Loading...
HomeMy WebLinkAboutOpening of Bids - Spec E - One or More 2018 or Newer 60' Aerial Two Wheel Drive Tower Truck Complete - Altec IndustriesOUT11 J), All CITY OF SOUTH BEND, INDIANA SELLER'S BID FOR SALE OR LEASE OF MATERIALS AND NON -COLLUSION AND NON DEBARMENT AFFIDAVIT AND 1965 NON-DISC�RIM [NATION COMMITMENT FOR SELLERS BID NAME Spec E — One (1), or, More 2018 or Newer 60'Aerial Two Wheel Drive Tower Truck Complete FOR BIDS DUE April 10, 2018 at 9:30 a.m. Bidder Date: 4/9/2018 (Firm): Altec Industries Address: 1255 Port Terminal Dr. City/State/Zip: Duluth, MN 55802 Telephone Number: ( 218 ) 625-1686 Agent of Bidder (if Applicable): When lite prospective Contractor is unable to certify to any of Ilse statements below, it sball atrach on explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND, CERTIFICATION OF USE, OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids, Please type or print) STATE OF MINNESOTA ) SS: ST LOUIS COUNTY The undersigned Contractor, being duly sworn upon his/her/its oath, affirms tinder the penalties of perjury that: I . Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person fi-om bidding nor to induce anyone to refi-ain fi-om bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded kom participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. 4 a. For purposes of this Certification, "IraW' means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from tirne-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from thrie-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or iL Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contraetor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, tenns, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the 5 Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year fi-om the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 09 day of April 2018 Altec Industries Contractor/Bidder (Firm) P11 AMY R' HERSTAD Sigt of ClAtor/Bidder or Its Agent NOTARY PUBLIC M MI OT 'e, Cal Sales INNESOTA is i J kl� Commission Expires Jan, 31,2021 Printed Name and Title Subscribed and sworn to before me this 09 day of April 20 18 My Commission Expires No@ry-Pthic County of Residence Bidders are required to state exactly what they intend to furnish; otherwise it is fully understood they shall furnish all items as stated. Brochures & Literature: Your proposal must be accompanied by descriptive literature, marked and indicating the exact items to be furnished, The term "as specified" will not be. acceptable. Please state the nearest authorize service center for parts and maintenance for the unit you propose to furnish. Quantity: One (1) or more. Unit to be bid as a complete aerial tower truck with service body. Trade -In: Unit SN 470, 2000 International Crane Truck S/A, VIN#IHTSCAAM3YH321554 Warranty: All warranties are to be as specified in these specifications. The successful bidder, is responsible for all warranty repairs. If the location for warranty repair is outside the City limits of South Bend, the successful bidder will be responsible for transportation of the unit within eight hours of notification. BID/PROPOSAL ,,e CITY OF SOUTH BEND 0? Spec E — One (1) or More 2018 or Newer 60' Aerial Two Wheel Drive Tower BID NAME Truck Complete FOR BIDS DUE —April 10, 20�18 at 9:30 a.m. Description Year/Make/Model Unit Price Altec Model LS60 Altec Model LS60 on a 2019 Freightliner M2-106 Chassis $ 185,676.00 [us Year Make/Model — Trade In Unit Price 2000 UNIT SN 470, 2000 International Crane Truck S/A, VIN#IHTSCAAM3YH321554 $3,000.00 Estimated number of days for delivery from award 330 date. Bidder (Firm): Altec Industries Address: 1255 Port Terminal Dr. City/State/Zip: Duluth, MN 55802 Telephone Number: (218) 625-1686 BOARD OF PUBLIC WORKS Gary A. Gilot, President Suzanna M. Fritzberg, Member James A. Mueller, Member M Fax Number: 722-6443 J0\ j ($gr1at&e) 00re (Printed Name) Technical Sales Elizabeth A. Maradik, Member Therese J, Dorau, Member Attest: Linda A Martin, Clerk 20 (To be conipleted only by ContractorslBidders claiming to be a "local Indiana business "pursuant to LC. 36-1-12-22) INDIANA LOCAL BUSINESS PREFERENCE CLAIM A "local Indiana bisfiness" refers to an), oJ'theJb1loiving: (1) A business whose principal place qfbusiness iv located in an affected counly. (2) A business that pays a majority of its payroll (in dollar voluine) to residents oJ'aflMed counties. (3) A business that eniploys residents of affected counties as a majority of its eniployees. (4) A business that makes significant capital investinenis in the q1fected counties as defined in rides adopted by the political subdivision. (5) A businews that has a substantial positive econoinic inipact on the q&cted counties as dcfined by criteria in rules adopted by the political subdivision. An "affected county " refers to St. Joseph Counlj� Indiana, or thefillowing counties located adjacent to St. Joseph County Elkhart County, Marshall Counf)� Starke County and LaPorte County There are thefillowing price preferancesfor supplies purchasedfi-oni a local Indiana business: . 