Loading...
HomeMy WebLinkAboutOpening of Bids - Spec G - Three More or Less 2018 or Newer 28 Cubic Yard Front Loading Refuse Trucks - Pyramid EquipmentBID/PROPOSAL CITY OF SOUTH BEND Spec G — Three (3) More or Less 2018 or Newer 28 Cubic Yard Front BID NAME Loading Refuse Truck FOR BIDS DUE April 10, 2018 at 9:30 a.m. Description Year/MakelModel Unit Price P-QvIm4d � 20k1i Mo_,,�, LJW4R, vj',-�VN E2Pc,(k VLGJ� $ 3 0,91:�Zoi 9 1 Option# Description Cost/Truck Total I Three (3) More or less 28 Cubic Yard Front Loading Refuse Truck $ 3 (9 $ 0 3. (a ;�'� 0 Estimated number of days for delivery from award date. Bidder (Firm): Address: City/State/Zip: V C'k \'C � 0, )IV qVS Telephone Number: Fax Num ber: S) 2— By (Signature) (Printed Name) BOARD OF OUBLIC WORKS Gary A. Gilot, President Suzanna M. Fritzberg, Member James Mueller, Member 24 Therese J. Dorau, Member Elizabeth A. Maradik, Member Attest: Linda M. Martin, Clerk � 0 4�c� CITY OF SOUTH BEND, INDIANA SELLER'S BID FOR SALE OR LEASE OF MATERIALS P pe, Spec G — Three (3) More or Less 2018 or Newer 28 Cubic Yard Front LoA'ThtF,�" BID NAME Refuse Truck FOR BIDS DUE _Ap!g 10, 2018 at 9:30 a.m. Bidder Date: (koCIA ko i:�0\8 (Firm): 'Zk k S 0 ' - Address: City/State/Zip:fLo\�-,,, Telephone Number: (211�) 3 Agent of Bidder (if Applicable): 0 When the prospective Contractor is unable to certift to any ofthe statements beloiv, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIF41CATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE SS: L,C,P,a COUNTY The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: I . Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other � bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have, or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value. on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. 4 a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended fi-om time -to -time. b. As provided by Ind. Code § 5-22-16.5-9, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods of services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program, The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business 5 Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBEIVVBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or.foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable, I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this JO'r�4 dayof '� 20 1 e , ( I,-- ,,- p -Dk- - r6,�Vv\-( J Con& -a ctor/Bidder- (Firm) t Signatu ofC ntractor/Bidderor Its Agent IN Printed Name and Title Subscribed and sworn to before me this () . ......... day o k�u 1 20 My Cornmission Expires 6 - T. Q, A- ill Notary Solon$ A County of Residence 2-2o "Y N T RY PUBL-'C N T RY SEAL ev Rrte Co OF (To be completed only by ContractorsIBidders claiming to be a '7ocal Indiana business" pursuant to I. C. 36-1-12-22) INDIANA LOCAL BUSINESS PREFERENCE CLAIM A "local Indiana business" refers to any of the following: (1) A business whose principal place of business is located in an affected county. (2) A business that pays a majority of its payroll (in dollar volume) to residents of affected counties. (3) A business that employs residents of affected counties as a majority of its employees. (4) A business that makes significant capital investments in the affected counties as defined in rules adopted by the political subdivision. (5) A business that has a substantial positive economic impact on the affected counties as defined by criteria in rules adopted by the political subdivision. An "affected county" refers to St. Joseph County, Indiana, or the following counties located adjacent to St. Joseph County. Elkhart County, Marshall County, Starke County and LaPorte County There are the following price preferences for supplies purchased from a local Indiana business: 0 5% for a purchase expected by the purchasing agency to be less than $50,000 . 3% for a purchase expected by the purchasing agency to beat least $50,000 but less than $100,000. - 1% for a purchase expected by the purchasing agency to be atleast $100,000. Date: Ll— 10--Zo%9 Pursuant to I.C. 36-1-12-22, EA I(CIVVIK 'k vv-,,e 'A '2� 4- claims a local Indiana business preference for Project 5.8f--L G P"�� Lo tZL:�" (Project # located within the City of South Bend, St. Joseph Cbunty, Indiana. 0 The location of the principal place of business is Z-11 5 1 AJ 4- 6 3 (Address) St, Joseph County, Indiana 0 The following county located adjacent to St. Joseph County, Indiana: The majority of the business's payroll for the 12 months prior to the date of this Bid is to residents of St. Joseph County, Indiana or the adjacent county noted above. The majority of the business's employees for the 12 months prior to the date of this Bid are residents of St. Joseph County, Indiana, or the adjacent county noted above. If the business is deemed to be the apparent lowest, responsible, responsive bidder, then it shall provide supporting documentation for the 12 month period prior to the date of the Bid of (i) the total payroll amount paid to all employees of the business, and (ii) the total payroll amount paid to employees who are residents of St. Joseph County and the adjacent county noted above. WHEN SUPPLYING SUPPORTING PAYROLL RECORDS, BIDDER SHALL REDACT ALL SOCIAL SECURITY NUMBERS. Dated this / 19 "r-111 day of 4f �r,'� 20)9 L &k6)jD8e--* I CoAtractor/Bidder (Pttm) 13 Si��.re(�V Cb-n-tractor/Bid der or Its Agent (� " c V�) ax& 0 �-V 50J t PdRed Ame and Title M WESTBEND A MUTUAL INSURANCE COMPANY" Bond Number 2381352 KNOW ALL BY THESE PRESENTS, That We, Pyramid EquIpment, Inc. as Principal, and WEST BEND MUTUAL INSURANCE COMPANY, a corporation organized under the laws of the State of Wisconsin and having its principal office in Middleton, Wisconsin,, in said State, as Surety, are held and firmly bound unto City of Souith Bend as Owner, in the full and just sum of Ten Percent 10 %) of amount bid for the payment whereof said Principal binds its heirs, administrators, and executors and said Surety binds itself, its successors and assigns firmly by these presents WHEREAS, said Principal has submitted to said Owner a bid or proposal for Three (3) Residentlat Front Load Trucks NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH that if within Sixty days hereof and in accordance with said proposal a contract shal�l be awarded to said Principal and the said Principal shall enter into a contract for said work and shall furnish bond with surety as required for its faithful performance then this obligation shall be void, otherwise remain in full force and virtue, Signed and Sealed this 10 day of Aprit 120 18 Principal: Pyramid Equipaent, Inc K� r7��-NN (SEAL) Name Trped: Jon-P`aN,1-5-�, �on Witness: Title S "'O'yj Westq Mutual ns , uranc�- rn� Y. " =7" A, 7 B (SEAL) Witnes X I-,, Name tv'ped: Ta`rJa M Patterson Attorney -In -Fact ;y Name: Address: Phone Number: DAN BERRY INSURANCE AGENCY INC 5�4101 IRONWOOD RD SOUTH BEND, IN 46635 (574) 255-6222 Title MICHIGAN ONLY� This po�licy is exempt from the filing requirements of Section 2236 of the Insurance Code of 1956, 1956 PA 218 and MCL 500,2236, N13 0192 11 17 Page 1 of 1 PO Box 620976 1 Middleton, WI 53562 1 Phone: (608) 410-3410 1 Fax: (877) 674-2663 1 www.thesilver�ining.com WESTBEND A MUTUAL INSURANCt COMPANY' F POWER OF ATTORNEY THE SILVER LININGID Bond No. 2381352 Know all men by these Presents, That West Bend Mutual Insurance Company, a corporation having its principal office in the City of West Bend, Wisconsin does make, constitute and appoint: Tara M Patterson lawful Attorney(s)-i n -fact, to make, execute, seal and deliver for and on its behalf as surety and as its act and deed any and all bonds, undertakings and contracts of suretyship, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the sum of: Seven Million Five Hundred Thousand Dollars ($7,500,000) This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of West Bend Mutual Insurance Company at a meeting duly called and held on the 21s' day of December, 1999. Appointment ofAttorney-In-Fact. The president or any vice president, or any other officer of West Bend Mutual Insurance Company may appoint by written certificate Attorneys -In -Fact to act on behalf of the company in the execution ofand attesting of hands and undertakings and other written obligatory instruments of like nature. The signature of any officer authorized hereby and the corporate seal may be affixed byJacsimile to any such power ofattorney or to any certificate relating therefore and any such power of attorney or certificate bearing such facsimile signatures orfacsimile seal shall be valid and binding upon the company, and any such power so executed and certified byfacsirnile signatures andfacsimile seal shall be valid and binding upon the company in thefuture with respect to any bond or undertaking or other writing obligatory in nature to which it is attached. Any such appointment may be revoked, for cause, or without cause, by any said officer at any time. In witness whereof, the West Bend Mutual Insurance Company has caused these presents to be signed by its president undersigned and its corporate seal to be hereto duly attested by its secretary this 22nd day of September, 2017. lug Attest -CORPORAM6�, Christopher C. ZWi�rt Secretary �SEA� 5 i Yj� State of Wisconsin County of Washington Kevin A. Steiner Chief Executive Officer/Piesident On the 22nd day of September, 2017, before me personally came Kevin A, Steiner, to me known being by duly sworn, did depose and say that he resides in the County of Washington, State of Wisconsin; that he is the President of West Bend Mutual Insurance Company, the corporation described in and which executed the above instrument; that he knows the seal of the said corporation; that the seal affixed to said instrument is such corporate seal; that is was so affixed by order of the board of directors of said corporation and that he signed his name thereto by like order. rX, juli A�B�nedum '.'�A`% P0000 SemofCotporate Attorney Notary Public, Washington Co., Wl My Commission is Permanent The undersigned, duly elected to the office stated below, now the incumbent in West Bend Mutual Insurance Company, a Wisconsin corporation authorized to make this certificate, Do Hereby Certify that the foregoing attached Power of Attorney remains in full force effect and has not been revoked and that the Resolution of the Board of Directors, set forth in the Power of Attorney is now in force. Signed and sealed at West Bend, Wisconsin this 10th dayof April 2018 N1, PPO s." S Heather Dunn Vice President — Chief Financial Officer ...... .. .... Notice: Any questions concerning this Power of Attorney may be directed to the Bond Manager at NSI, a division of West Bend Mutual Insurance Company. 1900 S. 1811, Ave. West Bend, W1 53095 1 ph (262) 334-6430 1 1-800-236-5004 1 ftix (262) 338-5058 1 www.tliesilverliningxorn 211 5outh Prairie 5treet, PO Box 127 Rolling Pr�airie, IN 463,71-0127 219 778-2591 Fax: 219 778-2592 Spec G Front -Load Refuse Truck Specifications Deviations -Page 11 Fuel tanks. Three 25 "x 80" tanks for 102.5 DGE capacity. -,Page I I Cab. Mack LR 64 R G cab with left and right-hand drive. -Page 12 Section C #1. Floor has radius design to act as a I 00-gallon sump for liquids in the load. This prevents liquids slopping over the bulkhead. #3a. Lower hopper sides are 3/16" 100 K steel. #4b. Body floor is 1/4" 1 OOK steel. -Page 13 Section C #6b. Horizontal bracing meets the purpose and the specification stated is proprietary. -Page 15 Section D #9b. EZ Pack utilizes only 2 cylinders on the tailgate that lifts, lowers, and locks the tailgate, Only two are required. -Page 16 Section E #7. EZ Pack does not utilize a clamp -on design to secure the arms. #9. Metered cylinders are not used. #10a. Forks are I" thick T-1 steel. #11. No transducers are used. -Page 17 Section F #2. Unit has a Muncie MLS pump with a flow -regulated system. Has a no -kick -out feature when dumping containers. This allows the driver to pack on the run without overheating. ,-Page 18 Section L EZ Pack meets the purpose. The specification listed is proprietary. g. Valve is not located under the body. -Page 19 Section 1 #1. No PLC needed. #2 EZ Pack utilizes relays. �-Page 19 Section J #2. A separate joystick is provided to operate the carry can. -Pag�c 20 Section J #3b. Red button not required. There is a separate joystick to operate the carry can. EXCEPTIONS: - Pyramid Equipment, Inc takes exception to the liquidated damages incurred because of lead times stated due to circumstances beyond our control. -Pyramid Equipment, Inc will not be able to hold pricing for time stated in bid due to the current unstable steel market. P ramid Equi st p repent, Inc 21X South Prairie t P 0 Box 127 Rolling Praline, IN 46371-01127 Voice: 219-778-2591 Fax: 219-778-2592 City of South, Bend Solid Waste Office 3113 Riverside Dr South Bend, IN 46619 QUOTATION RE: Spec G Quote Number: 6941 Quote Date: Apr 9, 2018 Page: 1 CustomerlD Good Thi Payment To rm!s Salles,,Re'o­'� CSOU 1024 5/9/18, Net 30 Days Dadlow, Greg 4LY WEIV ILUM 1LJ wumolIPLIV I I 3.00 ack LR64R Low -entry Dual -steer