Loading...
HomeMy WebLinkAboutAward Bid - Two Way Conversion of Colfax Ave Proj No 115-053A - Rieth Riley Construction1316 Coiwry-Crry Bun,Dimi 227 W. JEFFERSON BOULEVARD SOU'rii BEND. INDIANA 46601-1830 CITY OF SouTH BEND PETE BUTTIGIEG, MAYOR 130ARD OF PUBLIC WORKS May 22,2018 Joshua McCormick Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 PHONE 574/235-9251 FAx 574/ 235-9171 RE: Award Bid — Two -Way Conversion of Colfax Avenue — Project. No. 11 5­053A Dear Mr. McCormick: The Board of Public Works, at its meeting held on May 22,2018, awarded the above referenced project to you in the amount of not to exceed $546,703.93. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal by June 5, 2018 to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance narning the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235-925 1. Sincerely, V Linda M. Mai -tin, Clerk Enclosures Roger Nawrot, Engineering GARY A. Gn,o'r SUZANNA M. FRITZBERG Ei,IZABETii A. MARADIK JAW'.s A. MUELLER Ti-I FR 17SE J. DORA I J BOARD OF PUBLIC WORKS CITY OF SOUTH BEND INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 2,2nd day of May, 2018, by and between, Rieth- Riley Construction Co., Inc,, 25200 State Road 23, South Bend, IN 46614, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a part of this Contract, for: PROJECT NO.: 115-053A DESCRIPTION: TWO-WAY CONVERSION OF COLFAX AVENUE COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: NOT TO EXCEED $546,703.93 R"AA"INUAWIM The total bid for this improvement were those prices as received and accepted by the Board on the April 2, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed, This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final. acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC WORKS w. Gary A. Gilot, President _ Elizabeth A. Maradik, Member RIETH-RILEY CONSTRUCTION CO., INC, Printed Name Suzanna M. Fritzberg, JaTes A. Mueller, Member Signature Member Therese J. Oorau, Member hest: Linda M. Martin, Clerk CERTIFICATION (To be completed if Contractor is a Corporation) I, , certify that I am Secretary of the Corporation named as Contractor herein, that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing; body, and is within the scope of its corporate powers. Secretary Corporate Seal CITY OF SOUTH BEND, INDIANA "A %T, CONTRACTOR'S BID FOR PUBLIC WORK 1065 Project Name Two -Way Conversion of Colfax Avenue Project No. 115.053A For Bide Due April 24,2018, Due at 9:30 AM'! Local Time PART I (Must be completed for all bids. Please type or print) Date: April 24, 2018 Bidder (Firm); Rieth-Riley Construction Co., Inc. Address: 25200 State Road 23 City/State/Zip: South Bend, In. 416614 Telephone Number: ( 574 ) 288-8321 Agent of Bidder (if Applicable): Johua A. McCormick Pursuant to notices given, the undersigned offers to furnish labor an public works project of: Two -Way Conversion of Colfax Avenue Project No. 11 5-053A necessary to complete the the City of South Bend, Indiana, in accordance with plans and specifications prepared by: DLZ Indiana, LLC and dated n/a for the sum of (enter the Total Bid as shown on the Proposal) Five hundred forty six thousand, se,ven hundred three dollars and ninety three cents. 