5%fir a purchase expected by the purchasing agency to be less than $50, 000 - 3%./brapurchase expectedb), tbepurchasing agency to beat least $50,000 but less than $100,000. - ]%_fo)-apiii-eliasee�,�eted�ytljepiti-chasi)igageiiej,to beat least $100,000. Date: Pursuant to I.C. 36-1-12-22, preference for Project South Bend, St. Joseph County, Indiana. M The location of the principal place of business is claims a local Indiana business (Project # ) located within the City of (Address) El St. Joseph County, Indiana El The following county located adjacent to St. Joseph County, Indiana: The majority of the business's payroll for the 12 months prior to the date of this Bid is to residents of St. Joseph County, Indiana or the adjacent county noted above. The majority of the business's employees for the 12 months prior to the date of this Bid are residents of St. Joseph County, Indiana, or the adjacent county noted above. If the business is deemed to be the apparent lowest, responsible, responsive bidder, then it sball provide supporting documentation for the 12 month period prior to the date of the Bid of (i) the total payroll arnount paid to all employees of the business, and (ii) the total payroll amount paid to employees who are residents of St. Joseph County and the adjacent county noted above. WHENSUPPLYING SUPPORTING PA YROLL RECORDS, BIDDER SHALL REDACTALL SOCIAL SECURITY NUMBERS, Dated this day of 20 Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title H'. fri"YOWDY "i-ogr-In It 1=1 4 CONTRACTOR (Name, legal status and address): SURETY (Name, legal status and principal place of business): Altec Industries, Inc, Fidelity and Deposit Company of MaiCyland 210 Inverness Center Drive 1299 Zurich Way, 5th Floor Birmingham, AL 35242 S,chaumburg.-IL 60196-1056 OWNER (Narne, legal status and address): City of South Bend Office of the Board of Public Works, 13th Floor County —City Building, Room 1316 227 W Jeffersoii, South Bend, IN 466011 BondAmount.- Ten Percent of Amount Bid �10%) PROJECT: (Name, location or address, and Project number, if any) - Spec E — One (1) or More 2018 or Newer 601 Aerial Two Wheel Drive Tower Truck Complete The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein, The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters in to a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material ftimished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiverof notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If (his Bond is issued in cormection with a subcontractor's bid to a Contractor, the term Contractor in this Bon�d shall be deemed to be Subcontractor and the term Owner shall be deemed by the Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrorn and provisions confonning to such statutory or other legal requirement shall be deemed incorporated herein, When so fumished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond, Signed an�d scaled this 5th day of-A-pril 20 18 Altec Industries, Inc. "114-1 .......... 611, A& By: (Witness) (Seat) (Pri all (Sea!) (Title) (iNkh, r"A'-- r-/'kqV- (Wiftness) (Seat) Language confoirris to AIA Document A310 Bid Bond BID700OIZZ0311f Fidelity pnd Deposit Company of Maryland (surety) By: (Title) Mark W. Edwards, II, Attorney —in —Fact ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by DAVID MCVICKER, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Mark W. EDWARDS, It, Jeffrey M. WILSON, Robert R. FREEL, Alisa B. FERRIS, William M. SMITH, Anna CHILDRESS and Ronald B. GIADROSICH, all of Birmingham, Alabama, EACH its true and lawful agent and Attomey-in- Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 23rd day of October, A.D. 2017. ATTEST: Assistant Secretary Joshua Lecker ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURE, TY COMPANY FIDE LITY AND DEPOSIT COMPANY OF MARYLAND .. .... ........ 