Chassis P er specifications,& deviations WITH * EZRack 28 cubic yard Residential Front-lo�ader w/Automated Cuirrato Carry Cain - Per specifications & deviations PLEASE NOTE: Pricing includes Freight Due to the instability of th�e steel market, prices subject to change without warning Any app��icaWe ta),,,'ies, Le. N Sa�ies Tax, Fedieii4l Excise'Tax (FET), etc,wflHl be charqed on the lrw6ce Urfless a vald E`xeinpfion Cerfificate �s �nicl�,�idied Mth order, 367,875.00 1 1, 103,625 Subtotal 1,103,625.00 Sales Tax SPECIFICATIONS CITY OF SOUTH BEND Spec G - Three (3) More or Less 2018 or Newer 28 Cubic Yard Front BID NAME Loading Refuse Truck FOR BIDS DUE -April 10, 2018 at 9:30 a.m. Pursuant to notices given, the undersigned offers bid(s) to the City of South Bend in accordance with the following attachment(s) which specify the class or item number or description, quantity, unit, unit price. SPEC G — THREE (3) MORE OR LESS 2018 OR NEWER 28 CUBIC YARD FRONT LOADING REFUSE TRUCKS This specification describes a 28 yard hydraulically actuated partial pack residential front loader with a manual or automated carry can feature for use by the City of South Bend. It shall also have a container hoisting device capable of handling 1-10 c-ubic yard containers with side pockets. The body shall be capable of compacting and transporting refuse to a landfill or transfer station and dispensing the load by means of hydraulically ejecting the load from the body. This unit shall be left hand drive. Proprietary products or specific manufacturers may be referenced herein. Such references are only made to demonstrate minimum scope, quality, and style of the equipment desired. Equipment that is bid pursuant to these specifications shall be equal quality and size, or greater, to those referenced, and are subject to approval by the South Bend Board of Public Works. Unit to be bid as a complete unit including all costs associated with delivery to the City of South Bend Central Services Division. Successful bidder is responsible for all repairs during the warranty period. The City of South Bend reserves the right to reject any or all bids or to accept a full or partial award for the bid or bids which, in its judgment, will be in the best interest of the City of South Bend. Any exceptions to the following specifications must be noted on a separate sheet by the dealer at the time of bidding in order for the bid to be valid. Vendor to complete bid proposal, options, and non-discrimination commitment contained in this bid specification and attach to the submitted bid. Proprietary products or specific manufacturers may be referenced herein. Such references are only made to demonstrate minimum scope, quality, and style of the equipment desired. Equipment that is bid pursuant to these specifications shall be of equal quality and size, or greater, to those referenced, and are subject to approval by the South Bend Board of Public Works. NOTE: Vendor shall provide all information requested in specifications to qualify for bid. If information on brochure submitted does not completely cover specifications requested, it shall be typed and attached to brochure. 9 INSTRUCTIONS: NOTE ANY VARIATION IN SPECIFICATIONS OF EQUIPMENT YOU ARE BIDDING. PLEASE CIRCLE YES OR NO AND INCLUDE A WRITTEN EXPLANATION FOR ALL NO'S. Chassis: Tandem Axle, cab over. Approximate wheel base of 250 inches based on CES)o body recommendation, Steel front bumper with tow pin or tow hooks to be included. Front Axle: 20,000 lb. minimum capacity with 20,000 suspension and shock absorbers. ES 0 Rear Axle: 46,000 lb. minimum capacity, Hendrickson 4 link with transverse rod air )�ES 0 bag suspension or leaf spring equal. Driver controlled traction differential for both axles. Engine: 320 horsepower, with 1,000 ft. tbs. torque minimum Cummins Westport 0 ISL G320 natural gas engine. Emergency shutdown system for low oil (5N pressure, high water temperature. Cooling fan to be reversing type, electric over air with dash mounted switch. Air filter shall be replaceable paper.type with a restriction gauge. Oil filter to be a combination full flow/bypass type. Fuel system to include a low pressure coalescing fuel filter. 1,500 watt block heater, with thennostat, to be included, Engine warranty to be a minimum of 5 years/200,000 miles/10,000 hrs. Engine troubleshooting manuals/software to be included. Transmission: Allison 4500 RDS or equal with push button controls. To include temperature gauge, auxiliary oil filter and oil cooler. 5 year unlimited mileage warranty to be included. Troubleshooting manuals/software to be included. Exhaust: Vertical, must not interfere with CA dimension or mounting of packer body. PINO Vertical exhaust pipe guard and rain cap to be included. Cooling: Gates blue stripe or equal hoses with radiator to accommodate front mount (9�40 PTO pump. Coolant to be permanent type set to - 34T with coolant filter. Electrical: t2 volt system with 130 amp minimum alternator. 3 maintenance ftee 0 batteries with a minimum 1,875 CCA. Circuit breakers in lieu of fuses. Lighting to meet all DOT requirements. All electrical connections to be water proof sealed. Back-up alarm to be included. Steering: Full power assist with dual steering gear boxes. E INO Tires & Wheels: Hub piloted disc type wheels 22.5 X 9,0 fi-ont and 22.5 X 8.25 rear, YE /NO 315/8OR22.5 20 ply tubeless front tires and I IR22.5 20 ply tubeless rear tires niud and snow type. Brakes: Anti -lock brake system to include 30.4 CFM compressor and air dryer Y &ES 0 equipped with spin on desiccant cartridge and heater. 16.5 X 6 fi-ont, 16.5 x 7 10 rear brake chambers parking brake system with four chambers, tandem MGM or equal. Must include backing plates. Frame: 13 3/8" x 3 1/4" x 3/8" steel frame. Steel Section Modulus 23.49 cu. in./ (9�q 0 RBM 2,818,800 in. lbs. per rail, Approximately 100" rear fiame overhang. Fuel Tanks: Seven 15 gallon CNG Type III tanks. Tanks to be mounted in tailgate. YE4 Must include defueling port. � Y e,;) f117 Cab: Cab over left hand drive. Driver's seat to be low profile low back air E�O suspension, RH seat to be standard seat. Seat belts to be included for both seats. Steering column to be adjustable, tilt, telescope, Interior and exterior grab handles to be included for both right and left sides. Cab to include hour meter, speedometer, tachometer, oil pressure, water temperature, and transmission temperature " gauges. 16" x 7" west coast mirrors with 6" convex mirror attached. Tinted windshield, dual sun visors, electric washer and intermittent wipers. Heavy duty heater, deftoster, and air conditioning. Dual air horns with snow shields. Door activated interior dome light. Roof mounted strobe light with brush guard. Must have ground wire, battery hot, and ignition hot wires for installation of two way radio minimum of 20 amps. Must have factory installed one handle control for operator to set parking brake and place transmission in neutral. Grill to have bug screen mount on back side. To include 2" fender extensions. Factory repair manuals/software to be included. OTIN Rust Proofing: Full five year warranty. kE,5,1NO Safety: Truck and equipment to conform to all State and Federal requirements, as (Y�E)No well as O.S.H.A. and D.O.T. back up alarm to be included. Lighting to be LED type lights with mid body turn signals. Roof top strobe and two rear strobe lights to be included. Unit shall have one camera for the left side blind spot, one for hopper and one rear facing and shall include color LCD monitor. Body: A. Capacity: The body shall have a capacity, excluding the receiving hopper, of not less 0 than 28 yards. B. Body Dimensions: I . Body length including 52"cab shield is 352". INO 2. Overall length with arms down and forks in full tuck position is 415". g1NO 3. Overall length with arms down and forks in horizontal position is S 0 453". 4. Body width, overall structure outside shall be no more than 96". INO 5. Body width, inside should be a maximum of 88". ES 0 11 (Body cont'd) 6. Body height, inside should be a minimum of 87 V2 ". 0 7. Body height above chassis rail, arms down is 107". f/N 0 8. Body height above chassis rail, an -as up with full tuck forks is 120". INO 9. Height above frame with tailgate raised including rear underride NO guard is 199 ". 10. Hopper width (bottom), above guide tracks, must be no less than 80". INO 11. Hopper width (top) must be a minimum of 8 1 ". NO 12. Hopper length at roof must be a minimum of 94". NO 13. Hopper depth must be a minimum of 9 1 INO C. Body Construction: I . Packer body will have flat hopper and body floor with curved roof and YES/@ body sides and of overhead loading design. Hopper will be designed to properly handle containers from 1-10 cubic yard capacity. !�-Zyceeote' 5/16" 2. Roof - Minimum 8 gauge high tensile steel sheet 80,000 PSI typical yield. (&INO 3, Side Walls: a. Lower hopper sides — minimum 3/16" AR400 abrasion resistant plat steel YESkD/ with typical 184,000 PSI tensile strength and 145,000 PSI typical yield strength. b. Upper hopper sides — minimum 8 gauge high tensile steel sheet, 80,000 /VESN0 PSI typical yield. c. Body sides — minimum 8 gauge high tensile steel sheet, 80,000 PSI typical yield. 4. Floor: a. Hopper floor — minimum 1/4" AR400 abrasion resistant plat steel with typical 184,000 PSI tensile strength and 145,000 PSI typical yield strength. b. Body floor — minimum 1/4" AR400 abrasion resistant plat steel with typical 184,000 PSI tensile strength and 145,000 PSI typical yield strength. Roof and Side Reinforcements: a. Upper longitudinal corner brace shall be I I gauge 80,000 PSI typical yield 4" x 6" deep formed channel fully welded to the roof and body side sheets. b. Lower longitudinal corner brace shall be I I gauge 80,000 PSI typical yield 4" x 16" deep formed channel fully welded to the body side sheets c. Forward vertical body side bolster shall be 3/16", 80,000 PSI typical yield 6.72" x 7" deep formed channel conforming to the curved body sides and fully welded to the body sides. d. Rear vertical body side bolster shall be 3/16", 80,000 PSI typical yield 6.7" x 5" deep formed channel conforming to the curved body sides and fially welded to the body sides. 12 j�OINO 1� &ES�NO YESVO (YE�INO &0 (91NO 6E �O (Body cont'd) 6. Hopper Side Reinforcements: a. The bottom side brace shall be 7 gauge formed 6" x 2" channel, 50,000 YE WO PSI typical yield. 0 b, Lower and intermediate side bracing — minimum of five (5) 11 gauge YES 80,000 PSI typical yield 7-1/4" x 1-1/2" formed angles of lap (9 construction. c. All external welds of hopper side bracing shall be continuous full scam. (S�qo 7. Floor Reinforcements: a. Cross members shall be 7 gauge 80,000 PSI typical yield, 6" x 3"' formed (ONO channel. Members shall be spaced on approximately 21-1/2" centers in low compaction zone and 17-1/4" centers in high compaction zone. Cross members shall be full width, single piece construction. b. Cross members shall interlace with body longitudinals to fully support (ONO the floor. 8. Body Longitudinals. (Long Members) - Shall be minimum of 7 gauge &0 80,000 PSI typical yield formed box section. 9. Side Access Door - The side access door shall be located at the front street (940 side of the body with minimum opening of 27" x 29-1/2" (796.5 in�). Steps and grab handles shall be provided for ease of entry. An electrical interlock shall be provided to disable the pump whenever the side door is open. 10. Hopper Sump - A 32 gallon hopper liquid sump with a 14" x 5.5 " door each 0 (S� side of the hopper will be provided for ease of clean out. 11. Hopper Sump Drain — A 3" sump drain valve located on the street -side: and 0 (5N curbside shall be provided for the removal of liquid waste from the hopper sump. 14� 12. Front Head Closure - A 5 1 " x 79" front head closure screen made of QLSyO expanded metal shall be provided to prevent loose debris from entering the area in front of the packer and to prevent unauthorized entry by non -service personnel. 13. A splash guard shall be provided around the front of the packer cylinders to 640 prevent the exiting of refuse material and liquid. 14. The body shall be equipped with a rear hinge style to allow for the manual (9NO raising of the body for serviceability. Two (2) inter -connected tubular aluminum body props will be provided to hold the empty body in a partially raised position for servicing the unit. When the props are released and the body is raised the props automatically position themselves in the support pockets. The props will have a 2" through shaft hinge and will be secured under the body by a positive type chain lock. 15. A plastic shovel and bracket shall be mounted to the rear of the packing &NO blade for the sump area cleanout. IF, '.1111 16. A single 201b fire extinguisher shall be provided and be readily accessible. 