HomeMy WebLinkAboutAward Quotation - 2018 Preventative Maintenance & Repairs of HVAC Equip and Controls - Ideal Consolidated Inc1316 COUNTY-Crry BUILDING
227 W. JEFFERSON BouLEVARD
Sou'rut BEND, INDIANA 46601-18 30
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
June 26, 2018
Tim Stuver
Ideal Consolidated, Inc.
806 W Sample Street
South Bend, IN 46601
PHONE 574/235-925
FAX 574/ 235-9171
RE: Quotation Award — 2018 Preventative Maintenance and Repairs of HVAC
Equipment and Controls
Dear Mr. Stuver:
The Board of Public Works at its meeting held on June 26, 2018, awarded the above
referenced quotation to you in the amount of $65,821 for three (3) years (alternate bid).
A representative from the Utilities Department will be in contact with you regarding the
award.
If you have any further questions regarding this matter, please call this office at (574)
235-9251.
Sincerely,
Linda M. Martin, Clerk
1101 _. O _ L1llS._i
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Members of the Board of Public Works
Eric Horvath, Director of Public Works
Clara McDaniels, Board of Public Works Attorney
FROM: AI Greek, Director of Utilities
Jacob M. Klosinski, Assistant City Engineer
SUBJECT: Agenda Request Form — Quotation Award
South Bend Utilities — 2018 Preventative Maintenance & Repairs of HVAC
Equipment and Controls (3-Year Contract)
DATE: June 18, 2018
On June 12, 2018, the Board of Public Works opened and read quotations for the above
project. The Division of Utilities reviewed four (4) quotation packages for completeness and the
quotes were determined to be responsive. The four (4) contractors quotes presented pricing as
follows:
The Base Quotes (1 -Year Contract) ranked as follows based on price:
Contractor
Base Bid Prices 1-Year Contract
Wastewater
Subtotal 1 -Year
Water
Subtotal 1-Year
Total
1. Ideal Consolidated, Inc.
$13,125.00
$7,150.00
$20,275.00
2. Johnson Controls, Inc.
$18,456.00
$14,061.00
$32,517.00
3. Herrman & Goetz, Inc.
$23,060.00
$19,485.00
$42,545.00
4. Dynamic Mechanical Services
$27,442.00
$22,600.00
$50,042.00
The Alternate Quotes (3-Year Contract) ranked as follows based on price:
Contractor
Alternate Bid Prices 3-Year Contract
Wastewater
Subtotal 3-Year
Water
Subtotal 3-Year
Total 3-Year
1. Ideal Consolidated, Inc.
$42,609.00
$23,212.00
$65,821.00
2. Johnson Controls, Inc.
$55,368.00
$42,183.00
$97,551.00
3. Herrman & Goetz, Inc.
$72,696.00
$61,426.00
$134,122.00
3. Dynamic Mechanical Services
$85,326.00
$70,800.00
$156,126.00
The Division of Utilities recommends the award of the contract for South Bend
Utilities 2018 Preventative Maintenance & Repaiirs_HVAC Equipment Controls to the
lowest, responsive, responsible bidder, Ideal Consolidated Inc. JSouth Bend Indiana at
the Alternate Quote (3-Year) total price of $65,821.00 lump sum not to exceed price for this
service contract to be effective July 1, 2018 through June 30, 2021.
Quotation Award Memorandum: South Bend Utilities — 2018 Preventative Maintenance &
Repairs of HVAC Equipment and Controls (cont.)
The Division of Utilities will appropriate sufficient funds from Division of Utilities, Other
Contractual Services Account (641-0630-793-63-35) and Building Maintenance 641-0630-793-
36-01 and other Utilities as appropriate for Wastewater and Waterworks accounts. Please note
that this is a multi -year contract and funding for 2018, 2019, 2020, and 2021 budgets as
necessary to accommodate the subject service agreement.
If there are questions regarding the subject project, please contact Al Greek (Ext. 4210) or
Jacob M. Klosinski (Ext. 9496) at the Division of Utilities.
Z ie
QUOTEWROPOSAL
CITY OF SOUTH BEND
Preventative Maintenance & Repair of HVAC Equipment & Controls
QUOTE NAME South Bend Utilities 2018
FOR QUOTES DUE June 12, 20,18
BASE QuoTE: Preventative Maintenance & Repair (1 -Year Term)
Preventative Maintenance & Repair of HVAC Equipment and Controls
Item
Description
Qty
Unit
Unit Price
Total Price
1
Wastewater
I
LUMP Sum/Year
$
$ 13,125.00
2
Waterworks
A
1
Lump Sum/Year
$
$ 7150.00
TOTAL FOR BASE QUOTE
$20,275.00
ALTERNATE QUOTE: Preventative Maintenance & Repair (3-Year Term)
Preventative Maintenance & Repair of HVAC Equipment and Controls
Item
Description
City
Unit
Unit Price
Total Price
I
Wastewater
3
Lump Sum/Year
$
$ 42,609.00
2
Waterworks
3
Lump Sum/Year
$
23,212.00
..J
TOTAL FOR ALTERNATE QUOTE
$ 65,821.00
Selection shall be based on the lowest, responsive, responsible bidlder. The City of South Bend
will also consider the cost -benefit of the Base Quote (one-year) pricing, Alternate Quote (three-
year) pricing, as well as the Contractor's attached rate schedule and questionnaire responses.