4* RAL POP, 0 Vice President David Me fl'icker lv� 'j, State of Maryland County of Baltimore On this 23rd day of October, A.D. 2017, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, DAVID MCVICKER, Vice President, and JOSHUA LECKE R, Assistant Secretary, of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. fN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. (a Constance A, Dunn, Notary Public My Commission Fxpires� July 9, 2019 POA-F 033-0161 . . . . . . ..... I CA0 Spec E - One (1) or More 2018 or Newer 60' Aerial Two Wheel Drive BID NAME Tower Truck Complete FOR BIDS DUE April 10, 2018 at 9:30 a.m. Pursuant to notices given, the undersigned offers bid(s) to the City of South Bend in accordance with the following attachment(s) which specify the class or item number or description, quantity, unit, unit price. SPEC E — ONE (1) OR MORE 2018 OR NEWER 60'AERIAL TWO WHEEL DRIVE TOWER TRUCK COMPLETE it is the intent of these specifications to describe a vehicle or piece of equipment for the City of South Bend. The unit shall be bid as a fully equipped complete unit as set out in the attached specifications. No partial or split bids will be accepted. Unit to be bid with and without trade-in if applicable. Vendor to complete bid proposal contained in this bid specification and attach to the submitted bid. These are minimum specifications. Any variation fi-om the specifications must be spelled out on a separate deviation list in order for the bid to be valid. Any items not listed on the deviation sheet will be assumed to be part of the unit. Proprietary products or specific manufacturers may be referenced herein, Such references are only made to dernonstrate minimum scope, quality, and style of the equipment desired. Equipment that is bid pursuant to these specifications shall be of equal quality and size, or greater, to those referenced, and are subject to approval by the South Bend Board of Public Works. Vendor shall provide all information requested in specifications to qualify for bid, If information on brochure submitted does not completely cover specifications requested, it shall be typed and attached to brochure. If an alternate is included within these specifications, please be advised that, alternate items placed in the specifications are to determine the best configuration of'the item within a budgeted amount and may be included in the award criteria, If the Board elects to award one or more (s), the base bid price and the alternate bid price(s) will be totaled and compared for all bidders offering the final configuration, Award will be made based on the lowest resp�onsible/responsive bid prices submitted for the base bid with selected (s), if applicable. Failure to submit a bid on an alternate may result in the entire bid being non -responsive, depending on the final configuration of the product. 24 Payment will be processed once the unit is inspected and accepted as to meeting the specifications by the Division of Central Services. This will include all manuals and warranty documentation. Bidder must state as accurately as possible an intended delivery date from the date of the bid award. Due to the age of the City's existing fleet, it is imperative that the unit be delivered as quickly as possible. Stated delivery lead time may be included as an integral part of our bid selection process. FOB Central Services. The unit and all related paperwork is to be delivered to: Central Services Division 1045 West Sample Street South Bend, Indiana 46619 All Certificates of Origin/Title Work shall list the owner as: The City of South Bend 1045 West Sample Street South Bend, Indiana 46619 The Board will award the bid to the lowest responsible and responsive bidder. If the bid is not awarded to the lowest bidder, the factors used to justify the awards will be stated in writing at the request of any bidder. The Board reserves the right to reject any and/or all bids or portions thereof and to waive any irregularities or informalities. Cab & Chassis: Conventional style medium duty cab and chassis. The following are minimum cab and chassis specifications. Vendor should consult aerial tower manufacturer to verify all minimum requirements. Chassis: Standard cab, 187" wheelbase, 120" cab to axle minimum, 25,999 GVWR. Two wheel drive w/dual rear wheels. Frame: Heavy duty ftame with inverted "L" frame reinforcements with two