0 17. Front and Rear mud flaps shall be provided to give the utmost protection ES 0 from road debris. M 18. A safety Triangle kit shall be provided in the cab. YES 0 D. Packing Mechanism 13 01 3. E (Body cont'd) A hydraulically actuated packer traversing a minimum of 83-1/2", from &0 the front head, shall clear the hopper of material with a maximum cycle time of twenty-six (26) seconds. The lower packing panel face will be a minimum 3/16" AR400 abrasion &40 resistant plat steel with typical 184,000 PSI tensile strength and 145,000 PSI yield strength. The upper vertical face will be a minimum 7 gauge, 80,000 PSI typical yield. The packer will be reinforced with a combination of structural members for maximum rigidity. Packing mechanism guide rails: a. The hopper zone packer guide rails (2) in the side of the body shall be (9/NO comprised of 3/8" 50,000 PSI typical yield structural angle welded to 3-1/2" x 1/4" ASTM A500 Grade B structural tubing on each side of body. The structural tubing shall be of a continuous piece the full interior length of the hopper, 128" long, b. Abrasion resistant wear bars, AR500 abrasion resistant with typical OYE N 0 184,000 PSI tensile strength and 145,000 PSI yield strength x 500 BffN, shall be clad to the hopper zone guide rails, each side, in the following manner: a. Bottom horizontal track wear bar shall be 1/4" thick x 3-1/2" wide &NO and located 3-1/2" above floor at corner. b. Top horizontal track wear bar shall be 1/4" thick x 2-1/2" wide. 0 c. Outer vertical track wear bar shall be 1/4" thick x 2-1/2" wide. 0 #INNO c. The ejection zone guide rails shall be 3/8" 50,000 PSI typical yield structural angle welded to the full length 3-1/2" x 3-1/2" x 3/16" ASTM A500 Grade B structural tube. A 1/4" x 2-1/2" H.R.S, wear bar shall be welded to the vertical and undersides surface of the guide rail assembly. The top wear surface shall be clad with 1/4" x 3-1/2 H.R.S. steel. d. The packer panel shall be guided on each side of the body with 3 " x 6" 1&0 x 1/4" ASTM A500 Grade B structural tubing clad with AR500 abrasion resistant with typical 184,000 PSI tensile strength and 145,000 PSI yield strength wear bars in the following manner: a. Bottom horizontal packer panel wear bar shall be 3/8" thick x 3" wide(YEV/NO x 41 " long. b. Top horizontal packer panel wear bar shall be 1/4" thick x 3" wide (g/No x 41 " long. c. Two (2) vertical packer panel wear bars, located below the structural CES tubing, shall be 1/4" thick x 2" wide x 18" long. Bolt -on lugs: a. The packer panel shall be provided with bolt -on lugs for each of the two Q (2) packing cylinders. The cylinders shall be attached to the packer panel lugs via two inch (2") diameter pins. Cylinder removal may be accomplished by either pulling the pins or by removing the entire bolt -on lugs. The lugs shall be attached to the packing panel with six (6)3/4 diameter bolts for each lug assembly. b, The body front head shall also be provided with bolt -on lugs for packing 0 cylinders. The lugs shall retain cylinder pins with four (4) 1/4" diameter bolts. 14 (Body cont'd) 5. Packer cylinders: a. The packer will be hydraulically actuated by two (2) double acting VE INO telescopic cylinders with 5-1/2" bore. b. Packer cylinders shall have spherical bearings on both ends. 0 c. The Packer cylinder grease zerks that are located on the rod and base 0 end shall be equipped with a remote lube system that is accessible ftom the ground. 6. Packing force— minirnum. cylinder compaction force shall be 117,000 @NO pounds. D. Bustile Tailgate 1. Tailgate must be one piece; top hinged and shall open approximately 4' G)INO above horizontal. 2. Tailgate back sheets shall be constructed of a minimum 10 gauge, 80,000 S 0 PSI typical yield steel. 0 so 3, Tailgate side sheets shall be constructed of a minimum I I gauge, 80,000 PSI typical yield steel, P—N. 4. The tailgate shall be reinforced by a minimum 1/4" 80,000 PSI typical yield, "S 0 horizontal boxed braces. 5. The tailgate will be secured to the body by two (2) sets of hinges with 2" P�� Ulpo hinge pins at the roof line. 6. The Tailgate hinge grease zerks shall be equipped with a remote lube system @No that is accessible from the ground. 7. A heavy duty rear door positive seal of rubberized gasket material will be &NO installed the full length of the bottom and 68" up the sides of the tailgate to preventleakage. 8. The tailgate shall be secured in the closed position by means of a fully ONO automatic latching mechanism actuated by a separate control in the cab. 9. Hydraulic tailgate: a. The tailgate shall be raised and lowered hydraulically actuated by two (2) OE INO double acting cylinders with a minimum bore of 3" x 28-1/4" stroke with 14/2" diameter hardened chrome plated rod. Cylinder design shall also include an orifice fitting in the base port which will prevent the rapid descent of the tailgate in the event of a hydraulic failure. b. The tailgate shall be locked by two (2) look cylinders with a minimum YE6 bore of 3" x 3-5/8" stroke with 1-1/2" diameter hardened chrome plated rod. Lock and tailgate raise cylinders shall be actuated by separate controls in the cab. 10. All lights will be LED and recessed into the tailgate with the lens flush with YOE )INO the outer skin. Clearance, backup and directional lights shall be a Lexan lens, shock mounted in a protective housing. The whole unit will be "pop-ouf' and replaceable. All vehicles will meet FMVSS #109 and state lighting and reflector requirements. 11. An in -cab light and audible alarrn will be provided to indicate that the tailgate(g/No is not fully closed. 15 (Body cont'd) E. Lift Arms 1. The lift arms will be 3" x 8" box reinforced type construction rated and capable of lifting 8,000 pound gross container and payload. 2. Lift arms shall be capable of lifting loaded containers from a truck dock with 10' maximum pocket height. 3. Lift arms shall allow for the center of the fork cross shaft tube to be 15"- 19" in the working position. 4. Lift arm cycle time will be approximately 18-20 seconds. 5. Pick-up, dump, and disengagement wilt be done without the need for assistance and without the driver leaving the cab. 6. The lift arms, during the dump cycle must not obstruct or interfere with the opening of the truck cab doors on either side. 7. The two (2) 3" x 8" rigidly constructed lift arms will be held tight to the torque tube using 4" thick ASTM A-487, 60,000 PSI yield cast steel clamping devices, and secured using two (2) 7/8" Grade 8 bolts and lock nuts on each side. 8. The arm torque tube will be mounted in four (4) split beating blocks with four (4) replaceable split bronze bushings with grease provisions. The split bearing blocks will be rigidly welded to the lower front of the body. 9. Lift arm hydraulics: a. The lift arms will be hydraulically actuated by two (2) double acting cylinders 4-1/2" bore x 41-1/2" stroke with a 2-1/2" diameter induction hardened and chrome plated rods, The street -.side cylinder shall be equipped with a Linear Vertical Displacement Transducer Sensor that will allow the Cortex controller to monitor the position of the arms at all times. b. The cylinders will be located outside the body at the body floor level and directly attached to the lift arms. 10. Container Forks a. Two (2) 1-1/2" x 63" grip high tensile, 50,000 PSI typical yield forks shall be welded to a 4-1/2' O.D. x 3/8" wall C- 10 18 Seamless tubing fork cross shaft assembly. This assembly shall include rubber bumpers to reduce impact and prevent damage to containers, b. Fork cross shaft assembly shall be attached to the arms with two (2) split bearing blocks with replaceable split bronze bushings fitted with grease provisions. 11. Fork Hydraulics - The forks will be hydraulically actuated by two (2) double acting cylinders, 4" bore x 25" stroke with a 2" diameter induction hardened and chrome plated rods. The street -side cylinder shall be equipped with Linear Vertical Displacement Transducer Sensor that will allow the Cortex controller to monitor the position of the forks at all times. 12. The fork cross shaft tube shall have guide disks welded to the cross shaft. that will contact wear resistant guides that are mounted to the chassis front bumper that will reduce the horizontal cab motion while using the Automated or Semi Autornated Carry Can. 16 YES(9 (9NO YESO (9� 0 YES)O YES 9/NO (Body cont'd) 13. Forks shall be designed to provide the necessary dump angle to assure 00 complete discharge of materials fi-om the refuse containers. 14. Lift arms shall be brought to a smooth stop in the raised and lowered G)/NO position by use of hydraulic arm cylinders. 15. Heavy dut ' y bolt -on hard rubber arms stops located at the side of the (aO body will cushion and prevent over travel of the lift arms. 16. Maximum height with the lift arms raised in the full up and forks fully YOE No tucked position will be 13'6" (based on a chassis rail height of 42"). 17. An in -cab mounted warning light will be provided to indicate when any 1@NO part of the arms are raised above the body. F, Hydraulics 1. The maximum operating pressure of the system will be 2500 PSI. 2. The hydraulic pump shall be a PTO mounted, load sensing HAWE Y%ES piston pump with minimum working pressure of 3000psi with load sensing capability. It shall have the capability of producing 40 GPM when mounted to a 116% PTO at an engine speed of 120ORPM. It shall have an electronic over -speed control and shall be capable of producing the required flow to sustain both the Automated or Semi -Automated Carry Can and the packing panel of the unit. 3. Pump -to -body hard plumbing shall be provided and shall be securely OY�E INO supported and clamped to prevent vibration, abrasion, and excessive noise. Flex hoses shall be provided at each end of the hard plumbing to provide adequate flexure to prevent hydraulic leaks. 4. The pressure side of the hydraulic system shall be filtered by a high @No pressure filter capable of handling 3000 psi hydraulic pressure with a 50 psi bypass pressure and shall filter to a 5 micron filtration level with a beta of >200. The filter housing shall be equipped with a visual indicator that indicates when the filter element should be replaced. G. Curotto/Carry Can Hydraulics 1. The Curotto/Carry Can hydraulics shall be routed down the streetside arm CYE::S�O in a manner to prevent damage from tree limbs and other obstacles. 2. Hydraulic Hoses a. All hydraulic hoses shall conform to S.A,E standards for designed (91NO pressure. Bends shall not be more than recommended by S.A.E. standards. Flat Spots in hoses will not be acceptable. 4 wire hoses are not utilized due to reduced bend radius and increased opportunities for loosened fittings. b. All pressure hoses shall be protected with fabric guard. 0 3. Hydraulic Oil Reservoir a. The hydraulic oil reservoir shall have a gross capacity of 47 gallons YES 0 filled with 41 gallons of hydraulic fluid. 9 b. The tank shall be complete with a screened fill pipe and cap, filter E 0 breather, clean out cover, shut off valve, oil level sight, and temperature gauge. 17 (Body cont'd) c. The hydraulic system shall be protected by a three (3) micron, in tank, elll� Q!910 return line filter along with a 100 mesh (140 micron) reusable oil strainer in the suction line. d. The return line filter shall also include an in -cab filter by-pass monitor (YES 0 which shall alert the operator or service personnel when the filter is need of replacement. e. A hydraulic pump shut down system shall also be included which shall (90 prohibit prolonged operation of the hydraulics when the filter is in the bypass mode. f. The hydraulic circuit shall consist of (2) proportional controlled valves. YES(9 These valves will be proportionally controlled by pulse width modulation through the in cab mobile controller. g, The packing, an-ris raise/lower, and the fork valve sections will be located YESO under the mid body on the street -side of the unit. This valve will be protected with a steel cover to prevent contamination and damage. This valve assembly shall consist of a relief to prevent overload damage to the body. h. The tailgate cylinders, and the tailgate lock cylinders shall be controlled SINO by a valve located on the street -side rear body side skirt. This valve shall be an electric over hydraulic valve with in cab controls to prevent the operator from exiting the cab to operate. This valve shall also be protected by with a steel cover. i. These valves shall have a minimum capacity of 50 GPM @ 2500 PSI and(qyE INO designed to properly operate all the hydraulic components, Hydraulic valves located behind the cab near high -temperature engine exhausts are not acceptable due to the difficulty of servicing and the potential risk to hydraulic components due to excessive engine temperatures. H. Controls 1. Arm, fork, packer, tailgate raise, and tailgate lock controls shall be provided. (9�qo Arm and fork movement shall be accomplished by two in cab single multi function joysticks located one on the left hand side of unit and the other located on the right hand side of the unit that can be switched from right or left hand operating position from the control panel. 2. Both joysticks will return to the neutral position when released. An arm rest 0 shall be provided for operator comfort. Packer, tailgate raise, and tailgate lock controls shall be controlled by a control panel housing solid state Computer Area Network (CAN) based rocker switches. 3. All controls shall be located inside the cab within easy access to the driver. YES 0 A separate in -cab control shall be provided for tailgate lock function. 4. All controls shall be properly labeled and indicate the direction of travel YES 0 (i.e., arms up, arms down, etc.) with warning lights to indicate "Tailgate Open", "Arms Above Transit Position", "Low Oil", "Arm and Fork Overheight" Left or Right hand operation, and Auto -Lift mode. E (Body cont'd) I. Electrical 1. A mobile controller with control center and an In Sight display YE6) shall be provided to monitor system functions and operation of the truck. This controller shall be able to withstand the vibration, moisture, dirt ingress, and climate variations that are present in the cab of the vehicle. 2. The controller shall use solid-state technology with no mechanical relays or YEe switches inside the controller. This controller shall use IEC 61131-3 software and will have SAE J 193 9 built into the controller for communication to the vehicle powertrain. The mobile controller shall be installed inside the truck cab and shall display self -diagnosing error codes in readable text format which identify the potential trouble source. Both audio and text alerts must be made available to aid in locating trouble source. Programmable logic controllers with mechanical relays shall not be permitted. 3. The mounting of cam type strikers to the arm cross shaft tube that will (�Dxo provide a proximity sensor a signal that will be used for arm position sensing are not permissible. 4. All electrical wiring connectors to be automotive double -seat, with wiring 0 in split convoluted loom. All wiring connections to be soldered with rubber molded covering or crimp type connectors with shrink wrap. Unprotected wiring in any application is unacceptable. 5. Clearance, back up, and directional lights shall be Lexan lens, shock (9�40 mounted in a protective housing. The whole unit shall be pop out and 6. replaceable. All lights shall be LED and provided in accordance with FMVS S# 108, (@No plus mid body turn signals on each side of the body and a center brake light on the rear. 7. A 360 degree strobe light shall be provided on the lower mid section of the YOE S No tailgate. 8. A hopper light illuminating the hopper area shall be provided and controlled 9NO by an on/off switch in the cab. J. Functionality 1. The operator shall be able to switch the unit in between Manual Lift and Y DES 0 Auto Lift Modes by selecting the Auto -Lift Enable switch on the control panel. 2. The operator shall be able to AutoLift the container by pressing the red YES/O button on the side of the joystick. This function shall be enabled when the right had drive and the Curotto enable is selected. 3. The unit shall be able to be placed in 3 different modes of operation. a. Manual operation - includes forward and rearward movement of the 0 joystick that controls the arms up and down. The left and right movement of the joystick controls the forks up and down and does include an interlock that prevent the container from being rolled into the cab through the use of the in rod sensor that provides the Cortex controller with the location of the forks. 19 (Body cont'd) b. Auto Lift Mode — Depressing and holding the red push button on the top of the joystick activates Auto -Lift Mode (and the display shows Auto -Lift Mode) where pulling back on the joystick executes an Auto - Lift movement with Can Roll -In (based on engine speed, <1000RPM no roll -in >1000 RPM roll -in. Pushing forward on the joystick will bring the can out of the hopper before moving the arms down. While holding the red push button down the operator can control the forks angle by moving left and right and the Cab Interlocks will prevent rolling the can into the cab. c. When the red push button is inactive the Multi -Function Joystick controls the Curotto Can Arm in a normal operation mode. Back and front, left and right, rocker left and rocker right are lift up and down, lift in and out and grabber close and open. d. The Odyssey unit shall have the ability to "creep" the Curotto arm out at a slower speed by moving the joystick to the right slowly. Moving the joystick fully to the right will cause the Curotto Arm to extend at full speed. e. Service Mode - is a functionality limiting mode that runs the arms, forks and packer at a reduced speed to get the arms, forks and packer in a safe position to travel. This mode is not one that is fully accessible to the driver and should be only invoked when directed by maintenance personnel. K. Rear Underride Guard 1. The body shall be equipped with a rear under -ride guard as standard equipment, to meet Federal Motor Carrier Safety Regulation, 49CFR393.86, TTMA RP No.41-02, and SAE J682, Oct 84. L. Painting N�� _y CN �U` e_ ef 'JOA ov- E ceeS 1. First Step � Smoothing - All weld stag, splatter or roughness shall be removed with the appropriate hand tools. No sand, shot or glass air blasting shall be permitted to eliminate contamination and possible damage to bearings or pin surfaces and possible distortion of higher gauge sheet materials used on the body. 2. Second Step — Purgation - A heated pressure wash shall drench the entire body with a silicated alkaline phosphate based pre -cleaner to clean all metal surfaces. This solution shall soak through and break down the oil film and other contaminants found on steel. The solution shall be non -corrosive to metals and shall be environmentally friendly. 3. Third Step — Pre -Treatment — An organically accelerated phosphoric acid based pretreatment will be applied to all metal surfaces. This step provides a chemical conversion coating which changes the chemical and physical nature of the surface by providing a surface that the next application (prime) will adhere to. go] YESAQ YES@ YES/6 (gNo &0 K7`7'� QES �Xo (�E >S 0 �90 4. Fourth Step — Scaling - The entire body shall be coated with an application (4 0 of the patented Dry -In -Place Seal fi-orn Henkel Surface Technologies. This process shall dramatically improve the surface finish's resistance to rusting that occurs from general wear and tear, and shall provide improvements to paint adhesion and other related corrosion that occurs over the life of the products. This shall help retain the "as new" appearance of the factory paint surface. 5. Fifth Step - Primer Coat Paint - The seal coat shall be painted using DuPont 0 Corlar - a high performance, low VOC/HAPS epoxy polyamide primer - sealer. Corlar is a two -component gray primer -sealer that is lead and chromate free. This shall be applied in an amount necessary to achieve a dry film thickness of 1.2 mil. 6. Sixth Step - Finish Top Coat Paint - A high luster finish coat shall be applied ES 0 using DuPont Imron Elite — a high-performance, low VOC (<3,5 lbs/gal RTS)& two -component polyurethane enamel. An arnple amount shall be applied to achieve a dry film thickness of 2 mil and shall result in a finish of 3.2 mil minimum film thickness. 7, The body and attaching parts shall be sealed with Tersotat Joint Sealer and 0 CavityCoat for rust prevention protection. M. Body Undercoating 1. Body Undercoating shall be provided and cover all surfaces under the body. ES 0 t Warranty: One full year complete unit, Engine and drive train extended warranties ES 0 as specified. Hydraulic cylinders and pumps to be warranted for five (5) full years. Body to be warranted for one (1) full year. Successful bidder is responsible for all warranty repairs. Vendor to state nearest warranty dealer. If travel outside the City of South Bend is required for warranty repairs, transportation of the unit is the responsibility of the successful bidder. Transportation must take place within the next normal working day or the responsible party will be charged $ 100 per day late fee. A one year complete body warranty covering parts and labor shall take effect on the body contract date. Curotto-Can Technical Specifications: Dimensions: Overall Size 55"H x 64"W x 81.75"L Inside Height 45.88" Lifting Pocket 6"H x YW x 0.25" thick high -strength steel Weight 1,680 lbs. (Curotto-Can Capacity: Carts Lift Capacity Volume 32 to 96 gal. 500 lbs. 4.6 cu. yd. 21 Technical Specifications cont'd) Cycle Times at 14 gpm: Full Slide Extend 2.5 seconds Full Slide Retract 1.5 seconds Dump 2.0 seconds Dump Return 1.2 seconds Control System: Externally mounted curbside and/or streetside joystick -type cab; optional curbside -accessible switch bank mounts to cab interior. Hydraulic System: Pressure Minimum 2,000 psi Auto Cover: Unit to include an auto cover for the carry can when dumping into the hopper for compaction complete with an in -cab control. 4. Equivalent Bids: (YE�/NO Specific manufacturers, models and brand names are mentioned in these specifications to establish the level of quality sought by the. City of South Bend, IN, Manufacturers, models and items of equivalent or greater quality may be substituted and so noted in writing on the applicable exception sheets, The burden of proof as to the equality of any substitution shall be the bidder's responsibility. Performance Evaluation: Each bidder should be prepared to provide the City with a unit for evaluation @NO within 10 days of b id opening. A performanc e evatu ation will be c onducted by a team of City employees. Performance as determined by the City will be used to 0" decide if the unit bid is responsive to the needs of the City of South Bend. The City of South Bend reserves the right to have a representative from an outside agency attend the performance evaluations. The results of these perfonnance evaluations will be used to determine if the unit bid meets the minimum performance standards of the City of South Bend. The evaluation results are the property of the City of South Bend and cannot be used by anyone other than City employees for evaluation purposes. Quantity: Three (3) more or less fully automated. "E INO 22 Parts Manual: Bidder shall furnish a complete part's, maintenance, and operator's manual with each body sold. Price Guarantee: The successful bidder shall guarantee the bid price for a minimum of 12 months to the City of South Bend. The City reserves the right to purchase up to four (4) additional units at this price within 12 months of bid award. Delivery: Bidder must state as accurately as possible an intended delivery date. Due to the age of the City's existing fleet, it is imperative that the unit's be delivered as quickly as possible. Stated delivery lead time may be included as an integral part of our bid selection process. FOB Central Services. Liquidated damages of $ 100.00 dollars per day, per unit will be assessed by the City and deducted from any monies owed to the vendor if the units are not delivered complete to the City by the stated date. The unit and all related paperwork is to be delivered to: Central Services Division 1045 West Sample Street South Bend, Indiana 46619 The Board will award the bid to the lowest responsible and responsive bidder. If the bid is not awarded to the lowest bidder, the factors used to justify the awards will be stated in writing at the request of any bidder. The Board reserves the right to reject any and/or all bids or portions thereof and to waive any irregularities or informalities. 23 YESO YES 9 CITY OF SOUTH BEND INSTRUCTIONS TO BIDDERS BID FORMS AND EXECUTION Bidders are expected to examine the Drawings, Specifications, Proposal and all Instructions. Failure to do so will be at the Bidder's risk. B. Each Bidder shall furnish all information required by the Notice, Instructions to Bidders and Specifications. Bids must be made on the form provided, The Bidder shall sign the Proposal and Non -Collusion Affidavit, which is a part of the provided form, where indicated, provide a notary signature and provide all other information required. C. The Bidder shall sign the Proposal in the following manner: If the Proposal is made by an individual, his/her name and post office address must be shown. If made by a partnership or joint venture, the name and post office address of each member of the partnership or joint venture must be shown. If made by a corporation, the Proposal must be signed by an officer of the corporation or by a representative duly authorized by the corporation to execute the Proposal in its behalf. 2. SEALED BIDS ONLY A. Bids, Proposals, Guaranty, and other required documents must be submitted in a sealed envelope marked on the outside with the general classification of material bids, i.e. "Bid for Computer Equipment," "Bid for Front End Loader," or "Bid for Office Supplies." B. When samples are required, such samples shall be delivered or shipped at the bidder's expense to the address specified in the Invitation to Bid. Samples must be shipped separately from bid documents and labeled clearly with the Bidders name, address and the commodity or equipment classifications and documents, the item (and item number, if any), and Material Safety Data Sheets (if applicable). All samples must be representative of the commodities or equipment which will be supplied by the successful Bidder. All samples will become the property of the City of South Bend and none will be returned, unless otherwise stated in the Specifications. C. In the event of an inconsistency between provisions of the contract documents, the inconsistency shall be resolved by giving precedence in the following order: ORDER OF PRECEDENCE A. Bid Form attached Proposal B. Amendments to Specifications C. Specifications D. Special Provision E. Instructions to Bidders F. Notice to Bidders 4. DELIVERY OF BIDS A. Bids must be delivered to the Off ice of the Board of Public Works, 131h Floor, County -City Building, Room 1316, 227 West Jefferson Boulevard, South Bend, Indiana 46601 (574) 235- 9251, by the time specified (local time) in the Notice to Bidders. If not delivered personally, the sealed envelope containing the Bid must be mailed to the following address: City of South Bend Clerk of the Board of Public Works 1316 County -City Building 227 West Jefferson Boulevard South Bend, Indiana 46601 B. The Post Off ice Department will be considered agent of the Bidder in delivering the bid. The City will not be responsible for deliveries. Any Bids received after the time specified will be returned unopened. 4 C. Bids will be opened and read publicly at the time and place designated in the Notice to Bidders. Bidders, their authorized agents, and the public are invited to be present. D. Bidders may bid on one (1) or more item, provided however, that the bid submitted for each is delivered in a separate, sealed envelope, with the envelope clearly labeled on the outside as to the specific item for which the bid is being submitted. Bidders may submit separate bid bonds for each item being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all bids submitted. E, The Board may reject any bid based on being non -responsiveness should such bid not conform to these requirements as listed herein or if a bid cannot be delivered in a manner consistent with the needs of the City. ADDENDA — NO VERBAL INTERPRETATIONS A. No inquiries by Bidders relative to interpretation of Plans, Specifications, Special Provisions, or other Bidding Documents will be answered verbally. If any prospective Bidder is unable or unwilling to comply with one or more requirements of the bidding document, such Bidder should so inform the Board of Public Works in writing. Upon receipt of such information, consideration will be given to the advisability of issuing an Addendum which would thereupon become applicable to all Bidders. Any such inquiry must be submitted at least seven (7) days prior to the bid opening date in order to give the Board sufficient time to consider any necessary Addendum. All answers to such inquiries, in the form of Addenda, will be furnished to all prospective Bidders who have registered with the City. All Bidders are required to acknowledge receipt of any Addenda by inserting the Addendum number and the issuing date on executed Proposals. 6, REJECTION OF PROPOSALS CONTAINING ALTERATION, ERASURES, INCOMPLETE BIDS AND ETC. A. Proposals shall be rejected if they show any alteration of form, additions not called for, conditional or alternate bids (except when and insofar as are invited), incomplete bids, erasures or irregularities of any kinds. B. All blank spaces for bid prices must be filled in, in ink, with the unit price and total price for each item (This does not apply to divisible bids). In case of incorrect totaling of amounts and where the unit price and the extension thereof do not agree, the unit price for each item shall govern, and the City is authorized to correct all erroneous extension and totals for the purpose of comparing bids. 7. TRADE DISCOUNTS Trade discounts shall not be shown separately, but shall be incorporated in the Bidder's unit price, unless otherwise specified. 8, VEHICLE BIDS A. Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on the outside as to the specific vehicle for which the bid is being submitted. Bidders may submit separate bid bonds for each vehicle being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all vehicle bids submitted. B. If an Option is included within these specifications, please be advised that, optional items placed in the specifications are to determine the best configuration of the item within a budgeted amount and may be included in the award criteria. If the Board elects to award one or more option(s), the base bid price and the option bid price(s) will be totaled and compared for all bidders offering the final configuration. Award will be made based on the lowest responsible/responsive bid prices submitted for the base bid with the selected option(s), if applicable. Failure to submit a bid on an option may result in the entire bid being non -responsive, depending on the final configuration of the product. 9. The Board may reject any bid that does not conform to these requirements as non -responsive. to. TAX EXEMPTIONS A. The City of South Bend is exempt from the payment of federal excise and transportation taxes levied under the provision of the Internal Revenue Code. It is also exempt from the Indiana State Gross Retail Tax (sales tax). The City will furnish the successful Bidder with any certificate of exemption required. it. WITHDRAWAL OF BIDS A. Withdrawal of bids will be allowed only in those cases in which a written request to withdraw a bid is received by the Board of Public Works prior to the date and hour for receiving and opening bids. In such cases, the same will be returned to Bidder unopened. 12. ESCALATOR OR CONTINGENT CLAUSES A. The use of escalator clauses or other contingent clauses by the Bidder is prohibited, unless requested or permitted by the Invitation to Bid. No Proposal shall contain nor be accompanied by any writing purporting to limit or qualify the City's right to accept such Proposal or purporting to alter such Proposal or any Contract which may be executed pursuant thereto. 13. PRICES MUST BE DELIVERED PRICES A. The bid price shall be a delivered price. All materials shall be shipped F.O.B. destination as specified in the Invitation to Bid. No fuel surcharges accepted. 14. AWARD —WAIVER OF TECHNICALITIES A. The Award of Bid, if any award be made, will be made within sixty (60) calendar days after the opening of Proposals to the lowest responsible and responsive Bidder who's Proposal complies with all the requirements prescribed, exclusive of technicalities waived. Until the final award of the Bid, however, the right is reserved by the City to reject any and all Proposals and to waive technical errors. 15. SPLITTING OF AWARDS/DIVISIBLE BIDS A. Bids will be awarded on the basis of the total dollar amount for all items in the Proposal unless the bid is described by the City as a Divisible Bid. The City may award a Divisible Bid to the lowest responsible and responsive Bidder for each item or class of items as indicated in the bid documents. 16. BIDDER QUALIFICATION A. The City may require any Bidder to submit evidence of qualifications, and may consider any evidence of the financial, technical, and other qualifications and abilities of the Bidder. The City will not award a Contract to a Bidder who, in its opinion, is not fully qualified on the basis of financial resources and responsibility, possession of adequate equipment, personnel, experience, and past record of performance to perform the obligations to be undertaken competently and without delay. 17. PURCHASE ORDERS A. A Purchase Order will be issued to the successful Bidder after formal acceptance of the bid is made by the City. 18. NEW MANUFACTURE A. Unless otherwise specified in the Invitation to Bid, the items offered shall all be new and the latest model of manufacture. 19, SOURCE OF SUPPLY A. If the Bidder is not a manufacturer, the source of supply must be shown and all sub- contractors must be identified. 20. PACKAGING K All items shall be delivered strongly packed and marked according to accepted commercial practice unless otherwise directed in the Specifications. No charge shall be made for containers and the City shall have no obligation to return containers unless otherwise provided by the Specifications or Special Provisions. Any items not received in good condition will be rejected. .1 2L INSPECTION OF GOODS The City of South Bend reserves the right to inspect and have any goods tested after delivery for compliance with the specifications. Notice of latent defects, which would make the item unfit for the purposes for which they are required, may be given at any time within one year after discovery of the defects. B. All items rejected must be removed immediately by the Contractor at the expense of the Contractor, If the Contractor falls or refuses to remove the rejected items, they may be sold by the City of South Bend. C. In some cases, at the discretion of the City, inspection of the commodities or equipment will be made at the factory, plant, or other establishment where they are produced before shipment. D. The above provision shall not be construed in limitations of any rights the City may have under any laws including the Uniform Commercial Code. 22. ASSIGNMENTS A. No person to whom a Contract has been awarded may assign his interest in the Contract without the consent, in writing, of the City. 21 CANCELLATION A. The City of South Bend reserves the right to cancel any Contract for failure or refusal of performance, fraud, deceit, misrepresentation, collusion, conspiracy, or any other misconduct on the part of the Contractor. 24. DEDUCTION OF DAMAGES A. If the City cancels the contract for any cause, it shall deduct from whatever is owed the Contractor on the Contract or any other Contract, any amount sufficient to compensate the City for any damages suffered by it because of the Contractors wrongdoing. 25. METHOD OF INVOICING FOR PAYMENT T Contractor shall bill the City of South Bend 1. On regular invoice form giving a complete and detailed description of the goods delivered, including purchase order number. 2. If the Contractor allows a discount, the period of time in which the City must make payment to qualify for the discounts shall be computed from the date the City received the invoice (completely filled out), or the date the goods are delivered and accepted, whichever may be later, and shall not be less than twenty (20) days. 3. If more than one shipment is made under the Contract and on the same purchase order, the City will make partial payments on a basis that is agreeable to both parties. 26. OWNERSHIP OF GOODS A. The goods which are the subject of the Contract shall remain property of the Contractor until delivered to and accepted by the City of South Bend. 27. ESTIMATED QUANTITIES TV If the quantity set forth in the Notice to Bidders and Proposal is approximate and represents the estimated requirements of the City for a specified period of time, the unit price and the extended total price thereof shall be used only as a basis for the evaluation of bids. The actual quantities necessary may be more or less than the estimate, but the City shall neither be obligated nor lim ' ited to any specific amount. The City will, if at all possible, restrict increases to twenty percent (20%) of the estimated quantity and will, if at all possible, restrict decreases to twenty percent (20%) of the estimated quantity. 28. TERM "OR EQUAL" K Where the term "OR EQUAL" is used in these Specifications, the Bidder deviating from specified item shall file with his/her bid a letter fully explaining and justifying his/her proposed article or equal. The City of South Bend shall be the sole judge in determining if the "OR EQUAL" offered meets the Specifications. 29. INDEMNIFICATION CLAUSE The contractor agrees to indemnify, defend, and hold harmless the City of South Bend, its agents, officers, and employees from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by the Bidder or because or arising out of any defect in the goods, materials or equipment supplied by the Bidder. NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. If you are sending your bid via Federal Express or another overnight source, please confirm that your package will arrive before the bid opening time and date. M NOTICE TO BIDDERS Notice is hereby given that the City of South Bend, Indiana, will receive sealed bids at the Office of the Board of Public Works, 13th Floor, County -City Building, Room 1316, 227 West Jefferson, South Send, Indiana, until the hour of 9:30 AM, Local Time, on April 10, 2018, for the following: Spec G — Three (3) More or Less 2018 or Newer 28 Cubic Yard Front Loading Refuse Truck Specifications are available for download by visiting the City of South Bend's web page at www.southbendin.gov: x Click on "Business" x Click on "City Public Bids" x Click on "Vehicles, Equipment and Miscellaneous Bids" x Select specification to download x A pop up screen will appear; input company information (address/phone/fayje-mall) where indicated x Click on "Submit Responses" x Print the specification or save it to your computer There is no charge for the specifications, The specifications are also available for review only during regular working hours in the Department of Public Works, 1308 County -City Building, South Bend, Indiana 46601. Bids received after 9:30 AM, Local Time, on April 10, 2018, will be returned unopened. Bids must be on the City of South Bend Bid/Proposal form provided, which includes a Non -Debarment Affidavit, Non -Discrimination Commitment form, and a Non -Collusion Affidavit Form. Certified Check or Bid Bond in the amount of not less than 10% must be submitted with the bid. A refund of the bid security will be issued upon satisfaction of Bid Award. The Board may reject any bid that does not conform to these requirements as non -responsive. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interest of the City of South Bend. BOARD OF PUBLIC WORKS Linda M. Martin, Clerk Publish two times: March 16, 2018 March 23, 2018 r-22.Rack ( 0,01101111" HERCULES Product Overview 6',A, N—A �' S" P" 0. e C For over 60 years E-Z Pack has been the industry leader in mobile refuse collection, vehicle designs and specializes refuse body manufacturing. E-Z Packs reputation is noted for its high, quality, durability, easy to use operator controls, giving, you the lowest cost of ownership in the industry. The following for your review is detailed information on the HERCULES Commercial Front Loader design and manufacturing process. Plus information on optional equipment,to customize your equipment to your needs. E. - ZZA ;� HERCULES Features .. .... . .... A1,A-'14,,d,,,S,d,W �Ic The legendary E-Z Pack HERCULES offers unique design features that are unmatched in the industry. Compare for yourself and you will see why the HERCULES is the best buy in the business. Standard Features include: V' Industry's Largest Hopper Opening 101 • Heavy Duty Interlaced Hopper Floor Support • Radius Body Sides, Roof and Floor • Large Side Hopper Access Door ,/Automatic Locking Tailgate with Safety Pins -/ HD Packer Panel with (4) AR500 Wear Shoes and'Tracks v/ Heavy Duty Packer Cylinder Bulk Head Plug and Play Sectional Main Body Wire Harness Premium Powder Coat Body Paint The legendary IIERCULE' is, buill, with high gn"Ide "S'n,'Part, Steel" givirig you yeam, of reliable service. . ...... . .... f Refulo Nauhng SOA06ang, U C Body Front Post Hopper Sides Body Mid. Post Curved Body Roof Curved Body Sides 1114" 50K Top & Bottom 3/16" 1/4" 100K 12GA 50K F LO,O 3/16" 1 OOK Arm Construction Wrappers 3/4" 80K Side Plates 1/4" 100 Forks- Std., 6 T-1 Steel I "T Arm Torque Tube Hopper Floor 3/16" 1 OOK Curved Rear Body Floor 3/4"' Wall 80K 1/4" AR400 1/4" 100K ate rValls I OOK itudinal �OOK HERCULES SteelSpecifications E-Z Pack cleve�opecl an engineered grade steel for the refuse application, We call this product SMARTSTEEL. E-Z Pack's SMARTSTEEL metal goes through a slightly different quenching and tempering process than standard AR steel, which gives ita tough and wear -resistant exterior while eliminating all brittleness within the core of the steel. '.311,1�11'11,1"11'1 MINE Hopper Floor AR 155,000 PSI Single Plate Hopper Long Sill 7 Ga. 100,000 PSI Smart Steel Form Channel Hopper Long Sill Crossmember 3/16" 4" x 3" Steel Tube ........ . .... .... ���member Support 7 Ga. 8" Long Sleeve Hopper Transftion Crossmember 1/4" 6" x 4" Steel Tube Hopper Lower SWe Walls 3/16" 100,000 PSI Smart Steel Hopper Lower Sidle Wall Liner 10 Ga, �100,000 PSI Smart Steel 22" High Fl9pper qRper Hopper Side Walls 10 Ga. 100,000 PSI Smart Steel Cab Guiard 12 Ga. 50,000 PSI Smart Steel Body Roof 10 Ga. PSI Smart Steel - Raidius Body Side Walls Body Floor ]100,000 100,000 PSI Smart Steel - Radiius 100,000 PSI Smart Steel - Radius 100,000 PSI Smart Steel 2 1/4" x8 3/8" Fromed Roof Superstructure 7 Ga. Channell Roof Superstructure 3/16" x 2" Steel Tube . ......... __ . . ............. Body Floor Structure 7 Ga. PSI Smart Steel N" Cha,nnel Body Floor Rear Bolster 1/4" �100,000 PSI Smart Steel Formed Channel Uft Arm Support Bar 3/4" 80,000 PSI Smart Steel - Bar Lift Arm Side Plates 1/4" :100,000 PSI Smart Steel - Plate Lift Arm Cylinder Anchor Plates Fork Tangs 6V 1/2" V 50,000 PSI Smart Steel - Plate T-1 Steel Plate Fork Torque Tube 3/4" Seamless Steel Tubing 3 1/2" O.D. Packcr Panel Super Structure 1/4" .......... . .. 100,000 PSI 3" x 3" Steel Tube Packer Panel Lower Face Pla t e 1/4"' 100,000 PSI Smart Steel - Plate Packer Panel Slope Face Plate Packer Panel Upper Face Plate Packer Panel GuWe Channels 7 Ga. 10 Ga. 3/8" 100,000 PSI Smart Steel - Plate . ..... . .... 100,000 PSI Smart Steel - Plate AR500 180,000 PSI 3" Mde Wear Plate Packer Panel Center Wear Tracks 3/8" ­­.­­­­­ . . AR500 180,000 PSI 6" Wid�e Wear Plate ........... - ........... . . [r�llI a I_gat, Walls 10 Ga. ��100,000 PSI Smart Steel a ailgate Braces 7 Ga� �100�,000 PSI Smart Steel ilg,t, hilimte Hinaes, 1/?"', �100�.000 PSI Smart Steel - Plate U�����U U0 �� U����U�����=� ������U���� �U��� ���U�U�d��� ----- - -- - " "��^~-~�~~�~�~~ Interlaced Hopper Floor Support The HERCULES front loader hopper floor support is designed and built with a leading interlaced hopper floor design that eliminates any wash boarding effect to the impact loading area. Cut out ofthe hopper long member allows the floor cross -members tobeneoesyed giving you full support cross and length ways support inthe hopper area. Across-member support [oalso added for additional strength, Commercial Grade Hydraulic System From steel line sizes to the large hydraulic filters, Hercules sets the industry standard by offering a premium hydraulic system. HYDRAULIC PUMP - At the heart of the Hercules hydraulic system is the Muncie MILS. hydraulic pump. The Muncie MLS hydraulic pump is a flow regulated- hydraulic system that offers a "No Kick Out" feature when dumping containers. Plus the MLS pump allows the operator to "Pack on the Run" with, no pump damage or over heating. HYDRAULIC FILTRATION - Some manufactures talk about the small micron hydraulic filters as a fix all, but the Hercules also offers the largest return line fiilte,r with "in -Cab Service Indicators" for extended hydraulic service life. HIGH QUALITY HYDRAULIC CYLINDERS — All E-Z Pack products are equipped with premium hydraulic cylinders just for the waste industry, giving you years of trouble free service. RUSTPROOF HYDRAULIC LINES - The Hercules hydraulic system offers maximum line sizes throughout the system allowing less restriction and faster fluid cooling. Plus all steel lines are made from "Rust Proof' steel, and are held in place with high quality claimps for a long service life. . . . ..... '761ago Mulling So/w/mys, UC At the heart of the hydraulic system is E-Z Pack's new Dual Vane hydraulic pump that is designed for dedicated flows to the automated carry can and the packe for smooth precise operation. E-Z Pack's new hydraulic pump is designed for continues operation, in gear and at idle. This new system eliminates a priory valve, giving you a cooler operating temperature and plus delating component for less maintenance. (No PLC Boards here!) The pump is drive PTOJ so and/or replace. 3/11800 W driven from a constant no clutches to service . .111� � � 11 F E-Z Pack Refuse Hauhng Solutions, LLC, reserves the right under its Product Improvement Program to modify construction and/or design and furnish equipment without reference to illustrations and specifications shown herein. All specifications are subject to change without notIce. E_ Z (I . . . ....... New Integrated Controls with Auto -Dump Feature E-Z Pack's new integrated controls with auto -dump feature is easy to use with built in safety features. The operator only needs to pull the control back to complete a lift dump cycle. Push the control forward the and carry can will roll out of the hopper and back to the work position. On top of the controls are push buttons to easily tilt the container up or down for road obstacles. The automated carry can controls are separated from the arm controls to avoid any mishaps of not pushing the right control buttons. No PLC boards or metering cylinders aire required. E-Z Pack Refuse Hauling Solutions, LLC, reserves the right under its Product Improvement Program to modify construct On and/or design and furnish equipment without reference to illustrations and specifications shown herein. Ali specifications are subject to change without notice. .... . ... E AZ f?eftj.,;e ti�ivflng Sohitiomi, ZLC New Designed Hydraulic Reservoir For 2018 models �E-Z Pack has updated their front loader and automated' side loader hydraulic reservoir for ease of service. The newly designed hydraulic reservoir includes an integrated return line hydraulic filter that will allow fo r easy filter replacement and additional frame clearance when installing auxiliary axles. A 12" Sight and Temperature gauge has been added that will allow for fluid level checks at any position of the hydralulic cyllinders. Accessory ports has also been added to accommodate filter buggy connections and or hydraulic heaters. High Quality Packing Cylinders! n, r", s,'Aak"", 9 d C The E-Z Pack HERCULES front loader is equipped with premium industry le�ading, packer cylinders designed specifically to withstand the severe environment of waste removal application. The HERCULES front loader packer cylinders offers the following features: N E-Z Pack knows that their products lives a hard life and that is one of the reasons that E-Z Pack powder coats their products. Powder coat paint is 6 times more, durable than the traditional wet paint process, giving, you more value. As a standard benefit from E-Z Pack, a protective industrial grade undercoating is appfied to the body for a long: service l,ife in all types of extreme weather conditions. Another advantage is that no electrical or hydraulic lines are paint over for easy trouble shooting and cleaner appearance. Plus E-Z Pack's powder coat paint is environmentally friel vs conventionall spray paint methods. 11111111 ill llllq�lllnr Stage 1 Body cleaned, deburred, weld spatter and slag removed Stage 2 Multi -stage chemicat treatment and h,igh pressure wash. Stage 3 Apply Powder coat primer and finish coat Stage 4 Bake Booth — 325 Degrees untill fully cured. Stage 5 Apply ffidustrial Grade Undercoating to Body Stage 6 Quality Control Inspection Specification and Performance: 1 ) Dry film thickness is to be minimum 4 to 6 miIls coverage. 2) Paint must pass minimum 1250 hours salt spray test for corrosion resistance. 3) Paint must pass UV test of 2000 hours for minimum loss of gloss and collor shift. 4), Hydraulic cylinders and valves to be 1painted back semi -gloss. 5) Hose ends and hydraulic fittings to be anodized and remain unpainted. 6) Hydraulic tubing to be zinc dichromate piated and unpainted, Electrical harnesses, connections, switches, pneumatic tubing and fittings to be weatherproof and remain unpainted, .... ..... . ... ffi,A-, H""Auq' UX Model FL0080J40SE FL Front Loader 00 Commercial Grade Body 80 8,,000 Lift Capacity J Mode�l Lift Arm 40 40 Cubic Yard Capacity S Slicling Top Door; E Full Ejection Style Standard Equipment Includes the following: Commercial Grade Superstructure Assembly Bol't-on Lift Arms — 10, 000 Lbs Construction Heavy Duty Tailgate with Auto Latch and Safety Prop SMART STEEL Radius,es Body Floor, Side and Roof * 100 Gallon Body Sump for Liquid Retention * Bolt on Cab Shield * Sliding Hopper Cover * Large Body Access Door with Safety Grab Hand�ies * 8" Convex Mirror — Driver Side * Operator In Cab Air Control — Forks I Arm * Auto Pack — Packer Controls * Commercial Grade Hydraulic Package Premium Packer Cylinders — 3 Year Warranty E-Z Pack Prox. Control Switches v/ Powder Coating Paint White with Body Undercoating • DOT Approved Reflective Tape • MVSS1 08 Compliant Lights with LED Light • High Mount Tailgate Lights with Center Brake Light • Factory Made Wiring Harness • ANSI Approved Top Body Tie Off Containment • ANSI Approved Top Body Access Ladder • Full Factory Mount • _Hop�per Sump Overlay • 7 Ga Body Side Walls • Integrated Operator Controls • Packer Panel Remote Lube Lines ,," Top Body Access Ladder &Z Pad Refuw 11 tg Sdu5ons, LLQ re�s U righl undu 4 Prodmt hprwamanl Progm In moddy -nskwfion andla das�gn and furrdsh equ4mentw�fmuftraf"enca W NmtaWns and Weaoab— dwwn Wain AD 6peGiWons wo sub*[ W ohmp wMW nobre. 14 0 .. ..... ... ... . .. EZ RaCP' .. . ....... .... . . Option includes the following: (4) 4" Heavy Duty Weld -in Sharks Teeth installed on, the upper section of the packer panel. E.ZPwk Refuse Hwling$olubons, LLO, re�silwotunckeii& Pmd�ftmprweumnt R-gram W andlor design end turrdth equipment WhouDetemnmi b tfuslratmns mdspecifi.atbm, shown hereln An sWftalkeis "m sub*l 10 Ch"ge v4jho�t netime, 15 Option includes the following: ac The Body / Hopper access ladder provides a easy and safe manor for "MI the operator to access the body hopper. Bolt -on Design, "14111111111row E-ZPackRdw�o Hauling Solutions, LI.Qre�wsthe right undulto In nxurVy oars"ain mullor cloaIgn and With equIpment without reforenon to illustrations and specifications .h— hordn. All me subjed to change W1.0 notice az* Option includes the following: Heavy Duty expanded metal to cover the body front bulk head. Weld -in I 17 EY'Pac, Option includes the following: Bolt In Rear Body Hinge Assembly Body Safety Props REAR HINGE INSTALL E.ZP%kRefum HadngSduhms, LLC,m—s heflghtundu�b ftdud1mpmemm[Rogram to moWy —s5udon mcV� desiga md f�M equipment wilhwt mWan� b Muskdons md spmikaj— Owl h 1. W] ...... . .. A'fq� . ....... O�ption includes the following: Ez-Mv "PacP Complete Body Service Hydraulic Hoist Kit Rehm, Avul,�2 S"A'alom, 11, . . .. .... . . . .... ....... A E-Z Peek Rehm Naubng Sddoas, LLO, re�s the �gbt under h Rodwt Imp—ml Progrm to M* wmkudo. -Wor ck.ig. -d ftnkh e�rip.