Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name 2018 Curb and Sidewalk Construction <br />Project No, 118-007 <br />For Bids Due June 26th, 2018 at 9:30 am Local Time <br />DIVISION' Al <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />I <br />CONCRETE SIDEWALK, REMOVE <br />807 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />818 <br />Sy <br />3>r,,2 <br />3 <br />CONCRETE CURB, REMOVE <br />1017 <br />LF <br />, -7 3 e, <br />4 <br />CONCRETE CURB, MODIFIED <br />1017 <br />LF <br />5 <br />CONCRETE APPROACH, REMOVE <br />102 <br />Sy <br />2 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />79 <br />SY <br />1341 <br />to" <br />7 <br />TOPSOIL AND SEEDING <br />783 <br />SY <br />/5- <br />It 0­2 V5- <br />10 <br />TREE, REMOVE, 18 IN <br />4 <br />EA <br />11 <br />TREE, REMOVE, 30 IN <br />3 <br />EA <br />12 <br />TREE, REMOVE, 48 IN <br />1 <br />EA <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2,5 IN <br />8 <br />EA <br />:46 <br />15 <br />CURB RAMP, REMOVE <br />39 <br />SY <br />16 <br />RAMP ONE-WAY PERPENDICULAR CURB <br />26, <br />SY <br />ell le <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />23 <br />Sy <br />19 <br />REMOVAL, MULBERRY BRUSH, 60-1INCH <br />1 <br />EA <br />DIVISION -Al TOTAL# <br />DIVISION A2 <br />Item <br />No. <br />1 <br />Description <br />CONCRETE SIDEWALK, REMOVE <br />Quantity <br />150 <br />Unit <br />Sy <br />Unit Price <br />Total Amount <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />150 <br />SY <br />3 <br />CONCRETE CURB, REMOVE <br />158 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />158 <br />LF <br />Ci - <br />5 <br />CONCRETE APPROACH, REMOVE <br />34 <br />SY <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />34 <br />SY <br />7 <br />TOPSOIL AND SEEDING <br />76 <br />SY <br />eve" e�a, <br />3'el -,e <br />9 <br />TREE, REMOVE, 10 INI <br />I <br />EA <br />10 <br />TREE, REMOVE, 18 IN <br />2 <br />EA <br />ex, <br />11 <br />13 <br />TREE,. REMOVE, 30 IN <br />STUMP, REMOVE <br />1 <br />3 <br />EA <br />EA;„ <br />1�- <br />4 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />4 <br />EA <br />200 <br />15 <br />CURB RAMP, REMOVE <br />11 <br />Sy <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />11 <br />SY <br />2 35" e22 <br />00 <br />DIVISION A2 TOTAL, 4 <br />Bidder (Firm): A. 5'o <br />1 0 1 011 4 /, 0 /c. <br />Version 10/17/2017 Contractor's Bid for Public Works - 7 <br />AIDDENDUUI #1 <br />