HomeMy WebLinkAboutSupplemental Agreement No 2 - DLZ Indiana LLC - Adjustments for Colfax Ave Two Way Conversion1316 COUNI'y-Crry BUILDING
227 W. JEFFERSON BOULEVARD
SOUTi-i BEND. INDIANA 46601-1830
QTYOF SOUTH BEND PETE BUTTIGIEG, MAY-VM
BOARD OF PUBLIC WORKS I
June 12, 2018
Gary Fisk
DLL Indiana, LLC
2211 East Jefferson Blvd.
South Bend, IN 46615
RE: Supplemental Agreement No. 2
Dear Mr, Fisk:
PHONE 574/235-9,251
FAX 574/ 235-9171
The Board of Public Works, at its meeting held on June 12, 2018, approved the above
referenced agreement regarding the adjustments and redesign for Colfax Avenue Two -Way
Conversion in the amount of $19,650, for a new total of $23,4,150,
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Unda M. Martin, Clerk
Enclosure
c: Roger Nawrot, Engineering
GARY A. GtLo-i' SUZANNA M, FRITZBMi Ei,iZABETH A. MARADIK JAMEs A, MUELLER Tau .iRESE, J. DORAU
SUPPLEMENTAL AGREEMENT NO.2
This Supplemental Agreement No. 2 is made and entered into this day of , 20/
by and between the City of South Bend, Indiana, acting by and through the Board f Public Works,
hereinafter referred to as the "Owner", and DLZ Indiana, LLC, 2211 East Jefferson Blvd., South Bend, IN
46615, hereinafter referred to as the "Engineer".
WITNESSETH
WHEREAS, the Owner and Engineer did, on February 28, 2017 enter into an agreement for the
preparation of construction documents for the construction of the Colfax Avenue Two -Way Conversion
as modified by: Supplemental Agreement Number 1 dated October 10, 2017, and
WHEREAS, during the course of design, certain additional services, not included in the original
contract or Supplemental Agreement No.1, have become necessary; specifically:
• Preparation of Three Conceptual Alignments for West ColfaxAlleyApproach
• Redesign of West ColfaxAlleyApproach
• Repackage the Colfax/Studebaker Intersection Design from the 2018 into the 2019 Project.
• Preparation of a Right of Way Dedication Plat for additional right of way required for
realigning the West Colfax Alley Approach, if required
• Additional negotiation services
NOW THEREFORE, the Owner and the Engineer desire to amend the above referenced Design
Contract as follows:
Add Sub -Section A.5.a.4 ix To Section A1.02 as follows:
ix) The Engineer shall provide additional acquisition coordination for Parcel Number . With
the property owner's request to relocate the house andgarage, it will be necessary to
obtain additional quotes for expenses required to move the structures at 1119 West
ColfaxAvenue. Additional coordination will also be required to work though the issues
associated with this parcel.
Add Sub -Section A.5.a.4 x To Section A1.02 as follows:
x) If directed by the Owner, the Engineer shall assist the Owner in obtaining the Right of
Way donation from St. Joseph County Parcel 71-08-11104-002. 000-026 for realigning the
alley near the intersection of W. ColfaxA venue and Birdsell Street.
Ill. Add Sub -Section A.1.c. to Section A1.04 of Exhibit A as follows:
c. The Engineer shall develop up to three conceptual alignment options forre-aligning the
West Colfax Alley approach.
1of5
Supplemental Agreement No. 2
IV. Add Sub -Section A.1.d. to Section A1.04 of Exhibit A as follows:
d. The Engineer shall develop design and plans for re aligning the West ColfaxAlleyApproach
based on the Owner's selected preferred alignment option.
V. Add Sub -Section A.2.a. to Section A1.04 of Exhibit A as follows:
a. As part of the review of the 90%plan submittal, the Owner directed the Engineer to move
the design for the ColfaxAvenue and Studebaker Intersection from 2018 phase (115-053A)
to the 2019 phase (115-053B).
