Loading...
HomeMy WebLinkAbout6D 10& 13 C/o) memo r an cl u rn „�► ,V1,ilr;r, o Community & Economic Development 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission, Board of Public Works From: Bill Schalliol, Economic Development Planner Subject: Resolution 2893 and Addendum To Master Agency Agreement Mayflower /Hutsfield Square Infrastructure Project Date: June 8, 2011 Attached to this memorandum is Resolution 2893 and Addendum To Master Agency Agreement for the Mayflower /Hutsfield Square Infrastructure Project. Attached to the Addendum is a copy of the professional services proposal from Abonmarche to provide project oversight and inspection related to both the sewer and roadway construction projects. The Mayflower /Hutsfield Square Infrastructure Project consists of two projects. The first is the Mayflower Boulevard Construction with a contract amount of $2,499,736.21. This work will include the construction of a new roadway, all related drainage and utility work, street lights and pedestrian trail. The work will also include a new traffic signal at Mayflower Boulevard and Cleveland Road. The second project is the Mayflower Sewer Construction with a contract amount of $1,868,743.50. This work will include the construction of a new sewer force line that will intercept sewage at the intersection of Mayflower and Brick and force the material to the Blackthorn Lift Station located on Nimtz Parkway. There will be additional sewer network configuration that will be part of this project that will free up capacity in the existing network on the northwest side of town. There is also a contract from Abonmarche to provide Project Oversight/Inspection in the amount of $86,740.00. The City will assign an inspector to this project but Abonmarche will serve as an additional inspector and be in the field to deal with project construction issues. Staff requests approval of Resolution 2893 and the Addendum To Master Agency Agreement for the Mayflower /Hutsfield Square Infrastructure Project. What We Do Today Makes A Difference! Z' 1� N W Z 80 -- �o J �m hr 4 .. - R Ut � ?y i N k , kl; IF Y � g � d A d of AQ AQ A A�i AAE A3 �•���k�ggg�p, M�MrN ✓�sik9 t` tt�tf ■a�d a' sap E 6 E E� ppgg ■s IF Y � g � d A d of AQ AQ A A�i AAE A3 �•���k�ggg�p, M�MrN ✓�sik9 t` tt�tf ■a�d a' sap E RESOLUTION NO. 2893 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN ADDENDUM TO THE MASTER AGENCY AGREEMENT (Mayflower /Hutsfield Square Infrastructure Project) 2893 -11 WHEREAS, effective January 1, 2011, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2011; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Mayflower /Hutsfield Square Infrastructure Project to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Addendum to Master Agency Agreement (Mayflower /Hutsfield Square Infrastructure Project) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on June 14, 2011, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana 46601. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission ADDENDUM TO MASTER AGENCY AGREEMENT (Mayflower/Hutsfield Square Infrastructure Project) 2893 -11 This Addendum to Master Agency Agreement (this "Addendum "), made and entered into as of the 23rd day of June, 2011, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Mayflower /Hutsfield Square Infrastructure Project (the "Project "). WHEREAS, effective January 1, 2011, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2011; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Mayflower /Hutsfield Square Infrastructure Project to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: 1. The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being more specifically described in "Exhibit A ", attached hereto and made a part hereof. 2. All of the ternis and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Carl Littrell, Member Don Inks, Member ATTEST: Linda Martin, Clerk Exhibit "A" MAYFLOWER/HUTSFIELD SQUARE INFRASTRUCTURE PROJECT Proiect Budget Mayflower Boulevard Construction - $ 2,499,736.21 Mayflower Sewer Construction - $ 1,868,743.50 Project Oversight /Inspection - $86,740.00 See attached proposal from Abonmarche dated June 3, 2011 Abonmarche Professional Services Agreement Confidence By Design AGREEMENT between: Abonmarche Project Number: Client name: City of South Bend Department of Public Works Date: June 3, 2011 Client address: 227 W. Jefferson Blvd., County -City Building Rm. 1316, South Bend IN 46601 Phone: 574- 235 -9251 Fax: Email: to as the Client, and Abonmarche Consultants, Inc., referred to as Abonmarche, of 750 Lincoln Way East, South Bend, IN 46601. The Client contracts with Abonmarche