Loading...
HomeMy WebLinkAboutAward Bid - Ameritech Drive Pavement Improvements Proj No 117-057A - Walsh & Kelly Inc1316 COUNTY -CITY BUILDING 227 W. JEHERsoN BouLEVARD SOUTH BERD, INDIANA 46601-1830 June 26, 2018 John Peisker Walsh & Kelly, Inc. 24358 SR 23 South Bend, IN 46614 PHONE 574/235-925 FAX 574/235-9171 RE: Award Bid — Ameritech Drive Pavement Improvements -- Project No. 117-057A Dear Mr. Peisker: The Board of Public Works, at its meeting held on June 26, 2018, awarded the above referenced project to you in the amount of $3 89,000 for the Base Bid only, Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal within two weeks to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Y(0- Linda M. Mai -tin, Clerk Enclosures I] LTJ 611 Eeel 2:1 ki lei 101 Mal Cal TO: Linda M. Martin, Clerk Board of Public Works '--2 FROM: Roger Nawrot, Assistant City Engineer SUBJECT: Award Project No. 117-057A Project Name: Ameritech Drive Pavement Improvements DATE: June 18, 2018 On June 12,, 2018, the Board of Public Works opened and read quotes for the above project. I have reviewed them and found them correct. The bidders ranked as follows: Bidder Base Bid Alternate A 1. Walsh & Kelly, Inc. $389,000.00 $,131,570.00 2. Rieth-Riley Const. Co.,Inc. $437,133.40 $177,112.50 I recommend award of a contract for Tucker Drive to the lowest responsive / responsible bidder, Walsh & Kelly_ for the Base Bid in the amount of $389,000,00 and reject Alternate A. Sufficient funds have been has appropriated from RWTQ 324-10,50-460.31-2 Please call with your questions. Bid Tabulation attached. BOARD OF PUBLIC WORKS CITY OF SOUTH BEND INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 26th day of June, 2018, by and between, Walsh & Kelly, Inc., 24358 SR 23, South Bend, IN 46614, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the "Board". WITNESETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard. Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a pail of this Contract, for: PROJECT NO.: 117-057A DESCRIPTION: A ERITECH DRIVE PAVEMENT IMPROVEMENTS COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $389,000; BASE BID ONLY FUNDING: RWDA TIF The total bid for this improvement were those prices as received and accepted by the Board on the June 12, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented. to the Board for final Payment with one (l) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC O S Gary A. Gilot, President Suzanna M. Fritzberg, Member Therese J. Dorau, Member Clerk. A. Maradik, Member A. Mueller, Member Linda M. 'Martin, ALSH & KELLY, INC. Printed Name Signature CERTIFICATION (To be completed if Contractor is a Corporation) 1, , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation, that said agreement was dully signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate Sea] 9 !Its] Project Name Ameritech Drive Pavement Improvements Project No. For Bids Due 117-057A June 12, 2018 PART I (Must be completed for all bids. Please type or print) Date: 6/12/18 Bidder (Firm): Walsh & Kelly, Inc. Address: 24358 SR 23 City/State/Zip: South Bend- IN 46614 Telephone Number: ( 574 ) 288-4811 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Ameritech Drive Pavement IImprovements the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Abonmarche Consultants and dated 4/30/18 for the sum of (enter the Total Bid as shown on the Proposal) Five hundred twenty thousand five hundred & seventy dollars and zero cents ($ 520,570.00 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of mate �Iqljncluded In the contract are needed, the cost of units must be the same as that shown in the origliilqtaccepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemiz1fle. ul its,,$hdl be shown on epa to attachment. yORAI"' Py (Sigri-ature) 6ofin MI. Peisker, VP of Asphalt Operations (Printed Name of Per -son Signing) ACCEPTANCE The above bid is 26 �4 6 day of Subject to the following conditions: 20 3 0 6 0 Suzanna M. Fritzberg, Member r se,J. Dorau, Member t...: Y Att6st: Linda