ChapinDevelopment Area.
G. South Side Development Area
There was no business in the South Side
Development Area.
H. Northeast Neighborhood Development Area
There was no business in the Northeast
Neighborhood Development Area.
I. Douglas Road Economic Development Area
There was no business in the Douglas Road
Economic Development Area.
B. South Bend Central Development Area
(1) Staff report on disposition of property in
the South Bend Central Development
Area. (Rink Riverside site)
Ms. Laurent noted that Mike Keen and Dean
7
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B South Bend Central Development Area
() continued...
Bergeman, partners in the Eco-Urban
Collaborative, have submitted a proposal for
development of the Rink Riverside site.
They have been provided a list of questions
the Commission has concerning their
proposal and have prepared a written
response to those questions which will be
transcribed into the minutes of this meeting.
Also, Commissioners may ask for additional
clarification or ask additional questions at
this time.
1. Purchase Price offered by Applicant
a. Your proposal states "It is in order to
make the project financially viable that we
are offering a bid of $ l ... as well as
requesting other assistance."
Does this mean that Eco-Urban
Collaborative is not willing and able to
proceed with the proposal unless the city
agrees to (i) sell the Site for $1 and
(ii) provide at no cost all the items listed
under "Participation by City of South
Bend?"
Written Answer: Eco-Urban
Collaborative is able to proceed, but may
not be willing. Eco-Urban has offered $1
because it does not believe that the current
market for residential, commercial, and
retail properties is strong enough to
support sale prices or rental rates that
would allow it to complete the project
8
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
profitably if it must factor in the land cost.
One of the reasons Eco-Urban is
interested in working with the City of
South Bend to complete this project
successfully is to help contribute to the
continuing revitalization of downtown
South Bend. In particular, Eco-Urban
hopes to contribute to a remigration of
urban residents that will lead to the
establishment of a vibrant downtown and
the kind of square foot sales and rental
rates that could support continued mixed-
use development without city assistance.
Mr. Hojnacki noted there is a big
difference between "full cost" and "no
cost." He asked if there was room for
compromise.
Mr. Keen responded that there is room for
compromise.
Mr. Hojnacki asked if Eco-Urban knows
what the maximum is they would be
willing to pay for the land.
Mr. Keen responded that there are a
number of possibilities. Eco-Urban's
financial projections show they would
need to sell at $308,000 per unit without
adding in land cost. They could see
paying for the land and raising the price of
the units if the city would make additional
improvements such as building a parking
garage. Eco-Urban could pay $300,000
for the land, but they would have to ask
for something else from the city to make
that work financially. They would like to
9
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
work with the city to come up with good
faith negotiations. They will put all their
numbers on the table.
Mr. Bergeman noted that they have shared
their pro formas with staff already.
Mr. King asked for clarification: IsEco-
Urban is saying that if land costs go up, it
forces up the price of its product to the
point that no one would buy it?
Mr. Keen responded that their market
research has shown that people will pay
about $300,000 to move downtown. They
believe the reason the project on the
Wharf site has not moved forward is that
its units were projected to sell for
$250,000 to $425,000 and the market
analysis did not support that. Eco-Urban's
market analysis confirms that.
Mr. Keen noted Eco-Urban believes they
could have a much more vibrant market
for the loft units proposed for Phase II,
selling them for $120,000 to $150,000.
Mr. Bergeman added that another thing
that factors into calculation is the South
Bend tax rate. Based on an estimated
value of $300,000, the annual tax bill of
each unit would be $6,000.
Mr. King asked if that doesn't make Eco-
Urbanwonder if building residential here
is a good idea. If it doesn't appear to be
economically wise, why do you think it's a
good idea to build residential on this site?
Mr. Keen responded that they believe this
10
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
is an investment in the future. There are
c it ie s that have invested in bringing
residential downtown. That has been the
secret across the country to downtown
revitalization. People follow people.
Where cities have been able to create a
critical mass of residents, that catalyzes
things. If we were making this proposal
in Chicago, we wouldn't be asking for free
land. VUe'd be bidding three times the
asking price and we'd be able to sell the
units for $700,000. They have the critical
residential mass already.
Mr. Keen indicated they had just
convened a focus group of young
professionals who were excited about this
kind of vision. They have come from
urban areas where they've earned their
degrees and they want to live in an urban
area, but there isn't anything like that here.
VUe think the city and Eco-Urban will
benefit from rising real estate rates.
Mr. Bergeman responded to Mr. King's
question regarding Eco-Urban's interest in
developing the property as residential.
VUe simply take the 7-8 residential row
houses we're proposing and assume a tax
rate of $6,000. Your payback on the
property is seven years. That doesn't even
include the buying potential of the
owners, probably averaging a billion and a
half net worth. So you start thinking
about the type of people you are bringing
downtown. We look at this as truly an
investment in South Bend. Also, when
11
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
you combine this with our focus on an
energy stewardship based approach,
you've got to be pretty excited about the
fact that we want to invest in S o uth B end
for the right reasons. What we're asking
back from the city is really a pretty
minimal investment in terms of the
capacity of this site, and, as we've
demonstrated on the rest of Sycamore
Street, we can bring upward of ninety
people on one block. No new sewer, no
new water, no new roads. We do have a
good model, but it has to start slowly in
South Bend, helping people realize there
is an alternative to the suburbs. South
Bend is a great place to be and we believe
in that. We're trying not to ask for very
much, but we do feel like the payback to
the city, just purely in tax base, is a very
short term return for a long term view.
b. Your proposal states "...we believe it is
only fair and responsible stewardship of
the city's economic resources that if the
city shares some of the risk and
investment in a development project, it
should also share in some of the return."
Does this mean that you propose to
establish a legal relationship with the city
whereby the city would be entitled to
receive some of the profit that may be
produced by your development?
Written Answer: Yes.
If yes, please provide the details of your
proposal including: (i) the definition of
12
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
the "profit" that would be shared with the
city that is, how "profit" would be
computed, (ii) the percentage of such
"profit" to which the city would be
entitled, (iii) whether the city would also
be required to accept liability for the same
percentage of any losses that may be
incurred by your development.
If no, please explain what the statement
quoted means.
Written Answer: In the RFP released by
the Commission, there is a statement
which indicates the city may be willing to
enter into a partnership with the
developers, though it does not specify
what the details of such a partnership
should or would entail. Eco-Urban
Collaborative is willing to establish a
legal relationship with the city whereby
the city would be entitled to receive some
of the profit that may be produced by the
development. We think that might be a
good model to establish. However, Eco-
Urbancan only provide the details of what
any such arrange might consist of after it
has been informed what kind of
participation the city wishes to offer.
Eco-Urban assumes that these details
would be the result of good faith
negotiations intended to offer the greatest
benefit possible to both the city and Eco-
Urban Collaborative. It does not
anticipate the city would be responsible
for any losses that maybe incurred by the
development.
13
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Mr. King asked how "profit" would be
defined. With all the numbers submitted,
where do you compute the profit that
would be sharable?
Mr. Bergeman responded that prior to
submitting the RFP Eco-Urban sat down
with staff to try to get its hands around
this statement (the partnership). We were
given the impression that this would be a
model that we would be developing, so
we're willing to put our numbers on the
table and come to a reasonable model.
We did not have anything specific in
mind.
Z. Proposed Site purchase -all 0.83 acres
Your proposal states "Our proposal has gone
beyond the limits of this site to include a
vision for both sides of Sycamore St. north to
LaSalle Street, for which we estimate
that... another 23-69 residential units... could
be added...with only minimal investment by
the city."
Does this mean that you would enter into a
contract to purchase the Rink Site ~ if the
contract obligates the city to undertake the
further investment referred to?
Written Answer: No. Eco-Urban
Collaborative may well be interested and
willing to enter into a contract to purchase the
Rink Site without any commitment on the
city's part to undertake further investment.
However, while Eco-Urban may not require a
14
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
commitment to additional investment on the
city's part, it will require a commitment as to
what further development in the immediate
area will entail. Like any developer, Eco-
Urbancannot commit to several million
dollars worth of development without some
understanding of what is likely to occur
around the site. For example, the possibility
of a fast-food establishment, drive-thru bank,
unsightly parking garage, or other
developments that would undermine the value
of its own would negatively impact Eco-
Urban'swillingness to go forward with the
project. So, too, would the building of any
above ground walkways. As has been the
case in Minneapolis, Charlotte, and
Cincinnati, such walkways tend to dampen
pedestrian traffic on the ground and hinder
the development ofstreet-level businesses.
Maintaining and fostering such traffic and
business is fundamental to Eco-Urban's
vision for the site and the city. This is why
Eco-Urban thinks it is so important that part
of any development on this site require some
sort of master planning so that the city and
developers can have the confidence necessary
to move forward with long-term investments.
Mr. Bergeman added that Eco-Urban expects
that the city would share that vision for Eco-
Urban to acquire the additional properties-not
necessarily that the city would acquire the
properties for them, but give them first right
of refusal so we could control our own
destiny. For example, there's a real estate
office and a cell tower that sits on the east
15
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
side of the street, so those are some issues
that, together, we're going to have to work
out in order to realize this vision. We
have had substantial conversations already
with the Maennerchor Club and feel like
we have a good relationship established
with them. We have shared our plans
with them, so I think we've done a lot of
due diligence for our part.
Mr. Hojnacki asked how Eco-Urban
would resolve the Maennerchor
relocation. Who would pay for it?
Mr. Keen responded that Eco-Urban has
discussed with Maennerchor the
possibility of trading some of the Phase II
retail space for its present building. We
want the Maennerchor Club to stay where
it's at. We think they are part of the
history of the place. They help define the
place. They've been there since the 1870s.
We don't need all the retail space. We
could give them 1,000 sft or 2,000 sft.
We've discussed this with them.
Mr. Hojnacki asked if, then, there would
be no cost to the city to provide the
Maennerchor site for development.
Mr. Keen responded that the city would
not need to pay for its relocation, but Eco-
Urbanwould like the city to be a
negotiating partner and provide a master
plan for that area would be important.
16
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
3. Description of proposed development -
private investment
a) It appears that the $ 5, 510,15 8 "Total
Project Cost" shown in your proposal
includes amounts that neither you nor the
eventual owners would actually pay-i.e.,
land cost of $337,500 and site
improvements cost of $122,600. Is this
correct?
Written Answer: This is correct. At the
suggestion of the staff, Eco-Urban
Collaborative has provided as accurate an
estimate of the costs as it could, in order
to demonstrate to the Commission just
what it will take to complete this project,
and why it has offered only $1 for the
property. These figures are based on cost
estimates from two well-regarded local
construction firms. From these figures, it
is quite clear that given the level of the
current real estate market in South Bend,
Eco-Urban cannot complete this project
profitably if the above costs are included.
Eco-Urban Collaborative would like to
point out that the tax load on the
residential properties of Phase I alone is
likely to amount to $35,000-40,000/year.
If the taxes for the commercial office
space and Phase II are added, the city will
see a return of tax revenues from the
property of more than the cost of the land
within 5-7 years of project completion.
For the most part, site improvement costs,
17
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
i. e., street, sidewalks, and river walk, will
need to be made whatever the ultimate
use.
b} It appears from the description of
financing in your proposal that all the
private investment will consist ofdown-
paymentsand debt service paid by
eventual owners of the townhouses, office
building, and condominiums. Is this
correct?
Written Answer: No.
Ms. Jones asked, "What is correct?"
Mr. Keen responded that in addition to
that kind of support, Eco-Urban partners
are prepared to put in some of their own
private investment.
Mr. Bergeman added that there are other
third parties who are very interested in
investing if that should be necessary. A
case in point: If we decided we'd like to
do Phase I and Phase II at the same time,
we'd probably seek a third party so we
could do the whole project atone time.
