From: Matthew Sikora, Economic Development Planner *
Subject: Resolution 2927 and Addendum To Master Agency Agreement
LaSalle Square Phase One — Supplement #1 Project
Date: August 9, 2011
Attached to this memorandum is Resolution 2927 and Addendum To Master Agency
Agreement for the LaSalle Square Phase One — Supplement #1 project.
On June 28, 2011 the Redevelopment Commission approved Resolution 2912 to allow for
the design, and development of bid documents for, the construction of Bonds Avenue ( ±470
feet) and a new city street ( ±340 feet) adjacent to the St. Joseph County Public Library, as
part of site improvements for a proposed senior housing development (Heritage Place at
LaSalle Square). Additional work included utility survey, environmental assessment of the
former Fernando's restaurant (prior to demolition) and engineering design to relocate
sanitary sewer and water main currently running through the development site. Total cost
of these services was approved for $62,400.
The attached document includes an engineer's estimate of all work to be completed as a
continuation of this project, including the cost of the road and sidewalk improvements to
both Bonds Avenue and the library drive, utility realignment and the demolition of the former
Fernando's restaurant. This work will be coordinated among the city, Abonmarche and its
client Sterling Group, LLC (developers of the senior housing), to ensure timely completion,
to protect against damage as a result of concurrent construction activity at the site, and to
allow all improvement to be made and the resulting city- standard streets to be turned over
to the Street Department for maintenance prior to winter. Total cost estimated for this work
is $398,555, with a request for a not -to- exceed amount of $400,000.
Staff requests approval of Resolution 2927 and the Addendum To Master Agency
Agreement for the LaSalle Square Phase One — Supplement #1 Project.
What We Do Today Makes A Difference/
RESOLUTION NO. 2927
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT
TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT
(LaSalle Square, Phase One — Supplement #1)
11 -2927
WHEREAS, effective January 1, 2011, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2011; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission added
the LaSalle Square, Phase One — Roadway and Utility Design project to the Master
Agency Agreement by way of an Addendum on June 28, 2011 (11- 2912); and
WHEREAS, the Commission desires to amend the Addendum by way of this
Amendment.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Amendment to the
Addendum to the Master Agency Agreement (LaSalle Square, Phase One — Supplement
#1) and hereby authorizes its execution in substantially the form attached hereto with
such changes as the Commission may deem necessary or appropriate upon the advice of
counsel, said execution thereof to be conclusive evidence of the Commission's approval
of such changes. The Clerk is hereby directed to file a copy of this Amendment to the
Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
August 9, 2011, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana
46601.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
AMENDMENT TO THE ADDENDUM TO THE
MASTER AGENCY AGREEMENT
(LaSalle Square Phase One — Supplement #1)
11 -2927
This Amendment to the Addendum to the Master Agency Agreement (this
"Amendment "), made and entered into as of the 22nd day of August, 2011, by and
between the South Bend Department of Redevelopment, acting by and through its
Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a
municipal corporation duly organized and existing pursuant to the laws of the State of
Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of
the Commission designating the BPW to act as the Commission's agent to undertake the
LaSalle Square Phase One — Supplement #1 (the "Project ")
WHEREAS, effective January 1, 2011, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2011; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission added
the LaSalle Square Phase One — Roadway and Utility Design project to the Master
Agency Agreement by way of an Addendum on June 28, 2011 (11 -2912)
WHEREAS, the Commission desires to amend the Addendum by way of this
Amendment.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being originally described in "Exhibit A ", and now amended as described in "Exhibit B ",
attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
(Signature Page Follows)
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Carl Littrell, Member
Don Inks, Member
ATTEST:
Linda Martin, Clerk
Exhibit "A"
LASALLE SQUARE PHASE ONE — ROADWAY AND UTILITY DESIGN
See attached Proposal from Abonmarche dated May 4, 2011 and approved by the
Board of Public Works on July 11, 2011
Exhibit "B"
LASALLE SQUARE PHASE ONE — SUPPLEMENT #1
See attached proposal from Abonmarche dated June 7, 2011
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BoW"ARD
SouTm BEND, 1NDumA 46601 -1830
CITY OF SOUTH BEND STEPHEN J. LUECKE, MAYOR
BOARD of PUBIX WORKS
July 11, 2011
Mr. John Linn
Abonmarche Consultants
750 Lincoln Way East
South Bend, Indiana 46601
RE: Professional Services Agreement — LaSalle Square, Phase 1
Roadway and Utility Design
Project No. 111-056
Dear Mr. Linn:
PNoNE 5741235 -9251
FAx 5741;235 -9171
REQUEST
Requested
Acd
Prof. Code 4-5,'
Entered by---.4
Dept. Req. App,
iR PURCHASE ORDER
S'- �
The Board of Public Works, at its meeting held on July 11, 2011, approved the above
referenced Professional Services Agreement in the amount of $62,400.00.