546,70&93 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. if the bid is to be awarded an a unit, basis, the itemization of the units shall be shown on a separate attacbmem, By, Joshua A.MGG0M1l&,­9M!esonager (Printed Naime of Person Sigring) ACCEPTANCE The above bid! is accepted this, s day of 20 Subject to the following conditions: d' BQARD OF PU LIC Gary, A ilot, Presid Suzan�na M. Frit7berg, Member k�VT U B-1—zabeth X Maradik, Member James A. Mueller, Member Version 10/1712017 Contractor's Bid for Public Works - 2 BIDIPROPOSAL CITY OF SOUTH BEND Project Name Two -Way Conversion of Colfax Avenue Project No. 115-053A For BidsDue April 24,2018, Due at9:30 AM Local Time I-M-34-Avi"Wo, Item No. Description Quantity Unit Unit Price Total Amount $9,000.00 $9,000.00 I CONSTRUCTION ENGINEERING 1 LSUM $5,050.00 $5,050.00 2 MOBILIZATION AND DEMOBILIZATION 1 LSUM $16,000.00 $16,000.00 3 CLEARING RIGHT OF WAY I LSUM $16A5 $14,114.10 4 PAVEMENT, REMOVE 858 SYS $4.00 $7,908.00 5 CURB, CONCRETE, REMOVE 1,977 LFT $20.57 $10,984.38 6 SIDEWALK CONCRETE, REMOVE 534 SYS $10,622.54 $10,622.54 7 BUILDING DEMOLITION 1 LSUM $42.00 $55,692.00 8 BORROW 1,326 CYS $30.40 $20,276.80 9 EXCAVATION, COMMON 667 CYS $78.45 $1,804.35 10 TEMPORARY INLET PROTECTION 23 EA_ $26.41 $1,267.68 11 NO. 2 STONE 48 TON $2.95 $472.00 12 TEMPORARY GEOTEXTILE 160 SYS $42.00 $3,108.00 13 STRUCTURE BACKFILL, TYPE 1 74 CYS $29.87 $13,560.98 14 COMPACTED AGGREGATE, NO. 53, BASE 454 TON $7.00 $9,170.00 15 MILLING, ASPHALT, 11/2 IN. 1,310 SYS $0.01 $10.37 16 JOINT ADHESIVE, SURFACE 1,037 LFT $100.86 $17,247.06 17 HMA, SURFACE, TYPE B 171 TON Bidder (Firm): IRieth-Riley Construction Co., Inc. Version 10/17/2017 Contractor's Bid for Public Works - 7 BIDIPROPOSAL CITY OF SOUTH BENID Project Name Two -Way Conversion of Colfax Avenue Project Nio. 115-053A For Beds Cue April 24,2018, Due at9:30 AM Local Time 7.T1Kq3r-.T[71 Item Description � Quantity] Unit Unit Price Total Amount No. $104.74 $8,274.46 18 HMA, INTERMEDIATE, TYPE B 79 TON $0.01 $0.02 19 ASPHALT FOR TACK COAT 2 TON $60.00 $68,340.00 20 PCCP, 10 IN. 1,139 SYS $31,00 $4,247.00 21 RETROFITTED TIE BARS 137 EA $6336 $4,181.76 22 PCCP FOR PATCHING, 10 IN. 66 SYS BLACK, VINYL COATED, CHAIN LINK GATE, 12 2 EA $473.63 $947.26 23 FT. BLACK, VINYL COATED, CHAIN LINK FENCE, 6 109 LF'T $28.50 $3,106.50 24 FT. $70.00 $8,050.00 25 BRICK PAVERS, INSTALL 115 SYS $79.50 $9,619.50 26 CURB RAMP, CONCRETE 121 SYS $205.72 $3,702.96 27 DETECTABLE WARNING SURFACES 18 SYS $59.94 $33,446.52 