VI. Add Sub -Section A.2.b. to Section A1.04 of Exhibit A as follows:
A As part of moving the design for the ColfaxA venue and Studebaker Intersection to the
2019 phase, the City directed the Engineer to re -design the West ColfaxAlleyApproach.
The revised alignment will reduce the length ofnewpavement, which will reduce
construction costs
V11. Add Sub -Section A.2.c. to Section A1.04 of Exhibit A as follows:
c. The Engineershall perform a boundary survey and create a legal description for the
Proposed Taking across St. Joseph County Parcel71-08-11-104-002.000-026, located near
the intersection of W. ColfaxA venue and Birdsell Street. The survey will be performed in
accordance with the minimum standard requirements for retracement surveys per 8651AC
1-12. A Plat of Survey will be prepared at a suitable scale and will be signed and stamped
by an Indiana Professional Land Surveyor. Unless already monumented, the corners of the
parcel will be staked with 5/8'rebar with plastic identibcanon caps, or other suitable
material. Easements of recordmaybe shown, if provided in the title search.
The remainder of this page intentionally left blank
2of5
Supplemental Agreement No. 2
Vlll. Revise Table in Item A.1. of Section C2.01 of Exhibit C as follows:
Item I
Description
Amount
Type
Design Services:
a.
Topographic Survey
$18,900.00
LumpSum
b.
Study and Report Phase
$7,500A0
Lump
Sum
C.
12-Hour Traffic Counts
$2,400.00
Lump
Sum
d.
Design and Plans for the Two -Way Conversion of Colfax Avenue Including:
i)
Two -Way Conversion of W. Lasalle Avenue, Realignment of W. Lasalle
$6,900.00
Lump
Avenue, and Visitor Parking Lot
Sum
ii)
Two -Way Conversion of Colfax Avenue
$3,900.00
Lump
Sum
iii)
Street Improvements along Elm Street
$6,900.00
LumpSum
iv)
Redesign of West ColfaxAlleyApproach
2'400.00
Cutup Sum
e.
Building Demolition (as directed by Owner)
$5,700.00
LumpSum
Using Owner's Template, Prepare up to One (1) Separate Quote Package
$2,000.00
Lump
f
for Building Demolition, if Required
Sum
Design and Plans for Intersection Improvements at Colfax Avenue with
$8,000.00
Lump
9-
Studebaker Street
Sum
h.
Landscape Design and Plans (Subconsultant)
$36,100.00
LumpSum
L
Utility Coordination
$4,900.00
LumpSum
Lighting Design - Elm Street, from Washington Street to and Including the
,.00
$6500
Lump
Intersection of Colfax Avenue with Elm Street, and the Visitor Parking Lot
Sum
k.
Installation of Stop Signs and Sidewalk Repair
$2,000.00
LumpSum
I.
Public Information Meeting (up to 3 @ $2,800,00)
$8,400.00
LumpSum
M.
Bidding, Preconstruction, and Construction Phase
$4,500.00
Hourly
Conceptual Intersection Improvement Plan for Intersection of Colfax
$4,600.00
Lump
n'
Avenue and LaPorte Avenue
Sum
Design and Plan for Intersection Improvement at Intersection of Colfax
$10,400.00
Lump
°'
Avenue and LaPorte Avenue
Sum
P.
LaSalle Alignment Study
$3,100.00
Lump
Sum
q.
Preparation of Conceptual Alignments for West Colfax Alley Approach
$4,000.00
Lump
sum
Repackage the Colfax/Studebaker Intersection Design from the 2018 to the
$4,900.00
Lump
r
2019 Project
sum
Total Design services:
$154,000.00
3of5
Supplemental Agreement No. 2
R.Q.W. Services:
Right of Way Descriptions (Total take only, No plat) (up to 5 parcels @
$2,250.00
Lump
S.
$450.00/parcel)
Sum
Acquisition Coordination Services (up to 4 parcels @ $1,000.00/parcel and
$6,700.00
Lump
t
1 parcel @$2,700/parce4
Sum
U.
Relocation Coordination (up to 4 parcels @ $1,000.00/parcel)
$4,000.00
Lump
Sum
v.
