Loading...
HomeMy WebLinkAbout6. F (5) Revised proposal for Mayflower Road realignmmenti . F Cs~ ~ ~ .9'.:., yo ~ H B~~O d v ~// 2 Community & Economic Development ~~ ~Y~.,;, IB65 1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 To: Redevelopment Commission From: Bill Schalliol, Economic Development Planner Subject: Revised proposal for planning and design services related to Mayflower Road realignment Date: February 17, 2011 Attached to this memo is a Revised Proposal for Planning Services, Survey Services and engineering Services to prepare a Variance Petition, and Construction Plans for the proposed Hutsfield Drive, Design/Engineering work for parking/delivery area as part of Mayflower Road realignment project. The original proposal was approved on March 1, 2010, to hire Dancher, Harner and Associates, Inc., to prepare design and construction plans for the realignment and construction of new roadways related to the Hutsfield Square subdivision project at the northeast corner of Mayflower and Cleveland Road. The roadway construction plans are complete and this revised proposal will allow for completion of some additional items that have been required as this design process has progressed. The revised scope of work has a total contract amount of $33,600 for a full scope of work detailed in the attached proposal. It is anticipated that with the completion of these work items, and after the final plat approval for the subdivision on April 7th, the city would be able to proceed with development of the infrastructure related to this mixed use development site. As a companion project to this work, the Mayflower Trunk Sewer project will also be paired with this project to allow for coordinated construction development for the two projects. Staff requests approval of the revised proposal to complete predevelopment work associated with this project. What We Do Today Makes A Difference! Danch, Harner & Associates, Inc. Effective Date: January 12, 2007 SCHEDULE OF HOURLY RATES AND DIRECT EXPENSES CLASSIFICATION HOURLY BILLING RATE Senior Professional Engineer $138.00 $80.00 En ~neering Designer - $70~~ _ Pro~ect En Weer $138 00 Senior Professional Land Sun~eyor . ____, _ Senior Survey/En ineering Tech $80.00 Sun~ey/En - Bering Tech $55.00 Senior Professional Landscape Architect _ $138.00 Two Person Pield Crew _ _ $120.00 $70.00 Survey Manager 5138.00 Principal $45.00 Clerical ITEM UNITS UNIT PRICE Mileage Miles $0.50 Co ies* Each $0.2~ Standard Size Prints {24 x 36) Each 54.00 Oversize Prints Scare Foot $ I.00 Vellums (24 x 3G size) Each $10.00 Overni ~t Travel: Meals ~~ Cost L.od in _ Cod Public Tran nation *Note: Copies include 81/2 x 11, S1/2 x 14, or 11 x 17 size sheers. Other direct expenses may include cost to obtain copies of documents such as deeds or plats, maps, or other items purchased as a direct result of employment on the project. NOTE THAT MILEAGE IS NOT CHARGED FOR PROJECTS WITHIN ST. JOSEPII COUNTY, INDIANA OR BERRIEN COUNTY, MICHIGAN. vFi~ Uanch, f-/arner~ ~Z Associates, Inc. Land Surveyors ~ Professional Engineers Landscape Architects ~ Land Planners Office: (574)234-4003 / (800)594-4003 ~ Fax: (574)234~F009 1643 Commerce Drive ^ South Bend, IN 46628 March 1, 2010 Revised March 10, 2010 Mr. Bill Schalliol Planner Community and Economic Development Department Cit~ of South Bend 12t Floor County-City Building 227 West Jefferson Blvd. South Bend, Indiana 46601 RE: Proposal for Planning Services, Survey Services and Engineering Services to prepare Street Vacation Documents and Construction Plans for the Realignment of Mayflower Road from Cleveland Raad to Brick Road and Signalization Plans for the Mayflower Road-Cleveland Road Intersection, South Bend, Indiana. Dear Mr. Schalliol: Danch, Harner & Associates, Inc. (DHA} is pleased to submit this proposal for professional Planning, Surveying and Engineering services to provide road and storm drainage construction plans for the realignment of Mayflower Road from Cleveland to Brick Roads. Services would also include providing a Traff c Impact Analysis Study for the proposed signalization of the Mayflower Road and Cleveland Road intersection and preparation of a Signalization Plan for said intersection by a Traffic Engineer. Planning services would include preparing Street Vacation documents