28 SIDEWALK, CONCRETE, 4 IN. 558 SYS $26.39 $4,48630 29 CONCRETE CURB AND GUTTER 1701 LFT $19.75 $14,002.75 30 CONCRETE CURB AND GUTTER, MODIFIED 709 LFT $21.17 $13,125.40 31 CURB, INTEGRAL, CONCRETE 620 LFT 3,2 COMBINED CONCRETE CURB AND GUTTER, 89 LFT $19.70 $,1,753.30 MODIFIED $,1,053.03 $1,053.03 33 CURBJURNOUT 1 EA $56.21 $5,283.74 34 PCCP FOR APPROACHES, 6 IN. 94 SYS Bidder (Firm): Rieth-Riley Construction Co., Inc. Version 10117/2017 Contractor's Bid for Public Works - 8 BIDIPROPOSAL CITY OF SOUTH BEND Project Name Two -Way Conversion of Colfax Avenue Project No. 115-053A For Bids Due April 24, 2018, Due at 9:30 AM Local Time Item Description Quantity Unit Unit Price Total Amount No. $14.20 $10,252.40 35 D-1 CONTRACTION JOINTS 722 LFT 36 TEMPORARY PERIMETER PROTECTION, FIBER 1,121 LFT $9.10 $10,201.10 ROLL $7.73 $17,145.14 37 SODDING, NU,RSERY WITH 4 IN, TOPSOIL 2,218 SYS $450.00 $900.00 38 DECIDUOUS TREE, 2'' CAL. 2 EA $100.00 $100.00 39 SHREDDED HARDWOOD MULCH 1 CYS $170.63 $2,388.82 40 ADJUST WATER VALVE TO GRADE 14 EA $275.86 $1,103.44 41 PIPE, CIRCULAR, 10 IN. 4 LFT $46.17 $13,897.17 42 PIPE, CIRCULAR, 12 IN. 301 LFT $34.31 $4,974.95 43 PIPE, CIRCULAR, 8 IN. 145 LIFT $1,537.28 $1,537.28 44 STANDARD INLET 1 EA $1,862.36 $18,623.60 45 STANDARD CATCH BASIN 10 EA $4,606.91 $18,427.64 46 DRYWELL, 1800 GAL. 4 EA $308.38 $308.38 47 CASTING, ADJUST TO GRADE I EA $681.15 $4,768.05 48 CASTING, FURNISH AND ADJUST TO GRADE 7 EA $4,629.94 $4,629.94 49 MAINTAINING TRAFFIC 1 LSUM 50 TEMPORARY PAVEMENT MiARKIiNG, 6,513 LFT $0.90 $5,86130 REMOVEABLE, 4 IN. 51 TEMPORARY PAVEMENT MARKING, STOP 103 LFT $2.95 $303.85 BAR, REMOVABLE, 24 IN. Bidder (Firm): Rieth-Riley Construction Co., Inc. Version 10/17/2017 Contractor's Bid for Public Works - 9 1% . A r, E. BIDIPROPOSAL le CITY OF SOUTH BEND Project Name Two -Way Conversion of Colfax Avenue Project No. 115-053A For BIdsDue April 24,2018, Due at 9:,30 AM Local Time �W Item Description Quantity Unlit Unit Price Total Amount No. $129.00 $2,709,00 52 CONSTRUCTION SIGN, A 21 EA $50.00 $1,300.00 53 CONSTRUCTION SIGN, B 26 EA $12.100 $1,728.00 54 BARRICADE, 111-13 144 LFT $89.00 $356.00 55 DETOUR ROUTE MARKERASSEMBLY 4 EA 56 SIGN, SHEET, SHEETING TYPE IV, WITH 108 SIFT $14.00 $1,512.00 LEGEND 0.080 IN, SIGN POST, SQUARE, 2, UNREINFORCED 216 LFT $10.00 $,2,160.00 57 A NCHOR BASE $500.00 $,500.00 58 TRAFFIC SIGNAL EQUIPMENT, REMOVE I EA . $750 $787.50 59 CONDUIT, SCHEDULE 80, PVC, 2 IN. 105 LFT $1,600.00 $4,800.00 60 LUMINAIRE 3 EA $1,650.00 $4,950.00 61 LIGHT POLE 3 EA $1,000.00 $3,000.00 162 LIGHT POLE FOUNDATION, Tx 8' 3 EA - WIRE, NO. 4 COPPER, IN PLASTIC DUCT, IN 394 LFT $10.00 $3,940.00 63 TRENCH: 4 I/C 64 CABLE, POLE CIRCUIT, THWN, NO. 10 180 LFT $1.50 $270.00 COPPER, STRANDED 1/C MULTIPLE COMPRESSION FITTINGS, NOW 8 EA $18.80 $150.40 65 WATERPROOF - $28.00 $84.00 66 CONNECTOR