Quoter (Firm):
F-IT4 ni =_
Cky/State/Zip:
Telephone Number:
Ideal Consolidated, Inc.
806 West Sample Street
South Bend, IN 46601
7A
574-282-1228 Fax Number: 5,zl-282-1128
By
............................. �Sjgnature) (Signiture)
Tim� z,� , ".,
�m Stuiver
(Printed Name)
Vice President
(Title)
Version 8 — 02/25/14
BOARD OF PUBLIC WORKS
Gary A. Gilot, President ��
Suzanna M. Fritzberg, Member
Jam, s A. Mueller, Member
Elizabeth M. Maradik, Member
Therese J, Dorau, Member
ATTEST: Linda M. Martin, Clerk
Version 8 -- 02/25/14
Date
Name
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
June 18. 2018
Jacob M. Klosinski
Department Utilities Wastewater
BPW Date June 26, 2018 Phone Extension (574) 235-9496
Require
.... .. d Prior to Submittal to $oard
Legal ® Attorney Name Clara McDaniels
Controller ® Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing
® *AI Greek, Director of Utilities
❑ Agreement
U Contract ❑ Proposal LJ Addendum
❑ Professional Services
❑
Resolution
❑ Bid Opening
❑
Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑
Quote Opening
® Quote Award
❑
Change Order No.
❑ C/O & PCA No. ❑ PCA
❑ Ease/Encroach.
❑ Traffic Control
I] Other:
Company or Vendor Name Ideal Consolidated, Inc. (South Bend, Indiana
New Vendor ❑ Yes ❑ No ❑ If Yes, Approved by Purchasing
MBEIWBE Contractor ❑ MBE ❑ WBE
MBENVBE Contractor Requested ❑ No ❑ Yes Name of Company
South Bend Utilities - 2018 Prevantative Maintenance & Repair of
Project Name HVAC Equipment and Controls
Project Number n/a
Funding Source 2018 Utilities, Other Contractual Services & Building Maintenance
Account No. 641-0630-793-63-35 and 641-0630-793-36-01
Amount $ 65,821.00 Total for 3-Year Agreement
Terms of Contract 3-Year (refer to quote package for details)
Purpose/Description The Division of Utilities requests the Board of Public Works approval
of Utilities Preventative Maintenance & Repair of HVAC Equipment
and Control Annual Contract for a 3-year agreement. Refer to Inter -
Office Memorandum fo details.
❑ Required Contractor's Certification Form Attached (Non -
Collusion. Non -Discrimination.. Non -Debarment, E-Verifv. Iran, etc.)
Amount of ❑ Increase $
❑ Decrease $
Previous Amount $
Current Percent of Change:
New Amount $
Total Percent of Change:
Copy
Original
®
❑
Dispersal After Approval
Al Greek, Director of Utilities
Jacob M. Klosinski, Assistant City Engineer
,Director of Financial Services, Environmental Services
1316 COUNTY-Crry BUILDING
227 W. JEFFERSON BOULEVARD
Sol rii BEND, INDIANA 46601-1830
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
June 26, 2018
Kevin Con -cry
Dynamic Mechanical Services
1606 Chestnut Street
Mishawaka, IN 46545
PHONE 574/235-925
FAX 574/ 235-9171
RE: Quotation Award — 2018 Preventative Maintenance and Repairs of 1TVAC
Equipment and Controls
Dear Mr. Conery:
The Board of Public Works, at its meeting held on June 26, 2018, awarded the .above
referenced quotation to Ideal Consolidated, Inc. in the amount of $65,821 ror three (3)
years.
We thank you for bidding and hope you will bid with us again in the future.
If you have any finther questions regarding this matter, please call this office at (574)
235-9251.
Sincerely,
Linda M, Martin, Clerk
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
Soui'ii 131-.NI), INDIANA 46601-1830
June 26, 2018
Larry Gripe
Herrman & Goetz, Inc.
225 S. Lafayette Blvd.
South Bend, IN 46601
PHONE 574/235-925
FAX 574/ 235-9171
RE- Quotation Award — 2018 Preventative Maintenance and Repairs of HVAC
Equipment and Controls
Dear Mr. Cripe:
The Board of Public Works, at its meeting held on June 26, 2018, awarded the above
referenced quotation to Ideal Consolidated, Inc. in the amount of $65,821 for three (3)
years.
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574)
235-9251.
Sincerely,
)�b
Linda M. Martin, Clerk
1316 COUNTY-Crry BUILDING
PEACE
227 W. JEFFERsoN BouLEVARD
SOUTi-i BENI), IND[ ANA 46601-1830
CITY OF Soum BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC' WORKS
June 26, 2018
Brian Gilliand
Johnson Controls, Inc,
4312 N. Technology Drive
South Bend, IN 46628
PHOW 574/235-925
FAX 574/ 235-9171
RE: Quotation Award — 2018 Preventative Maintenance and Repairs of HVAC
Equipment and Controls
Dear Mr. Gilliand:
The Board of Public Works, at its meeting held on June 26, 2018, awarded the above
referenced quotation to Ideal Consolidated, Inc. in the amount of $65,821 for three (3)
years.
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574)
235-9251.
Sincerely,
Linda M. Martin, Clerk