and representation at public hearings for the vacation of a portion of the southern end of the existing Mayflower Road right-of--way between Brick Road and Cleveland Road. Our design team will include Traffic Engineering Consultants, PC of South Bend, Ken Herceg & Associates, Inc. of South Bend and Alt & Witzig of South Bend. We anticipate the following scope of services will be provided by DHA and our consultants: SCOPE OF SERVICES: We would furnish construction plans for road and storm drainage improvements within the road right-of--way and drainage easements provided to the City by the landowners in the development area. A storm water pollution preven#ion plan will also be prepared. All of the requested services must meet applicable standards of the City of South Bend and the State of Indiana. We have listed some optional items at the end of this proposal as extra services that we can provide in the event they are needed. Our understanding is that the City would supply us with current digital drawings and survey information from Abonmarche Inc. for the pending sewer improvements along the existing Mayflower Road alignment, so that we can coordinate our work with those plans and the existing business access points. Our surveying services will include picking up all topography necessary for the proposed Mayflower Road re-alignment, for drainage improvements and for intersection tie-ins to Cleveland Road and Brick Road. We would establish temporary benchmarks for the project and tie into Abonmarches' work with a precision bench loop. Planning Services: 1). Preparation of a Street Vacation Petition for a portion of the southern end of the dedicated right-of--way of Mayflower Road as required. This will allow for the re- direction of existing traffic to access the proposed re-aligned Mayflower Road. Services includes preparation of a Street Vacation Diagram (working with Tony Molnar), all required Application forms, representation at all required Public Hearings, and meeting with affected property owners & City to discuss project and review proposed access for affected property owners to re-aligned Mayflower Road. Cost of Planning Services including fees .............................................. $ 3,250 Surveying Services: In order to proceed, we would need to conduct a topographic survey of the site and verify the provided survey information for layout and elevations. Therefore, we must include the following minimum Surveying services: Survey Control: a. Locate initial horizontal and vertical control points on the project site and determine actual GPS location and elevation by OPUS solution. b. Tie into existing control points, irons, and right-of--way markers to coordinate the surveys and provided drawings. c. Tie into existing benchmarks using a precise leveling loop to ensure accuracy. d. Establish Project Benchmarks on or near the site to facilitate construction. 2. Topography: a. Conduct a topographic survey over the route of the proposed road realignment and in the areas of proposed drainage improvements, and connect to vertical and horizontal controls by Abonmarche in the existing road right-of--way. b. Verify the tie in locations and elevations of existing pavements in Cleveland Road and Brick Road. c. Verify the Location and Elevation of all existing Manhole and Inlet Rims and other structures within the proposed right-of--way and proposed intersection improvements. d. Provide additional topographic survey services to be used for the preparation of the signalization engineering plans for the intersection of Mayflower Road and Cleveland Road. 3. We would orient provided cad drawings to our established local coordinate system, perfann a drawing translation, and incorporate them into our cad database for the project. Total Cost of Surveying Services as Listed above ................................. $ 19,775 Note: If for some reason the provided topographic information cannot be verified or is not sufficient for our design work, we would request additional survey work be completed, prior to commencing the Engineering Design work. That work is not included in this contract, and would be charged on a time and materials basis. Engineering Services: We will provide the following engineering plans and services based upon our project meeting. 