Loading...
HomeMy WebLinkAbout6C (4)LF) • • u rn eoura g4ili7i o Community & Economic Development 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission From: David Relos, Economic Development Planner ° Subject: Century Center Island Pavilion Island Bridge Professional Services Agreement Island Wall Repair Date: July 26, 2011 In an effort to further enhance the beauty and character of the Century Center island, ADG has been studying a variety of permanent pavilion styles that could be erected to not only provide shelter, but to be an artistic compliment to Century Center's architecture and the surrounding community. Attached are pictures of the island as it is today, and of the final design of the pavilion as it will appear on the island. The projected cost of the pavilion, including installation, is $531,920. This new, permanent pavilion will replace the current, temporary tent on the northern end of the island. Secondly, the original plans for the construction of Century Center included a second pedestrian bridge connecting the island to the building. This bridge would connect to the island in the area of the new pavilion, run above the rapids, and connect to the building in the vicinity of the north east corner of the Grand Hall. The attached proposal from ADG to study design concepts, construction documentation, bidding, and construction oversight for this bridge is in the amount of $22,000. Thirdly is a contract addendum in the amount of $5,500. This addendum is for the design of removable wind screens, located at the corners of the new pavilion, to help block winds if needed, and, because of a drainage issue on the island's eastern wall, a combination surface and sub -grade storm water collection and drainage system. This drainage system is needed to alleviate the drainage of storm water that currently leaks out the wall and is causing settlement of the pavement above, and is projected to cost no more than $30,000. Staff requests the following approvals: • Construction of a new island pavilion in a not -to- exceed amount of $535,000 • Proposal to design a second pedestrian bridge in the amount of $22,000 • Design of wind screen / drainage system contract addendum in the amount of $5,500 • Construction of a new drainage system in a not -to exceed amount of $30,000. What We Do Today Makes A Difference! Century Center Island Park Pavilion Projected Cost of Construction PAVILION SIZE 6,400.SF 80x80 CONSTRUCTION COSTS A. DESIGN (Under Contract $60,000) Architeicture /Engineering B. GEOTECHNICAL SURVEY (Under Contract and Paid $6,177.25) Soil Borings /Foundation Recommendtions C. GENERAL CONTRACTOR $14,000 Gen'I Conditions, Overhead, Profit D. DEMOLITION /EARTHWORK $8,000 E. FOUNDATIONS $26,000 F. CONCRETE $3,000 Slab, Curbs, Walls G. FABRIC STRUCTURE $425,000 H. ELECTRICAL $12,000 Lighting J. CONTINGENCY (9% of I.) $43,920 TOTAL PROJECTED CONSTRUCTION COSTS (1.+J.) $531,920 NOTES: 1. Fabric Structure projected costs include engineering, project management, steel /fab, fabric /fab, installation, equipment, shipping 2. Recommend a not -to- exceed Total Projected Construction Cost of $535,000 APPROVED South Bend Redevelopment Commission Date: