My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Beck's Lake Overflow Valve Materials Procurement - Ferguson Waterworks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - Beck's Lake Overflow Valve Materials Procurement - Ferguson Waterworks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:03:45 AM
Creation date
4/26/2018 2:03:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: Beck's Lake: Overflow Valve Materials Procurement <br />PROJECT NO. nla <br />QUOTES DUE April 24, 2018 <br />(Must be completed for all quotes. Please type or print) <br />Date: ri t dl Firm: irergJ56VA. <br />Address: I 7 7y/ ,; tier • f, i✓ e—ovr+ <br />City/State/Zip: ,�� &J 211 , Y4�01 Telephone Number: (,574) 26o2 "02,3,,q3 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Beck's Lake: Overflow Valve Materials Procurement <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated April 13, 2018 ] for the sum of (enter the Total Quote as shown on the Proposal) <br />off, b4 n kA4U J - .1�c�G c R n.c 1S-.2q(0'= ) <br />(En Sum of Total Quote plus Alternates shown on pos ) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. I the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachm <br />By <br />71AI, <br />(Signature) <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of 20 <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President Suzanna M. Fritzberg, Member <br />Elizabeth A. Maradik, Member Therese J. Dorau, Member <br />James A. Mueller, Member Attest: Linda M. Martin, Clerk <br />Version 10/1812016 Page -1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.