HomeMy WebLinkAbout06/29/1923 Board of Public Works Minutespresent.
ments:
Board met in regular session at 10:00 A.M. All members
Bids were received opened and read on the following improve
PAVEMENT ON MARIETTA STREET.
Bid of White Construction Company,
Walk per sq. ft............................$.20— ----
Cement curb per Iin ft.................... .50
Grading per cu. yd......... ...............1,?0
Sheet asphalt Trinidad Nat, Lake Asphait
per sq, yd........................3.02
Sheet asphalt Mexican.Oil asphalt,
per sq, yd........................2.85
Brick in street car tracks using sand cushion
& bituminous. Filler per sq. yd..:........$3.98
Asphaltic concrete using Mexican
asphalt per sq yd......,............. 2.55
Asphaltic concrete using Nat. Lake
Trinidad per sq. yd... 2.72
8 inch conduit pipe per lin ft............. 1,00
Storm water inlets, eaeh...................i3.00
Marginal curb.per lin ft.................... .40
Resetting inlets, each......................5000
Resetting manhole covers, each..............3.00
Check $198.00
Bid of Williston Construction Company.
Curb per lin ft..............................60
Grading per cu. yd .........................$1.25
asphalt pavement using Trinidad Lake
asphalt per sq. yd.................. 3.05
Asphalt pavement using Mexican oil
asphalt per sq. yd.................. 2.82
Brick pavement on Concrete base per sq. yd 3.90
Brick pavement on Gravel base sand filler
per sq, yd...... 2.80
Brick pavement on Gravel base asphalt
filler per sq. yd.. 2.95
Extra concrete per cu, yd..................i6.00
Asphaltic concrete Mexican per sq, yd...... 2.52
asphaltic concrete Natural Lake asphalt
per sq, yd............. 2.72
flinch conduit pipe per lin ft.............. 1*00
Storm water inlets, each ... ............. ...13.50
Marginal curb per lin ft................... .40
Resetting inlets, each......................3.00
Resetting manholes covers, each.............3.00
PAVEMENT ON BROOKFIELD STREET FROM LIIfC--DN WAY WEST TO
VASSAR AVENUE.
Bid of WhiteConstruction Co.
Walk per sq. ft............................ .20
Curb per lin ft............................ .50
Grading per cu. yd......................... 1.05
Sheet asphalt using Trinidad Nat. Lake
a sp ha 1 t p e r s q . yd ........ . . . . . . . . . . . . . . . 3.02
Sheet asphalt using Mexican asphalt
per sq, yd ............................... 2.85
asphaltic concrete Mexican asphalt
per sq. yd............................ 2.55
asphaltic concrete using Nat. Lake
asphalt per sq. yd................. 2.72
8 inch conduit pipe per lin ft..............1.00
Marginal curb pr lin ft..................... .40
Storm water inlets, eaeh...................13.00
Resetting inlets, each ..................... 3.00
Resetting manholes, each ................... 3.00
Friday June 29th., 1923. Continued.
Bid of Williston Construction Co.
Bid of Hoban & Roach.
bituminous filler.
AND KOSCIUSZKO STRIZET.
Cement curb per lin ft..........................0.60
Grading per cu. yd.............................1.00
Sheet asphalt pavement using Mexican oil
asphalt per sq. yd•......................2.82
Sheet asphalt pavement using Trinidad Lake
asphalt per sq. yd.... , ... , ..`......3.05
Asphaltic concrete Mociaan oil asphalt per sq. yd 2.52
,asphaltic concrete Trinidad Lake per sq. yd..... 2.72
8 inch conduit, pipe per tin ft:.................1.00
}Storm water inlets, each . ......................13.50
Marginal curb per lin ft..................tl........ ,40
Resetting inlets, each......`..........,.',,.......3.00
Resetting manhole covers, each............'.......3.00
Cheek'$420.00
Pavement on Makiet:ta Street,
Paving with brick block on 6"inch concrete'base and a
Grading per cu. yd.................................1,50
#1 Veedersburg Block per sq. yd.................... 4.45
Metrolpolit;an Block per sq. yd.................... 4.80
Marginal curb per lin ft.......................... .40
Resetting inlets, each...,,..............�......... 3.00
Resetting manhole covers,seaeh.................... 3.00
GRADE CURB AND WALK ON MAGNOLIA S1`REET9 PULASKI STREET,
Bid of Highways Improvement Co.
ialk per sq. ft...................................$.18
Cement curb per lin rt............................ .45
Grading per cu. yd................................ .80
Bid of H. N. Barnes. +
walk per sq. ft.....................;............. .18
curb per lin ft................................... .40
Grading per cu. yd ............................... 1.00
Bid of Highways Materials 'Company.
o cement walk per sq. ft............................ .17
Cement curb per lin ft..............................40
Grading per cu. yd....... ..........,..,............ .60
Check $200.00
GRADE CURB AND WALK ON OS'WALD COURT FROM WALNUT MT. TO
MAGNOLIA SICREET.
