Loading...
HomeMy WebLinkAboutOpening of Quotations - APS Installation at LWW and Cushing Street - Pemberton Davis ElectricPROJECT NAME: APS Installation at LWW and Cushing St. PROJECT NO. 118-06IR QUOTES DUE June 12, 2018 9:30am EST (Must be completed for all quotes. Please type or print) Date: June 12, 2018 Address: 916 E. McKinley Ave Firm: Pemberton Davis Electric, Inc. City/State/Zip: Mishawaka, IN 46545 Telephone Number: ( 574 ) 277-7001 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of. APS Installation at LWW and Gushing St. the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Depart rient of Public Works and dated May 30,2018 ] for the sum of (enter the Total Quote as shown on the Proposal) Six thousand four hundred sixty four and 64/100 (.t 6,464.64 (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits, a proposal for each in accordance with the notice. Any addenclums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the, same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attacl melnt. — The above quote is accepted this .1 -2- — day of Subject to the following conditions: � W'A 1A NO'. . lot, P eside A ara i , Met , Maradik, Member James A. Mueller, Member (Printed Name of Person Signing) Suzanna M. Fritzberg, Member ThA, ese J. or , Me r loesCt-inda IVI'MaNin, CI I 20 19 Version 10/18/2016 Page - 1 Public Works Quote PROJECT NAME APS Installation at LWW and Cushing St. PROJECTNO. 118-061R QUOTES DUE June 12,201.8 9:30am EST Item No. Description,. Quantity Unit Unit Price Total Amount Furnish all labor, services, materials, and equipment for the I removal of existing pedestrian 4 EA 1,616.16 $ 6,464.64 push button and the installation of I Pedestrian Push Dutton, APS Total Amount of Quote $ 6,464.64 Firm: Pemberton Davis Electric, Inc. F—IT, ro I =- City/State/Zip: 916 E. McKinley Ave. 46545 Telephone Number: — ( 574 ) 277-7001 Fax Number: ( 574 204-2565 Y. (Signature) John A. Ferro (Printed Name of Person Signing) Version 10/18/2016 Page - 2 Public Works Quote When Ilse prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) } St. Joseph SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or .more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized Version 10/18/2016 Page - 3 Public Works quote alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- Version 10/18/2016 Page - 4 Public Works Quote 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States, I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 11th day of June 12018 Pemberton Davis Electric, Inc Contractor/Bidder (Firm) Si ature of Cont for/Bidder or Its Agent John A. Ferro, President Printed Name and Title Subscribed and sworn to before me this iJ day of .tr 2018 My Commission Expires ZhIZO40 Notar Public County of Residence Sr. -7&4�pd M HAIMBAUGH .�•a�T+,,,,, KELLY °'°"'O Notary Public, State of Indiana :µOTA;'. St. Joseph County Commission # 63269,8 _A SEM. , My Commission Expires February 02, 2020 %h I1rN Version 10/18/2016 Page - 5 Public Works Quote Pedestrians are finding it more challenging to cross safely at signalized intersections, The Guardian mini provides important cues to assist all pedestrians to cross the intersection safely by providing audible, tactile, and visual indications at the crosswalk. A locator tone tells a pedestrian that the crossing is equipped with APS and where it can be found.Th,e acknowledgement tone and visual LED indication accompany a pedestrian call. An extended press provides specific intersection information and access to additional functions. The walk tone or message is accompanied by a vibiro-tactile indication during the visual walk display, Optional clearance phase indications may provide additional information to the pedestrian where appropriate. Includes Ambient Gain Control (AGC). • Independent Locations - USB Interface - Ped Ountl(all data • 4-wire Interface - Simple Menu Utility - 1: 1 Ped Display to A6PS • Configuration Templates - NEMA TS 2 Certified - No devices in cabinet • Event Tracking Log - Meets MUKD 6uidefines - Simple & easy install DESIGNED FOR THE AGENCY * Designed for flexibility and ease of use. * Each station can be configured at the factory or in the field, Software with GUI BS_SIze___ interfaces guide technicians through programming and configurations with BS Weight "roll-over" help menus, Power (rest) III Night mode volume controls with Quiet Signals Technology, curren-t(rest) Max Power Accommodate residential and evening business. Switch life IN Agencies can Identify specific parameters for residential, retail, and industrial operational force areas and save them as a configuration templates. operating Temp N Campbell's Simple Field Programmer (SFP) hand held configurator allows one maxvolume button press configuration. ACC Range LED Will AGPS is designed to also work properly with: Volume I c I on I t I roi - RRFBs, Solar Mid -Block crossings, Passive pedestrian detectors, Nan -pedestrian actuated downtown core areas, Reporting • Data collection • Night Mode Volume -Sound Directionality ® Station Angle Adjust Synchronlclty INSTALLATION KlghWode Ready to install, out of the box, a, four conductor cable connects to the Signal Power Interface (SPO in the head. Aesthetically Selectable Options pedestrian signal pleasing i (options selected via lap extension brackets and mounting hardware are available allowing stations to top USB connection via a be mounted within accessibility guidelines. menu drive utility) e�_ I , 7, P- Interface -' ,Windows Utility Input voltage I e 85 -135 VAC ji Audio File Update USB 220�VAC Data - F I ormat - CSv output voltage 12V DC Firmware Upgrade USB Connection -4wire-11 Dimension 2.75" x 3.5'x 1.875" 4" OD x 4.4' L 125 lbs 1/3 watt @ 12 VDC 25 mA @ 12VAC 8.4 W 100 X 106 < 31bf -40C to +85C 10OdB @ Im Adjustable 0 — 5dB over ambient 3000 mcd, 160 degree viewing am Fully adjustable, independent channels Pedestrian Usage, Event Logging, System Evaluation Beaconing/sync volume,-Rec-all,orcomplete (onfiguration. EPAPS,Vib Pulse Call, Recall, Beaconing, Group Walk, Walk time out, Locator Tempo, EP Time, Vib Intensity 3 year Functionality J M UTCD 4E, TAC Transient VdItage N EMA TS2 Protection Mechanical Shock and Vibration U 13