RE: Quotation Award — Leighton Parking Garage Entrance Repair— Project No. 118-038
Dear Mr, Peisker:
The Board of Public Works at its meeting held on May 22, 2018, awarded the above
referenced quotation to you in the amount of $28,025,
Please forward the following documents in one submittal by June 5, 2018 to my attention
for Board of Public Works approval:
1) One (1) original of the Contract (enclosed); and
2) Certificate of Insurance naming the City of South Bend as an additional insured.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M, Martin, Clerk
C: Tara Weigand, Engineering
GARY A, G i t,o'r SUZANNA M. FRITZBERc, ELIZABET1 i A. MARADIK JAMES A. MUELLER T1 IER ESE J. DORAIJ
BOARI-) OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
THIS AGREEMENT, made and entered into this 22nd Day of May, 2018, by and between,
Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, HEREINAFTER called the
Contractor, and the Board of Public Works herein called the "Board".
WITNESSETH: That the Contractor covenants and agrees to make the following improvement,
as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans,
and Bid Proposals, all of which are set forth as a part of this Contract, for:
PROJECT NO. 118-038
DESCRIPTION: LEIGHTON PARKING GARAGE ENTRANCE REPAIR
SEE SPECIFICATIONS
$28,025
MAJOR, MOVES
COMPLETION DATE:
AMOUNT:
FUNDING:
The unit prices for this improvement were those prices as received and accepted by the Board on
the 8th Day of May, 2018,
The Contractor further agrees to notify the Engineer when this improvement is completed. This
notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final
acceptance of the improvement by the Engineer, the Contractors final estimate will be presented
to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of
a Waiver of Lien.
BOARD OF PUBLIC
IC
W 14-*,0-"n
Gary A. Gigot, President Eliza eth A. Maradik, Member
Suzanna M. Fritzberg, Jaipes A. Mueller, Member
Me e
yr
Therese J. 160'rau, Member Aktest: Linda- M. Martin,
Clerk
CERTIFICATION (To be completed if Contractor is a Corporation)
WALSH & KELLY, INC.
Printed Name
Signature
1, , certify that I am Secretary of the Corporation named as
Contractor herein; that who signed this Agreement on behalf of the Contractor
was then of said Corporation; that said agreement was duly signed for and in
behalf of said Corporation by authority of its governing body, and is within the scope of its
corporate powers.
Secretary
Corporate
Seal
I awsaouagm
[901 z4;S611111161 IME01 MU1111111:11 4
PROJECT NAME: Leighton Parking Garage Entrance Repair
PROJECT NO. 118-038
QUOTES DUE May 8, 2018
(Must be completed for all quotes. Please type or print)
Date: 5/8/18 Firm: Walsh & Kefly, Inc.
Address: 24358 SR 23
City/State/Zip: South Bend, IN 46614 Telephone Number: ( 574 ) 288-4811
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to, complete the
public works project of:
aity_of South Bend, Indiana - Leighton Parking Garage Entrance Repair
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
The City of South Bend, Department of Public Works
and dated for the sum of (enter the Total Quote as shown on the Proposal)
Twenty eight thousand twenty five dollars and zero cents ($ 28,025.00
(Enter Sum of Total Quote shown on Proposal) (Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units
',AAM7 shown on a separate attachment,
E
By
(Signature)
0�y 0 RA
n M. Peisker, VP of Asphalt Operations
• (Printed Name of Person Signhg)
ACCEPTANCE
D I
'14#1010 01,
The above quote is accepted this day of )ia.-A/ 20
Subject to the following conditions:
B
�RDOFLIBI PIC WO S -i Tk��
GarOlPilot,'President
izabeth X Maradik, Member
James A. Mueller, Member
Suzanna M. Fritzberg, Member
Thy e,J. Dorq, Member
'Atfek Linda M. Martin, -Clerk
Version 10/311/2017 Page - 8 Public Works Quote
PROJECT NAME Leighton Parking Garage Entrance Repair
PROJECT NO. 118-038
QUOTES DUE May 8, 2018
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Mobilization and Demobilization
I
LS
$
$2,500.00
2,500.00
2
Maintenance of Traffic
1
LS
$1,250-00
$
1,250.00
3
Trench Drain Removal
1
LS
$5,000-00
$ 5,000.00
4
Pipe, Slotted Vane Drain, 12 in
60
LF
$290.00
$ 17,400.00
5
Pipe Connection
1
LS
$500.00
$ 500.00
6
Concrete Curb, Modified
11
LF
$125.00
1,375.00
Total Amount of
28,025.00
Firm: Walsh & Kelly, Inc. . ... ...