Enclosed is a copy of the Professional Services Agreement for your records.
If you have any questions, please contact me at (574) 235 -9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure ,
c: Matthew Siroka, CED
Rob Nichols, Engineering
Toy Villa, Engineering
Beth Leonard, CED
Judy Love, CED
GARY A. G1LoT, P.E. DONALD E. INKS CARL R ljn ULL
PRESIDENT MEMBER MEMBER
1A-
ABONMARCHE
Confidence By Design
May 4, 2011
Mr. Matthew Sikora, Economic Development Planner
City of South Bend
Community & Economic Development
County -City Building, Suite 1200
227 West Jefferson Blvd.
South Bend, IN 46601
RE: LASALLE SQUARE, PHASE ONE - ROADWAY AND UTILITY DESIGN
Bonds Avenue Extension & New City Street Adjacent to Library
Professional Services Agreement
Dear Mr. Sikora:
Engineering
Architecture
Land Surveying
Marina /Waterfront
Community Planning
Landscape Architecture
Development Services
Abonmarche Consultants is pleased to present this proposal to provide professional services
for the project referenced above. We have developed this proposal based upon our past
meetings with you and Sterling Development.
We greatly appreciate the opportunity to submit our proposal and look forward to working
with you on this project. Our proposed scope of services is set forth in Appendix A; the
schedule of fees in Appendix B; and the anticipated project schedule in Appendix C. If you
have any questions or concerns, please do not hesitate to contact our office.
If our proposal is acceptable, please sign and return the enclosed standard agreement to
authorize us to proceed. We thank you for this opportunity to serve the City of South Bend.
Sincerely,
Abonmarche Consultants, Inc.
CIA—
John W. Linn, PE,
Principal
750 Lincoln Way East 341 Airport North Office Park 95 West Main Street
South Bend, IN 46601 Fort Wayne, IN 46825 Benton Harbor, MI 49022
574.232.8700 260.497.8823 269.927.2295
www.abonmarche.com
361 First Street
Manistee, MI 49660
231.723.1198
503 Quaker Street
South Haven, MI 49090
269.637.1293
6; 1
ON The Abonmarche Group Professional Services Agreement
AGREEMENT between:
Abonmarche Project Number:
Client Name CITY OF SOUTH BEND, COMMUNITY & ECONOMIC DEVELOPMENT
Client Address
cell
COUNTY -CITY BUILDING, ROOM 1200, 227 WEST JEFFERSON BLVD
SOUTH BEND, IN 46601
Date 05 -04 -11
Phone 574 - 235 -5834
fax 574- 235 -9021 email msikora @southbendin.gov hereinafter referred to as
Client, and Abonmarche Consultants of Indiana, LLC, referred to as Abonmarche, 750 Lincoln Way East, South Bend, Indiana, 46601.
The Client contracts with Abonmarche to perform professional services with regard to the Client's project generally referred to as:
LASALLE SQUARE, PHASE ONE — ROADWAY AND UTILITY DESIGN
Project Name BONDS AVENUE EXTENSION AND NEW CITY STREET ADJACENT TO LIBRARY
Project Location BENDIX AVENUE AND ARDMORE TRAIL_ _
The professional services to be provided by Abonmarche, collectively referred to as the Proposal/Work Plan dated
Project Scope PROFESSIONAL SERVICES AS OUTLINED IN APPENDIX A
Project Schedule SCHEDULE IN APPENDIX C I __
05-04.11 _ is as follows:
The Client agrees to promptly pay for services provided by Abonmarche for the Scope of Work according to the following:
Amount of: $ 62,400.00 AS DETAILED IN APPENDIX B
Prior to commencement of work, the Client will specify any and all documentation that the Client requires for submission with the invoice
for services provided by Abonmarche. Absent any special request from the Client, Abonmarche will send its standard form of invoice. if,
after receipt of an invoice from Abonmarche, the Client has any questions, or if there are any deficiencies in the invoice, the Client shall
identify the issue in question within ten (10) days of its receipt. If no objection is made or question noted within the ten (10) day period, any
such question or objection shall be deemed waived.