1. Prepare roadway engineering, Layout, plan & profile drawings: Includes: Cover Sheet, Existing Site Conditions, Overall Site Layout and Alignment Plan, Typical. Road Cross-Sections, Road Plan & Profile Sheets, Intersection Grading Details, Sanitary Sewer and Water Main Plan & Profile Sheets with laterals, Storm Sewer Plan & Profile Sheets and Mass Grading Plan with Cut & Fill Cross-Sections. Existing utilities will be shown according to our field survey work and survey information from supplied Abonmarche drawings. 2. Bio-Retention Swale plans. 3. Storm Surge (100-yr) Retention Basin. 4. Outlet Control Structure{s) and controlled outflow pipe to Cleveland Road as required. 5. SWPPP/SESC Plan & Details. 6. Standard Construciion Details. 7. Standard Specifications. 8. Roadway Lighting Plan 9. Engineer's Estimate of Probable Cost. Traffic Engineering Services for Si~aalization of the Re-alined Mavflower Road and Cleveland Road intersection and preparation of Traffic Impact Analysis Report for intersection design: We will provide the following traffic engineering plans and services based upon our project meeting for the Re-aligned Mayflower Road Cleveland Road intersection. 1. Prepare roadway engineering, layout, plan & profile drawings: Includes: Cover Sheet, Existing Site Conditions, Overall Site Layout and Alignment Plan, Typical Road Cross-section, Road Pian & Profile Sheets, Intersection Grading Details, Drainage/Storm Design Plan. 2. Bio-Retention Swale plans, as required or needed. 3. Standard Construction Details. 4. Standard Specifications. 5. Engineer's Estimate of Probable Cost. 6. Preparation of standard Traffic Impact Analysis report for forecasting vehicle usage of signalized intersection. 7. Traffic Signalization Plan. {Traffic Signal Design & Typical Section Design) 8. Roadway Lighting Plan, Pavement markings and Signage. 9. Demolition Plan for proposed portion of Vacated Mayflower Road. 10. Develop Construction Demolition Plans and Specifications for existing Mayflower Road and Cleveland Road intersection. 11. Prepare quantities and estimate. Engineering plans for the signalized intersection will be based on an "isolated intersection" and not an interconnected system with other intersections. Our understanding is that we would provide astorm-water management plan that will have adequate drainage and retention to serve the right-of--way development, and to include provision of connection and increased retention storage for the eventual development of ail of the 44 or so acres of adjacent property. Soil Borings Services: We will contract with a local geotechnical firm to provide soil borings and furnish a geotechnical report showing the existing soil types and bearing capacities, determination of high-water table in proposed storage areas, hydraulic conductivity and percolation rate, suitability for type 'B' backfill, and providing estimated support values and pavement recommendations for the road. We would: 1. Review the geotechnical report. 2. Coordinate our design based upon that information. 3. Include pertinent information from the report in the site plans. Total Cost for Engineering services as listed above ................................ $ 89,500 Construction Engineering/Inspection would be done on our standard hourly rates as needed. M__ayflower Streetscane: Preliminary Plans: This will include the submission of conceptual design options to the City staff. The conceptual drawings will address various components of the design including an integrated pedestrian path, landscape plans & material usage, bio-retention plant materials, amenity types and styles along with their proposed locations, street light locations using the City standard fixture, and probable construction cost estimates. The conceptual plans will be submitted to the City for review and comment. We anticipate two additional meetings with the City staff to finalize the conceptual design before moving to final design. Construction Documents: After review and approval from City staff, Danch Hamer will provide bid ready, final construction draw7ngs that will include landscape plans, bio-retention planting plans, details, specifications, and final construction cost estimates. Cost for Streetscape services listed above ........................................... $12,244 Special