-[Wffioul We� b 16skations and s"fkaWs ,h.� hmi�, AM �pdkab— are wb�O 1. ehange .11-1-fice W �"010 . . . . ......... ...... . ... __ ....... ... . .... ....... . ....... ­­­ ­_." Description: This new cab shield is radius so that any debris that falls out of the container when dumping will roll -off so that the operator will not need to climb on top the truck to remove the, debris. .............................. This option includes the following: • New bolt -on Radius Cab Shield • Pneumatic Extension • Fork/Arm Interlock • Side Exhaust Ports • Raised Side Walls for Side Exhaust • Available on: • Autocar ACX • Mack MRU • Peterbilt 320 2018 Kq�� FB14 F-Z Pack RA.Hading S016�9, LLC,ras�g the 601 un" Rs RoductImprovementftg'an to ad! u:s Cant= Wth Air Flin ExL sbown her6n. N1 tpeckatoos are tub*% to charge wigmt noboe. 20 . ...... .. . . . . ...... E Z Option includes the following: (11-"�� Canopy Liner fevh,m Nz�,,&,y Clean Shield has been developed with input from Waste industry leaders to solve the long-suffering issue of Cab ShileIlds degrading and looking awful. Clean Shield is a multi -layered sandwich of films and adhesives designed to be easily applied, long lasting and most of all impervious to even the most corrosive mixture of environmental and waste related pollutants. Clean Shield can handle just about any poHutant you can throw at or on it! How Does Clean Shield Work? Clean Shield is a muiti-iayered sandwich of unique films which s,elf-adheres to the surface of your cab shield and provides a permanent barrier between all the damaging corrosive agents in the air and in the clumpsters and your shield. The outer layer is a special Fluoropolymer which repels pretty much any type of damaging or corrosive liquid or dirt. Even Sulfuric Acid will roll off its back like a water on a duck. What Colors Does Clean Shield Come in & What About Custom Graphics? Clean Shield is a custom-made product and allows for any color or graphic to be incorporated. Clean Shield can be matched to any PIVIS color and graphics can be printed in any shape, color or design to support your brand . 20'18 IRM=- FB35 E-1. Pack ReNvi H.1ing S*5.n.. LLG. --flisd UK -der& Roduct proggm to rno" constm Bon aniVordes4i and turrash equpinentwithoWelwancato 1160ralion a and "droatons Cabshoild Liner I d shown huoh. AM speoftabnns we subjact Id changi without notm III n&hleffie--*� M oow. 10 EZ'A;;p ....... .. _7101i , I DEX, qj-T� -Ir 1 21 K!��FFV IE ACCE'. 3 762 2 1 21190f7 0 5186 I 1?� R,�, .59 �L 4,CC ESS 5 i, REF: 2 t I r�j4 7 Q Tm H F. X L,-�C, K i 14,28 00^11 CYNI&I Suppod Frame rQ 1 Weld Frame assy (# 1) nh opontng �n 2113354 Cylindipr SUpport ass Position fhnh voth front of Bottom phip ind wNd Io be leakproof, (4 --Ig-Z Pack Mfg:. LLC R PaO 1�1 I�a4d 2117056 �A �Iu 0 ��,F I EF .... . . . ...... . .... . . . . . . ............. . . . . . ........ ... . . . ...... . Ez"PaCAA Rofwe� Op�tion includes the following: • Factory Installed • Rubber Fender Extension — bolt -on E-Z Pxk Ref.. fthq Setti—, LLQ r.eawea he fightundff its NOW Impow..PM-Ware W rx Option includes the following: E-Z-2"' 4" Rubber housing flood light mounted on the main control valve mounting bracket pointed into the body hopper. - Switched from in cab located on the packer control box E-ZPad� ReWeHnling SoMsms, to _ft o-shcUon �dnrdas�gi ad ftgnl5h equIpmealwithoW reWen" to 40a6as ad speoftegms shown hoWin. AN we bo& so h.p wffioulnobce 24 Option includes the following: * (4) Amber LED l'ights replace red turn signals ° Lights function asboth thule-flash, alternating strobes and rear turn signals. ~ Hard -wired LED design for long life and low amp draw. = StrobiDQfQmotion meets SAE ]D45 specification. ° Turn signal function meets DOT rear turn specification. ° Activating turn signal automatically overrides strobe function. ° Two power wires allow strobes to be activated two ways, i.e. with cab switch and automatically when shifted into reverse. w 25 Option includes the following: . ........ - Camera System - Dual This is a layout for a dual -view camera system for a front loader application. This ideal when bi out of ally ways ot to building. 1 — Hopper View 2 — Back up View Operator can t�ou( screen for selecte view. qnpu � 8 M "",00060 E, � Z. Roluse Hauhng LLC The following is a list of items included: • Street Side Arm/Fork Controls - JoyStick • Curb Sid,eAuto-Dump Fork/Arm Controls • 60" Forks with 8" Bumper Extension Pads • E-Z Pack Dual Hydraulic System • Deceleration Valve - Lower Cushioning • Special Cushioned Fork Cylinders • O.E.M. Qu�ick Connect / Disconnect • O.E.M. Operator Joystick Controls • Front LED Work Lights E—ZPwk RafijwHwlinqSdutiop�, LLC, m�&M floh I und� its RoductImp(mmankRogram b moWy—h.g.. d. d.6U. d f�N A wd specft.Ws dm� hmin. AN epectodon a m subimM char go wWukno*e. M ........ . ..... . . . . .. Hauling5ohdolonx, LLC 102.5 DG�E Capacity (3)25 )1 x80"'Ta n ks 0 102.5 DGE CNC Fuel System is Integrated into Tailgate Each system includes the top of the line FMM with transit f H and, NGV-1 receptacles. High quality MFT regulator, high and low pressure gauges and J1939 chassis integration. Mounted in the cab is afuel gauge with distance to empty, system pressure, and the traditional E to F readings. All fittings in the FMM are O-ring style with color coded lines. E-Z Pwk Robw HadN SaMom , LLC,r.—UvIO(unft its Roifml hpm.—iftoorm to m&�consh�iw W" deggi 'Ad Unish aqujpmenWthmtrefvenceWAustAons and spadfications shftn WeIn. Al sp"ififabons e �.b*l, 1. h-W Mloutnotioe. PE .. .... .. go R'b"'a Muding Option includes the following: (1) 20 Lbs Fire Extinguisher mounted on street side of the body. . . . . . . .. . . . M0,000 SQ. FT.,of sparks, steel, and hard work-.....,= Th�ey say a house is on�ly as good as it's foundation. If the foundation of a manufacturing company is it's factory, then we have a great base to build on. With over 350�,000 squaire feet under roof, our p�lant provides us the opportunity to stabilize, modernize and improve the EZ-Pack Product line,. We are making investments in new technologies, new fixtures, and new methods of production to ensure that we stay competitive and deliver a high quality product that lives up to the EZ-Pack name. We invite you to come see what we're about. Factory tours are always available, a,nd we're excited to show our new home. Come meet the hard working men and women that actually build your next body. We'll even let you drive your completed unit off the line, just let us know and we'll be happy to arrange it. in BRUCKNER TRUCK SALES, INC. Da(e 3/3012018 In Progress Quole no. BRUC201800008BF286 Your ret. EZ PACK CHTH LLC 200 LADISH RD CYNTHIANA410312500 KY Technical Specification Please find below the Technical Specification for your new Volvo Truck(s) . LR 64R G CUSTOMER[VEHICLE INFO 2019 MODEL YEAR REGIONAL FLEET 25 OR MORE VEHICLES IN OWN FLEET OF ANY VEHICLE BRAND 2008-10-07 LR 64R G DAYCAB COMMERCIAL ALL 50 STATES, NON-CARB ENGINE EMISSION (US17) ENGLISH CLASS B HIGHWAY -INNER CITY REFUSE FRONT LOADER TRUCK NORMAL HIGHWAY, STARTING GRADES<12% CONCRETE LOADING AND / OR UNLOADING SURFACE REFUSE / LANDFILL OPERATION APPLICATION PACKAGES WITHOUT SPECIAL SALES PACKAGE NO PILOT REQUESTED ENGINEITRANSMISSIONS WITHOUT DIRECTION CHANGE ENABLE FUNCTION (DATALINK) WITHOUT DIRECT HOLD INPUT FUNCTION ISL9-G 320 CUMMINS-NZ 320HP @ 2200 RPM (GOV), 1055 LB -FT, US'17 4500 RDS 6 SP-ALLISON RUGGED DUTY SERIES GEN 5 W/PROGNOSTICS REFUSE W/AUTO-NEUTRAL, NO GEAR LIMIT SECONDARY MODE WITHOUT GPIO PACKAGE WITHOUT AUXILIARY FUNCTION RANGE INHIBIT WITHOUT LOAD/GRADE SHIFT SENSING WITHOUT ROLLING DIRECTION CHANGE INHIBIT WITHOUT ALLISON PRESELECTED GEAR DURING ENGINE BRAKING WITHOUT PRIMARY CALIBRATION SHIFT SELECT MASK WITHOUT SECONDARY CALIBRATION SHIFT SELECT MASK WITHOUT FUELSENSE WITHOUT DYNACTIVE BIAS, PRIMARY CAL WITHOUT DYNACTIVE BIAS, SECONDARY CAL WITHOUT NEUTRAL AT STOP WITHOUT ALLISON ACCELERATION RATE MANAGEMENT EXHAUSTIEMISSIONS 3 - WAY CATALYTIC CONVERTER (CNGILNG) MOUNTED VERTICAL RIGHT HAND SIDE. W/O DPF NO MUFFLER, SINGLE (RIS) VERT STRAIGHT EXH STACK PLAIN END, SIDE OUTLET DIFFUSER, OUTBOARD STANDARD EXHAUST SYSTEM MATERIAL FINISHING 3 WAY CATALYTIC CONVERTER EMISSION OBD, DISPLAY ONLY, USA2018 CARBON MONOXIDE DETECTION SYSTEM ENGINE EQUIPMENT CUMMINS TWIN 30.4 CFM 15" SINGLE ELEMENT FACTORY OPT 12V1 60A DELCO 24SI BRUSH TYPE 3-12V MACK M/F 31 650 CCA THREADED STUD TYPE CHEVRON FULLY FORMULATED COOLANT W/ NITRATES (50/50 MIX DYED PINK) TO -34DEG WINTERFRONT EXTRA NARROW RADIATOR WITH LENGTH1 (60 DM2),41 DEG C ATB COOLING CAPACITY "W/AUX RAD." 220 VOLT / 1.5 KW, ENGINE BLOCK HEATER HORTON FAN, "ON -OFF" -- replaces 1181010 W/O ENG BRK CUMMINS CNG COALESCING FUEL FILTER STANCHION MTD ON FRAME FUEL EQUIPMENT, HEATER FOR THE CNG SUPPLY REGULATOR FUEL LEAK DETECTOR, GAS SILICONE TETHER PK2: BATT BOX COVER SINGLE BOX 3 BATT MAX PERP.TO FRAME 11 "FROM NTOF BASIC BATTERY BOX COVER MECHANICAL SWITCH POSITIVE CONNECT TYPE- US10 BATTERY SHOCK PADS EMERGENCY START STUDS, B.O.C. INCREASE 10 MINUTE MAXIMUM TIME CLUTCHITRANS EQUIPMENT MERITOR 176 MXL"XTENDED LUBE" FURNISH TC521 FOR USE W/ ALLISON(HD,RDS) TRANSMISSION TRANSYND SYNTHETIC AUTO TRANS FLUID REMOTE MTD OIL COOLER FURNISH FOR ALLISON TRANSMISSION PROP SHAFT INTERAXLE, UNIV JOINT HALF -ROUND TYPE PROPELLER SHAFT MAIN, UNIVERSAL JOINT HALF -ROUND TYPE MERITOR 17 MXL"XTENDED LUBE" TRANSM OIL MONITORING, REMOTE FITTING FOR OIL SAMPLE ENGINE SMART TORQUE FEATURE, ENABLED WITHOUT TRANSMISSION PROTECTION WITHOUT HILL START ASSIST FRONT AXLE EQUIPMENT FXL20 20000 LB-MACK (HIGH OFFSET) 9100KG BENDIX ES165-06NG 16.5 X 6 HD STAMPED SPIDER BRAKE LINING MATERIAL FRONT, EATON ES- 1100/600 CAST IRON BRAKEDRUM, FRONT AXLE FRONT BRAKES WITHOUT DUST SHIELDS BASIC MATERIAL HUB (STEELICAST IRON),FRONT WITH SHOCK ABSORBER, FRONT FRONT BRAKE ADJUSTMENT, AUTOMATIC HALDEX 20,000 LB TAPERLEAF 9100KG WITH BUMP STOP, FRONT SUSPENSION M100P,PLUS RIGHT SIDE ASSIST CYLINDER FRONT BRAKE CHAMBER MANUFACTURER, MGM FRONT BRAKE CHAMBER 30SQ INCHES (SERVICE) REAR AXLE EQUIPMENT REAR AXLE CASING WIDTH, STANDARD BRAKE LINING MATERIAL DRIVE, EATON EES-600 REAR BRAKE ADJUSTMENT, AUTOMATIC HALDEX S462R 46000LB-MACK 20900KG CAST HSNG MACK mRIDE46 PARABOLIC LEAF 46K WITHOUT SUSP. LEVELING DEVICE CRDPI50/151 RATIO 4.80, REAR AXLE BENDIX ES165-08NG 16.5 X 8 5/8 HD STAMPED SPIDER CAST IRON BRAKE DRUMS REAR DRIVE BRAKES WITHOUT DUSTSHIELDS WITHOUT LUBE PUMP,REAR AXLE IRON PRESET HUB, DRIVE, W/ INTEGRATED SPINDLE NUT PREMIUM HUB OIL SEAL, DRIVE POWER DIVIDER LOCKOUT, W/BUZZER & LIGHT WITH SHOCK ABSORBERBEAR PETROLEUM OIL IN REAR AXLE WITHOUT REAR SPRING INSULATOR MGM MODEL TR-T; TAMPER- RESISTANT BRAKE CHAMBERS REAR BRAKE CHAMBER 30 / 30 SQ INCHES (SERVICE/EMERGENCY) BOGIE SPREAD, 1370MM (54.0") W/O INTR-WHL/DIFFRNTL OPTNS WITHOUT REAR SUSPENSION TRANSVERSE TORQUE ROD WITHOUT REAR SUSP. BEAM BUSHING SPINDLE NUTS, MAIN AXLE, INTERGRATED ABS 4 SENSORS & 4 MODULATORS (FRONT & REAR AXLES) BRAKE CHAMBER DIAPHRAGM, BASIC MERITOR/WABCO ABS I ATC WITH MUD/SNOW SWITCH FRAME EQUIPMENT/FUEL TANKS STEEL-3/8"X 133/8"X 31/4" (CLASS 8) 210" 68" WITHOUT LINER MUDFLAP, FRONT AXLE, BASIC (NO ANTI -SPRAY) SHORT BUMPER, PAINTED STEEL FLUSH STL-1/2"PL BOLTD BOC & INTRMDTI/8"BELO RAIL,GR5 BB,lST XMBR BOC RR 38.17"FROM A LINE I AUX. CROSSMEMBER, BACK TO BACK REAR CROSSMEMBER, STRAIGHT FRAME END (BASIC) WITHOUT FRAME RAIL CLEARANCE GUARD - RADIATOR ONE PIN TOWING DEVICE, FRONT WITHOUT TOWING DEVICES,REAR WITHOUT FRONT FRAME EXTENSION, BOLTED ON FUEL HOSES, HIGH PRESSURE AIRIBRAKE WITHOUT AUX. Al RTAN K WITHOUT BODY BUILDER AIR PREPKIT WABCO AIR DRYER, I 800P WITH COALESCING OIL FILTER AIR DRYER POSITION STANDARD STEELAIRTANK AUTOMATIC DRAIN VALVE, HEATED AUXILIARY (WORK) BRAKE HAND CONTROL, ACCESSIBLE BOTH SIDES PARKING BRAKE VALVE, I YELLOW KNOB, ALL PARKING CHAS PACK CONFIG 16, AIR TNKS INSIDE & UNDER RAIL FORWARD RA ELECTRICAL DRL WHEN ENG RUNNING, PARK BRAKE OFF BACKUP ALARM 87/112 DB, PRECO (ADJ TO AMBIENT SOUND) AUX POWER OUTLET, 12V DOGHOUSE ALL CIRCUITS FUSE/BREAKER PROTECTED HEADLAMP BULB TYPE, LED WITHOUT TAIL LAMPS WITHOUT WARNING LIGHT BODY HEADLAMP PROTECTION SIDE INDICATOR LAMP TYPE, LED TRAILER CONNECTIONS EXTERIOR INDICATOR LAMP, MAIN SWITCH, BASIC PTO/SPECIALTY EQUIPMENT FURNISH ENG PUMP MTG PROVISIONS - INCLUDE WIRiNG, SWITCHES,AND INDICATORS AS REQ'D WITHOUT PROP SHAFT FROM MAIN TO AUX TRANSMISSION CUSTOMER GUARANTEED WEIGHT, MUST BE CERTIFIED WEIGHT WITHOUT TRANSP. RUST PROTECTION UNIFORM LOAD NO ADAPTATION EL PREP KIT,REFUSE (NO PASS THRU, 9 & 29 PIN BOC),CTRL LINK2 FRONT END PTO- 1350 SER FLANGE WITHOUT PTO ENGINE