To Redevelopment Commission
From Geri Hathaway, Ignition Park Director
Subject Ignition Park Infrastructure - Phase 1A
BSA LifeStructures - Phase 1A Site Design Proposal
Addendum to The Master Agency Agreement
Date July 26, 2011
Infrastructure must be put in place at Ignition Park to support development. The
initial phase is referenced as 1A and provides the continuation of Stull Street from
the east, Cotter Street from the west, the connecting circle based on the Master Plan
and the extension from that circle to develop Scott Street north of the existing rail
tracks.
Committing to this Phase 1A Infrastructure Project will allow this Commission to
sell land along these roads to developers or future owner / occupants, such as Data
Realty, from whom there is a Contract For Purchase & Sale that shall follow this
request.
This Phase 1A Infrastructure is estimated to cost $2,775,000 and the BSA
LifeStructure's design fee to create the Site Documents is for $128,000. It is
imperative that Ignition Park be ready to do business and this request, if approved,
will allow that to happen.
Economic Development asks for your approval of this project in the amount of
$3,000,000.
C:13
IF -� ��q °o o'er
a
❑
Q
o ;mss a
i
0
i
q
0 `
a �
(, -D � i-)
r
�i
1■ � t' 111
1 ■IM 7. �I i1i
"1 1 ■Iu 1' 111
■i
-- W
o�
�a
r U
O
�
C
i
q
0 `
a �
(, -D � i-)
r
�i
1■ � t' 111
1 ■IM 7. �I i1i
"1 1 ■Iu 1' 111
■i
CITY OF SOUTH BEND ECONOMIC DEVELOPMENT 13 July 2011
South Bend, Indiana
Ignition Park Master Planning
BSA LifeStructures #15350001 Page 1
IGNITION PARK
Phase 1A — Scope of Work:
Intent of this work is to provide access from Lafayette Boulevard to the Data Realty Site and
provide utility support for the building.
SITE IMPROVEMENTS
A. Stull Street boulevard from Franklin Street to Circle Drive (Boulevard will be four lane width
utilizing half the boulevard for access in Phase 1 A).
B. Circle Drive from Stull Street to South Drive (Drive will be constructed to full width).
C. South Drive from Circle Drive to Data Realty West access point (drive will be full width).
D. Temporarily seed all disturbed lawn areas.
E. Sidewalks and landscaping will not be included.
SITE UTILITIES
• Communication: 2" conduit from Sample Street south to Stull Street west along South
Circle Drive to Prairie Avenue with handholes at 300ft intervals.
• Electric: Ductbank from west side of Studebaker Station south along Lafayette Street to
Stull Street west to Data Realty site.
• Gas: Extend gas main to east property line of Data Realty from Prairie Avenue along
Cotter Street.
• Sanitary: Extend sanitary sewer from east Data Realty property line to Prairie Avenue
combined
sewer (sewer is sized for full park (10" sewer)).
• Storm: Storm water will drain to a temporary detention basin and BMP along east side of
Data Realty site.
• Water: Water main to be extended from Lafayette Boulevard main to Prairie Avenue
main (water
line is sized for full park (12" pipe) with appropriate F.H.