The Client has designated MR. MATTHEW SIKORA as its Representative. The Representative will have the
authority to execute any documents pertaining to this Agreement or amendments thereto, and for the approval of all change orders,
addenda, and additional services to be performed by Abonmarche. The representative shall be the contact person for submission of all
documents, invoices or communicaTions.
Authorization to Proceed and Guarantee of Payment: By signing below I acknowledge that I have received and agree to the Terms and
Conditions on Page 2 of this Agreement, and I understand that the Terms and Conditions take precedence over all prior oral and written
understandings. Any notice or other communications shall be in writing and shall be considered to have been duly given when personally
delivered or upon the third day after beinq deposited into first class certified mail, postoqe prepaid, return receipt requested.
Authorized Client Representative
CITY of SOUTH BEND
Client COMMUNITY & ECONOMIC DEV.
Signature _
Printed Name
Title _
ATTEST:
BOARD of PUBLIC WORKS:
Signature
Signature
Signature
Signature
Date Signed
Authorized Abonmarche
Signature "" Y,�- —
Printed Name :Z��NW. LINN, PE
Title PRESIDENT / CEO _
Originating ABONMARCHE CONSULTANTS of
Office INDIANA, LLC
750 Lincolnway East
South Bend, IN 46601
Date Signed _ May 4, 201 1
COSB Reviewed 05/18/10 Page 1 of 2
TERMS AND CONDITIONS Of PROFESSIONAL SERVICES AGREEMENT
I Agreement. The Client may authorize Abonmorche to proceed with work
either by signing a Professional Services Agreement or by Issuing an
acknowledgement, confirmation, purchase order. or other communication
Regardless of the method used, these Terns and Conditions shall be
incorporated by reference and shall prevail as the basis of the Client's
Agreement to Abonmarche. Any Client document or communication in
addition to or in conffct with theses Terms and Conditions shall be
suborc inole and subject to these provisions.
2 Execution. Abonmorche has the option to render this Agreement null and
void, if it is not executed within thirty (30) days of delivery
3. Client Respond M&L The Client will provide all criteria and information
concerning the requirements of the Project.
4. Pedonmance. The standard of care for services performed by or provided by
Abonmorche will be the core and skill ordinarily used by Abonmorche's
profession practicing under similar circumstances at the some time and in the
some locality,
5. Hourly Biting Rates. Unless stipulated otherwise, the Client will compensate
Abonmorche at the current hourly billing rates, in place when the services
ore provided by Abonmorche.
6 Reln*umable Expenses, Reimbursable expenses, the actual costs incurred
directly or indireciy for the Gient's Project, will be charged at Abonrrorche's
current rates. Examples of Ir house reimbursable expenses include, but ore
not limited to: mileage, Jests and analyses, special equipment services,
postage and delivery charges, telephone and telefax charges, copying,
printing, and binding charges. Outside reimbursable expenses will be
charged on the basis of the actual costs times a factor of 1.15. Examples of
outside relmtxsrsable expenses Include, but are not limited to: commercial
transportation, Subcontractors. meals, lodging, special fees, licenses, permits,
and outside technical or professional services,
7 Additional Services. Additional services that may be provided pursuant to the
Agreement or any subsequent modification of the Agreement will be
authorized, when possible, by written amendment signed on behalf of the
Client and Abonmorche. Additional services. performed by Aborrmarche ore
subecl to of Terms and Conditions and the Client will be responsible for
payment. Should the Client, regulatory agency, or any public body or
inspector direct modification or addition to work covered by taus Agreement,
the cost will be added to the agreed price. Verbal requests for extra work
should be mode in writing via a change order, but none the less,
Abonmarche is entitled to be paid for extra work provkied whether if is in
writing or not
8. Underground Skuehsrm or Burled UMMes. Abonmorche will use public utility
location services where available to perform this service. The Client is
responsible for identification and location of all public and private buried
structures on the Cl property and the Project site, such as but not limited
to storage tanks and lines, or gas, water, sewer, electrical, phone, cable, or
any other public or private utilities. Abonmarche will take reasonable care to
avoid such structures but will not be responsible for accidental damage to
utilities or structures that were not specifically or clearly located by the Client
or for damages or losses claimed by third parties related hereto.
9 Site Aceess and Security. with the exception of access rights that land
surveyors are afforded by law, the Client will provide Abonmorche access to
the Project site and the Client will be responsible for obioining any necessary
permission from any affected third party property owners for use of their
lands. The Client is solely responsible for site security
10. Subcontractors Abonmorche may engage Subcontractors) on behalf of the
Client to perform any portion of the services to be provided by Abonmorche.
