July 20, 2011
Jeffrey V. Gibney
Executive Director
City of South Bend
Community and Economic Development
227 West Jefferson Boulevard, Suite 1200S
South Bend, IN 46601 -1830
RE: CENTURY CENTER ISLAND PARK
EAST FOUNDATION WALL DRAINAGE SYSTEM
PROJECTED COST OF CONSTRUCTION
Dear Jeff:
& C, (7)
Due to the existing conditions of the Island Park perimeter east walls, the newly completed pavement
resurfacing has experienced settlement due to the loss of the supporting sub -grade fill from the flow of
storm water through the walls. The area appears to be along the southern half of the perimeter east walls.
Architecture Design Group, Inc. (ADG) has prepared preliminary design sketches to address the situation
with a new combination surface and sub -grade collection and drainage system.
We have shared our preliminary design sketches with two local general contracting firms to estimate the
costs of construction for the drainage system. The projected cost of construction for the work is $28,500,
and will include all contractor general conditions, demolition, earthwork, and concrete surfacing
replacement.
We recommend a not -to- exceed cost of construction equal to $30,000.
Please contact me should you have any questions.
Respectfully submitted,
ARCHITECTURE DESIGN GROUP, INC.
I �-:LTWL' __
William R. Lamie RA, AIA
Principal
ACCEPTED BY:
DATE:
922 E. Wayne Street
South Bend, IN 46617
tel 574.288.6626
fax 574.288.6624
Jeffrey V. Gibney, Executive Director
City of South Bend
Community and Economic Development