to perform professional services with regard to the Client's project generally referred to as: Project Name: Mayflower Road Sanitary Sewer and Road Relocation Part Time Construction Inspection Location: Nimtz Parkway Lift Station to Brick Road The professional services to be provided by Abonmarche, collectively referred to as the Work Plan, are as follows: Scope of work: Engineering Services Outlined in Appendix "A" Project schedule: Schedule Outlined in Appendix "B" Special Provisions: Abonmarche proposal /work plan, dated described therein. hereinafter referred is incorporated into this Agreement by reference, and is limited to the services The Client agrees to promptly pay for services provided by Abonmarche for the Scope of Work according to the following: (fee $) Not -TO- Exceed $86,740.00 as Outlined in Appendix "C" Prior to commencement of services, the Client will specify any and all documentation that the Client requires for submission with the invoice for services provided by Abonmarche. Absent any special request from the Client, Abonmarche will send its standard form of invoice. If, after receipt of an invoice from Abonmarche, the Client has any questions, or if there are any discrepancies in the invoice, the Client shall identify the issue in writing within ten (10) days of its receipt. If no written objection is made within the ten (10) day period, any such objection shall be deemed waived. Abonmarche invoices are due upon receipt. The Client has designated Mr. Toy Villa as its Representative. The Representative shall have the authority to execute any documents pertaining to this Agreement or amendments thereto, and for the approval of all change orders, addenda, and additional services to be performed by Abonmarche. The representative shall be the contact person for submission of all documents, invoices or communications. Authorization to Proceed and Guarantee of Payment: By signing this Agreement the Client authorizes Abonmarche to provide services described above, and that the Client is the responsible party for making payment to Abonmarche. By signing below. I acknowledge that 1 hove received and agree to the Terms and Conditions on Pace 2 of this Agreement. and I understand that the Terms and Conditions take orecedence over all prior oral and written understandings These Terms and Conditions can only be amended, supplemented, modified, or canceled by a written instrument signe th parties. Any notice or other communications shall be in writing and shall be considered to have been duly given when personally delivered or u th d day after being deposited into first class certified mail, postage prepaid, return receipt requested. Authorized Client Representative Authorized Abonmarche res alive Client: City of South Bend Board of Public Works and Safety Signature: Date Signed: Printed Name: Roger T. Nawrot, PE b PLS Signatures: Title: Senior Pro ect En sneer Abonmarche Consultants, Inc. Originating Office: 750 Lincoln Way East South Bend, IN 46601 T 574.232.8700 F 574.251 .4440 Date Signed: June 3, 2011 Revised 5-4-11 Page 1 of 2 TERMS AND CONDITIONS OF PROFESSIONAL SERVICES AGREEMENT 1. Agreement. These Terms and Conditions shall be incorporated by reference and shall prevail as the basis of the Client's Agreement to Abonmarche. Any Client document or communication in addition to or in conflict with these Terms and Conditions shall be subordinate and subject to these provisions. 2. Execution. Abonmarche has the option to render this Agreement null and void, i S if it is not executed within thirty (30) days of delivery. 3. Client Responsibilities. The Client will provide all criteria and information concerning the requirements of the Project. The Client will assume responsibility for interpretation of contract documents and for construction observation and 1 6 will waive all claims against Abonmorche that may be in any way connected, unless Abonmarche's services under this Agreement include full -time construction observation or review of contractor's performance. 4. Performance. The standard of care for services performed by or provided by Abonmorche will be the core and skill ordinarily used ' by Abonmarche's profession practicing under similar circumstances at the same time and in the some locality. Abonmorche makes no warranty, expressed or implied, with respect to any services provided by Abonmorche. Abonmorche will not be liable for any claim, damages, cost, or expense (including attorney's fees) or other liability or loss not directly and solely caused by the negligent acts, errors, or omissions of Abonmarche. 