11 opinions al Cost. Any opinions of probable construction cost and /or total
project cost provided by Abonmorche will be on the basis of experience and
Judgment, but these ore only estimates, Abonmorche does not warrant that
bids or uhimate construction or total project costs will not vary from such
estimates.
12. Ownershlp of Work Product. Abonmorche will remain the owner of all original
drawings, reports, and other materials provided to the Client, whether in hard
copy or magnetic media form. The Client Is authorized 10 use the copies
provided by Abonmorche only in connection with the Project. Any other use
or reuse by the Client for any purposes whatever will be at the Client's risk
and full legal responsibility, without liability to Abonmarche and the Client will
defend, indemnify, and hold Abonmarche harmless from all claims,
damages, losses, and expenses, including attorney fees arising out of or
resulting there from.
13. Etectroale Media. Copies of data, reports. drawings, specifications, and other
materials furnished by Abonmarche that may be retied upon by the Client
are limited to the printed copies (also known as hard copies) that are
delivered to the Client pursuant to the services under this Agreement.
Computer files of text, data, graphics, or of other types of electronic media
are the sole possession of Abonmorche, unless specifically stated otherwise In
an amendment to this Agreement. Any electronic media provided under
this Agreement to the Client are only for the convenience of the Client. Any
conclusions or information obtained or derived from such electronic Idles will
be of the user's sole risk.
14. fonds and PemiNL The Client will be responsible for the adoption of any site
access or right of way bonds that may be initiated on their behalf At
completion of Abonmorche's services, the Client will take responsibility and
pay any ongoing bond or permit costs for any bonded or permitted work.
15 TMkd party kwoidng. If the Client directs Abonmarche to invoice other party
payers. Abonmarche will do so, but the Client agrees to be ultimately
responsible to Abonmorche's compensation until the Client provides
Abonmorche with the third party's written acceptance of all terms of this
Agreement and until Abonmarche agrees to the substitution.
16. Stop Work. In addition to any other remedies Abonmorche may have,
Abonmarche will have the absolute right to cease performance of any basic
or additional services in the event thct payment is not mode as provided or
otherwise agreed.
17. Lego) Expemes. If either the Client or Abonmarche makes a claim against
the other orising out of this Agreement. the prevailing party will be entitled to
recover reasonable expenses of litigation, including reasonable attorney's
fees. If Abonmorche brings a successful lawsuit against the Client to collect
invoiced lees and expenses, the Client agrees to pay Abonmorche
reasonable collection expenses, includng attorney fees.
18 Arbikallon. Any claims. counterclaims, disputes, and other matters in question
between the parties arising out of or relating to the Agreement or the breach
thereof will be submitted to Arbitration In the City of South Bend. Indiana in
accordance with the Rules of the American Arbftralion Association. The
award of the Arbitrator will be final and binding on the parties. Judgment
upon any award rendered may be entered in any court having jurisdiction.
19. Indemnity. Abonmorche will defend, indemnity, and hold the Client harmless
from any claim, liability, or defense cost for Injury or loss sustained by any
party from exposures caused by Abonmorche's negligence or willful
misconduct. Client agrees to defend, Indemnify, and hold Abonmarche
harmless for any claim, Nobility, or defense cost for injury or loss sustained by
any party from exposures allegedly caused by Abonmorche's performance
of services hereunder, except for injury or loss caused by the negligence or
willful misconduct of Abonmarche.
?J. Consequential Damages. The Client and Abonmarche waive consequential
damages for claims, disputes, or other matters in question relofing to services
provided as a part of this Agreement, including for example, but not limited
to, loss of business.
21. Governing Law. this Agreement will be deemed to have been node in St,
Joseph County, Indiana and shall govern by and construed In accordance
with the laws of the Stole of Indiana.
22 Considerations. The, successors, executors, administroton, and legal
representatives of the Client and Abonmorche are hereby bound on to the
other with respect to the covenonis, Agreements, and obligations of this
Agreement.
73. Acts of God. Neither the Client na Abonmarche will have any liability for
nonperformance caused in whole or in part by causes beyond
Abonmorche's reasonable control. Such causes include, but are not limited
to, Acts of God. civil unrest and war, labor unrest and strikes, octs of
authorities, and events that could not be reasonably anticipated.
'..4 Termkmlikin. Either the Client or Abonmorche may terminate this Agreement
by giving ten (101 days written notice to the other potty. If Client terminates
this Agreement, the Client will pay Abonmorche in full for all work previously
authorized an performed prior to the effective date of the termination, plus
(at the discretion of Abonmorche) a termination charge to cover finalization
of work necessary to bring ongoing work to a logical conclusion, Such
charge will not exceed thirty (301 percent of all charges previously Incurred.