REAR PTO TRANS MTD REAR, PREP KIT, PARKER-HANIFIN 890/891 SERIES WITHOUT DECALS CAB (A THRU G) RH & LH SIT DOWN;RH DRIVE ONLY, EXTENDED CAB VERSION FLOOR MAT, RUBBER MECHANICAL, GRADUATED, ON FILTER MANUAL TILT PUMP WITHOUT PREP KIT FOR CAMERA CAB STEP,BASIC U.S. UNITS (PREDOMINANT) TRANSMISSION OIL TEMP. GAUGE WITH HIGH TEMP. WITHOUT GEAR SHIFT INHIBITOR BRIGHT GRILLE (CHROME PLATED) PREMIUM STEREO, AM/FM, CD -PLAYER, MP3, WEATHER BAND, BLUETOOTH ANTENNA, RADIO, CAB COWL MTD, LH, SHORT RUBBER AUTOMATIC AUDIO SHUTOFF, REVERSE ENGAGED WITHOUT SPOTLAMP PREPARATION KIT WITHOUT AUXILIARY GAUGES 6LB EXTINGUISHER (ABC RATED) MOUNTED ON INTERIOR REAR CAB PANEL BETWEEN SEATS (FIRE EXTINGUISHER) WITHOUT CAB AUXILIAR FAN, WITHOUT ELECTRICAL OUTLET EMBLEMS OPTION, COMPLETE STANDARD HEATER UNIT MANUAL CONTROLLED CLIMATE CONTROL AIR CONDITION LR LH & RH FRONT HINGED DOORS W/POWER WINDOWS BOTH SIDES W10 PEEP WINDOW/ VENT WITHOUT FRONT CAB CORNER PROTECTION CAB (H THRU R) BLACK TWIN TRUMPET, UNDER CAB MOUNTED, WITH DUAL LANYARD CONTROL 2 SINGLE ELECTRIC HORN, DIFFERENT TONES LED TYPE ROOF MARKER ALL CHASSIS KEYED AT RANDOM - 2 KEYS LH & RH ELECTRIC HEATED & OPERATED, W/O MEMORY BLACK SQUARE HEATED CONVEX MIRROR - (except on bi-fold doors) RECTANGULAR CONVEX ABOVE LH + RH DOORS WITHOUT PERSONALIZED NAME PLATE WITHOUT ROOF HATCH WITHOUT ENGINE COMPARTMENT INSULATION WITHOUT REAR WALL STORAGE COMPARTMENT OVERHEAD SWITCH PANEL, BLANK CAB (S THRU Z) WITHOUT EXTERIOR SUNVISOR WITHOUT TIME COUNTER AIR -SEARS SEATING C-2 MID BACK FABRIFORM CUSHIONS AIR -SEARS SEATING C-2 MID BACK FABRIFORM CUSHION FABRIFORM CLOTH, BLACK DRIVER & RIDERS SEATS LAP & SHOULDER (BOTH SEATS) TO BE ORANGE IN COLOR ADJUSTABLE STEERING WHEEL DIAMETER 450MM STEERING WHEEL, RUBBER GRIP Vl SELF CANCELLING TURN SIGNAL WINDSHIELD PROTECTOR WASHER RESERVOIR BASIC POSITION WITHOUT INTERIOR SUNVISOR SIDE WHEELS & TIRES GHG STEER TIRE CATEGORY, LOW ROLLING RESISTANCE GFIG DRIVE TIRE CATEGORY, OTHER (NON -SPECIFIED) EIGHT REAR AXLE TIRES & WHEELS TWO FRONT TIRES & WHEELS DRIVE WHEEL STUDS, LONG 315/80R22.5 L BRIDGESTONE M860A 22.5 X 9.00 ALCOA ALUM DISC ULTRA ONE 10-HP; 11.25" BC, 5.96"INSET WHEEL FINISHING FRONT, MACHINED BUFF WHEEL NUT & FINISH BASIC, FRONT TIRE INFLATION VALVE, STANDARD TIRE SPEED LIMIT BASIC 11 R22.5 G BRIDGESTONE M726 EL A (DRIVE ONLY) 22.5 X 8.25 LVL ONE ALCOA ALU DISC UNININT 10 (10 HOLE HUB PILOT) ALCOA ALL WHEELS FINISH, MACHINED CLEAN BUFF WITHOUT HUBIWHEEL ISOLATOR DRIVE WITHOUT SPARE WHEEL WHEEL NUT BASIC FINISH, REAR VEHICLE ELECTRONICS MIN CRUISE, 32 KPH (20 MPH) WITHOUT 1ST RATIO FOR REDUCED HIGH IDLE WITHOUT COOLANT LEVEL ENGINE SHUTDOWN WITH CRUISE CONTROL MAX CRUISE, 105 KPH (65 MPH) DETECTION OF SPEED SENSOR TAMPERING, ENABLE WITHOUT ELECTRONIC HAND THROTTLE, JUMP TO MIN. ENGINE SPEED ELECTRONIC HAND THROTTLE, MAX ENGINE SPEED, 2100 RPM ELECTRONIC HAND THROTTLE, MIN ENGINE SPEED, 700 RPM WITHOUT ELECTRONIC HAND THROTTLE, SINGLE SPEED SETTING ELECTRONIC HAND THROTTLE, MAX ROAD SPEED, 16 KMH (10 MPH) WITHOUT ELECTRONIC HAND THROTTLE, SINGLE SPEED CONTROL ELECTRONIC HAND THROTTLE, SPEED RAMP RATE, 100 RPM/SEC WITHOUT ENG FAN CONTROL, A/C ON, TIME SETTING ENG TORQUE LIMITED TO 50%, IF SPEED SENSOR TAMPER DETECTED WITHOUT ENGINE IDLE ADJUST ENGINE IDLE COOLDOWN, DISABLE ENGINE IDLE DELAY TO START LOG, 2 MIN I DLE SHUTDOWN TIM E 10 M I N. ENGINE OVERSPEED, ALL CONDITIONS, TIME LOG IF ABOVE 2200 RPM ENGINE OVERSPEED, FUELED, TIME LOG IF ABOVE 2100 RPM ENGINE PROTECTION (SHUTDOWN) WITHOUT FAN ENGAGEMENT DUE TO PTO OIL PRESSURE, ENGINE SHUTDOWN COOLANT TEMP, ENGINE SHUTDOWN IDLE SHUTDOWN ABS TAMPER CHECK, ENABLED WITHOUT ENGINE IDLE SHUTDOWN TIME OVERRIDE IF EHT ACTIVE ENGINE IDLE SHUTDOWN TIME OVERRIDDEN IF PTO ACTIVE 38C DEG (100F), WARM UP TEMP DELAY 5 MIN. WARM UP TIME DELAY 30 SEC IDLE S/D WARNING TIME ENGINE IDLE SHUTDOWN, DISABLE ENG IDLE SHUTDOWN TIME OVERRIDDEN IF TORQUE > THAN LIMIT WITHOUT LAST RATIO FOR FULL HIGH IDLE ACTIVATE ALERT AT 90% OF THE TIME/DISTANCE SETTING DISABLE POWER DIVIDER LOCK OUT (PDLO) ROAD SPEED LIMIT 105 KM/H PEDAL ROAD SPEED LIMITER (65MPH) PERIODIC TRIP LOG, DAY 1 OF THE MONTH WITHOUT PERIODIC TRIP LOG, DAY OF WEEK WITHOUT PERIODIC TRIP LOG, HOUR PTO 1 ST, MAX ENGINE SPEED, 2100 RPM 1ST PTO, MAX ROAD SPEED, 10 MPH (16 KPH) PTO I ST, MINIMUM ENGINE SPEED, 600 RPM PTO 1 ST, ROAD SPEED LIMIT, 97 KMH (60 MPH) WITHOUT PTO IST, SINGLE SPEED CONTROL PTO 1 ST, SPEED RAMP RATE 100 RPM/SEC PAINT PTO 1 ST AUTO SET SINGLE SPEED, DISABLE WITHOUT PTO 1ST, JUMP TO MINIMUM ENGINE SPEED PTO 2ND, MAX ENGINE SPEED, 2100 RPM 2ND PTO, MAX ROAD SPEED, 10 MPH (16 KPH) PTO 2ND, MINIMUM ENGINE SPEED, 600 RPM PTO 2ND, ROAD SPEED LIMIT, 97 KMH (60 MPH) WITHOUT 2ND PTO, SINGLE SPEED CONTROL PT02 SINGLE SPEED SETTING, 100ORPM PTO 2ND, SPEED RAMP RATE 100 RPM/SEC PTO 2ND, AUTO SET SINGLE SPEED, DISABLE WITHOUT PTO 2ND, JUMP TO MINIMUM ENGINE SPEED PTO 1ST, SINGLE SPEED SETTING, 1000 RPM 105 KM/HOUR ROAD SPEED LIMITER(65 MILESIHOUR) WITH SERVICE ALERT WITHOUT TRANSMISSION PT01 SPLIT GEAR RANGE WITHOUT TRANSMISSION PT02 SPLIT GEAR RANGE SERVICE INTERVALS, VOCATIONAL APPLICATION VEHICLE OVERSPEED, FUELED, TIME LOG IF ABOVE 70MPH (I 13KMH) VEHICLE OVERSPEED,ALL COND, TIME LOG IF ABOVE 75MPH (121KMH) WITHOUT MAXIMUM ENGINE SPEED AT 0 MPH SINGLE COLOR MACK WHITE 08282PP; P9188 NO SECOND TRUCK COLOR PROVIDED; NO COLOR NO THIRD TRUCK COLOR PROVIDED; NO COLOR SOLID PAINT POLY BASE -POLY CLEAR SAME AS FIRST COLOR - CAB MACK BLACK; P3036 CHASSIS PAINT PROCESS, STANDARD COLOR (MACK BLACK) 6ABZ1X PAINT BUMPER SAME COLOR AS CHASSIS RUNNING GEAR W10 OPTIONAL FUEL TANK PAINT WITHOUT (UNPAINTED) WITHOUT (UNPAINTED) WITHOUT PAINT WITHOUT PAINT SAME AS CHASSIS RUNNING GEAR SAME AS CHASSIS RUNNING GEAR CALCULATED CODES - KAX COMPONENTS PRODUCT CLASS, CA CHANGE REQUIRED YES, THE ORDER MUST BE CALCULATED BASE WARRANTY & PURCHASED COVERAGES US - WARRANTY REGISTRATION LOCATION ALLISON TRANSMISSIONS (Contact Allison Transmission for standard warranty and extended coverage data NO GUARDDOG CONNECT (ASSIST & MACK ONECALL) WITHOUT OMNITRACS FOR MACK TRUCKS WIO TELOGIS PACKAGE HEAVY DUTY WARRANTY CLASSIFICATION STANDARD MACK HEAVY DUTY COVERAGE 36 MONTHS / 350,000 (563,000 KM) AIR CONDITIONING STANDARD COVERAGE (Sealed System Only) 12 MONTHS UNLIMITED MILEAGE STANDARD NORMAL I HEAVY DUTY CHASSIS TOWING 90 DAYS OR 5,000 MILES CUMMINS ENGINES (Contact Cummins for Standard Warranty and Extended Coverage Details) HEAVY DUTY STANDARD BASE COVERAGE 12 MONTHS/100,000 MILES (161,000 KM) CUMMINS ENGINES 8.91- (Contact Cummins for Standard Warranty and Extended Coverage Details) CUMMINS ENGINES (Contact Cummins for Standard Warranty and Extended Coverage Details) Customer Adaptation EMERGENCY START STUDS, B.O.C. 220 VOLT/ 1.5 KW, ENGINE BLOCK HEATER BATTERY SHOCK PADS 68" REAR FRAME LENGTH, 2410 MM CHAS PACK CONFIG 16, AIR TNKS INSIDE & UNDER RAIL FORWARD RA 5LB EXTINGUISHER (ABC RATED) MOUNTED ON INTERIOR REAR CAB PANEL BETWEEN SEATS (FIRE EXTINGUISHER) FIRE EXTINGUISHER LOCATION, REAR WALL PANEL, BETWEEN SEATS R.H. & L.H. SIT DOWN DRIVING POSITION, EXTENDED CAB VERSION Can't add option due to KAX error for number of switches. 254AB5 - 2540401 Drvr Cont. I ntr Wheel Diff Lock Can't add option due to KAX error for number of switches- 3CAC1X-CAFAN20H 2 Cab Auxillary Fans (overhead) Market Extras 19B Freight (29) Volvo Truck Corporation has a policy of continuous improvement and therefore reserves the (ight at any time without notice to change the design or specification of any products supplied by it. Any illustrations, descriptions or other data relating to any products supplied by Volvo Truck Corporation are given in good faith but Volvo Truck Corporation shall have no liability of any nature should there be any discrepancy between any products supplied and such illustrations, descriptions or data. Technical Specification Summary VEHICLE USE & REFUSE FRONT LOADER TRUCK BODY/TRAILER TYPE APPLICATION REFUSE-TERRAPRO 64R G-Allison-S462-mRIDE RECOMMENDATIONS 46k-Drum-Front Loader CNG DIRECTION CHANGE ENABLE WITHOUT DIRECTION CHANGE ENABLE FUNCTION (DATALINK) DIRECT HOLD INPUT WITHOUT DIRECT HOLD INPUT FUNCTION ENGINE PACKAGE ISI-9-G 320 CUMMINS-NZ 320HP @ 2200 RPM (GOV), 1055 LB -FT, US'17 TRANSMISSION 4500 RDE GEN 5 W/PROGNOSTICS ALLISON GPIO PACKAGE AUX FUNCTION RANGE INHIBIT LOAD/GRADE SHIFT SENSING ROLL DIRECTION CHANGE INHIBIT 6 SP-ALLISON RUGGED DUTY SERIES WITHOUT GPIO PACKAGE WITHOUT AUXILIARY FUNCTION RANGE INHIBIT WITHOUT LOADIGRADE SHIFT SENSING WITHOUT ROLLING DIRECTION CHANGE INHIBIT PRESELECT GEAR IN ENG. WITHOUT ALLISON PRESELECTED GEAR DURING BRAKE ENGINE BRAKING PRIMARY CALIBRATION SHIFT WITHOUT PRIMARY CALIBRATION SHIFT SELECT MASK MASK SECOND CALIBRATION SHIFT WITHOUT SECONDARY CALIBRATION SHIFT SELECT MASK MASK FUELSENSE CALIBRATION WITHOUT FUELSENSE DYNACTIVE BIAS IN PRIMARY WITHOUT DYNACTIVE BIAS, PRIMARY CAL MODE DYNACTIVE BIAS SECONDARY WITHOUT DYNACTIVE BIAS, SECONDARY CAL MODE NEUTRAL AT STOP WITHOUT NEUTRAL AT STOP ACCELERATION RATE WITHOUT ALLISON ACCELERATION RATE MOMENT BIAS MANAGEMENT CARBON MONOXIDE CARBON MONOXIDE DETECTION SYSTEM DETECTION SYS COOLING PERFORMANCE EXTRA NARROW RADIATOR WITH LENGTH1 (60 DM2), 41 DEG C ATB COOLING CAPACITY "W/AUX RAD." FRONT AXLE FXL20 20000 LB - MACK (H IGH OFFSET) 91 OOKG SPRINGS - FRONT 20,000 LB TAPERLEAF 9100KG FRONT AXLE BRAKES BENDIX ES165-06NG 16.5 X 6 HD STAMPED SPIDER REAR AXLES - TANDEM S462R 46000LB-MACK 20900KG CAST HSNG CARRIER - REAR AXLE CRDP150/151 REAR AXLE RATIO RATIO 5.04, REAR AXLE REAR SUSPENSION - TANDEM MACK m RID E46 PARABOLIC LEAF 46K BOGIE SPREAD, REAR BOGIE SPREAD, 1370MM (54.0") BRAKES - REAR BENDIX ES165-08NG 16.5 X 8 5/8 HD STAMPED SPIDER WHEELBASE 210" AF(OVERHANG) 9011 FRONTBUMPER BUMPER, STEEL PAINTED EXTENDED, INCLUDING CENTRAL TOW -PIN CAB CA531 TIRES BRAND/TYPE - FRONT 31518OR22.5 L BRIDGESTONE M860A WHEELS - FRONT 22.5 X 9.00 ALCOA ALUM DISC ULTRA ONE 10-HP; 11.25" BC, 5.96"INSET TIRES BRAND/TYPE - REAR I I R22.5 G BRIDGESTONE M726 EL A (DRIVE ONLY) WHEELS - REAR 22.5 X 8.25 STL DISC 11,25 BC. ACCURIDE ACCU- LITE 10-HOLE HP 5 HAND HOLES DRIVE WHEEL STUDS DRIVE WHEEL STUDS, LONG PAINTNINYL STRIPING - CAB SINGLE COLOR EXTERIOR PAINT COLOR - FIRST COLOR MACK WHITE 08282PP; P9188 Technical Specification Summary VEHICLE USE & REFUSE FRONT LOADER TRUCK BODYITRAILER TYPE APPLICATION WITHOUT SPECIAL SALES PACKAGE RECOMMENDATIONS DIRECTION CHANGE ENABLE WITHOUT DIRECTION CHANGE ENABLE FUNCTION (DATALINK) DIRECT HOLD INPUT WITHOUT DIRECT HOLD INPUT FUNCTION ENGINE PACKAGE ISL9-G 320 CUMMINS-NZ 320HP @ 2200 RPM (GOV), 1055 LB -FT, US'17 TRANSMISSION 4500 RIDS 6 SP-ALLISON RUGGED DUTY SERIES GEN 5 W/PROGNOSTICS ALLISON GPIO PACKAGE WITHOUT GPIO PACKAGE AUX FUNCTION RANGE INHIBIT WITHOUT AUXILIARY FUNCTION RANGE INHIBIT LOAD/GRADE SHIFT SENSING WITHOUT LOAD/GRADE SHIFT SENSING ROLL DIRECTION CHANGE WITHOUT ROLLING DIRECTION CHANGE INHIBIT 1k7w0f1-;w1 PRESELECT GEAR IN ENG. WITHOUT ALLISON PRESELECTED GEAR DURING BRAKE ENGINE BRAKING PRIMARY CALIBRATION SHIFT WITHOUT PRIMARY CALIBRATION SHIFT SELECT MASK MASK SECOND CALIBRATION SHIFT WITHOUT SECONDARY CALIBRATION SHIFT SELECT MASK MASK FUELSENSE CALIBRATION WITHOUT FUELSENSE DYNACTIVE BIAS IN PRIMARY WITHOUT DYNACTIVE BIAS, PRIMARY CAL MODE DYNACTIVE BIAS SECONDARY WITHOUT DYNACTIVE BIAS, SECONDARY CAL MODE NEUTRAL AT STOP WITHOUT NEUTRAL AT STOP ACCELERATION RATE WITHOUT ALLISON ACCELERATION RATE MGMENT BIAS MANAGEMENT CARBON MONOXIDE CARBON MONOXIDE DETECTION SYSTEM DETECTION SYS COOLING PERFORMANCE EXTRA NARROW RADIATOR WITH LENGTHII (60 DM2), 41 DEG C ATB COOLING CAPACITY "W/AUX RAD." FRONT AXLE FXL20 20000 LB-MACK (HIGH OFFSET) 9100KG SPRINGS - FRONT 20,000 LB TAPERLEAF 9100KG FRONT AXLE BRAKES BENDIX ES165-06NG 16.6 X 6 HD STAMPED SPIDER REAR AXLES - TANDEM S462R 46000LB-MACK 20900KG CAST HSNG CARRIER - REAR AXLE CRDP150/151 REAR AXLE RATIO RATIO 4.80, REAR AXLE REAR SUSPENSION - TANDEM MACK mRIDE46 PARABOLIC LEAF 46K BOGIE SPREAD, REAR BOGIE SPREAD, 1370MM (54.0") BRAKES - REAR BENDIX ES165-08NG 16.5 X 8 5/8 HD STAMPED SPIDER WHEELBASE 210" AF(OVERHANG) 6810 FRONT BUMPER BUMPER, PAINTED STEEL FLUSH CAB RH & LH SIT DOWN;RH DRIVE ONLY, EXTENDED CAB CA VERSION SUNVISOR, EXTERIOR WITHOUT EXTERIOR SUNVISOR TIRES BRAND/TYPE - FRONT 315/8OR22.5 L BRIDGESTONE M860A WHEELS - FRONT 22.5 X 9.00 ALCOA ALUM DISC ULTRA ONE 10-HP; 11.25" BC, 5.96"INSET TIRES BRANDITYPE - REAR 11 R22.5 G BRIDGESTONE M726 EL A (DRIVE ONLY) WHEELS - REAR 22.5 X 8.25 LVIL ONE ALCOA ALU DISC UNIMNT 10 (10 HOLE HUB PILOT) DRIVE WHEEL STUDS DRIVE WHEEL STUDS, LONG PAINTNINYL STRIPING - CAB SINGLE COLOR EXTERIOR PAINT COLOR - FIRST COLOR MACK WHITE 08282PP; P9188 I unit (s) LR 64R G Total Factory Price (Model, Options, CA) $ 217,962.00 Market Extras 19B Freight (29) $2,100.00 Vehicle Sales Price $ 220,062.00 Total Price $ 435,893.00 Tax Summary I TERRAPRO 64R G Tax Total Amount Subject To Tax %fAmount FET 215,831.00 0.0000 M 0.00 Total $0.00 I LR 64R G Tax Total Amount Subject To Tax %/Amount FET 220,062.00 0,0000 N 0.00 Total $0.00 Total Tax $0.00 Total Price (Incl. Tax) $ 435,893.00 Tax Amount Tax Amount