Mr. King asked where in the proposal it
says Eco-Urban Collaborative would put
in any private investment?
Mr. Keen responded that it is not in the
proposal, but Eco-Urban is prepared to put
in up to $250,000 of private investment.
Mr. Bergeman indicated that they have
talked to several financial institutions. It
is amazing the various approaches they'd
18
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
be willing to entertain. That's one reason
we're being somewhat vague. Depending
on who wants to move ahead with us on
this project, it will determine the exact
terms of the contract. Since we've
submitted that proposal, we've continued
to do our due diligence and learned a lot
more about possible options of what we
need to bring to the table, should it be a
traditional form of financing, which
would be as much as 25%. We're
prepared to do that.
c) Your proposal states that "both principals
intend to make this site their new
residential and business addresses."
Except for these investments, will either of
the principals or Eco-Urban Collaborative,
LLC invest any equity capital in the
development? If yes, by whom and in
what amounts will such investment be
made?
Written Answer: Yes. The amount will
depend upon what kind of ultimate deal
Eco-Urban is able to negotiate with both
the city and interested financial parties
including banks and other potential
investors.
d) With regard to availability of tax
exemptions/credits:
1) To what extent does your financing
rely on the successful application for these
exemptions and/or credits?
Written Answer: Eco-Urban
19
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Collaborative's financing does not
directly rely on the successful application
for these tax exemptions and/or credits.
However, likely success of the project is
probably dependent at least on the
exemptions. As the Commission is aware,
since the recent changes in the
assessments, tax rates in downtown South
Bend have sky-rocketed and are exerting a
chilling effect on the desire of many
households otherwise interested in
relocating to downtown. Tax abatements
and exemptions can help the city to offset
this negative influence. Frankly, we're
hoping the state does something to
straighten this out and not punish center
CltleS.
Ms. Jones noted that that would then
stretch out the time until the city could
recoup its investment. Mr. Keen agreed.
2) Please provide a reference of similar
projects in other communities which have
received these credits and the time line for
app lic at io n/approval?
Written Answer: It is Eco-Urban
Collaborative'sunderstanthng that the
recent development by the Cooreman
group in South Bend has received such
consideration. Eco-Urban does not know
the time-line. It would have to rely on the
redevelopment staff and their expertise
and familiarity with past practice and
timing in South Bend, as well as other
communities, to help determine this.
20
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
5. Description of proposed development -jobs to
be created or retained as the result of
improvements on the Site
Your proposal refers to "two creative
businesses...employing 25 people" on the
site.
Does this mean that 25 new jobs will be
created as the result of your development,
or are the 25 people already employed by
the two businesses at their present
locations? If the latter is the case and
your development does not proceed, will
some or all of the 25 jobs be lost?
Written Answer: The two creative
businesses with whom Eco-Urban is
working are both in need of new space.
The jobs to which Eco-Urban refers are of
people already employed at their present
locations. If this development does not
proceed on this site Eco-Urban will need
to find another. If that turns out to be
somewhere other than South Bend, then
there is a chance that some or all of those
jobs will be lost since both these
businesses are very interested in
relocating in the kind eco-urban
development proposed.
Mr. Keen added that in addition to jobs
related to the commercial offices in Phase
I, Phase II calls for some retail which
should bring additional jobs to the site.
21
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Mr. Bergeman indicated that he intends to
expand his business, MPA Associates, at
the new office on the site, so there would
be some additional jobs in his firm.
6. Description of proposed development
whe her the Property, when improved, will be
sold or rented, proposed buyers and/or
ttenants
a) It appears from your proposal that the part
of the Site occupied by Phase I
development will be sold to the occupants
of the row houses and commercial office
spaces. Is this correct?
Written Answer: Yes.
b} Will the "retail and residential block along
Sycamore Street" developed as Phase II be
owned by Eco-Urban Collaborative, LLC
or will it be owned by the occupants?
Written Answer: Eco-Urban
Collaborative will maintain ownership of
the ground floor retail portion of Phase II.
The upper floors will consist of lofts
which will be owner-occupied.
c) When you refer to Phase Icondos -will
these be totally owner owned/ operated or
will there be an owners association; and if
so, what are the anticipated ongoing
association/ maintenance fees?
Written Answer: The condos and lofts of
Phase I and Phase II will be owner
owned/operated. However, in both cases
there will need to be an owners
22
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
association established to take care of
common property and maintenance fees.
The exact amount of the fees will be
determined by the owners association
based on the services it wishes to provide
and maintain.
Mr. Bergeman added that Eco-Urban
anticipates, through Phase II with retail
coming online, that it would employ a full
time service person. That person could
serve the residential units also.
d) Please list, or give examples of, the
businesses likely to be the tenants who
will pay $12 - $15 SF + CAM for the
retail spaces developed in Phase II.
Written Answer: Eco-Urban
Collaborative plan to establish this area as
an eco urban and cultural arts destination
for South Bend. It will market these
properties to a selection of businesses
(ideally locally owned) which cater to this
lifestyle and provides the services and
products its residential, commercial, and
retail clients have indicated they would
like to have in the focus groups that it has
been holding. These include but are not
limited to a coffeehouse, a bistro or other
type o f small re staurant, a wine bar, a
small grocery, an art gallery or book store,
an outdoor sports store (walking, biking
etc), a health business (spa), an
environmental products and services
boutique, as well as an assortment of
professional offices and services including
legal, real estate, medical, etc. Eco-Urban
23
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
has already begun conversations with
some local business persons, as well as a
couple of national chains. No one has
committed as yet.
Mr. Hojnacki asked, "On a scale of one to
ten, how interested are those you've talked
to?"
Mr. Keen responded that the interest level
was about a five.
Mr. Bergeman noted a couple of recent
announcements of new retail in the
downtown. That's the kind of synergy
needed to encourage other businesses to
locate downtown.
Mr. Hojnacki noted that each retail
business needs a certain minimum amount
of traffic. Will there be enough people
there to actually support the types of
businesses you are envisioning?