5. Hourly billing Rates. If payment is on an hourly rate, Client will pay Abonmorche at the current hourly billing rates. The hourly rates are adjusted annually or as deemed appropriate. 18 6. Reimbursable Expenses. Reimbursable expenses, the actual costs incurred directly or indirectly for the Client's Project, will be charged at Abonmorche's 19 current rates. Examples of reimbursable expenses include, but are not limited to: mileage, tests and analyses, special equipment services, postage and delivery charges, telephone and telefax charges, copying, printing, and binding charges, commercial transportation, meals, lodging, special fees, licenses, and permits. Subconsultant and outside technical or professional services will be charged on the basis of the actual costs times a factor of 1.15. 20 7. Additional Services. Additional services that may be provided pursuant to the Agreement or any subsequent modification of the Agreement will be authorized, when possible, by written amendment signed on behalf of the Client and Abonmorche. Additional services, performed by Abonmorche ore subject 21 to all Terms and Conditions and the Client will be responsible for payment. Should the Client, regulatory agency, or any public body or inspector direct modification or addition to services covered by this Agreement, the cost will be 22 added to the agreed price. Requests for extra services should be made in writing via a change order, but none the less, Abonmarche is entitled to be paid for extra services provided whether or not it is in writing. 8. Underground Structures or Burled U=es. The Client is responsible for identification and location of all public and private buried structures on the Client's property and the Project site, such as, but not limited to, storage tanks 23. and lines, or gas, water, sewer, electrical, phone, cable, or any other public or private utilities. It 6 agreed that Abonmarche is not responsible for accidental damage to utilities or underground structures, whether known, unknown or improperly located. The client shall be responsible for design fees if changes ore 24. necessary. Utility locating or marking services provided by Abonmarche are not substitutes for complying with the utility owner notification requirements or the locating services (811 systems) required prior to an excavation. Utilities shown as located by ground penetrating rodar are approximate only. No excavation took place to verify the positions shown or to verify the type of utility (except as 25. noted). Careful excavation is required for verification of the buried utility. The owner or customer assumes the risk of error and the actual location of the underground utility. Abonmarche is not providing any certification or guarantee regarding the exact location of any underground utility. 9. Underground Conditions. Abonmarche shall have no responsibility for the identification of existing or unforeseen /differing underground conditions. The Contractor shall have sole responsibility for determining the nature of underground conditions and the means and methods of dealing with those 26. conditions. Abonmorche is entitled to rely upon the information provided by geotechnical consultants and shall have no responsibility for the accuracy or correctness of the data contained in the geotechnical reports. IO.SHe Access and Security. With the exception of access rights that land surveyors are afforded by law, the Client will provide Abonmarche access to the Project site and the Client will be responsible for obtaining any necessary permission from any affected third party property owners for use of their lands. The Client is solely responsible for site security. Abonmorche, unless specifically stated otherwise in on amendment to this Agreement. Any electronic media provided under this Agreement to the Client are only for the convenience of the Client. Any conclusions or information obtained or derived from such electronic files will be at the user's sole risk. .Bonds and Permits. The Client will be responsible for the adoption of any site access or right of way bonds that may be initiated on their behalf. At completion of Abonmorche's services, the Client will take responsibility and pay any ongoing bond or permit costs for any bonded or permitted services. .Third party Invoicing. If the Client directs Abonmarche to invoice third party payers, Abonmorche will do so, but the Client agrees to be ultimately responsible for Abonmorche's compensation until the Client provides Abonmorche with the third party's written acceptance of all terms of this Agreement and until Abonmorche agrees to the substitution. 7.Third Party beneficiaries. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the Client or Abonmorche. Abonmorche's services under this Agreement are being performed solely for the Client's benefit, and no other party or entity shall have any claim against Abonmorche because of this Agreement or performance or nonperformance of services hereunder. The Client and Abonmarche agree to require a similar provision in all contracts with contractors, subcontractors, subconsultonts, vendors and other entities involved in this Project to carry out the intent of this provision. .Suspension of Services. In the event of non - payment by Client, Abonmorche will have the absolute right to cease performance of any services. .Contractor's Work: Abonmarche shall have no authority to direct or control the Work of the Contractor or to stop the Work of the Contractor. Abonmorche shall not be liable to any party for the failure of the Contractor to perform the Work consistent with the Plans and Specifications and applicable Codes and Regulations. Abonmorche shall have no responsibility or be liable for safety procedures of the Contractor or its subcontractors. .Consequential Damages. The Client and Abonmorche waive consequential damages for claims, disputes, or other matters in question relating to services provided as a part of this Agreement, including for example, but not limited to, loss of business. .Governing Law. This Agreement will be deemed to hove been made in St. Joseph County, Indiana and shall be governed by and construed in accordance with the laws of the State of Indiana. Venue. The parties (a) irrevocably submit to the jurisdiction of any Indiana court sitting in St. Joseph County, Indiana in any action arising out of this agreement, and (b) waive, to the fullest extent that they may effectively do so, the defense of an inconvenient forum. The parties also agree that a final judgment in any such action shall be conclusive and may be enforced in other jurisdictions by suit on the judgment, or in any other manner provided by law. Considerations, The successors, executors, administrators, and legal representatives of the Client and Abonmarche ore hereby bound onto the other with respect to the covenants, Agreements, and obligations of this Agreement. Acts of God. Neither the Client nor Abonmarche will hove any liability for nonperformance caused in whole or in part by causes beyond Abonmarche's reasonable control. Such causes include, but are not limited to, Acts of God, civil unrest and war, labor unrest and strikes, acts of authorities, and events that could not be reasonably anticipated. Termination. Either the Client or Abonmarche may terminate this Agreement by giving ten (10) days written notice to the other party. In such on event, the Client will pay Abonmarche in full for all services previously authorized and performed prior to the effective dale of the termination, plus (at the discretion of Abonmarche) a termination charge to cover finalization of services necessary to bring ongoing services to a logical conclusion. Upon receipt of such payment, Abonmorche will return to the Client all documents and information that ore the property of the Client. Entire Agreement. This Agreement contains the entire agreement between the parties and there are no agreements, representations, statements, or understandings which hove been relied on by the parties which are not stated in this Agreement. End of Agreement. 11. Consultants. Abonmarche may engage Consultants at the request of the Client Reviewed by City of South Bend Legal Department 5/4/11 to perform services which ore typically the Client's responsibility, such as surveys, geotechnicol and environmental assessments. The Client agrees that Abonmarche will not be responsible for, or in any manner guarantee, the performance of services by the Consultants. The Client agrees that Abonmarche will not be liable for any claim, liability, or defense cost for injury or loss sustained by any party allegedly caused by the Consultants' negligence or willful misconduct. 12.Opinions of Cost. Any opinions of probable construction cost and /or total project cost provided by Abonmarche will be on the basis of experience and judgment, but these are only estimates. Abonmarche does not warrant that bids or ultimate construction or total project costs will not vary from such estimates. 