Bid of Highways Materials Co.,
walk per sq. ft................,.; ..,.................17
Curb per lin ft.................................... .40
Grading per cu. yd................................ .60
Check $200.00
SUB TRUNK SEWER ON MEADE STREET,
24" 18" 15"" 10" 8" 9" M. H, M. C.C. S. W. Inlets,
bid of L, H. Webster $5.10 4.00 3.40 3.00 1.00 1.00 per Ft each each each.
8.00 18.00 12.00
" of Hoban & Roach 5.00 4 00 3.30 2.50 .60 1.00 7.00 18.00 10.00
Go. Pontarellia 5;00 3.50 3.00 2.50 .751.00 8,00 18.00 ?0.00
PIPE SEWER ON MAGNOLIA STREETFROM IND.
Bids.
15"
10"
8"
6"
M. H,
M. C. C.
L. H.
Webster
3.40
2.70
1.00
1.00
7.50
16.00
I. W.
Staples
2.75
2.25
.90
1.00
°.00
18:00
Geo.
A. Harrbp
3.00
2.50
;::.80
1.00
7.00
29.00
Geo.
Pontarelli
2.80
2.30
.80
1.00
8.00
18.00
Hoban
& Roach
3.00
2.75
.60
1.00
7.00
18.00
AVE. TO PRAIRIE AVE..
S. W. inlets.
10.00
10.00 -
10.00
10.00
10.00
Vr{ An i. Jim,* :path _ . lQ2;i. Continued. .
PIPE SEWER ON
DAYTON STREET FROM
CAROLINE ST. TO
A POINT 409 ft.
east of center line
of Caroline St.
Bids. . . , 10inch _ ° 8. inch 6 inch- M. He
M. C.C.
S W. Inlets
Gerald MaGillieudd$2.40 *.80
$1 15
$8.00
�18.00
$10.00
L. H. Webster, • > > 2°.50- .. i°.00,
. • . ° ° • I'M
7.00
16.00
$10.00
I. W. Staples 2.65 .60
. . . . . . . . . . . . ° . . . .
1.00
., . . . . . . .
7.00
18.00
10.00
.-PIPE SEWER ON WEBS^1ER STREET FROM
INDIANA AVE. TO PRAIRIE AVE.
Bidders • . 12° Inch • ° .. , • > •
18 inch
8 inch
6 inch
M. H. M. C. S. W.
Hoban & Roach ; ° $2~.90A • • >
° °
3.60
$1.00
$7.00 $18.00 $100
Gerald McGilllmddy' 2:60' ' ' ' ' ' '
2:40° °
.80
1.15
8.00 18.00 10.0
Geo . Pontareliij ` ' 21.80.. ' . ` . ` '
- 2050- ' ' '
. 70
1.00
8.00 18.00 10.0
L. H. Webster{ ° ' ° ' 2.80. ' . ' ... "
' 2.70
1.00
1.00
7.00 16.00 10.0
I. W. Staples 2.50
2.25
.90
1.00
8.00 18.00 10.0
PIPE SEWER ON
FORD STREET FROM OLIVE STREET
TO MEADF'STREET
Bidders 10 inch
8 inch
6 inch
M. H.
M.C.C. S. W. I.
Hoban & Roach $2.75
$$ .60
$1.00
$7.00
$18.00 310.00
Geo. Pontaralii 2.50
.70
1.00
8.00
18.00 10.00
L. H. Webster 2.90
1.00
1.10
7.50
18.50 12.50
Check $100.00
' ' .. ' . ' PIPE SE99ER- OAT'
WAYNE> STREET' FROIt4 NOTRE DAME
AVE. TO FRANCIS ST
Bidders ... - 10,ineh••.•..•
8 inch
6 inch M. H.
M.C.C. S. W. I
Hoban & oa�i. Q
,�0,
$1.00
07.00
18.00 ti10.00
L. H. Webster. ....2,70........
1.00
1.10
1
16.00 10.00
All of the above bids were referred to the City Engineer
for tabluation to be reported on Tuesday July 3rd., 1923 at 9:00 A.M.
Bids for printing of Zoning Ordinanee as per instructions
of Board to Secretary of City Planning and Zoning
>... .............................
Commission.
Bid of R..E..Jobzson........ .............. .
$330.00
Bid of Bailey Printing Co.
634.00
Bid of Peerless Press
330.00
Bid of Peterson, Prtg:•Ce: ............. .
375.00
Bid of McClave•Printing-Ce.....>. .
350.00
Bid of Hibbetd°Ptint1flg• Cb;" ' > ... ' .. ...
363.50
Qontra ot,aw4rk�O.W Peerless Press at $330.00 and Secretary
C. A. Tail�ert,, of, C :try. Fjq.Auj.Tig, QgWj.eejon instructed to have Ordinance turned
over as soon.ss.possible...................
Contractor s bond for the sum
of $1,000.00 signed by
Tony Kubasik approved.
Partial estimate No. 1. for the
grade, curb and walk on
Sancome Avenue from Van Buren Street to California
Avenue alloyed to Frank J.
Murray at.:: •..:.....•..:.::::: J2;120: i7...... > .
Atteste;-
Clark of thI2 Board. '
Preside t.
. . >