Upon receipt of such payment, Abonmarche will return to the Client all
documents and information that are the property of the Client.
End of Agreement
Reviewed by City of South Bend Legal Department
05/18/10
COSB Reviewed 03/08/06 Page 2 of 2
May 4, 2011 = &
City of South Bend
Proposal for Professional Services
LaSalle Square, Phase One - Roadway and Utility Design ARONMARCHE
Bonds Avenue Extension and New City Street Adjacent to Library Page I of S
APPENDIX A
WORK PLAN
PROJECT SCOPE
The proposed project consists of the design and development of bid documents for the
construction of Bonds Avenue ( ±470 feet) and a new City Street ( ±340 feet) adjacent to the
St. Joseph County Public Library. Bonds shall be extended from Bendix Avenue to intersect
with the new City Street. The existing private drive adjacent to the library shall be
completely removed and reconstructed. Both streets shall be designed and constructed to
City Standards with a pavement width of 24 feet, combined concrete curb and gutter on
each side, sidewalk five feet wide on each side of Bonds, and a grass parkway. There will
be no proposed sidewalks on the new City Street. It is anticipated that Bonds will contain an
entrance for the proposed senior housing and an entrance for Faith Apostolic Church.
A new utility route for the existing sanitary sewer and water main shall be designed in the
new City Right -of -Way adjacent to the library to make way for the proposed senior housing
project. This utility work will be included with the roadway construction bid documents.
Separate construction bid documents shall be prepared for demolition of the restaurant
property located on the northwest corner of Bendix and Bonds. This project shall be bid prior
to the roadway construction project.
Traffic signal work is not anticipated at Bendix, although, pedestrian safety shall be
evaluated for walkers between the proposed senior housing project and Memorial's Facility
located on the east side of Bendix.
SCOPE OF SERVICES
The scope of services proposed herein includes the design and development of bid
documents for the demolition and roadway projects, and are further described as follows:
Task #1: Field Survey
This task includes performing a field survey of existing conditions and utilities for use in
designing the roadway and utility relocation design, demolition of the restaurant property,
and designing a temporary drainage basin anticipated to be located on the St. Vincent De
Paul's property. A benchmark level circuit shall be performed through the proposed project
corridor and control points shall be established for construction. This task also includes
researching existing utilities.
Task #2: Phase One Environmental Site Assessment (ESA)
This task involves performing a Phase One ESA of the Restaurant Property in accordance
with ASTM E1527 -05 (adopted in 2006) and generally accepted industry standards
concerning environmental site assessments. A written report shall be prepared that lists any
recognized environmental conditions identified, consolidate and discuss information
Engineers Landscape Architects Planners Surveyors
May 4, 201 1
City of South Bend
Proposal for Professional Services
LaSalle Square, Phase One - Roadway and Utility Design ADONMARCNE
Bonds Avenue Extension and New City Street Adjacent to Library Page 2 of 5
gathered from background research and site investigation, and include any significant
supporting documentation.
Task #3: Asbestos Investigation (Restaurant Property)
Site Inspection and Retort
This task includes performing a site inspection to identify the types and quantities of suspect
asbestos containing materials, and collecting sufficient samples and laboratory analysis of
suspect materials. A summary report shall be prepared detailing the findings and the
appropriate sections of the IDEM Notification of Demolition and Renovation Operations shall
also be prepared.
Remediation Specifications (If Required)
This task includes preparation of technical specifications for asbestos remediation work for
inclusion in the Demolition Bid Documents. This task also includes answering bidding
questions and reviewing the bid proposals from prospective Contractors.
Task #4: Demolition Bid Documents (Restaurant Property)
This task includes preparing construction drawings of the project site for bidding and
construction. These drawings shall identify removal items including above - ground and any
below - ground items located in the field via utility locates and items scaled from record
maps and as- builts. A quotation package shall be prepared to obtain pricing from
Contractors. This task also includes answering bidding questions, preparing necessary
addendums to the bid documents, and tabulating the bids for the City.
Task #5: Engineering Design
Sanitary Sewer and Water Main Relocation Desian
This task includes the work necessary to complete the engineering design of the sanitary
sewer and water main relocation to make way for the proposed senior housing building.
The construction plans shall identify proposed sewer and water main locations, elevations,
lengths, service locations, and installation and backfilling requirements. This task also
includes preparation and submittal of the Indiana Department of Environmental
Management (IDEM) permits.
Roadway and Drainage Design
This task includes the work necessary to complete the engineering design for the new City
streets. These plans are generally detailed in nature and include plan and profile drawings
for all roads, cross - sections, intersection construction details, storm sewer layout and design,
temporary drainage basin design, sidewalk layout and design, construction details,
maintenance of traffic plan, and pavement striping plan. These plans will be submitted to
the City for review and comment prior to finalizing for bidding. This task also includes
preparation of an easement and legal description for the temporary drainage basin.
Engineers Landscape Architects Planners Surveyors
May 4, 201 1 In 11,
City of South Bend
Proposal for Professional Services
LaSalle Square, Phase One - Roadway and Utility Design ABONMAKNE
Bonds Avenue Extension and New City Street Adiacent to Library Pace 3 of 5
Task #6 Soil Erosion and Sedimentation Control Permit
This task includes preparation and submittal of a sediment control plan with supporting
construction details, specifications, schedules, and methods for controlling soil erosion in
accordance with State Regulation 327 IAC 15 -5 (Rule 5) and South Bend's MS4 Program. A
permit is needed prior to any earthwork activities. Submittal and processing fees for this task
are included in the proposed fee.
Task 07: Construction Bid Documents
This task includes preparing the construction bid documents, estimate of construction costs,
attending the pre -bid meeting, answering bidding questions, preparing necessary
addendums to the bid documents, and tabulating the bids for Public Works.
Task #8: Construction Administration
This task includes attending the pre- construction meeting, addressing questions from the City
and Contractor during construction, performing periodic site visits, and attending any
progress meetings as required by the City.
Engineers Landscape Architects Planners Surveyors
May 4, 2011 =. 1i
City of South Bend
Proposal for Professional Services
LaSalle Square, Phase One - Roadway and Utility Design ASONMARCHE
Bonds Avenue Extension and New City Street Adjocent to Library Page 4 of 5
APPENDIX B
SCHEDULE OF FEES
Abonmarche will be paid a not -to- exceed amount of $62,400.00 for performing the Scope
of Services as described in Appendix A. Abonmarche will invoice the City on a monthly
basis for the percentage of work completed for the lump sum tasks listed below.
Task#1:
Field Survey ..................................................................... ..............................$ 5,500.00
Task #2:
Phase One Environmental Site Assessment (Restaurant Property) ........$
2,000.00
Task #3:
Asbestos Investigation (Restaurant Property)
$105.00 / hr.
Staff Engineer / Architect / Landscape Architect
a) Site Inspection and Report ............... ............................... ......................$1,200.00
Junior Engineer / Architect
$ 72.00 /hr.
b) Remediation Specifications .............. ............................... ......................$1,300.00
$ 72.00 /hr.
Task #4:
Demolition Bid Documents (Restaurant Property) ..... ..............................$
6,500.00
Task #5:
Engineering Design
$105.00 / hr.
Two -Man Survey Crew with Total Station
a) Sanitary Sewer and Water Main Relocation Design ..........................$ 7,000.00
Two -Man Survey Crew with GPS Station
b) Roadway and Drainage Design .......................... ..............................$
25,000.00
Task #6:
Soil Erosion and Sedimentation Control Permit .......... ..............................$
2,400.00
Task #7:
Construction Bid Documents ....................................... ..............................$
9,000.00
Task #8:
Construction Administration ......................................... ..............................$
2,500.00
TOTAL LUMP SUM AMOUNT ........................................................... ............................... $ 62,400.00
MAXIMUM HOURLY RATES BY JOB CLASSIFICATION
(for any additional services under this agreement)
CLASSIFICATION HOURLY RATE
Principal
$200.00 / hr.
Vice President / Senior Project Manager
$155.00 / hr.
Project Manager
$108.00 / hr.
Project Engineer / Architect / Landscape Architect
$105.00 / hr.
Staff Engineer / Architect / Landscape Architect
$ 85.00 / hr.
Junior Engineer / Architect
$ 72.00 /hr.
Computer / Drafting Technician
$ 72.00 /hr.
Urban Planner
$ 80.00 / hr.
Professional Land Surveyor
$105.00 / hr.
One -Man GPS Crew
$105.00 / hr.
Two -Man Survey Crew with Total Station
$120.001 hr.
Two -Man Survey Crew with GPS Station
$180.00 / hr.
Engineers Landscape Architects Planners Surveyors
May 4, 2011
City of South Bend
Proposal for Professional Services
LaSalle Square, Phase One - Roadway and Utility Design ABONMARCHE
Bonds Avenue Extension and New City Street Adjacent to Library Page 5 of 5
APPENDIX C
ANTICIPATED PROJECT SCHEDULE
From past meetings, Sterling Development has indicated starting construction the first of
September. This would require a cleared restaurant property and the sanitary sewer main to
be relocated. Below are project milestones in order to meet the requested time frame.
Project Milestones Estimated Completion Date
Demolition of Restaurant (cleared site)
Relocated Sanitary Sewer Main
Relocated Water Main & Hydrants
(for wood framing to commence)
Mid August
Mid August
October (estimated)
F: \Proposals \P thru T \S \South Bend City \LaSalle Square \Phase 1 - Road Design \Appendices 05 -04 -1 1.doc
Engineers Landscape Architects Planners Surveyors
LASALLE SQUARE, PHASE 1
IMPROVEMENTS TO NORTH /SOUTH STREET ADJACENT TO LIBRARY
340 feet of New R/W and Street consisting of 24 feet of asphalt milling and overlay, and new 6-inch curb on east side
Preliminary Cost Estimate
Revised June 7, 2011
REM NO.
DESCRIPTION
ESTIMATED
QUANTITY
UNITS
UNIT PRICE
ESTIMATED
COST
1
Mobilization / Demobilization
1
LSUM
5%
$4,700
2
Construction Engineering
1
LSUM
1.5%
$1,400
3
Material Testing
1
LSUM
0.5%
$500
4
Maintenance of Traffic
1
LSUM
0.5%
$500
5
Clearing
1
LSUM
$1,000
$1,000
6
Temporary Erosion and Sediment Control
1
LSUM
$1,000
$1,000
7
Earthwork
1
LSUM
$5,000
$5,000
8
Pavement and Curb, Remove
260
SYS
$10
$2,600
9
Miscellaneous Removals
1
LSUM
$2,500
$2,500
10
Pavement Milling, 1"
1,280
SYS
$10
$12,800
11
Compacted Aggregate Base, 6" (adj. to new curb)
35
TON
$17
$595
12
HMASurface, 1 1/2"
110
TON
$70
$7,700
13
HMA Base, 3 1/2" (adj. to new curb)
20
TON
$60
$1,200
14
Standard Concrete Curb
400
LFT
$15
$6,000
15
Concrete Sidewalk, 4"
10
SYS
$35
$350
16
Concrete Curb Ramp
10
SYS
$125
$1,250
17
Drive Approaches
1
EA
$4,000
$4,000
18
Seeding /Restoration
1
LSUM
$1,500
$1,500
19
Storm Sewer Structure
2
EA
$2,000
$4,000
20
Storm Sewer Pipe
90
LFT
$30
$2,700
21
Sanitary Sewer Manhole
5
EA
$2,500
$12,500
22
Sanitary Sewer, 12"
600
LFT
$40
$24,000
23
Pavement Markings and Signage
1
LSUM
$500
$500
SUBTOTAL:
$98,295
Contingency, 10%
$9,900
Engineering and Surveying (Estimated)
$20,000
ESTIMATED COST:
$128,195
FUTURE WORK
1
Conduit for Lighting
300
LFT
$7
$2,100
2
Light Pole and Foundation
2
EA
$7,500
$15,000
3
Conduit for Metronet, 2"
300
EA
$12
$3,600
4
Handhole
2
EA
$800
$1,600
ESTIMATED COST OF FUTURE WORK:
$22,300
ABONMARCHE CONSULTANTS, INC.
an 750 Lincoln Way East
NOPWN09 South Bend, IN 46601
F: \Projects \l 1 -0203 \IPreliminmy Estimates 06-07 -11 AslPhose 1 - Street Adj to Library
LASALLE SQUARE, PHASE 1
IMPROVEMENTS TO EAST /WEST STREET (FUTURE BONDS AVENUE EXTENSION)
490 feet of New R/W and Street consisting of 24 feet of asphalt, 6 -inch curb on each side, and sidewalk on north side
(Estimate does not include demolition of previous restaurant site)
Preliminary Cost Estimate
Revised June 7, 2011
ITEM NO.
DESCRIPTION
ESTIMATED
QUANTITY
UNITS
UNIT PRICE
ESTIMATED
COST
I
Mobilization / Demobilization
1
LSUM
5%
$8,600
2
Construction Engineefing Engineering
1
LSUM
1.57.
