My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - West Race Emergency Repair Project No 115-115 - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - West Race Emergency Repair Project No 115-115 - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:17:27 AM
Creation date
5/9/2018 11:51:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/3/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND" INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: West Race Emergency Repair <br />PROJECT NO. 115-115 <br />QUOTES DUE May 3, 2018 before 10:30 a.m. <br />(Must be completed for all quotes. Please type or print) <br />Date: 513118 __ Firm: HRP CONSTRUCTION INC. <br />Address: 5777 Cleveland Road, P.O. Box 266 <br />City/State/Zip: South Bend, IN 46624 Telephone Number: (574 ) 271-7800 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />West Race EmerQencv Reoair <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South, Bend. Devartment of Public Works <br />and dated 4/2018 for the sums of (enter the Total Quote as shown on the Proposal) <br />See Attached ($ <br />(Enter Sum of Total Quote shown on Proposal) <br />(Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the origiinal contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />la' <br />(Signatu <br />Byre) <br />Matthew D. Cain, President <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />Gary A. Gilot, President <br />Elizabeth A. IMaradik, Member <br />James A. Mueller, Member <br />Version 10/31/2017 <br />ACCEPTANCE <br />mm <br />W <br />Suzanna M. Fritzberg, Member <br />Therese J. DoraLl, Member <br />Attest: Linda M. Martin, Clerk <br />Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.