Loading...
HomeMy WebLinkAboutAmendment No 2 to PSA - McCormick Engineering LLC - Bowen Street Drainage1316 COUNTY-Cn-y BDi LDING 227 W. RETFERSON BOULEVARD Soo BEND. INDIANA 46601-1830 Tracy McCormick McCormick Engineering, LLC 234 N. Ironwood Drive South Bend, IN 46615 RE: Amendment No. 2 to Professional Services Agreement Dear Ms. McCormick: PHONt" 574/235-9251 FAX 574/ 235-9171 The Board of Public Works, at its meeting held on July 10, 2018, approved the above referenced amendment regarding additional services for the Bowen Street Drainage Improvements project in the amount of $74,530, for a new total not to exceed $193,783, Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, `Linda M. Martin, Clerk Enclosure GARY A, Gii,m, SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMEs A. MUELLER T[ IERESE J. DORAU AMENDMENT'No. 2 Dated as of,RL\�A 1 V 2018 to AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES by and between Board of Public Works, City of South Bend, Indiana ("Owner") and McCormick Engineering, LLC ("Engineer") For Bowen Street Drainage Improvements ("Project") This Amendment amends, modifies and supplements the Agreement between Owner and Engineer for Professional Services (the "Agreement"). The Agreement, whether or not it is attached to this Amendment, is hereby incorporated into this Amendment by this reference and is made part hereof as if it were fully set forth herein. The amendments, modifications and supplements to the Agreement contained in this Amendment are set forth by reference Section number contained in the Agreement. Unless a part of the Agreement is amended, modified or supplemented by this Amendment, the Agreement shall remain in full force and effect. Engineer's Additional Services under this Agreement: • Layout and integration of an additional permanent maintenance road into the Facility from the Miami Street Right -of -Way. • Geotechnical engineering services needed to incorporate the newly proposed permanent maintenance road into the design of the facility • Reconfiguration of access drive for maintenance of existing water quality structures • Preparation of revised design Plans and Contract Documents to remove accumulated sediment from the basin known as the "Miami Basin" as well as provide additional surface stabilization measures • Coordination and preparation of Contract Documents to provide improvements to an existing automated valve that will result in: o Elevation of the actuator motor above the existing ground surface o A new actuator motor with improved manual flywheel orientation o Reestablishment of electrical connections to actuator motor o Remote sensing of levels and/or flows from the Miami Basin o Ability to open and close the valve by means of the actuator motor from remote facilities by the City 1.01 Basic Agreement and Period of Service B. Engineer shall complete its services within a reasonable time, or within the following specific time period: The Engineer shall make every effort to complete the portion of the Work needed to solicit Contractor bids within three months from the Effective Date of Amendment 2. 7.01 Basis of Payment l of 2 A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows: 2. In accordance with, the time and material provisions of Paragraph 7.02. Total project payments shall not exceed an amount of $193,783.00, an Increase from total budget established in Amendment 1 of $74,530.100 for the Scope of Services outlined above without prior written consent and authorization of the Owner. IN WITNESS W1 IEREOF, the parties hereto have exCCLIted this Amendment 2 to the original Agreement, the Effective Date of which is indicated on page I . Owner: City of South Bend, Indiana Engineer: McCormick Engineering, LLC Board of Public Works By: By: Title: Gary A. Gilot, President Title: Tracy A. Mceormick, Managing Partner By: Title: suzanna-M. f rit`zbeYg,Wmber Title: By: James A. Mueller, Member ZAn Title: Elizabeth A. Maraclik, Member By: Title: Therese J. D6&, , Iviember Attest: Title: Lin da Martin, Clerk Date: Date: June 19, 2018 Engineer License or Firm's Certificate 19800331 No. State of: Indiana 2 of 2 Client: City of South Bend Board of Public Works Bowen Street Drainage Improvements - Amendment 2 - Manhour Justification Revision Date: 6/19/2018 RevWons Per;Addendum No 2 Additional Additional Task Hours Rate Amount Geotechnical Services for Phase 3 ------------------ •------------------------------------------------------------------------------------------------------------------------------ Geotechnical review and recommendations for permanent haul road improvem -- --- N/A ------ ----------- -------- ---------- $ -_7_OD0.00 --------------------- •---------------------------------------------------------------------------------------- Subtotal Survey and Geotechnical Services $ 7,000.00 Phase 3 - Ireland Road Drainage Improvements ------------------------------------------------------------------------ --------------------------------- -------------------------- -- ------- --- Contract Document Preparation ___-__---------___-_____ _ .----------- ---------------- ._------- --- - ------- ------- -------- ----- -.._...--- ----------- --------- --- ---- ----. Permanent Access Road Design Layout & Design - - --------------------- - -- -- W-- SO- $-135.00-T ----- $ -6,750.00 - - ---------------------- ------------------------------------------- Drive Design Layout & Design 20 $ 135.00 $ 2,700.00 -Maintneance - -------------------------------------------------------------------------------------------- Haul Road Plan Preparation 80 $ 135,00 $ 10,800.00 Technical Specification Preparation -- ----------------- - -- ---------------- 24- - $----- 135.00 $--___3_240.D0- --------------------------------------- ----- - ------------ Additional gwner Coordination 16 $ 135.D0 $ 2,160.00 ------ - Subotal - Engineering Services for Phase 3 $ 25,650.00 Subtotal Engineering and Geotechnical Services Phase 3 $ 32,650.00 Survey and Geotechnical Services for Phase 4 ---------------------------------- ------- ------------------------------------- ----------------------------------------------------------------..-- Topographic Survey by Abonmarche------------ ------------------------------ W- -N/A- ------------------------------------------- $ 3,000.00 Subtotal Survey Services $ 3,000.00 Phase 4 - Miami Basin Automated Valve Improvements 5coping of City Desired ImprovementsTTTT^^ - -------------------------------------------------- _-_-T10 $-135.00 -------------------- $ 1,350.00 - - - Survey Coordination 20 $ 135,00 ------- - ---------OQ $ 2,700.00 ---------- ---------------------------------------------------------------------------------------------------------------- ---- -i--- Utility Coordination 12 1-3- $5. $ 1,620.00 Coordination with Manufacturer •------------------- -------------------------------- ---------------------------------------------------------------......_----------------------------- Panel and/or Electrical Improvements --------- ------- - - - - 24 $135.00-_ - ______ $ T 3,240.00 ---- ---------------------------------------------------------------------------- Valve Actuator Improvements ------------------------ - -- ---------------------------- 16 $ 135.00 - ---------------------- $ 2,160.00 ------------ --------- --- ---------------------------- ---- Remote Sensor improvements______ _ ___________ --------------------------------- ____---- 16 $------135.00 -------------------- $ 2,160.00 --- Structure Elevation Impprovements to Elevate Actuator 24-$_-_-_-135.00TTT$ 3,,240_00 .__-.....------------------e---------_.....------_------------------____-_-_..------------------- - Coordination of valve sensor communication with ex City facilities - ------ _ 4O- $- _- 135.D0 $ _ - _ 5,40Q.00- Contract Document Preparation Preparation----------- --------- -----------------__ 50. $_-__ 135A0 $ 6------D ---Plan --------- Performance Based Technical Specification Preparation . _-____--------------__-__ _ ._-- 24 ------ $______135_00 $- 3,240.00- -------- ------- ------- ---------- -...---------------------------- Preparation of Bid Documents 8 $ 135.00 - - ---------- $ 1,080.00 ------------ -------------------------------------------------------........,_-----------------------------_...__-_-_-__------------___-_ Preparation of Cost Estimates 8 $ 135.00 $ 1,080,00 ---------------- --------------------------------------------------------.._..--------------------------------------------------- Owner Coordination 24 $ 1 35 .00 $ 3,240.00 Construction Administration Support - Shap Drawing Review 8--$ -----135_00-- $-^ 1,080.00 Construction Administration Support - Progress Meetings 4 $ 135.00 $ 540.00 Subotal - Engineering Services for Phase 4 $ 39,880.00 Subtotal Survey, Engineering and Geotechnical Services Phase 4 $ 41,880.00 Date Name BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM 6/29/18 Roger Nawrot Department Division/Bureau Public Works Engineering BPW Date 7/10/18 Phone Extension 5932 Re aired .Prior to Submittal to Board Legal ❑ Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ U Agreement LJ Contract LJ Proposal U Addendum ® Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ CIO & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: ® Other: Amendment No. 2 .'. ��AIV EiMA/'I IMFA MNI A+CAM .. Company or Vendor Name McCormick Engineering, LLC ❑ Yes ® No ❑ If Yes, Approved by New Vendor MBEMBE Contractor _Purchasing ❑ MBE ❑ WBE MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name Bowen Street Drainage Improvements Project Number 116-082 Funding Source Southside Development Area TIF Account No. 430.1050.460.42-01 Amount $193,783.00 (Previously $119,253.00, Increase of $74,530.00) Terms of Contract Not to exceed Purpose/Description Design of a permanent maintenance road off of Miami Road, reconfigure existing access drive for maintenance of the water quality structure, prepare contract documents for the dredging of the sediment from the basin and prepare contract documents for the remote control of lowering the water level and also monitoring the of the basin water level. ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Re aired For Chan e Orders Onl Amount of ❑ Increase $ ❑ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original ❑ 0 ---