To: Redevelopment Commission
From: Staff—Debrah Jennings, Property Manager
Subject: LaSalle Hotel Roof Repair
Date: March 8, 20l 1
The LaSalle Hotel ballroom is flooded; we think this is due to fi•ozen roof drainpipes when the snow
melted on the roof above the ballroom on the second floor.
Staff has acquired two bids to repair the roof. One bid in the amount of$1,000.00 and another in the
amount of$675.00.
� Staff has selected Morris & Sons Roofing, Inc. to repair the roof at a cost of$675.00.
� The flooding also caused excessive damage to the carpet in the Ballroom and had to be removed.
i
� CB Richard Ellis maintenance crew removed the damaged carpet at a cost of$1,370.00. �
�
i �.
� All water has been removed from the floor, and the floor is drying out. The base floor does not
� appear to have excessive damage
i
i CB Richard Ellis maintenance crew at a cost of$1,370.00 removed the carpet.
�
�
i
�
; Staff recommends approval.
i
�
i
i
''�
�
i
�
i
�
H:`WPDATA�coaect memo.doc
i
i
�
�
�
� , • �;
� �
�
CBRE Bradley
CB RICHARD ELLIS
� PROPOSAL
a
CUSTOMER: LaSalle Hotel DATE: 02-21-11 �
�
JOB LOCATION: 237 N Michigan St.South Bend.IN
JOB DESCRIPTION: Carpet and wood floor removal
� GENERAL REQUIREMENTS
1) Remove carpet and carpet padding on second floor(approximately 30`x 40'). Remove parquet flooring that has buckled �
and lay out in a room to dry out. Vacuum up remaining excess�vater. All work to be performed during normal business
hours. All clean up is included.
Notes:
Excludes: �
l. Any work not specifically noted above.
2. Any and all�e�ork associated with unforeseen conditions.
LABOR,MATERIAL&EQUIPMENT COST
Based on the information supplied to us the total project cost is$ 1,370.00
OMISSIONS
� This proposal does not include: Permits.Performance Bond,Builder's risk,Premium Labor rates
PAYMENT
. The�eff►a+e+�g outstanding balance�vill be due upon
completion of the��ork. � >
� � .This proposal is in good standing for 30 days.We trust this agreement satisfactorily
sets Torth your understanding oT the terms and condition between us. If this agreement meets�+�ith your approval.please sign in the space
� provided and return one copy to us as our�vritten "Notice to Proceed"]f you prefer to issue a Purchase Order.please include this proposal in
your correspondence with your purchase ordec CB Richard Ellis/Bradley will upon request from the owner supply all liabiliry insurance
coverage.Thank you for your confidence in CB Richard Ellis/Bradley and if you would have any questions please feel free to contact us.We
look}'orward to working with you on this project.
� AGREED AND ACCEPTED
Sincerely.
By: By�
John Martell
� Vice President�Partner
CB Richard Ellis�Bradley
Date:
�
� Scope has been revie��ed with tenant/landlord: ❑ Accepted ❑ Declined
�
�
� By. B�.
Supervisor Landlord
�
�
�
':�
• oz�zz�zoii i9:�s r•.a� �
C�000ii000i
�
i
�
��R.�Z�� $� S�NS ���FIN�, IN�6 '
208 E.Qw b Sr.
BouRSOrt,IN 46504
i
PNONE: (374)342-3095
oR: (574)342-2065
FAx: (574)342-U9Q8
ROOFING&SHEET METAL CO�ITRA.CTORS
PRUPOSAL
TU: DATE:
� CB Richard Ellis February 22,2011
202 S.Michigan St. -
South Be�d, IN 46b01
PRUJECT: Roof repairs on: Old LaSalle Hotel
�
° A�: Leonard
�
� �
V�TE PROPOSE'1'Q:
i
� 1. Furnish labor and material to caulk severai places in the termination bar on both sides of the wall.
f 2, Furnish labor and material to cauEk old windows that are closed off:
j 3. F�rnish]abor and material to roof cement several]aps in the zoofing and wall flashiug. �
� 4. Furnish labor and material to rcpair north�vest drain swnp, as nccded.
i
Labor and Material�675.0 .
� .
--.,
��--___�.�--
-
�
' �
;
�.
l
General Conditions:
"'*This pria is gcwd for on(y"l�irty days due to the fluetuetu�g priees of material at this time.*+
'�"Indiana salcs lax has been inclodcd in this proposal"'
"*Maintaio OSHA compiiency•
''*Providc Insurance Cedificxtes,as necessaiy+�
**Complete snd thorougk cteanup of onr sco�►c of work,upon completion«+
Owncr is to ttunis6 suitnbla wn�area during construcuon. �
Accept as contract 2011 MORRIS&SOIVS INC. �
i
By: gy: c��.
��x,-,
I �
j i
i THANK YUU I�'QR THE OPPCTRTUNITY!