Mr. Keen referred to the market data in the
proposal. There are quite a few people
within a five to seven minute walk o f the
site. A coffee house would be a good
anchor element. Coupled with a bistro and
a wine bar, they could draw a critical mass
of people. It's the chicken-and-egg
problem. ~Ue think using the beauty of the
river with some small, appealing
businesses would do the trick.
e) You mentioned that the condos on Hill
Street received no offers at $180,000 for
2000 GSF. In light of that, what is the
basis for your confidence level of pre-
construction commitments for the 7 town
homes at $308,000?
24
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
Written Answer: Eco-Urban
Collaborative'srnnfidence is based on the
responses it has gotten during the focus
groups it has conducted, as well as the
outpouring of interest it has received as a
result of the media coverage associated
with this public bidding process. Eco-
Urban is also aware of market research in
Mishawaka that confirms its findings.
This confidence is also based on the
recent history of sales on Hill Street and
the fact that this development is located
much more centrally.
7. Description of proposed development -
timeline outlining when major development
actions will occuN
a) Please provide a timeline for the major
development actions described as
"Phase I" in your proposal.
Written Answer: The schedule for our
project is dependent upon receiving
approval from the City to proceed and
also will be impacted by the time of year
as a result of the timing of that decision.
If a decision is made in a reasonable time
frame, we anticipate construction starting
in March of 2007, with the completion of
Phase I planned for October to November
of 2007. Phase II would ideally start
construction in March of 2008 and
complete construction by March of 2009.
The following is given in months rather
than specific dates due to this uncertainty:
25
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
Preliminary Project Schedule
Phase I
Market and Pre-sell remaining three (3) story units 3 - 6 months
Continue to Develop Final Site Plan with City 1 month
Develop Project Financing Ongoing
Continue to Develop Architectural Plans 4 - 6 months
Bid Project 1 month
Finalize Project Financing /Closing 1 month
Start Construction 8 months
b} Please provide a timeline for the major
development actions described as "Phase
II" in your proposal.
Phase II
Market and Pre-sell Retail and Loft Units 3 - 6 months
Develop Project Financing Ongoing
Continue to Develop Architectural Plans 4 - 6 months
Bid Project 1 month
Finalize Project Financing /Closing 1 month
Start Construction 8 -12 months
Mr. Bergeman mentioned, again, that
Phase II maybe completed at the same
time as Phase I. They would need to be
50%pre-leased. Part of the consideration
when they try to negotiate is whether Eco-
Urbancontrols the land. Residentially,
there's tremendous interest in the 18 units.
There could be more than 18 units if some
are made smaller to accommodate single,
young professionals interested in
purchasing 500 sft. Discussions with the
Chamber of Commerce revealed that other
26
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
cities sometimes provide seed money for
young professionals to get their first
housing in order to keep them in their
communities. Mr. Bergeman would like
to discuss incentives with the city staff.
There's a lot of excitement about Eco-
Urban's residential units.
8. Ability of the Applicant to finance and
complete the development as proposed
a) What impact does the LEED building
philosophy have on up-front construction
costs?
Written Answer: The impact LEED has
on up front costs depends upon what
elements are actually incorporated and
how well they are integrated from the
beginning of the project in the design
phase through construction. For example,
a green roof can add up to $6.00 per
square foot of rooftop. On the other hand,
because it reduces ambient temperature of
the building 5 to 7 degrees, the additional
cost can be offset by reduction in the
amount of HVAC expenditure. Actual
determination of the impact will require
climate modeling based on the specific
design elements integrated into the
structure. Based on other LEED projects
that have been completed, the impact can
be anywhere from 0 to 15% increase.
b) It appears from your proposal that all
financing related to the development
would be funds provided or borrowed by
27
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
the eventual owners; i.e., (a) down-
payments and mortgages by purchasers of
the residential units and (b) down-
payments, bank financing, and SBA 504
loans by purchasers of the office space. Is
this correct?
Written Answer: This will be an
important part of the financing. However,
depending on the terms of the deal Eco-
Urban is able to negotiate with the city, it
also plans to invest funds of its own, as
well as seek additional investors if
necessary, particularly if it seems possible
to do Phase II at the same time.
Mr. Schefineyer noted that, as a mortgage
banker, he is familiar with financing
condo projects. Eco-Urban keeps saying
it intends to use the down payments as
part of the equity. That's not permitted
under Indiana law. Payments must be put
into escrow until the project is actually
completed. You can't use down payments
from potential owners to finance
construction of the property. That has to
be done with equity put in by the
development group itself.
Mr. Bergeman responded that Mr.
Schefineyer is correct. Based on
discussions with financial institutions
...conceptually that money would go into
escrow.
c) Have any financial institutions indicated
what % of the town homes must be pre-
sold before financing will be granted?
28
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
Written Answer: One financial institution
indicated to us that it would require 100%
of the commercial and at least 50% of the
town homes to be financed before
financing will be granted. The three other
financial firms have indicated that these
percentages will depend upon the ultimate
financial package required and what kind
of participation the city chooses to offer.
For example, if we get the land at low or
now cost, that would reduce the
percentage they would expect to see up
front. Also, we have commitments for
100% of the commercial and 25% of the
townhouse development. We're pretty
confident we wouldn't have too much
trouble getting the additional 25%
commitment.
Mr. King asked about the level of
commitment from financial institutions.
In Eco-Urban's proposal there were a
couple of letters from financial institutions
that were kind of a "nice-to-meet you,
good luck with your project" letters. Mr.
King asked if there have been subsequent
conversations that have yielded more
specific indications of willingness by the
financial institutions to provide the
financing needed?
Mr. Keen responded that they have had
those additional conversations and
received assurances, as well as with
interested parties who might be willing to
invest in the project.
29
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
d) Does the financing plan described above
mean that (a) each unit will be separately
constructed when its owner has secured
financing, or (b) no construction will
begin until all units have been sold and
their owners have secured financing? If
neither of the foregoing is correct, then
how will the financing and construction
work?
