BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name 2018 Curb and Sidewalk Construction
<br />Project No, 118-007
<br />For Bids Due June 26th, 2018 at 9:30 am Local Time
<br />DIVISION' Al
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />I
<br />CONCRETE SIDEWALK, REMOVE
<br />807
<br />SY
<br />2
<br />CONCRETE SIDEWALK, 4-IN
<br />818
<br />Sy
<br />3>r,,2
<br />3
<br />CONCRETE CURB, REMOVE
<br />1017
<br />LF
<br />, -7 3 e,
<br />4
<br />CONCRETE CURB, MODIFIED
<br />1017
<br />LF
<br />5
<br />CONCRETE APPROACH, REMOVE
<br />102
<br />Sy
<br />2
<br />6
<br />PCCP FOR APPROACHES, 6-IN
<br />79
<br />SY
<br />1341
<br />to"
<br />7
<br />TOPSOIL AND SEEDING
<br />783
<br />SY
<br />/5-
<br />It 02 V5-
<br />10
<br />TREE, REMOVE, 18 IN
<br />4
<br />EA
<br />11
<br />TREE, REMOVE, 30 IN
<br />3
<br />EA
<br />12
<br />TREE, REMOVE, 48 IN
<br />1
<br />EA
<br />14
<br />PLANT, DECIDUOUS TREE, SINGLE
<br />STEM, 2-IN TO 2,5 IN
<br />8
<br />EA
<br />:46
<br />15
<br />CURB RAMP, REMOVE
<br />39
<br />SY
<br />16
<br />RAMP ONE-WAY PERPENDICULAR CURB
<br />26,
<br />SY
<br />ell le
<br />18
<br />PAIRED PERPENDICULAR CURB RAMP
<br />23
<br />Sy
<br />19
<br />REMOVAL, MULBERRY BRUSH, 60-1INCH
<br />1
<br />EA
<br />DIVISION -Al TOTAL#
<br />DIVISION A2
<br />Item
<br />No.
<br />1
<br />Description
<br />CONCRETE SIDEWALK, REMOVE
<br />Quantity
<br />150
<br />Unit
<br />Sy
<br />Unit Price
<br />Total Amount
<br />2
<br />CONCRETE SIDEWALK, 4-IN
<br />150
<br />SY
<br />3
<br />CONCRETE CURB, REMOVE
<br />158
<br />LF
<br />4
<br />CONCRETE CURB, MODIFIED
<br />158
<br />LF
<br />Ci -
<br />5
<br />CONCRETE APPROACH, REMOVE
<br />34
<br />SY
<br />6
<br />PCCP FOR APPROACHES, 6-IN
<br />34
<br />SY
<br />7
<br />TOPSOIL AND SEEDING
<br />76
<br />SY
<br />eve" e�a,
<br />3'el -,e
<br />9
<br />TREE, REMOVE, 10 INI
<br />I
<br />EA
<br />10
<br />TREE, REMOVE, 18 IN
<br />2
<br />EA
<br />ex,
<br />11
<br />13
<br />TREE,. REMOVE, 30 IN
<br />STUMP, REMOVE
<br />1
<br />3
<br />EA
<br />EA;„
<br />1�-
<br />4
<br />14
<br />PLANT, DECIDUOUS TREE, SINGLE
<br />STEM, 2-IN TO 2.5 IN
<br />4
<br />EA
<br />200
<br />15
<br />CURB RAMP, REMOVE
<br />11
<br />Sy
<br />18
<br />PAIRED PERPENDICULAR CURB RAMP
<br />11
<br />SY
<br />2 35" e22
<br />00
<br />DIVISION A2 TOTAL, 4
<br />Bidder (Firm): A. 5'o
<br />1 0 1 011 4 /, 0 /c.
<br />Version 10/17/2017 Contractor's Bid for Public Works - 7
<br />AIDDENDUUI #1
<br />
|