13.Ownershlp of Work Product. Abonmorche will remain the owner of all original drawings, reports, and other materials provided to the Client, whether in hard copy or magnetic media form. The Client is authorized to use the copies provided by Abonmarche only in connection with the Project. Any other use or reuse by the Client for any purposes whatever will be at the Cl'ient's risk and full legal responsibility, without liability to Abonmarche and the Client will defend, indemnify, and hold Abonmarche harmless from all claims, damages, losses, and expenses, including attorney fees arising out of or resulting there from. 14.Electronlc Media. Copies of data, reports, drawings, specifications, and other materials furnished by Abonmarche that may be relied upon by the Client are limited to the printed copies (also known as hard copies) that are delivered to the Client pursuant to the services under this Agreement. Computer files of text, data, graphics, or of other types of electronic media ore the sole possession of Revised 5 -4 -11 Page 2 of 2 June 2011 City of South Bend Proposal for Engineering Services Construction Inspection Mayflower Road Sanitary Sewer and Relocation Paae 1 APPENDIX A SCOPE OF SERVICES The proposed project consists of providing construction inspection of Mayflower Road Sanitary Sewer Project, Phase I City Project No. 109 -055 from the Nimtz Parkway Lift Station to Brick Road and the Relocation of Mayflower Road City Project No. 110 -036 from Cleveland Road to Brick Road. A. Engineering Personnel: ABONMARCHE will provide one (1) Resident Project Representative, inspectors, and clerical personnel as required for a period of time necessary to complete both of the construction projects and final construction reports. The full time Resident Project Representative will take directions from and report to the City of South Bend Construction Manager (Construction Manager) on all matters concerning contract compliance and administration. B. Description of Services: 1) Construction Schedule: Review the construction schedule prepared by the Contractor for compliance with the contract, and give to the City of South Bend (South Bend) detailed documentation concerning its acceptability. 2) Conferences: Attend pre- construction conferences as directed by South Bend; arrange a schedule of progress meetings; and such other job conferences as required for the timely and acceptable conduct of the project. Record for South Bend, as directed, minutes of such meetings. 3) Liaison: Serve as South Bend's liaison with the Contractor, working principally through the Contractor's Field Superintendent or such other person in authority as designated by the Contractor. Acting in liaison capacity, the Resident Project Representative shall be thoroughly familiar with the plans and specifications applicable to the project to insure that all provisions therein are complied with. Any deviation observed shall be reported to South Bend by the Resident Project Representative 4) Assistance: Assist South Bend, in obtaining from the Contractor a list of his proposed supplies and sub - contractors. Also obtain from the Contractor, additional information and details when needed as the job site for proper execution of work. 5) Review: The Contractor's payroll records as directed by South Bend and then forward the same to the Construction Manager. 6) Shop Drawings: a. Receive shop drawings and false work drawings and forward to the Design Engineer for approval. Engineers Architects Planners Surveyors June 2011 City of South Bend Proposal for Engineering Services Construction Inspection Mayflower Road Sanitary Sewer and Relocation Page 2 b. Review approved shop and false work drawings, specifications, and other submissions, record receipt of this data, maintain a file of all drawings and submissions, and check construction for compliance in accordance with the contract documents. c. Alert the Contractor's Field Superintendent when it is observed that materials or equipment are being or about to be used or installed before approval of shop drawings or samples, where such are required, and advise South Bend when he believes it is necessary to disapprove work as failing to conform to the contract documents. 7) Review of Work and Inspection: a. Conduct on -site inspection for South Bend of the work in progress as a basis for determining that the project is proceeding in accordance with the contract documents. b. Verify that required testing by the Contractor has been accomplished. 