Written Answer: All of the units will be
constructed at the same time, along with
the commercial office space.
Construction will begin as soon as Eco-
Urbanhas completed architectural and
construction drawings for the site. Two of
the financial institutions with which Eco-
Urbanhas held discussions are interested
in offering a financing package that would
include mortgages for those owners who
meet their requirements. One has
expressed an interest in taking advantage
of a new type of mortgage, the Energy
Efficient Mortgage (EEM), which is being
supported by the federal government.
Bringing such a product to South Bend
will allow potential residential and
commercial buyers to obtain additional
leverage for their investments based on
projected energy savings of green
building. If conditions allow, Eco-Urban
would actually like to construct Phase I
and Phase II at the same time.
e) Would Eco-Urban Collaborative, LLC be
willing to provide the city a performance
and payment bond to assure that the
30
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
development can be financed and
completed?
Written Answer: Yes, if deemed
necessary.
Mr. Bergeman asked how often that is
required.
Mr. Inks responded that on virtually every
project the city requires a performance
guarantee.
9. Public improvements or investments that may
be requested of the City of South Bend and/or
the South Bend Redevelopment Commission
Your proposal lists the following as
"Participation By City Of South Bend"
• Adopt our master plan for Sycamore St.
• Assist in property acquisition,
Maennerchor, Aflac, et al.
• Assist in relocation of cell tower
• Land at no cost
• Rebuild East Bank walkway and river
bank along western property line
• Streetscape improvements-curbs,
sidewalk, trees, tree lawn, pedestrian
lighting, street furniture along Sycamore
and Colfax
• Extend utilities front Sycamore to east
property line at no cost
• Provide topographic survey
31
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
• Provide soil borings
• 10 year tax abatement
• Keep Fire Arts as permanent residents
in current location
• Development partnership wherein city
participates in risk and reward
• Phase I environmental testing
• Collaboration in "People and Places of
Mill Race Isle Walking Tour"
Would you proceed with your
development o~ if the city agrees to all
of the above? If no, please state which of
the above you would not require.
Written Answer: No. Without having the
details of what the city is willing to
complete, Eco-Urban Collaborative
cannot really determine which it may or
may not require. Eco-Urban would look
forward to negotiating with the city on a
good faith basis to reach an agreement
that would best serve both parties as well
as contribute to the success of the project.
It can say that it could not continue with
the project if Sycamore Street were to be
closed or overhead walkways were
constructed. Eco-Urban would also be
very concerned about any plans to replace
Fire Arts, Inc. with some other use since it
is fundamental to its vision of developing
Mill Race Isle as a cultural arts district
and destination. While not absolutely
necessary, Eco-Urban would like to
reiterate its desire to rename Colfax
32
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Avenue either "Avenue of the Arts" or
"Colfax Avenue of the Arts."
Mr. Keen: We would be willing to
negotiate the "people and places of Mill
Race Isle walking tour." That is not
essential. ~Ue would also need to have
master planning. Without a master plan
we wouldn't have any confidence of what
was going to happen around our
development.
Mr. King: I understand your idea that
we'll all get together and negotiate. You
also know that you're not the only one
that's made a proposal to buy this
property. There are some legal constraints
on what we can do and there's also the
practicality of shooting at a moving target.
That doesn't work in business or public
affairs very well. So we can't just leave
everything totally open about these
proposals with you saying, "Let's get
together and talk about it." We can get
together and talk about it, but not after
you've been awarded the contract. I'm not
trying to be negative about this, but I'd
like you to understand that this is a
transaction that we have to do in
accordance with state law and with the
policies of the city government of South
Bend-that, as well as our own personal
feelings of responsibility here. Some of
the things that you have in your proposal
are no small thing. For example, "assist
in relocation of the cell tower." If you
say, absolutely, if you can't move that cell
33
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
tower, we're not going forward, that's
pretty important. Because it's our
understanding that moving the cell tower,
if it can be done at all, is in excess of a
million dollar project. If you're saying the
cell tower has got to go, just like you've
got to leave the people in Fire Arts or
we're not building our green development
here, then we know that that's a factor that
we have to confront. Before we can even
talk to you any more we have to come up
with the million bucks.
Mr. Bergeman: It probably affects both
projects, I expect.
Mr. King: Probably does. But we need
know before, not after.
Mr. Bergeman: It's not a deal breaker, but
it's something we have to creatively
integrate into our concept.
Mr. King: Understood. But the way this
question was written was to ask you about
deal breakers. Specifically, the question
said, "Would you proceed with your
development o~ if the city agrees to all
of the above. If no, please state which of
the above you would not require. So,
when you tell us the things you would not
require, what's left we would consider to
be deal breakers. Right? In other words,
maybe it's shorter. Maybe there are only
two things on here that you would require.
VUe need to know what the deal breakers
are.
34
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Mr. Keen: I understand that. One, I
suppose we could think about that. But
business does work through the process of
negotiation. Public po licy might not
allow us to, so part of our question would
be if there's some way we could have
some conversation about that. We can
probably come through and put some of
these things down. There might be a
possibility, too, one could imagine, since
we've got one, two three, twelve items
there, a variety of different options that
one could look at. In some sense, any one
option exists in a context. Would it be all
right for us to provide you with answers to
this in written form, say on Monday, so
we could sit down and think more
carefully and write up deal breakers?
Mr. King: One of the things that is
different about this than some of the
business negotiations you may be familiar
with is this is public business. We can't
sit down and negotiate with you in
private. We don't really want to negotiate
in public. What we asked you for as part
of our public process was a response to
our request for proposals, and when we
felt we needed additional information to
better understand your initial response to
our RFP, we sent you ahead of time a list
of written questions which you've now
had for about a month, right? Our hope
was that in the course of this public
meeting we'd get your answers to those
questions on the public record. If you
35
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
need more time to think about it, my view
is that we'd need to invite you back to
another public meeting and have you give
your answers then. Our hope is that you
understand that we sent you the questions
in advance. We sent similar questions to
the competing bidder. We asked for those
answers to be given to our questions, not
"we can't answer that because it's part of a
later process." To be frank with you, I
think you're being non-responsive, here.
We've tried to adhere to what's required
public policy and you haven't been much
help. What I would like you to do is
either respond today, or, if you need more
time, come to another public meeting and
be specifically responsive to the questions
that have been given to you in advance.
I'm speaking only for myself, but I know
that when the Commission discussed the
idea of inviting the bidders into answer
more questions, it was our idea that we
wanted to go through this process in
public and get specific answers that would
become part of our decision-making
process.
Mr. Bergeman asked, in the case of
several of these issues, are we able to
work with staff'? For example, like the
East Bank Walkway. I can see structural
steel at the bottom of those piers. I know
that it needs attention. So, as part of our
development, that needs to be addressed.
Architecturally, it will become our front
street. It will become the sidewalk by
which people enter our development. So
36
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
in the case of something like that, how do
we talk about those things back and forth?
I don't know that it's a deal breaker, but it
doesn't work with what we showed you on
January 20. We listed things also in good
faith hoping for some feedback, like "that's
something that would betaken care of by
public works" and "we'll work together to
get that taken care of." How can we have
that kind ofgive-and-take? We can arrive
at a reasonable list. We're not trying to be
unreasonable here, but in the case of
something like that, we really could be
talking about a million dollars torebuild that
walkway. I don't know if there are plans in
place in future capital budgets that we
could collaborate with and hope it would
compliment our site plan. Can anyone help
us understand how we should anticipate
some of those items?
Mr. Hojnacki: We've been sitting here for
an hour or so and I don't know that I know
any more about your plans than I did at the
beginning. We talked about Sycamore
Street. We can deal with that. You talk
about land at no cost. I'm not willing to
support a project when you're not going to
pay anything for the land. You've got to
give me a number: here's what we're
willing to pay for this land. It may not have
to be full price, but it's got to be something
more than nothing. You were talking about
developing a partnership where the city
participates in risk and reward. What does
that mean in terms of dollars and cents?
37
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
Ten year tax abatement. We can talk
about that, I suppose. I'm looking here
and saying as a representative of the
public, what is the public going to get
from your project? It looks like we're
paying the entire freight. You're not
putting any money into this thing. You
talk in a vague way about having some
potential financing, but you don't have
anything concrete now. I'm kind of
frustrated about this whole process.
Mr. Keen: Well, the frustration is a little
bit shared. We've been trying to get some
feedback as well. There's some stuff
we're not getting answers on.
Mr. Hojnacki: What haven't you gotten
an answer on?
Mr. Keen: We tried to find some
information out about tax load and tax
information. We haven't been able to get
much of that. We've been trying to get
some information about what kinds of
deals might be-the city is the one who put
in the RFP that we would be willing to
engage in some sort of partnership. We
asked to see what that might be-no
response. So we're sort of feeling like...
Mr. Hojnacki: You've got to tell us what
you're going to do ! What we have is a
piece of property over here that we're
trying to do something with. What we
said to anybody who's interested, tell us
what yo u want to do with it and we' 11
38
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
consider it. The burden is really on you
guys, isn't it?
Mr. Keen: I think the burden is on both
parties-for the city to work in good faith
with developers and for developers not to
have to be shooting in the dark. If you'll
just give us a couple of seconds I think we
can give you an answer. We understand
the problem that we can't sit here and
negotiate twelve items. On the other hand
we thought we might be able to
arrangethose negotiations through the
staff so we could work with the staff to
come up with some sense of what would
be a reasonable package. We assumed
that's what the staff does for you guys. If
that's not possible, then what we can do is
try to respond to that.
Mr. Downes: It just seems so obvious to
me that when you came up with the
concept for this, there had to be deal
breakers. Some of them have to be on
that list. All we're asking is what the deal
breakers are.
Mr. Bergeman: Item one and two are
linked together and that would be a deal
breaker, because that's the vision of
Sycamore Street, as is item three.
Mr. Downes: I understood with
Maennerchor, there's no financial
assistance being request from the city.
Mr. Bergeman: Other than the shared
vision that you would support the
39
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
continued vision down that side of the
street. That's absolutely correct. The cell
tower, Karl knows the value of it as I do
because it's been a challenge for a lot of
us to get our hands around. We're
certainly willing to work around that, so
it's not a deal breaker from that
standpoint. If there's anything we could
do together to make that a more successful
outcome, that would be much appreciated.
Land is certainly a deal breaker. The East
Bank Walkway, as I've just tried to
describe in architectural terms, is a deal
breaker simply from the standpoint that
it's floating out in the middle of the river
and it's not in good structural repair. It's
not something I think the city should be
OK with, and, certainly, it doesn't
compliment what we're trying to do with
our investment here. I don't think there's
anything else on this list, other than our
vision of an arts district. We can't
mandate that anybody stays, but I guess
that's part of number one, supporting our
vision of Sycamore Street. Those are
really the items that have impact on our
project.
Mr. King: So, the first five items are the
"must haves." Master plan for Sycamore
Street, assist in property acquisition,
assistance in relocation of cell tower, land
a one dollar, and rebuild East Bank
walkway. Those items are a must.
Mr. Bergeman: Yes. But what I want to
clarify is that items one, two, and three,
40
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
are no cost to the city. We're not asking
you to buy the Maennerchor Club. We're
not asking you to relocate the cell tower.
If that's not going to happen, we'll work
around it. But the land, I would say is
the...
10. Plans must meet current code.. and zoning
~equirernents,
Would your site plan require any
variances from current code and zoning
requirements? If yes, please describe each
such variance.
Written Answer: None that Eco-Urban
Collaborative is currently aware of.
11. Applicant is willing to accept responsibility
for knowing and meeting all enviNOnmental
standaNds
Are you willing to accept responsibility
for knowing and meeting all environ-
mental standards and paying any related
costs?