KIT, UNFUSED 3 EA $24.50 $73.50 67 CONNECTOR KIT, FUSED 3 EA $12.00 $96.00 68 INSULATION LINK, WATERPROOFED 8 EA Bidder (Firm): Rieth-Riley Construction Co., Inc.. Version 10/17/2017 Contractor's Bid for Public Works - 10 2 0S BID/PROPOSAL CITY OF SOUTH BEND Project Name Two -Way Conversion of Colfax Avenue Project No. 115-063A For BIdsClue April 24,2018, Due at9:30 AM Local Time F.TATRM-M-91 Item No. Description Quantity Unit Unit Price Total Amount $14.00 $56.00 69 INSULATION LINK, NON -WATERPROOFED 4 EA $900.00 $2,700.00 70 HANDHOLE 3 EA $9,000.00 $9,000.00 71 SERVICE POINT, 1 1 EA $100.00 $200.00 72 PAVEMENT MESSAGE MARKING, REMOVE 2 EA $0.62 $1,757A8 73 LINE, THERMOPLASTIC, SOLID, YELLOW, 4" 2,834 LFT $0.62 $104.16 74 LINE, THERMOPLASTIC, SOLD, D, WHITE, 4"' 168 LIFT 75 TRANSVERSE MARKING, THERMOPLASTIC, 391 LIFT $0.95 $371.45 CROSSWALK LANE, 6" 76 TRANSVERSE MARKING, THERMOPLASTIC, 73 LFT $5.35 $,390.55 STOP LINE, 24" PAVEMENT MESSAGE MARKING, 7 EA $25,0.00 $1,750.00 77 THERMOPLASTIC, BIKESYMBOL 1 PAVEMENT MESSAGE MARKING, MULTI- 3 EA $85.100 $25:500d 78 COMPONENT, BIKE SYMBOL 79 PAVEMENT MESSAGE MARKING, I EA $80.00 $80.00 THERMOPLASTIC, LANE INDICATION ARROW $2.15 $225.75 80 LINE, THERMOPLASTIC, SOLID, YELLOW, 12" 105 LFT $1.05 $120.75 LINE, THERMOPLASTIC, SOLID, YELLOW, 8" 115 LFT F81 82 LINE, MULTI -COMPONENT, SOLID, WHITE,4 659 LFT $0.48 $316.32 INI. 1 83 LINE, MULTI -COMPONENT, SOLID, YELLOW, 518 LFT $0.48 $248.64 4 IN. 84 TRANSVERSE MARKING, MULT11- 64 LFT $0.90 $57.60 COMPONENT, CROSSWALK LINE, 6 IN. 85 TRANSVERSE MARKING, MULTI- 13 LIFT $3.25 $42,25 COMPONENT, STOPLI N E, 241N. I I I Bidder (Firm): Rieth-Riley Construction Co., Inc. Version 10/17/2017 Contractor's Bid for Public Works - 11 BIDIPROPOSAL PRAt CITY OF SOUTH BEND POO Project Name Two -Way Conversion of Colfax Avenue Project No., 116-053A For Bids Due April 24,2018, Due at9:30 AM Local Time 1 Item Description Quantity Unit Unit Price Total Amount No. GROOVING FOR CENTERLINE PAVEMENT $0.56 $2,279.76 86 4,071 LFT MARKINGS 87 ASBESTOS REMOVAL - --------------- I ALL, $3,000.00 $3,000.00 ASBESTOS REMOVAL UNIT PRICES Item Description Unit Unit Price No. $22.00 1 THERMAL SYSTEM PIPE INSULATION LFT $3.100 2 FLOORING MATERIAL SFT $6.00 3 TRANSITE SIDING SFT Bidder (Firm): Rieth-Riley Construction Co., Inc. A o I . .... . .. .... ...... .. Address: 2,5200 SR 23 - City/State/Zip: South Bend, IN 46614 Telephone Number: (574) 288-8321 By 7-7 Joshua A. McCormick. Sales Manager (Printed Name of Person Signing) Version 10/17/2017 Contractor's Bid for Public Works - 12 INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Roger T. Nawrot, Assistant City Engineer SUBJECT: Award Project No. 115-053A Project Name: Colfax Two -Way Conversion DATE: May 10, 2018 On April 24, 2018,_the Board of Public Works opened and read quotes for the above project. The bidders