Loading...
HomeMy WebLinkAboutAmendment No 1 to PSA - Jones Petrie Rafinski - Additional Construction for Charles Black Center1316 COUNTY-Crry BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF, SouTH BEND PETE BUTTIGIEG, MAY BOARD OF PUBLIC WORKS I May 8, 2018 Dave Rafinski Jones Petrie Rafinski Corp. 325 S. Lafayette Blvd. South Bend, IN 46601 RE: Amendment No. I to Professional Services Agreement Dear Mr. Rafinski: ["HONE 574/235-9251 1"AX 574/ 235-9171 The Board of Public Works, at its meeting held on May 8, 2018, approved the above referenced amendment for additional construction phase services, for the Charles Black Center in the amount not to exceed $15,000. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Tara Weigand, Engineering Kara Boyles, Engineering CjAjiy A. GH..o'r SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAws A. MUFA,LER TiERESEA. DORAU This is EXHIBIT K, consisting of pages, referred to in and ,part of the Agreement between. Owner and Engineer for Professional Services dated May g, 2018. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: _,j U IV Z (, 20 1 b. Owner: Department of Public Works, City of South Bend, Indiana C. Engineer: Jones Petrie Rafinski Corporation (JPR) d. Project: 116-073 _ Charles Black Center 2. Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: A. Construction Administration: At the time the original Owner -Engineer Agreement was prepared it was anticipated that an inspector from City of South Bend Engineering would be conducting majority of the Construction Inspection/Administration for the Charles Black Center and that JPR would be assisting on an as needed basis. However, during the actual construction opeartions of the Charles Black Center the necessary time requirement and services provided by JPR will exceed the originally anticipated scope and fees for the following reasons: 1. The City inspector has limited experience with building construction and has relied on JPR to assist them with contractor questions, requests for additional information and project research. 2. The destructuctive investigation during construction has revealed several unforeseen conditions which have required JPR to conduct extra site visits to solve the various challenges. 3. Additional consulting :services are required to assist with color and material selections for both interior and exterial facets of the building. 4. The complexitiy of the building changed during the development of the design in both size and cost. This has increased shop drawing submittal review and associated construction administration to more than was originally anticipated. - Page 1 (Exhibit K - (Amendment to Owner -Engineer Agreement) - Attachment t) EJCDC E-500 Agreement Between owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. The additional construction administration services are to include: 1. Additional site visits and construction meeting requested by the City and the Contractor for input on construction items. 2. JPR will provide clarification/interpretations of the Contract Documents if such interpretations are necessary for the proper- execution or progress of work; 3. Review and approve, or take other appropriate action and forward to the client for final disposition, the contractor's submittals such as Shop Drawings, Product Data and Samples with respect to Contract Documents produced by JPR; b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: 1. Additional Construction Administration (Not to Exceed): $15,000.00 c. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: d. The schedule for rendering services is modified as follows: e. Other portions of the Agreement (including previous amendments, if any) are modified as follows: [List other Attachments, if cozy] S. Agreement Summary (Reference only) a. Original Agreement amount: $280,270.00 b. Net change for prior amendments: $00,000.00 c. This amendment amount (NTE) $15,000.00 d. Adjusted Agreement amount: $295,270.00 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Page 2 (Exhibit K— (Amendment to Owner -Engineer Agreement) —Attachment 1) EJCDC E-500 Agreement Behveen Owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is , May 8, 2018 31 A �011% B y: MAy n o V Title-, --T Date Signed: IMMM44"15, By: Dave Ra(in5ki, V resident Title: Date Signed: 05-08-2018 Page 3 (Exhibit K — (Amendment to Owner-Eriginter AgreeMeRt) — Attachment 1) EICDC C-500 Agreement Between Owner send Engineer for Professional Services. Copyright C 2008 National society of Professional Engineers for EJCDC. All rights reserved, BOARD OF PUBLIC WORKS AGENDA ITEM RE, VIEW Rr',QUEST FORM Date May 1, 2018 Department Public Works Name Tara Weigand Division/Bureau Engineering BPW Date May 8, 2018 Phone Extension 5998 Legal Attorney Name: Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing El N Agreement Amendment L_J Contract L_J Proposal LJ Addendum n Professional Services El Resolution F-1 Bid Opening El Bid Award ❑ Req. to Advertise ❑ Title Sheet 0 Quote Opening n Quote Award F-1 Change Order No. F1 c/o & PCA No. ❑ PCA F1 Ease/Encroach. ❑ Traffic Control: F-1 Other: Company or Vendor Name New Vendor MBEANBE Contractor MB,E/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of Jones Petrie Rafinski El Yes 12] No El If Yes, Approved by Purchasina LJ MBE LJ WBE R No F1 Yes Name of Comoanv Charles Black Center 116-073 $15,000.00 Not to Exceed Additional construction phase services due to unforeseen conditions and expanded scope 0 F1 Required Contractor's Certification IForms Attached (Non Collusion, Non-Discrim,ination, Non -(Debarment, E-Verify, Iran, etc,) Increase $ Decrease $ Previous Amount Current Percent of Change New Amount Total Percent of Change: Ala Copy Original Kara Boyles, City Engineer F-1 Tara Weigand El