ftont tow hooks. Engine: Turbo diesel powered, 6.7 liter, 6 cylinder 240 H.P. minimum with fuel/water separator. Transmission: Alison 2500 RDS automatic with overdrive. Heavy duty transmission cooler and PTO provisions. Front Axle Assembly: Detroit DA-F- 10,0-3 10,0001b, front axle with heavy duty shocks. Rear 10 Axle Assembly: 19,000 GAWR minimum, 2 stage multi -leaf springs, HD package available axle ratio 5.88. Lockable rear differential. Brakes: Hydraulic brakes with discs, Wabco ABS. Steering: Power assist tilt and telescopic steering wheel. Tires: I I R22.5 Michelin XDE M/S 16 ply radials, minimurn. Dealer shall equip truck with a full size spare tire and rim. Electrical: HD 160 amp alternator, heavy duty. Electrical package shall be heaviest duty available. Dual maintenance fi7ee batteries. Cooling: HD radiator, equipped with cold climate package. 1,500 waft engine block heater. Fuel System: 50 gallon aluminum fuel tank, heated fuel water separator with hand primer. DEF System: 6 gallon Diesel Exhaust Fluid Tank. Rust Proofing: 5 year minimum protection plan. Color: White Cab and Accessories: AM/FM radio bluetootb, power outlet, tinted windshield, vinyl HD high back bucket driver seat with two bench passenger seat, dual arm rests and sun visors, seat belts, HD floor mats, roof mounted marker lights, and clearly visible calibrated dash mounted engine temperature gauge, oil pressure gauge, voltmeter gauge, engine hour meter gauge, and fuel gauge. Electronic back-up alarm. Dual electric horns. Cab assist handles. Intermittent windshield wipers and washers. Air conditioning, cruise control, and tilt/telescopic steering wheel. Electric windows, locks, and mirrors. Warranty: 3 year/36,000 mile bumper to bumper. 5 year engine and transmission, 100% parts and labor. Aerial Tower: The following are aerial tower specifications. Vendor must be able to provide a demonstration of the exact model within two weeks after bid opening, Unit to be equipped with rear flashing left and right arrow boards. Access steps and all walk areas to be of non -slip material. Warranty: Unit to carry full one year warranty. Travel outside the City limits of South Bend for warranty repairs will be the responsibilities of the successful bidder and must take place within next normal work day. Manuals & Training: Successful bidder to provide eight hours of operation and maintenance training at the City Central Services facility, Two operators, parts and service manuals to be provided with the unit. Rear Mount 60 Foot Aerial Device Configuration A. Unit a. Aerial Device shall be Elliott Equipment Company Hi -Reach, Model L60R-MHA or equivalent as approved by the City. b. Boom shall consist of three (3) sections with two (2) sections telescoped hydraulically c. The boom shall attain an are of travel no less than 75 degrees above horizontal to 20 degrees below horizontal, 95 degrees total. d. Alt sharp edges on the unit and the boom shall be rounded off for safety. B, Platform a. Aerial device shall be provided with one (1) removable rotating platform manufactured of steel. b. Platform shall be attached to the leveling frame with a self -guided sel-latching detachable mount. Attachinent and removal must be accomplished utilizing the boom hydraulics. c. In addition to a self -latching pin mechanism, the detachable mount shall have a safety lock pin. d. The platform detachable mount shall be hinged to the leveling frame utilizing flanged bearings. e. Platform shall include a hydraulic cylinder rotator capable of allowing the operator to move the platform horizontally through an arc of no less than 45 degrees right and 45 degrees left or normal position, f Platform shall be rectangular g. Platform shall be 40 inches X 60 inches. h. Platform floor shall be punched aluminum i. Platform rails shall be 40 inches in height. j. Platform shall be equipped with safety chain on opening. k. The platform shall be equipped with two (2) safety lanyard attachments. C. Boom Construction a. The boom shall be constructed of high strength steel rectangular tube sections with 46,000 PSI min. b. The boom assembly shall include heavy duty cylinder fittings, heavy pivot pins and replaceable, ultra -high molecular weight polyethylene wear plates. 