Written Answer: It is Eco-Urban
Collaborative'sunderstanthng that the site
is not a brown field, and the city is
offering it as a clean site. As long as the
information that has been provided by the
city is accurate and reflects due diligence,
Eco-Urban is willing to accept this
responsibility. If the information is
inaccurate and this is in fact a brown field
site, Eco-Urban would want to work with
41
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
the city to bring it into compliance.
Mr. Bergeman: I think in any land
transaction, Phase I is due diligence. We
would expect to see that.
12. Other factors which will assure the
Commission that the sale of the Property, if
made, will further the execution of the South
Bend Central Development Area Development
Plan and will best serve the interest of the
community, fi^om the standpoint of both
human and economic welfare.
Please provide specific examples of
locations where "green building" has been
successfully implemented for multi-family
residential projects.
Written Answer: Attached is a list of
projects from the United States and
around the world (primarily U.S.), many
of which have received national and
international recognition and brought
positive attention to the cities in which
they have been constructed.
Residential:
1. Battery Park City-New York, NY
2. Benedict Commons-Aspen, CO
3. Civano-Tuscon, AZ
4. Conservation Coop-Ottawa, Canada
5. DeweesIslanl-Barrier Island, SC
6. Ecolonia-Netherlands
7. EcoVillage of Loudoun County-
Taylorstown, VA
8. Haymount-Caroline County, VA
9. Jackson Meadow-Stillwater, MN
42
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
(} continued...
10. Prairie Crossing-Granyslake, IL
Mixed Use:
11.2211 West 4th-Vancouver, Canada
12. Bamberton-Vancouver Island, Canada
13. Clackamas Town Center-Clackamas,
OR
14. Cleveland EcoVdlage-Cleveland, OH
15. Coffee Creek-Chesterton, IN
16. Denver Dry Goods Building-Denver,
CO
17. Elitcheardens-Denver, CO
18. Laguna West-Laguna, Ca
19. Mashpee Commons-Mashpee, MA
20. Middleton Hills-Madison, WI
21.OldElm Village-Petaluma, CA
22. Pilsen East/Podmajersky-Chicago, IL
23. Play Vista-Lost Angeles, CA
24. Prisam Nurenberg, Germany
25. Second Street Studios-Santa Fe, NM
26. The Crossings-Mountain View, CA
Mr. Keen: Some of these are mixed use.
2211 West 4th, Vancouver, Canada, that's
a rehab of a factory building that was
turned into mixed use. That is an example
of a property that has a lot of visibility.
They saved themselves about $80,000 on
marketing because they didn't need to do
marketing. Both number 11 and number
16, Denver Dry Goods Building, Denver,
Colorado, were able to sell out. They've
got waiting lists and they've gotten a lot of
marketing. In addition, both of those
43
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
developments have brought a fair amount
of attention to Vancouver and to Denver.
They are reported regularly in the
literature on green building in
architectural types of literature. Every
one of these has a Web site. We could
also make available to the staff and
Commissioners a disk that gives the
details on each of these.
Ms. Jones: I'm particularly interested in
number 14, the Cleveland, Ohio, one
because it's Midwestern. We're not
Chicago, we're not Denver. We won't
have the draw that those places have.
Cleveland is a similar place, although
bigger than South Bend. Is that
development similar to yours?
Mr. Keen: I suspect it's bigger. Mixed
use. The same types of principles, in
terms of the urban design, density, as well
as the kinds of technology used in the
building.
Ms. Jones: And, likewise, number 20, the
Madison, Wisconsin, one, because that's a
college town, there might be some
similarities there. Those are the two that
struck me as maybe .. .
Mr. Bergeman: Would you like us to get
you some additional information on
those?
Ms. Jones: Please. That would be great.
44
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Mr. Schefineyer stated that he liked the idea
of this type of development on the East Bank.
As a member of the Howard Park/East Bank
group, our entire group supports this type of
a vision for the East Bank. But, I can't help
but sit back, wearing my developer's hat, and
say that some of the conditions, the issues
that are involved in this development such as
the relocation of the cell tower, rebuilding
the East Bank walkway, are very high dollar
amounts in comparison to the potential
development value and property. It almost
seems to me that in order to get past some of
these, you have to have a much higher
volume of development for it to happen. I
would love to see this development group
successful. I don't want to see them get into
the middle of something with their life
savings and their time and their effort and
these great ideas that they have and then have
the reality of development and financing
come crashing around their ears. I'd like to
invite them to consider some other sites in
the East Bank/Howard Park area that might
be more reasonable, given the size of the
development.
Mr. Peterson: I had one question as to your
financing. In your proposal, you have the
Commission giving you land worth
$300,000. Today, you also mentioned that
you were discussing numerous financing
options with various lenders. When you
were discussing those options with them,
were you contemplating allowing the lenders
to have a mortgage on the property to get that
45
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
financing? I would imagine that they would
either want a mortgage on the property or
some equity placed as collateral. We
typically do not allow our developers to place
a mortgage on the property until the
development is complete so it could easily
revert back to the Commission should the
developer not be able to complete it.
Mr. Bergeman: There are no strings
attached. To pickup on that comment, in
terms of the partnership, one of the things we
could enter into with the city is that the City
of South Bend could be a partner in this
because they bring the land to the deal. And
then they would benefit from some of the
profit. That's one way we could structure a
win-win situation that would allow the
project to go ahead. We have discussed that
with our financial institutions and they're
perfectly acceptable to those types of
agreements. That's just one example that
we've come across, trying to respond to the
RFP of how we could make this awin-win
situation.
Mr. Keen: I appreciate Mr. Schefineyer's
comments, although I think we could
probably pay due diligence to our own
financial situation. I would like to ask Mr.
Schefineyer if he has any potential future
fiduciary interest in this property or any
relationship with anyone else who does, that
his comments might reflect?
46
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
Mr. Schefineyer: My interest is in seeing the
area and the site developed to its highest and
best use. To that extent I've looked at both
plans as they were reported in the paper. It
appears to me that the one that has the
greatest financial feasibility is the larger
project.
