HomeMy WebLinkAboutAmendment No 2 to PSA - McCormick Engineering LLC - Bowen Street Drainage1316 COUNTY-Cn-y BDi LDING
227 W. RETFERSON BOULEVARD
Soo BEND. INDIANA 46601-1830
Tracy McCormick
McCormick Engineering, LLC
234 N. Ironwood Drive
South Bend, IN 46615
RE: Amendment No. 2 to Professional Services Agreement
Dear Ms. McCormick:
PHONt" 574/235-9251
FAX 574/ 235-9171
The Board of Public Works, at its meeting held on July 10, 2018, approved the above
referenced amendment regarding additional services for the Bowen Street Drainage
Improvements project in the amount of $74,530, for a new total not to exceed $193,783,
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
`Linda M. Martin, Clerk
Enclosure
GARY A, Gii,m, SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMEs A. MUELLER T[ IERESE J. DORAU
AMENDMENT'No. 2
Dated as of,RL\�A 1 V 2018
to
AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES
by and between
Board of Public Works, City of South Bend, Indiana ("Owner")
and
McCormick Engineering, LLC ("Engineer")
For
Bowen Street Drainage Improvements ("Project")
This Amendment amends, modifies and supplements the Agreement between Owner and Engineer for
Professional Services (the "Agreement"). The Agreement, whether or not it is attached to this Amendment, is
hereby incorporated into this Amendment by this reference and is made part hereof as if it were fully set forth
herein. The amendments, modifications and supplements to the Agreement contained in this Amendment are
set forth by reference Section number contained in the Agreement. Unless a part of the Agreement is amended,
modified or supplemented by this Amendment, the Agreement shall remain in full force and effect.
Engineer's Additional Services under this Agreement:
• Layout and integration of an additional permanent maintenance road into the Facility from the Miami
Street Right -of -Way.
• Geotechnical engineering services needed to incorporate the newly proposed permanent maintenance
road into the design of the facility
• Reconfiguration of access drive for maintenance of existing water quality structures
• Preparation of revised design Plans and Contract Documents to remove accumulated sediment from the
basin known as the "Miami Basin" as well as provide additional surface stabilization measures
• Coordination and preparation of Contract Documents to provide improvements to an existing
automated valve that will result in:
o Elevation of the actuator motor above the existing ground surface
o A new actuator motor with improved manual flywheel orientation
o Reestablishment of electrical connections to actuator motor
o Remote sensing of levels and/or flows from the Miami Basin
o Ability to open and close the valve by means of the actuator motor from remote facilities by the
City
1.01 Basic Agreement and Period of Service
B. Engineer shall complete its services within a reasonable time, or within the following specific
time period: The Engineer shall make every effort to complete the portion of the Work needed
to solicit Contractor bids within three months from the Effective Date of Amendment 2.
7.01 Basis of Payment
l of 2
A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows:
2. In accordance with, the time and material provisions of Paragraph 7.02. Total project
payments shall not exceed an amount of $193,783.00, an Increase from total budget
established in Amendment 1 of $74,530.100 for the Scope of Services outlined above without
prior written consent and authorization of the Owner.
IN WITNESS W1 IEREOF, the parties hereto have exCCLIted this Amendment 2 to the original Agreement,
the Effective Date of which is indicated on page I .
Owner:
City of South Bend, Indiana
Engineer:
McCormick Engineering, LLC
Board of Public Works
By:
By:
Title: Gary A. Gilot, President Title: Tracy A. Mceormick, Managing Partner
By:
Title: suzanna-M. f rit`zbeYg,Wmber
Title:
By:
James A. Mueller, Member
ZAn
Title:
Elizabeth A. Maraclik, Member
By:
Title:
Therese J. D6&, , Iviember
Attest:
Title:
Lin da Martin, Clerk
Date:
Date: June 19, 2018
Engineer License or Firm's Certificate 19800331
No.
State of: Indiana
2 of 2
Client: City of South Bend Board of Public Works
Bowen Street Drainage Improvements - Amendment 2 - Manhour Justification
Revision Date: 6/19/2018
RevWons Per;Addendum No 2
Additional
Additional
Task
Hours
Rate
Amount
Geotechnical Services for Phase 3
------------------
•------------------------------------------------------------------------------------------------------------------------------
Geotechnical review and recommendations for permanent haul road improvem
-- ---
N/A
------ -----------
-------- ----------
$
-_7_OD0.00
--------------------- •----------------------------------------------------------------------------------------
Subtotal Survey and Geotechnical Services
$
7,000.00
Phase 3 - Ireland Road Drainage Improvements
------------------------------------------------------------------------ ---------------------------------
--------------------------
-- ------- ---
Contract Document Preparation ___-__---------___-_____
_ .-----------
----------------
._------- ---
- ------- ------- -------- ----- -.._...--- ----------- --------- --- ---- ----.
Permanent Access Road Design Layout & Design - -
---------------------
- -- -- W--
SO-
$-135.00-T
-----
$
-6,750.00
- -
---------------------- -------------------------------------------
Drive Design Layout & Design
20
$ 135.00
$
2,700.00
-Maintneance - --------------------------------------------------------------------------------------------
Haul Road Plan Preparation
80
$ 135,00
$
10,800.00
Technical Specification Preparation -- ----------------- - --
----------------
24-
-
$----- 135.00
$--___3_240.D0-
--------------------------------------- ----- - ------------
Additional gwner Coordination
16
$ 135.D0
$
2,160.00
------ -
Subotal - Engineering Services for Phase 3
$
25,650.00
Subtotal Engineering and Geotechnical Services Phase 3
$
32,650.00
Survey and Geotechnical Services for Phase 4
----------------------------------
-------
------------------------------------- ----------------------------------------------------------------..--
Topographic Survey by Abonmarche------------
------------------------------
W- -N/A- -------------------------------------------
$
3,000.00
Subtotal Survey Services
$
3,000.00
Phase 4 - Miami Basin Automated Valve Improvements
5coping of City Desired ImprovementsTTTT^^ - --------------------------------------------------
_-_-T10
$-135.00
--------------------
$
1,350.00
- - -
Survey Coordination
20
$ 135,00
-------
- ---------OQ
$
2,700.00
----------
----------------------------------------------------------------------------------------------------------------
---- -i--- Utility Coordination
12
1-3-
$5.
$
1,620.00
Coordination with Manufacturer
•------------------- -------------------------------- ---------------------------------------------------------------......_-----------------------------
Panel and/or Electrical Improvements --------- -------
- - - -
24
$135.00-_
- ______
$
T 3,240.00
---- ----------------------------------------------------------------------------
Valve Actuator Improvements ------------------------ - --
----------------------------
16
$ 135.00
- ----------------------
$
2,160.00
------------ --------- --- ---------------------------- ----
Remote Sensor improvements______ _ ___________ ---------------------------------
____----
16
$------135.00
--------------------
$
2,160.00
---
Structure Elevation Impprovements to Elevate Actuator
24-$_-_-_-135.00TTT$
3,,240_00
.__-.....------------------e---------_.....------_------------------____-_-_..------------------- -
Coordination of valve sensor communication with ex City facilities
- ------
_
4O-
$- _- 135.D0
$
_ -
_ 5,40Q.00-
Contract Document Preparation
Preparation----------- --------- -----------------__
50.
$_-__ 135A0
$
6------D
---Plan
---------
Performance Based Technical Specification Preparation . _-____--------------__-__
_ ._--
24
------
$______135_00
$-
3,240.00-
-------- ------- ------- ---------- -...----------------------------
Preparation of Bid Documents
8
$ 135.00
- - ----------
$
1,080.00
------------
-------------------------------------------------------........,_-----------------------------_...__-_-_-__------------___-_
Preparation of Cost Estimates
8
$ 135.00
$
1,080,00
---------------- --------------------------------------------------------.._..---------------------------------------------------
Owner Coordination
24
$ 1 35 .00
$
3,240.00
Construction Administration Support - Shap Drawing Review
8--$
-----135_00--
$-^
1,080.00
Construction Administration Support - Progress Meetings
4
$ 135.00
$
540.00
Subotal - Engineering Services for Phase 4
$
39,880.00
Subtotal Survey, Engineering and Geotechnical Services Phase 4
$
41,880.00
Date
Name
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
6/29/18
Roger Nawrot
Department
Division/Bureau
Public Works
Engineering
BPW Date 7/10/18 Phone Extension 5932
Re aired .Prior to Submittal to Board
Legal ❑ Attorney Name: Clara McDaniels
Controller ❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
U Agreement
LJ Contract LJ Proposal U Addendum
® Professional Services
❑ Resolution
❑ Bid Opening
❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
❑ Quote Award
❑ Change Order No.
❑ CIO & PCA No. ❑ PCA
❑ Ease/Encroach.
❑ Traffic Control:
® Other: Amendment No. 2
.'. ��AIV EiMA/'I IMFA MNI A+CAM ..
Company or Vendor Name
McCormick Engineering, LLC
❑ Yes ® No ❑ If Yes, Approved by
New Vendor
MBEMBE Contractor
_Purchasing
❑ MBE ❑ WBE
MBE/WBE Contractor Requested
❑ No ❑ Yes Name of Company
Project Name
Bowen Street Drainage Improvements
Project Number
116-082
Funding Source
Southside Development Area TIF
Account No.
430.1050.460.42-01
Amount
$193,783.00 (Previously $119,253.00, Increase of $74,530.00)
Terms of Contract
Not to exceed
Purpose/Description
Design of a permanent maintenance road off of Miami Road,
reconfigure existing access drive for maintenance of the water
quality structure, prepare contract documents for the dredging of
the sediment from the basin and prepare contract documents for
the remote control of lowering the water level and also
monitoring the of the basin water level.
❑ Required Contractor's Certification Forms Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
Re aired For Chan e Orders Onl
Amount of ❑ Increase
$
❑ Decrease
$
Previous Amount $
Current Percent of Change:
%
New Amount $
Total Percent of Change:
%
Dispersal After Approval
Copy Original
❑ 0
---