Address: 24358 SR 23
City/State/Zip: South Bend, IN 46614 Telephone Number: ( 574 ) 288-4811
L L Fax Number: (5,74 289-7174
By 44-1
(Signature)
John M. Peis,ker, VP of Asphalt Operations
(Printed Name of Person Signing)
Version 10/31/2017 Page - 12 Public Works Quote
I] LTJ F."i L91 O-Kel 214 MI.,! I-214V 10
TO: Linda M. Martin, Clerk
Board of Public Works
FROM: Tara Weigand, Project Engineer
SUBJECT: Award Project No, 118-038
Leighton Parking Garage Entrance Repair
DATE: May 14, 2018
On May 8, 2018, the Board of Public Works opened and read quotes for the above project. I
have reviewed them and found them correct.
The quoters ranked as follows:
Quoter
Total Quote
Amount
1, Walsh & Kelly, Inc.
$ 28,025M
2. HRP Construction, Inc.
$28,500.00
3, C & E Excavating, Inc.
. ..... . . .......
$61,300.00
I recommend award of a contract for Leighton Parking Garage Entrance Repair to the lowest
responsive I responsible quoter, Walsh & Kelly, Inc. in the amount of $ 28,025,00.
Sufficient funds have been has appropriated from Ma'or Moves, 412-0401-415.36-01.
Please call with your questions (59918).
Enc. Quote Tabulation
o
C)
o
6
F6o
-
o
W
M
—
M
M
o
m
oa E
c4
Ld
r�
6
>
,m
to
u
x
LU u
o
o
0
o
o
o
stl IL
oa
0
r2
M
a
�
L) 7L
2
it
S.
S.
o
ct
S
E
w
o
o
cl
o
0
o
o
o
o
u)
o
m
GI
Iq
IQ
c�
cq
m
E E
cq
c.4
o
47) o
LU
6o
m
m
m
ea
*o
,v
u
c
Q
Q
o
g
g
o
uj CL
o
Lfl
Cl
Lil
a
Q
co
o
o
Lo
oo
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW .REQUEST FORM
Date May 14, 2018
Department
Public Works
❑
Agreement Amendment
❑ Contract ❑ Proposal I_J Addendum
❑
Professional Services
❑ Resolution
❑ Bid Opening
❑ Bid Award ❑ Reg. to Advertise ❑ Title Sheet
❑ Quote Opening
® Quote Award
❑
Change Order No.
❑
CIO & PCA No. ❑ PCA
❑
Ease/Encroach.
❑
Traffic Control:
I-1
Other:
Company or Vendor Name
New Vendor
MBEANBE Contractor
MBEANBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Walsh & Kelly, Inc.
❑ Yes M No ❑ If Yes, Approved by
Purchasing
❑ MBE WBE
❑ No ❑ Yes Name of Company
Leighton Parking Gara e Entrance Repair
118-038
Major Moves
412-0401-415.36-01
$ 28,025.00
Current Percent of Change: %
New Amount $
Total Percent of Change: %
Dispersal After Approval
Copy Original
® ❑ Kara Boyles, City Engineer
® ❑ Roger Nawrot, Assistant City Engineer
® ❑ John Martinez, VPA
1316 CoIwry-Crry BUILDING
227 W. JITFEIRSON Bok.m,EVARD
SOUTH REND. Its DIANA 46601-1830
CITY OF SOUTIi BEND PETE BuTTiGIEG, MAYI
BOARD OF PUBLIC WORKS
May 22, 2018
Matthew Cain
1IRP Construction Inc.
5777 Cleveland Road, PO Box 266
South Bend, IN 46624
NioNv 574/235-9251
FAX 574/ 2359171
RE: Quotation Award — Leighton Parking Garage Entrance Repair — Project No. 118-038
Dear Mr. Cain:
The Board of Public Works, at its meeting held On May 22, 2018, awarded the above
referenced quotation to Walsh & Kelly, Inc. in the amount of $28,025.
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
I,inda M. Martin, Clerk
GARY A. GILOT SUZANNA M. FR1TZBFR(.j ELIZAm�.'I'tj A. MARADIK JAML,'s A. MUELLMTIi[-`RFHSE J, DORAU
1316 COUNTY -CITY BUILDING
227 W, JUK11TRSON BouLF-.VARD
Som-i I BEND. INDIANA 46601-1830
CITY OF SOUTFi BEND PETS BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
May 22, 2018
Thad Bessinger
C&E Excavating, Inc.
53767 County Road 9
Elkhart, IN 46514
PHONE 574/235-9251
FAX 574/2359171
RE: Quotation Award — Leighton Parking Garage Entrance Repair — Project No. 118-038
Dear Mr. Bessinger-
The Board of Public Works, at its meeting held on May 22, 2018, awarded the above
referenced quotation to Walsh & Kelly, Inc. in the amount of $28,025.
We thank. you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
GARY A. Gii,o'r SUZANNA M, FRITZBERG El. ZABi.-i'n A. MARADIK JAM[",,s A. MIJELLEX Ttit-'Ri"'st: J. D0RA(J