$2,600
3
Material Testing
1
-SUM
0.5%
$900
4
Maintenance of Traffic
1
LSUM
0.5%
$900
5
Clearing
1
LSUM
$1,500
$1,500
6
Temporary Erosion and Sediment Control
1
LSUM
$2,000
$2,000
7
Earthwork
1
LSUM
$7,500
$7,500
8
Earthwork - Shallow Depressions
1
LSUM
$3,000
$3,000
9
Pavement and Curb, Remove
2,800
SYS
$6
$16,800
10
Miscellaneous Removals
1
LSUM
$2,500
$2,500
11
Compacted Aggregate Base, 6"
580
TON
$17
$9,860
12
HMA Surface, 1 1/2"
145
TON
$70
$10,150
13
HMA Base, 3 1 /7'
340
TON
$60
$20,400
14
Standard Concrete Curb
820
LFT
$15
$12,300
15
Concrete Sidewalk, 4"
230
SYS
$35
$8,050
16
Concrete Curb Ramp
25
SYS
$100
$2,500
17
Drive Approaches
3
EA
$4,000
$12,000
18
Seeding/Restoration
1
LSUM
$2,000
$2,000
19
Landscape Restoration / Stone
1
LSUM
$5,000
$5,000
20
Storm Sewer Structure
6
EA
$2,000
$12,000
21
Storm Sewer Pie
140
LFT
$30
$4,200
22
Subsurface Drainage (Perforated Pipe with Stone Bedding)
200
LFT
$60
$12,000
23
Fire Hydrant Assembly
2
EA
$2,000
$4,000
24
Fire Hydrant Assembly, Reconnect
1
EA
$500
$500
25
Water Main, 8"
500
LFT
$35
$17,500
26
Pavement Markings and Si na e
1
LSUM
$500
$500
SUBTOTAL:
$179,260
Contingency, 1017.
$18,000
Engineering and Surveying (Estimated)
$25,000
ESTIMATED COST:
$222,260
ALTERNATE
Save Existing Curb on South Side 180 1 LFT $20 - $3,600
FIITIIRF WORK
1
Sidewalk, 4 ", south side
260
SYS
$35
$9,100
2
Conduit for Lighting
500
LFT
$7
$3,500
3
Light Pole and Foundation
2
EA
$7,500
$15,000
4
Conduit for Metronet, 7'
500
EA
$12
$6,000
5
Handhole
2
EA
$800
1 $1,600
ESTIMATED COST OF FUTURE WORK:1 $35,200
ABONMARCHE CONSULTANTS, INC.
- 750 Li -dU Way East
ypyryla� South B.,d.IN 46601
F'\ Projects\ I I -0203 \ftdimr -y Bfi-tes 06-07-11 xis]Phase 1 - Bonds
LASALLE SQUARE
PHASE 1
IMPROVEMENTS TO BONDS AVENUE EXTENSION AND NORTH /SOUTH STREET
and DEMOLITION TO RESTAURANT PROPERTY
830 feet of New R/W and Street
Preliminary Cost Estimate
Revised June 7, 2011
ABONMARCHE CONSULTANTS, INC.
- 750 Lincoln Way East
South Bend, IN 46601
F: \Projects \l 1 -0203 \[Preliminary Estimates 06 -07- 11.x1sjTotal Phase 1
DESCRIPTION
ESTIMATED COST
Phase 1 - North /South Street Adjacent to Library
$98,295
Phase 1 - Bonds Avenue Extension
$179,260
Phase 1 - Demolition to Restaurant Site
$30,000
Subtotal
$307,555
Contingency, 10%
$30,800
Engineering and Surveying (Estimated)
$60,000
$398,355
ABONMARCHE CONSULTANTS, INC.
- 750 Lincoln Way East
South Bend, IN 46601
F: \Projects \l 1 -0203 \[Preliminary Estimates 06 -07- 11.x1sjTotal Phase 1
• y�` j� i�l! 1430NOO
_ Yp 3vvnt)S 311VSV1 1N3W3AOMdW1 OVOM c �0
SS 1` aa
03iOdold
t ? 9 S
� r
. = � =M -= - - - - - -- -
3/11lIaX IaN3 9
z�
-----------
1
I I
0
v 3
4 ZD +
ch
:s +
N a O O Fo
Ch j cb 11
I 1 \ C 111
I
1 ,
I 1 \ \ 1
I 1
1
0-0
��m
C)
Q o .
Q d JO c
�\
'^ 1
= J $
1
w 1
Ln
O is 1° 1
3 1
O 1
W 1
C
0
I• I nom
c
1 g
� 1 n
� 1
- - - - -- /
(09 07 ,06 Way SaNeA M/ll)133W 03SOdOl/d s
-0 C,--------------- -------
�, 1� Nay
\\ c
\\ I 60
\\ !p o^C