ranked as follows: Bidder Total Bid Amount 1, Rieth-Riley Construction Co., Inc. $546,703.93 2. HRP Construction Co., Inc. $616,000.00 3. Walsh & Kelly, Inc. $616,999.00 4. Indiana Earth, Inc. $669,698.37 There was an error in the Indiana Earth, Inc. extension of line item no.13 that changed the total amount of the base bid from $720,980.37 to $669,698.37. I recommend award of a contract for Colfax Two -Way Conversion to the lowest responsive 1 responsible bidder, Rieth-Riley Construction Co., Inc. for the Total Bid Amount of $546, 703.93 . Sufficient funds have been has appropriated from 422,1050.460.42.03. Please call with your questions. Encl. Bid Tabulation p rD ^ m y i N O O D Y ➢ p O m z G z m O Y w " i a =+ m C) 3 V 4 A b m W N W l0 m H w opI' tr A V ~ N Z Z ~ W Z IKn Ir{i D N N C op N W vKi c C Z %' y. 4F ln. y iA iA ih in 4 .N N W W N w iTl A p -:: O :N.:�� (3] �.:�' k :0.: �➢ -.O O fn :'fq N A ::W A 0 O � tl O �. '::� W pNp y y N W m 0 ~4 W NO W N O �i � R O (too] tn ul p N C m 44�. A A O in y y y Vs in V? y 4R y y lw N N y y w C V O P b O O t/T tl` t/t y y 1n 4n p lA+l O O O in /n N y lV0 V O W A N Y F+ W In W In rj 1" N W � 0 Op N H V N p O O AV Op O O 0 tl 0 pbo l� ,lOo d O O O Q VF (/I 41 LT VT.' �N in O. w p ih in y y y y N In O lO H � W W W z w A O P O F+ 00 Sn A W O O V V W � Ri y y y y y y y y N P p O O O O P O O O 0 0 1Y1 fZ V O P O b A Y a o 0 0 0 0 $ o o a o 0 0 c4i b o o o Z P p tl o 0 o p o N w m V Uwi UI A uwi N N O lO W V m N N A W NNa �� O n� v m O S O O m v n ry n cc n o n oo m m v rn W z c7 D C C p c n m v P K v N O ArCO m rn� D O y ^ m w z Cr n N n n n n z z Z n Z n x n A c G] c a Gt A r o Cy i n rn W p z o A A n z c z tl z _ z z T D V ;1 W N w w e Val 4 ;V : C pk V Ol W:� OO W O N'N O V V N tIv.. (� m AN W N b Z 2 4 O tl O O O O N O O b Y O V w V W N A b W N L} in Lf On Va In N h � � V In 1p A N yWy A (Wig O Q OWI (2nR U, F+ N N N 4n C: a w w w F' A a Z N N O O W 3�+ In W 4P1 O N pA A M, C N p Z Z � Z 0o Z Vs o.. lM1 � to a l tin Vs in fn {M1 5 O O.:' O. .':P O -:'O iM1 VL N � O In to i/� N yn �h N P O P O O O O O O b O p 0 P RI Sn ih Vi N V+ lR iR a N W w N ipJ O N N O Vi V! iR O O :_Vl W an O O O O oOo •UW, O .ONO W pap O pip p N Q it O �._. a _• in K "' y m N :'A tIF t? v to N :A N N VI V! 1rt F' SM1 iM1 Y�.+ V! V1 _W t� Vr N 4n :.� VT � VL V� in W O P - pQ ...:..... .. ^1 m Vi N N O O S O P O O ip N O p pOp O W O b O PO O 4tn O O O N p �N^ O 0 p O 0 O O o pJ0 a O P �Va o N O n 4 o y yy Z RI v C m m y N O Z x O O p v Z Z A m n D p O m C ((C�: m D A p m A A y m o N A n A n M z c z fi N Z W O 00 c m N Z a z Ll Z 3 E T n S y -v z Vl o x of m m D O Z 0 O2 A �' A O m Gl p O W M+ W ti� y y iD N y y to w oP o o P o m F N w v n N o ?' PIP W O No y y y y N y y y in y N y O O O P O O O T W A W N N y y y y y ? O O V N 10 •A N A N � UJ � N y P O O O O P In 4 p O W W i A W N � o N m J OVI vVi V A V w v N r V w m dti [n in m '� p Da V m A b� RI om 7v ioz m C: m r m r m -i m n n m m z W z to n p n p y nn 7 C'7 m m 0 m z c Y mb G m a z Z p A s m m m A~ z m m ^' A '^ D A �° m v O m O O m m O Z f� O n O p v p Ov 1 m +n W a 7 z T n >- w A x m S W ��" - x 1 1 ro m A Z � O m n n G) m m w Gl .