City ofSouth Bend
South Bend, Indiana
Ignition Park
15350001
07.20.11
PREDESIGN PPC
Component
PHASE [A
Improvements
Stull Street Blvd
Stull Street Resurface
Circle Drive
Scott Street
Finish Grade and Seed
Landscape Allowance
Utilities
Electric Duct Bank
Routing Repairs
Water Main
Sanitary Sewer
Communication
Natural Gas
Storm Drainage
PHASE IA Subtotal
Contingency 15%
PHASE IA Construction Cost
Project Design and Permitting Fees
Phase Ut Probable Prolect Cost
Unit
Quantity
Material Cost
LF
425
$290.00
LF
400
$110.00
LF
900
$295.00
LF
425
$150.00
LS
1
$25,000.00
LS
1
$525,000.00
LF
3800
$100.00
LF
2800
$70.00
LF
3400
$75.00
LF
1750
$75.00
LF
4200
$20.00
LF
1750
$40.00
LS
1
$250,000.00
Labor
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
LS 1 $0.00 $128,000.00
Total
$123,250.00
$44,000.00
$265,500.00
$63,750.00
$25,000.00
$525,000.00
$380,000.00
$196,000.00
$255,000.00
$131,250.00
$84,000.00
$70,000.00
$250,000.00
$2,412,7SD.Bo
$361,913.00
$2,774,663.00
$128,000.00
SZ.902.663.00
06 July 2011
Geri Hathaway
c/o Innovation Park at Notre Dame
1400 E. Angela Blvd.
South Bend, IN 46697
Re: Ignition Park -Phase 1A Site Design
South Bend, IN
Dear Geri:
BSA LifeStructures is pleased to submit a proposal for the site infrastructure design services
required for Phase 1A of the current Master Plan (site connection and utilities to Data Realty
property/building). According to the Master Plan, it appears the following scope will be necessary
for the design:
• Extend Stull to the edge of the new circular drive at the center of the park
• Construct a portion of the circular drive around to the southwest to where the new south
entry road ties in.
• Construct the new south entry road from the circle to the tracks.
• Add a curb cut and road connection off the south entry road to the east to the Data Realty
Property line.
• Design the utility infrastructure to support the Data Realty project, from its current
location to the property line, keeping with future Master Plan development within the
Park.*
* Water, Sewer and Storm Sewer will be routed and sized per the overall master plan. A
duct bank for power will be designed that connects Data Realty to the existing substation,
but will not be connected to the future master plan implementation.
This work will be performed both by BSA LifeStructures as well as local and MBE /WBE consultants.
The timeline required for this design is as follows:
Signed Agreement by the City of South Bend August 1
Issue Bid Documents October 20
Bids Received by City December 1
Contracts for Construction Awarded December 20
Geri Hathaway
06 July 2011
Page 2 of 2
For the infrastructure design outlined above, BSA LifeStructures would propose the following fee:
Civil Engineering $114,000
Permitting (labor to obtain permits) $ 7,000
Reimbursable Allowance (travel and other standard reimbursables)* $ 7,000
Total Fee (maximum)
$128,000
*Reimbursables will be billed as part of the base fee up to the $7,000 maximum. This amount does
not include the actual cost of requiredpermits
If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require an
executed letter agreement, which will be sent after all parties agree to the scope and fee, prior to
commencement of work. We would like to thank you for this opportunity to assist your
organization in igniting life sciences growth in downtown South Bend and look forward to working
with you in the future. Thanks again.
Sincerely,
Chris W. Lake, AIA, LEED AP
Principal -in- Charge
CITY OF SOUTH BEND ECONOMIC DEVELOPMENT 06 July 2011
South Bend, Indiana
Ignition Park Master Planning
BSA LifeStructures #15350001 Page 1
IGNITION PARK
Phase I — Scope of Work:
Intent of this work is to provide access from Lafayette Boulevard to the Data Realty Site and provide
utility support for the building.
SITE IMPROVEMENTS
A. Stull Street boulevard from Franklin Street to Circle Drive (Boulevard will be four lane width
utilizing half the boulevard for access in Phase 1 A).
B. Circle Drive from Stull Street to South Drive (Drive will be constructed to full width).
C. South Drive from Circle Drive to Data Realty West access point (drive will be full width).
D. Temporarily seed all disturbed lawn areas.
E. Sidewalks and landscaping will not be included.
SITE UTILITIES
• Communication: 2" conduit from Sample Street south to Stull Street west along South Circle Drive
to Prairie Avenue with handholes at 300 ft. intervals.
• Electric: Ductbank from west side of Studebaker Station south along Lafayette Street to Stull Street
west to Data Realty site.
• Gas: Extend gas main to east property line of Data Realty from Prairie Avenue along Cotter Street.
• Sanitary: Extend sanitary sewer from east Data Realty property line to Prairie Avenue combined
sewer (sewer is sized for full park (10" sewer)).
• Storm: Storm water will drain to a temporary detention basin and BMP along east side of Data
Realty site.
• Water: Water main to be extended from Lafayette Boulevard main to Prairie Avenue main (water
line is sized for full park (12" pipe) with appropriate F.H.