Prepare Legal Description and Plat for Property Donation, as required
$3,500.00
Lump
Sum
W.
Title and Encumbrance Reports (6parcels @ Est. $450.00/parcel)
$2,700.00
Hourly
Appraisals Services (based on 4 Appraisal Problem
Analyses, 4 @ Est. $270.00/ea = $1,080.00; 4
Residential Short Form Total Take Appraisals, 4 @ Est.
X.
$3,360.00/ea. = $13,440.00; 4 Residential Short Form
$21,000.00
Hourly
Total rake Appraisal Reviews, 4 @ Est, $1,620.00 =
$6,480,00)
(Reimbursable/Subconsultant)
$51,000.00
Y.$9,900.00
Negotiation Services (4 parcels)
Hourly
(Reimbursable/Subconsultant or Hourly Rate)
Relocation Services (based on 4 residential owner, 3
Z.
tenant parcels = 7 parcels @ Est. $4,300.00/parcel)
$30,100.00
Hourly
(Reimbursable/Subconsultant)
Total R.O.W. Services:
$80,15000
Total Compensation: $134,150.00
The remainder of this page intentionally left blank
4of5
Supplemental Agreement No. 2
Ix. Amendment:
This Supplement Agreement No. Iincreases the current contract fee ��14,500,00 by $19,650.00 to
'2q4,150.00'andincorporates all other terms and conditions asset forth |mthe original Agreement dated
February 28, 2017 and Supplement Agreement No. I dated October 10, 2017. The original Agreement,
dated February 28, 2017, and Supplemental Agreement No. 1, dated October 10, 2017, shall remain in full
force and effect, except asherein modified.
The undersigned attests, subject tothe penalties for perjury, that he isthe contract party, mrthat he is
the representative, agent, member or officer of the Engineer that he has not, nor has any other member,
employee, representative, agent or officer of the firm, company, corporation or partnership represented
by him, directly or indirectly, to the best of his knowledge, entered into or offered to enter into, any
combination, collusion ofagreement to receive or pay, and that he has not received or paid, any sum of
money or other consideration for the execution, of thiis Contract other than that which appears upon the
face nfthe Contract.
IN TESTIMONY WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2.
Bm
Gary K. FisX,P.E.
Vice President
CITY OFSOUTH BEND, |NDIANA
BOARD OF PUBLIC WORKS
Gary A. Gilot, P.E., Board President
SuzammaM.Fritzberg, Member,
James A. Mueller, Member,
Elizabeth A. Maraidik, Member,
Therese J. DoAu, Member
ATTEST�
Linda 14. Martin, Clerk
\\SBxz\pmj\PROJ\1761\2448Co�f�ax2-Waycu 7\S422018-0427.doc
Supplemental Agreement No. 2
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 6/05/18
Name Roger Nawrot
Department
Division/Bureau
Public Works
Engineering
BPW Date 6/12/18 Phone Extension 5932
H Agreement Ll Contract L] Proposal Ll Addendum
® Professional Services ❑ Resolution
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award
❑ Change Order No. ❑ CIO & PCA No. ❑ PCA
❑ Ease/Encroach. ❑ Traffic Control:
6a Other: Amendment No. 2
Company or Vendor Name
DLZ Indiana, LLC
❑ Yes ® No ❑ If Yes, Approved by
New Vendor
Purchasing
MBEANBE Contractor
❑ MBE ❑ WBE
MBE/WBE Contractor Requested
❑ No ❑ Yes Name of Company
Project Name
Colfax Avenue Two -Way Conversion
Project Number
115-053
Funding Source
West Washington Development Area T1F
Account No.
422.1050.460.42.03
Amount
$234,150.00 (Previously $214,500.00, Increase of 19,650.00)
Terms of Contract
Adjustments to ROW Services, Split the project into two
Purpose/Description
contracts for bidding with the second contract bid in 2019,
redesign of the West Colfax Alley approach and preparation of
riaht-of Wav Dedication Plat.
U Required Contractor's Certification Forms Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
Amount of ❑ Increase
❑ Decrease
Previous Amount
Current Percent of Change
New Amount