8) Modification: Consider and evaluate the Contractor's suggestions for modifications in drawings and /or specifications and report them with recommendations to South Bend. 9) Records: a. Prepare and maintain at the job site, orderly files of correspondence, reports of job conferences, shop drawings and other submissions, reproductions of original contract documents, including all addenda, change orders, and additional drawings subsequent to the award of the contract, progress reports, and other project related documents. b. Keep a diary or log book recording hours on the job site, weather conditions, and a list of visiting officials, decisions, general observations, and specific observations with regard to test procedures. c. Maintain for South Bend a record of names, addresses, and telephone numbers of all sub - contractors and major material supplies. d. Maintain a set of drawings on which authorized changes are noted, and deliver to South Bend upon request, but in any event at the completion of the project. e. Prepare the final construction record and final estimate as required by South Bend. 10) Reports: Furnish to South Bend, at periodic intervals as required, progress reports of the project, including the Contractor's compliance with the approved construction schedule. 11) Progress Estimates: Review progress estimates for periodic partial payments to the Contractor and deliver to South Bend for review and processing. The payments to the Contractor will be based on estimates of the value of work performed and Engineers A r c h i t e c i s Planners Surveyors June 2011 City of South Bend Proposal for Engineering Services Construction Inspection Mayflower Road Sanitary Sewer and Relocation Page 3 materials complete in place in accordance with the contract. 12) Project Responsibility_: The Resident Project Representative will be responsible for the documentation of pay quantities and estimates, and the maintenance of appropriate records related to the construction of this project. 13) Work Schedule and Suspension: The Abonmarche crew will be required to regulate their work week to conform to the Contractor's hours in accordance with the directions of the Construction Engineer. If work on the construction project is suspended and all matters concerning contract compliance and administration are complete, the services of the consultant may also be suspended without cost to the project. APPENDIX B ANTICIPATED SCHEDULE The consultant will be prepared to begin the work under this agreement within five (5) days after a letter of notification to proceed is received from the local public agency. The consultant shall complete and deliver the final construction record and final estimate to the Construction Engineer within forty -five (45) calendar days after the Contractor's last day of work. Engineers Architects Planners Surveyors June 2011 City of South Bend Proposal for Engineering Services Construction Inspection Mayflower Road Sanitary Sewer and Relocation Page 4 APPENDIX C SUMMARY of FEES and SCHEDULE The fee paid Abonmarche by the City of South Bend or the work performed will be on a hourly basis plus reimbursable expenses for mileage, overnight travel pertaining to this project, overnight mail, and outside sub - consultant services (invoices x 1.15) if necessary. The overall estimated fee for the work set forth in Appendix A will not exceed $86,740.00. Abonmarche will invoice the City of South Bend monthly for the work performed in accordance with the following rate schedule: MAXIMUM HOURLY RATES BY JOB CLASSIFICATION CLASSIFICATION HOURLY RATE Regional President $ 200.00 / hr. Vice - President / Senior Project Manager $ 155.00 / hr. Project Manager / Project Engineer / Landscape Architect $ 105.00 / hr. Staff Engineer / Landscape Architect $ 85.00 / hr. Junior Engineer $ 75.00 /hr. Computer / Drafting Technician $ 72.00 /hr. Professional Land Surveyor $ 105.00 / hr. One -Man GPS Crew $ 105.00 / hr. Two -Man Survey Crew w /Total Station $ 120.00 / hr. Two -Man Survey Crew w /GPS Station $ 170.00 / hr. Administrative Assistant $ 54.00 / hr. F: \Proposals \P thru T \S \South Bend City \Mayflower Road Sanitary sewer \P T Construct. Insp. May. Rd. San. Sewer and relocation 6 -3 -1 l.doc Engineers Architects Planners Surveyors Exhibit No. 1 City of South Bend Mayflower Road Sanitary Sewer Phase I & Mayflower Road Rerouted Part Time Construction Inspection Manhour Justification Abonmarche Consultants, Inc. June 2, 2011 201 2012 City Project No. 109 -055 & 110 -036 Weeks Inspection Staff Engineer Supervision per Month Hours Der Week Hniirc u,,,,.� I Junel 2 1 40 80 - 6 Jul 4 40 160 8 Au ust 5 32 160 10 Septemberl 32 128 8 Octoberl 4 32 128 8 November 4 32 128 8 December 4 20 80 8 January 4 20 80 8 Manhours Estimated 944 64 Hourly Rate $80.00 $155.00 Classification Total $75,520.00 $9,920.00 Staff Engineer $75,520.00 Senior Project Manager $9,920.00 Expenses (mileage) $1,300.00 Estimated Total Amount $86,740.00 F:Proposals\P thru 71S\Mayflower Road Sanitary Sewer