M. Martin, CWk Version 10/1712016 Contractor's Bid for Public Works - 2 Conctractor's Bid for Public Work - City of South Bend Project No. 117-057A i ■ ! Ili ■ I, r ■ y# l a Addendum No. 1 PROJECT MANE Ameritech Drive Pavement Improvements PROJECT NUMBER 117-057A FOR BIDS CUE June 12 2018 Base Bid May 2018 Item No. Description Quantity Unit Unit Price Total Amount 1. Construction Engiineering 1 LS $ 3,700.00 $ 3,700,00 2. Mobilization/Oeimobilization 1 LS $ 18,500.010 $ 18,5010,00 3. Clearing Right of Way 1 LS $ 8,450.00 $ 8,450,00 4. Sheet Sign, Remove and Relocate 3 EACH $ 400.010 $ 1,2010,00 5. Fire Hydrant Assembly, Remove and Relocate 1 EACH $ 5,200.00 $ 5,200.00 6. Concrete Curb and Gutter, Remove 820 LFT $ 5.30 $ 4,346,00 7. Concrete Approaches, Remove 240 SYD $ 11.00 $ 2,640.00 8. Common Excavation 2,370 CYQ $ 24.00 $ 56,880,00 9. "B"° Borrow 1,490 CYD $ 30.80 $ 45,892,00 10. Milling, Asphalt, Variable Depth 4,060 SYD $ 3.00 $ 12,180,00 11. HMA for Patching (Undistributed) 340, TON j $ 58,00 $ 19,720.00 12. Compacted Aggregate for Base, No. 53 630 TON $ 40.00 $ 25,200.00 _ 13. HMA Surface, 9.5 mum, Type B 480 TON $ 82,00 $ 39,360.00 14. HMA Intermediate, 19.0 mm, Type B 170 TON $ 78.00 $ 13,260.00 15. HMA Base, 25.0 mm, Type B 670 TON $ 58.00 $ 38,860.00 16. Concrete Curb and Gutter, 6" 820 LFT $ 29,00 $ 23,780.00 17. PCCP for Approaches, 6" 60 SYD $ 72,00 $ 4,320.00 18. PCCP for Approaches, 9" 320 SYD $ 79,50 $ 25,440.00 19. Mulched Seeding, Type U 860 SYD $ 6,67 $ 5,736.20 20. 21. Maintaining Traffic Line, Thermoplastic„ Yellow, 4" 1 518 LS LFT $ 15,474,80 $ 2.00 $ 15,474.80 $ 1,036.00 22. Line, Thermoplastic, White, 4"' 230 LFT $ 2.00 $ 460.00 23. Transverse Line, Thermoplastic, White, 24", Stop Bar 40 LFT $ 10.00 $ 400.00 24. 25. Pavement Message Marking, Thermoplastic, Lane Indication Arrow HMA for Temporary Pavement 2 445 EACH SYD $ 250.00 $ 37.00 $ 500.00 $ 16,465.00 Total Amount of Base Bid (items 1 through 25) 1 $389,000.01 Alternate A: Mill and Resurface North of Cleveland Road Item No. Description Quantity Unit Unit Price Total Amount Al. Milling, Asphalt, Variable Depth 8,650 SYD $ 3.60 $ 31,140.00 A2. HMA Surface, 9.5 mm, Type B 750 TON $ 79.00 $ 59,250.00 r--A3. IHMA for Patching (Undistributed) 710 TON 1 $ 58.00 $ 41,180.00 Total Amount of Add Alternate A (Items Al through A3) 1$ 131,570.00 Total Amount of Base Bid $389,000.00 Total Amount of Add Alternate A $131,570.00 Total Amount of Base Bid + Add Alternate A $520,570.00 Bidder (Firm): Walsh & Kelly,Inc. Address: 24358 SR 23 City/State/Zip: South Bend IN 46614 Telephone Number: (574) 288-4811 John M. P"er, VP of Asphalt Operations (Printed Name of Person Submitting) V : �pORATF BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Roger Nawrot Department Division/Bureau Public Works Engineering BPW Date June 26, 2018 Phone Extension 5932 Required Prior to Submittal to Board Legal Z Attorney Name: Clara McDaniels Controller z Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy F-1 Agreement F-1 Contract L] Proposal H Addendum F1 Professional Services ❑ Resolution E] Bid Opening Z Bid Award El Req. to Advertise Title Sheet F-1 Quote Opening El Quote Award ❑ Change Order No. [:] C/O & PCA No. [] P CA ❑ Eas,e/Encroach, F-1 Traffic Control: F] Other: Company or Vendor Name New Vendor MBEA1VBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Walsh & ��l 0 Yes M No Purchasing Inc. If Yes, Approved by LJ MBE Ll WBE F-1 No F-1 Yes Name of Company Ameritech Drive Pavement Improvements 11 5-053A 18JO24 River Wiest, T IF 324-1050-460,31-20 $389,000.00 Not to Exceed " Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) F_ Required For'Chan` Amount of increase $ F] Decrease $ Previous Amount Current Percent of Change New Amount Total Percent of Change: Copy Original F-1 F-1 0 El El F] R Michael Devitta Ameritech orive Pavement fmmoveme0ts Protect No. 111-057A Bid Tab June 12, 2018 Ameritech Drive Pavement improvements City Project No. 117-067A City of South Bend 131d Tabulation Base Bid Engineer's Estimate Walsh & Kelly, Inc. I Rleth-R€€ey Constr. Co. Inc Item No. Doseripttan &antlty Unit Unit Price I Amount Unit Pdco Amount Unit Price Amount 1. Go Stru6orr Engirleedru 1 LS 1.5% $5,294.10 $3,700.00 $3.700.00 $1,000.00 S4,000.00 2. MotaBsakor,r0emabilizatfnn 1 LS 5.0% $17,647.90 S'18,500.00 51a,600.00 $3,000.00 $3,000.00 3. Claming Righl of Way 1 LS 'siipw00 $5,00.00 S8.450.00 48,450.00 $7,600.00 $7,600.Oo 4. Sheal 819n, Remove aW Relocate 3 EACH $seo.n0 $900.00 $400.00 $1.2uu 9n $30o.0o $900.00 5. Fire Hydrant Assembly, Remove and Relocate 1 EACH $600.00 $600A0 S5.2w 00 $5.200.00 $2,300.00 $2,3W 00 6, Gamete Curb and Gutter. Remove 020 LFT $9.uo $7,380.00 $5.30 $4.346.00 $14.00 $11,480.00 7. Comets Approaches, Remove 240 sY0 $1eilo $2,400.00 $11.00 $2,640.00 $37.00 $8,880.00 a 1comMon Excavation 2,370 CYO $20.00 $47,400.00 $24.00 558,880.00 $28.00 $86,360.00 9. B'Borroa 1,490 CYOr$25.00 $26,820.00 330.80 $45,892.00 $3400 $50,860.00 10. Milling, Asphalt Variable Depth 4,000 SYD $8,120,00 $3.00 $12,180.00 $3,50 $14,210.00 11. HMA for PatchiN(undistributed) 340 TON $34.000.00 $50.00 519,72o-W $135.00 $454900.00 12. Compacted Aggregate ff Base, Na. 53 630 TON $15,750.00 $4000 $25,200.00 $3300 $20,790A0 13. HMA SvAace, 9.6 mm, Type U 480 TON M.800.00 $0200 $39,360.00 $97.00 $46.%0.00 14. HMA Intermediate,#9.0 mm. TypeB 170 TON $13,260.00 $78.00 $13,200.00 $130.00 $22,100,00 15. AMA Base, 25A MR Type O 670 TON $70.00 $46,900.00 $58.00 $38,660.00 $84.00 $58,280A0 18, Calmat. Curb and Ginter, 6. 820 LFT $26.00 $20,500.00 $29.00 $23.780.00 $27.00 422,140,00 17, PCCP for Approaches, 8' 60 5YO $6500 $3,W0.00 $7200 $4.920.00 $65.00 $3,900.0o W PCCP for Approaches. 9' 320 5Y0 $75.00 $24,000.00 $79.50 $25,440.00 583.00 $20,16ano 19. Mulched $mdinu, Type U 660 SYO $1.50 $1,290.00 $6.67 $5,736.20 $6,28 $5,400,80 20, MaInIoWng Traffic 1 LS $30,000.00 $30,000.00 $15,474.80 $15.414.60 $8,000.00 $6,000.00 21, Jne, Therm Pastic, Yellow, 4' 614 LFT $1.00 $518.00 32A0 $1,03ana $1.45 $751.10 22, Jne, Thaw oastic, While, 4' 230 LFT $1.00 $230,00 $2.00 $460.00 $1.45 $333.60 23, ransverse Uns, Thermoplastic, White, 24", Stop Bar 40 LFT $6.00 $240,00 $10 00 $400.00 $5.95 $238.00 24- Pavement Message Mwkirug, Ther nopla Uc, Lorne Ind!-V. 2 EACH $350.00 $700.00 $250,00 $500.00 S80.00 516Uc0 26. iAMA fnr Temporary Pavement 445 5YU $50.00 $22.250.00 L $37,00 S55,465.00 534.00 $16,130.00 Total - Base Bid $375,900.00 $389,000.00 $437.133.40 ,. A RAlll .....r Anc„Hann rJnrlh n(nrpvalanH Rnad Engineers Estimate Walsh & Kelly, Inc. Rlettl-R€ley Constr. Co. Inc E Oescript€on 4auanury Unit Unit Pr€co Amours! Unit Pdce Al Milling, AsphalL Vadable Oepth 8,650 sYp $2.00 $17,21M00 $3.80 1 $31,140,00 $1.651 S14,272.50 A2. AMA Surface, 9.5 mm, Type 11 750 TON $95,00 $63,75000 $79.011 1 $59,25ario $95.00 571,250.00 A3. AMA for Patchhg(UAdfSlribuled) 710 TON $100.00 $71,0W.00 $56-00 1 $41,180.00 $129.co $91,690.00 Total - AlternateA $152.050.00 $131,570.00 $177,112,50 Englneers Estimate Walsh & Kelly, Inc. I Rfeth•Rlley Conste. Co. Inc Total Base Bid $375,900.00 $369 o0G.00 $437,133.40 total Base B€d +AlternateA $527,950.00 $520.570.00 $614,245.90 Addendum 41 Acknowledged A - stttt I hereby certify that the above truly and accurately{�!t! represents bids received for this project on June 12, 2018 A K0.�os�otoz �jl." � ar. 14 / 1 � � �� ■ Chad A. e Abonmarthche Consultants, Inc. Yes Yes loft 1316 COUNTY-CHY BUILDING 227 W. JEFF]"IRSON 13OLTLEVAR D Souni BEND, 1NMANA46601-1830 CITY OF Souni BEND FETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS June 26, 2018 Joshua McCormick Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 PHONE 574/235-925 FAX 574/ 2359171 RE: Bid Award — Ameritech Drive Pavement Improvements — Project No. 117-057A Project No. Dear Mr. McCormick: The Board of Public Works, at its meeting held on June 26, 2018, awarded the above referenced project to Walsh & Kelly, Inc., in the amount of $389,000 for the Base Bid only. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Linda M. Martin, Clerk Enclosure