� m� Gl Q' _r w m Z p `C C Z C S7O�j � � � n Y1 p ,Zi O O o O p z O A m z S y O 4 Z r z O Z A o D z m o Z Oo < m O Gl Ll �G1 p C) m G] v O O z o z ? o A W N '_' W V w A W N t❑i, Y m A N W W A m W W m W O Sq n o : J. r:`m cn -.m a ❑ O O:'.: O In :_ O A '- N N N VF in N N N In N N N t/� iR N lR trt N N N N 0 is O N fOp N0 1f, N : O 0 a W o Y o N N Y W p o P U n O N a ❑ tl w w N o in N P m N o m N A o p o 0 O o 0 O a ❑ b hYi o O p p pp 0 O 00 Q Y p =i A n � "�G)Z s p� y ` 9P Q Iqi W FO Ln 1 n FA ��77 T xa n' y D y CO � O W CSO > Z o 0 9 QI n +R A�N+ N FWN+ W �rt INOn N NVIn lA 90bJ N N Q O Sn OL. ❑p +n 0 Wb�^ N WVI in O YAQf in WV O iR OP t? O Otl N tl ❑ p N O �n pW O N w I O ih A O O V+ P N O � N O N_ O'. w ih W N N:, �.. Vl � O tin N N O N V N O N :. O N (Vn i/? Vi A N a 'V) V w. O 4T W O iA O '. 4F '.O N b N �Aa .O Ves N N (�� m � W O O O O b Y W p O O p O b p O O 01 4-+ O O O O Y p W O O O O O b ➢ O O VNi O INi, M p O tAl, N O b _ Z N :92 2 O N O N p O Y W N O b O q N W A o n m Y QO O O O O P O Y W p O N Co A O O N b O O m O . O O N of o O p .0 ❑ P N F+ o lWll O p O O Y N VWi Ob' O O O p iz W VI z p 0 b Z O Vf iR N-: M i/!'.. N ': In O P:.N N N N +A Sn 1ry N N N N N V! ih ih N N in N ih N N. C... N O Y O F+ O N W p O lVif p O ❑ p In O O O b W p W O P p W O p O O lWrx O LLNi N p O O iNi O O z :1 Z f• _ GI tl M W O a Oda O P � D O O .VHi q O O O VVi O ❑ O O J UWI b O ❑ 4 a p o ❑ A p O N O q tl ❑ p O O ❑ O O p O O O N A A, tl 0 O t? tR O m Q ❑ O p A fA 4'i W _� p � p Z O w m 0 p � p p opi 0 o ? m a 3 a 7 � C o a a a a H a a my�, - S c 0 0 " o m 0 a a s � m w W N� ➢ � a µ O 0 ... o m o d .��.• w K µ' $ m o 3? w H �• a 8 n, a .°f. a n c p m a S '17 Z O z f� z Y7 m mK K -i m m K N N [mil Vl [n lmil vi.c K FiOZ + o n -��• Y C 3 N � R O G n vi v ri O V CL p D C. ' 0 a y W y: m c C) m o 0 Y O w m 0 w p a o � z p � C w D p 0 i fin" z O Z r-^ z C Z z in N � m o n�A z p } r z m C � i n O � m O z 5 zz m ? E A C i aa M nn_ l9 o v v n C S w 2 W 'A O 8 O P W A O P �O N z 47 m o � n aYm N W ApNa � Z 00 D jy N � it p O P Z � G5 p N �l '� 22 Z 0 n a m I 1n yr in R N �pV+ W 00 �P m o n�i N o z r'i 8 0 0 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date May 10, 2018 Name Roger Nawrot Department Division/Bureau Public Works Engineering ❑ Agreement [J Contract ❑ Proposal L] Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ® Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ CIO & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: R Other: Company or Vendor Name Rieth-Riley Construction Co., Inc. ❑ Yes Z No [J If Yes, Approved by New