Mr. Keen: So that indicates that you don't
have any fiiture desires to develop anything
on that site or participate in anything on that
site?
Mr. Schefineyer: No. My development
years are over.
Mr. Hojnacki: Mike, in a very serious way,
you have the old Wharf site that John Phair
owns. That's going to be sitting there vacant,
in your conception. Do you have ideas or
thoughts or plans to do with it?
Mr. Keen: VUe don't own that site.
Mr. Hojnacki: Well, certainly whatever
happens there is going to affect your project.
Mr. Keen: A couple of ideas. Quite frankly,
we think that the office complex that John
has propo sed there, if he did not put the
cutout there on Colfax Street, which we don't
think is a very good idea because what that
tends to do is cutouts stop pedestrian traffic
and they make dams, so if John were to move
his cutout around the back and put his office
complex right here, we think that having an
47
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
office complex would be a terrific
compliment to what we have, as long as
there's not a walkway coming down
Sycamore because what that means is that
those folks don't want to live in the city, they
want to live above it. We think there are
some real possibilities for some terrific
synergy here. We're competitors right now.
Whoever gets this site ... if it's John, then
John's going to be working with what he's got
thereto do his whole thing. If it's us, the day
after we get this site, Holladay is our best
friend because now we both have an
incredible interest in working together.
We've met with them. We've shared our
plans with them and they've shared their
plans with us. We both know the details of
each. We've tried to maintain a po sitive
relationship with them because we see them
as important partners on that island and we
want to continue to work with them. If we
do not want to go forward with the office
complex, the way we see this is that, the
reason they have let that sit empty over there
is because they just didn't see a way to make
the residential go on that. Our suspicion is
it's because they were trying to bite off too
big of a chunk of too many residential units
at too high a price to begin with. Our vision
is that a smaller element acting as an urban
catalyst can help to then catalyze further
development upon there. You could take this
project we've got right here and practically
flip it over. Or, if John were interested in
working together with us on something like
48
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
this... The other possibility for us would be
to turn this into all condos. You would have
condos on every side. And for John to put
the retail along here, so we would have retail
on this street going through. There's a lot of
potential for collaboration on that. It's up to
the city to decide whether you want to put a
hotel there. As a citizen, I'd rather see the
LaSalle Hotel be turned into a boutique hotel,
and part of the city fabric. I think if we put a
hotel there, that's going to compete with that.
But that's the city's decision to make, not
ours.
Mr. Bergeman: On a more human note, I
think what separates the two proposals, and I
don't know that it's really been understood by
people, is truly the environmental aspect of
what we're proposing for the City of South
Bend. I don't know that people can really get
their hands quite around the concept of
sustainable design. The fact that we would
be reducing energy bills by as much as 30%-
50%. So each of you could look at your own
energy bills (we've had a very mild winter).
What does it mean that we care about
everybody's air quality. I mean that very
sincerely. That's not a rhetorical question.
This is truly something about the future of
South Bend. It's not just another bunch of
bricks and sticks and mortar. This is an
environment that will make a difference in
South Bend. It's not another greenfield
development in the corn fields of St. Joseph
County. You need to think about that in very
real terms. There aren't any more dinosaurs
49
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
running around. The tipping point has been
reached for oil in our country and the model
that we currently live in cannot be sustained.
We can either be leaders, or we can continue
to build dinosaurs that will be obsolete. I
think there are some real human issues here;
for example, on that site Holladay is
proposing an office building. I think that's
wonderful. Great tax base. We're proposing
an environment where twenty-five people
will live there 24/7. We'll work there, take
care of it, we don't go home from it. It
becomes part of the city. It's a completely
different vision. Both projects are
outstanding on their merit, and I know you
have a tough decision. We've done our best
to provide all of you with answers to the best
of our ability. We appreciate that
opportunity. Obviously, we believe
passionately in what we are trying to do.
Mr. King: We want to thank you for coming
in today and taking the time to respond to
these questions and, hopefully, explain you
project, along with the effort you already had
invested preparing the proposal.
Mr. Keen: We'd also like to publicly thank
the staff, Sharon, Jennifer and Don, for their
work with us. We would also like to
commend the Commission for making this a
public discussion. To our knowledge, from
what we've understood, this is perhaps one of
the first times the Commission has put these
bids out and held these public hearings. We
know that takes a lot of time on your part.
50
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
6. NEW BUSINESS (CONT.)
B. South Bend Central Development Area
() continued...
We think this kind of transparency is really
terrific. We support that regardless of the
outcome of the project. We really appreciate
that and your time. Thank you.
Ms. Jones: You are absolutely right. I think
the public appreciates it and they deserve it.
That's what we're trying to do Mr. Peterson: I
had one comment, as far as the financing.
One of the things here in the proposal is the
Commission's giving land for $300,000 over
and start the financing of it. When you're
talking with the banks, are you anticipating
having a mortgage on that property, to get
your financing as equity, or is your equity,
are they securing your commitment
elsewhere, so if that just doesn't move
forward, because, typically, it would revert
back to the Commission so we don't have to
acquire it again-make everybody part of the
process.
Mr. Keen: We think it's good for South Bend
and anything that's good for South Bend will
make a good project.
7. PROGRESS REPORTS
There was no report.
8. NEXT COMMISSION MEETING
PROGRESS REPORTS
The next meeting of the Redevelopment Commission is NEXT COMMISSION MEETING
a Special Meeting scheduled for Friday, March 24, 2006
at 10:00 a.m.
51
South Bend Redevelopment Commission
Rescheduled Regular Meeting -March 10, 2006
8. NEXT COMMISSION MEETING (CONT.)
The next Regular Meeting of the Redevelopment
Commission is scheduled for Friday, April 7, 2006 at
10:00 a.m.
9. ADJOURNMENT
There being no further business to come before the ADJOURNMENT
Redevelopment Commission, Mr. King made a motion
that the meeting be adjourned. Mr. Downes seconded
the motion and the meeting was adjourned at 11:33 a.m.
Donald E. Inks, Director Marcia I. Jones, President
52