Conditions of this Contract: Copyright protection: Since we will be using drawings provided by others, we will assume that you will secure the permission(s) of those parties for our use of their drawings, and that you will indemnify us any claims, present or future, for our possession and use of the drawings in the production of our derivative works. Exclusions: The following services may not be required for this project. Therefore, they are not included in the scope of this contract. Upon request we can provide these services on a time and materials basis: • Extended Watershed Analysis (North of Brick Road.) • IDEM SWPPP approval. • CDR Foundation Construction Design Release • Bid documents other than sealed Construction Plans and City Standards that we normally include in our plan sets. We anticipate that, given our current workload, we can prepare the construction plans with sufficient detail for preliminary review within 12 weeks of receiving your approval. The final construction plans would be completed within two-to-three weeks after the geotechnical report, and City comments have been received. The Estimated Total Cost of this contract is $ 124,725 as detailed above. We propose that our Construction Staking Services, if requested, be billed on the basis of actual hours worked multiplied by our Schedule of Normal Hourly Rates and Direct Expenses (enclosed.) Additional services outside the scope of services will be billed on the basis of actual hours worked multiplied by our schedule of normal hourly rates and direct expenses. Terms Special Conditions as Listed on page four (4) of this contract apply. If revisions to the above plans detaiied above were requested by the owner or by review agencies, those revisions would be made at our standard hourly rates. Thank you for using DHA for this important project. If you have any questions, please call us at (574) 234-4003. If you find the proposal acceptable, please execute this document in the spaces provided below, and return it to us. Sincerely, Danch, Harper & Ass nc. Michael J. Danch - Presid Board of Public Works: Approved By & Date Memb r V . C~-_ M tuber Member 1316 COUNTY-CITY BUILDING 227 W. ]EFFERSON BOULCVARD SouTI{ BEND, INDIANA 46601-1830 CITY OF SOUTH BEND STEPHEN J. LtJECKE, MAYOR BOARD OF PUBLIC WORKS May 24, 2014 Mr. Michael Danch Danch, Harney & Associates 1643 Commerce Drive South Bend, Indiana 46628 PHONe574/235-9251 Fax 5741235-9171 TDD 574/ 235-5567 RE: Professional Services Proposal -Mayflower Realignment and Improvement Project Project No. 110-036 Dear Mr. Danch: The Board of Public Works, at its meeting held on May 24, 2010, approved the above referenced Professional Services Proposal in the amount of $124,725.00. Enclosed is a copy of the Proposal for your records. If you have any questions, please contact lne at (574) 235-9251. Sincerely, . \~ Linda M. Martin, Clerk Enclosure Bill Schalliol, CED Rob Nichols, Engineering GARY A. GILUT, P.E. DONALD E. INKS CARL P. LITTRELL PRESIDENT MEMBER MEMBER BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date May 18, 2010 Department BPW Date May 24, 2010 Phone C&ED 235-5842 Name Bill Schalliol Legal ® Attorney Name Lawrence Meteiver Controller review is required for all Contracts $5,000.00 or more Controller ^ and greater than one year in length per the City Purchasing Policy Other Appropriate Reviewers ^ .;~.k.#~~ ~ ~~°;~}'~ .~ Check the Aopropriate Item Tvpe -Required for All Submissions A reement Contract ~ Proposal Addendum Claim ^ Bid Opening Bid Award Req. to Advertise Title Sheet Quote Openin Quote Award Chg Order No. ^ C/O ~ PCA No. PCA Ease./Encroach. Traffic Control ^ Resolution Other: ' '~`~ ~r~ '~~~~.~~~ ;. Reauired:lnformation :,~' ~ "~' ~.~~3i~~~. k+ 4. '-a Com any or Vendor Name Danch, Harner & Associates Project Name Mayflower Reali nment and Improvement Project Project Number (En . Fundin Source AEDA Account No. 324-1050-460-31.02 Amount $ 924,725.00 Terms of Contract Purpose/Description Professional services contract for Danch Harner & Associates to design roadway and infrastructure improvements ' ~ '~sui 9 . ' : ~ K eK 1 "~~ 'SY Y ~~'~.. H~`°'~" Y .. ~J ~x'" 'S~.t~ 'i'krx`~u'aC` ,r{~~,~~~..~.. Dispersal After Approval ~~~~~~~.~~-~~,~~~n~~~~,, r~~~,~~~; Copy Original ^ ® Mike Danch, DHA ® ^ Bill Schalliol, C&ED-ED