Vendor Purchasing MBEIWBE Contractor ❑ MBE ❑ WBE MBEIWBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name Colfax Avenue Two -Way Conversion Project Number 115-053A Funding Source West Washington Development Area TIF Account No. 422.1050.460.42.03 Amount $546,703.93 Terms of Contract Not to Exceed Purpose/Description ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Required For<Char a Orders.Only Amount of ❑ Increase ❑ Decrease $ $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approyal - Copy Original ® ❑ Chris Dressel ❑ ❑ ❑ ❑ 1316 COUN'ry-Crry BUILIXNG 227 W. JEFFERSON BOULEVARD Souni BENI). INDIANA 46601-1830 CITY orSou'HiBEN D PFTEBLJTT1G1E(,,MAYOR BOARD OF PUBLIC WORKS May 22, 2018 Mark Oster Indiana Earth, Inc. 10343 McKinley Avenue Osceola, IN 4656,1 Pjiwl574/235-9251 FAX 574/ 235-9171 RE: Bid Award —Two-Way Conversion of Colfax Avenue — Project No. 115- 053A Dear Mr. Oster: The Board of Public Works, at its meeting held on May 22, 2018, awarded the above referenced project to Rieth-Riley Construction Co., Inc., in the amount not to exceed $546,703.93. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-925L Sincerely, a M. Martin, Clerk Enclosure GARY A. G ILOT SUZANNA M. FRITZBERci ELIZARi,'n,ii A. MARAJAK JAMEs A. Mur,,LLDDi FRESE J. DORM J 1316 COUNTY-0TY BuiLDING 227 W. JEFFERSON Boa LEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETEBUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS May 22, 2018 Matthew Cain HI�P Construction Inc. 5777 Cleveland Road, PO Box 266 South Bend, IN 46624 Pfl()Nu�' 574/235-9251 FAX 574/ 235-9171 RE: Bid Award —Two-Way Conversion of Colfax Avenue — Project No. 115- 053A Dear Mr. Cain: The Board of Public Works, at its meeting held on May 22, 2018, awarded the above referenced project to Rieth-Riley Construction Co., Inc., in the amount not to exceed $546,703.93. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this =tter, please call this office at (574) 23 5 -9251 . Sincerely, Linda M. Martin, Clerk Enclosure GARY A. Gn,o'r SUZANNA M. FRITZBERo ELIZABETH A. MARADIK JAMEs A. MUELLER TiIERESE J. DoiiAu 1316 COUNTY -CITY BUILDING 227 W, JEFFERSON BouLEVARD SOUTI I BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PUE BUTTIGIEG, MAYOR Bo,6,R1 OF PUBLIC WORKS May 22, 2018 Dustin Hilary Walsh & Kelly, Inc. 24358 State Road 23 South Bend, IN 46614 PHONE 574/235-9251 FAX 574/ 2359171 RE: Bid Award — Two -Way Conversion of Colfax Avenue — Project No. 115- 053A Dear Mr. Hilary: The Board of Public Works, at its meeting held on May 22, 2018, awarded the above referenced project to Rieth-,Riley Construction Co., Inc., in the amount not to exceed $546,703.93. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 23,5-9251. Sincerely, Linda M. Martin, Clerk Enclosure GAR A. GILOT SUZANNA M. FRn,zatiw ELIZABETj i A. MARADIK JAMr,,,s A. MUELLER Ttil,RESE J. DORAU