12 c. The boom shall be equipped with a steel cable carrier mounted on external to the boom� d. The cable carrier shall be stowed in the open without cover. D. Capacity a. The rated capacity of the platform shall not be less than 500 pounds in any boom position. E. Lift a. Lift shall be accomplished with one 6" bore doubling -acting, 58" stroke cylinder with 3" pins. b. Lift cylinder shall come equipped with a holding valve to prevent boom from falling in event of hose failure. F. Extension a. Extension shall be accomplished using two (2) opposing "piggyback" double acting 2-1/2 " I.D. cylinders, 1- 1/2 " diameter rod, and interconnecting the three (3) boom sections (no cables). b. The cylinder shall be pinned in place and equipped with holding valves for both in and out. Performance A. Attainable height of the unit as measured from ground level to the bottom of the platform shall not be less than 57 feet. B. The maximum attainable horizontal reach of the unit as measured from the centerline of rotation to the centerline of the platform shall not be less than 51 feet. Mounting A, Aerial turret box shall be subframe mounted to the chassis of the carrying vehicle by bolting, If sill strips are used, they must be made of steel. Wood or other organic materials are not acceptable. B. Aerial unit turret shall be located at the rear of the carrying vehicle so that the platform will stow at the front of the vehicle. C. Any overhang of the stowed aerial device in relationship with front of the vehicle shall not exceed two (2) feet. D. The unit, when mounted, on the carrying vehicle and in the stowed position, shall not exceed 12 feet 6 inch travel height (as measured from the highest point of the unit to ground level). This is attainable assuming truck frame is 42". E. Torque frame from main to rear outriggers shall be a box structure I I " H x 34-1/2" W. Turret & Turret Bearing A. The turret shall be a one-piece weldment with reverse offset design. B. The turret shall rotate on a ball bearing. Rotation 13 A. Unit shall provide continuous turret rotation with no stop$. B, A hydraulic motor, driving the turret through a self-locking worm gearbox (no brake) shall accomplish rotation. The gearbox is mounted on turret above rotation. C. The rotation system shall be capable of rotating the maximum rated load capacity of the unit at the maximum attainable horizontal distance away from the pedestal upwards on a five -degree incline. Leveling A. The platform shall be maintained in a level position relative to the chassis frame in all operating positions of the unit by a "closed" hydraulic system comprised of twin 21/2" platform cylinders interacting with a boom -actuated 4" master cylinder mounted in the boom support turret. B. The leveling systern shall be provided with a factory -set relief valves to compensate for oil expansion or overload during platform leveling operation. C. A leveling valve shall be provided in the boom control bank. D. The leveling system shall be permanently connected to the boom valve bank and be capable of being remotely re -leveled with an electrical switch in the platform. Stability A. Completed unit shall be stability tested prior to delivery and shall be in conformance with ANSI A92.2. Emergency Lowering A. Unit shall be provided with twelve -volt emergency lowering system. B, Switches shall be located at both the lower controls and upper controls. Hydraulic System A. The hydraulic system shall be of open center design with 2,500-psi minimum design pressure. B, The hydraulic pump shall be a gear type 14 GPM at 1,200 engine RPM. C. The pump shall be of domestic manufacture. D. The hydraulic pump shall be driven by a hot -shift PTO mounted to the transmission. E. The PTO shall include an indicator/warning light. F. The hydraulic pump shall be flange mounted to the PTO by means of an S.A.E. type flange mount. G. The load bearing ends of all hydraulic cylinders shall be equipped with check or counter balance valves capable of hydraulically locking the cylinder and preventing movement of the cylinder in the event of loss of hydraulic power or line failure. H. Hydraulic oil reservoir shall be properly labeled near the filler opening. I. Hydraulic oil reservoir shall be mounted to the side of the sub frame below the bed with a capacity of no less than 35 gallons. J. Hydraulic oil reservoir filler opening shall be of such design as to prevent oil from splashing out of the reservoir. K. Hydraulic oil reservoir shall be easily accessible and have a removable strainer. L. Hydraulic oil shall be supplied to the tuffet-mounted control valve through a rotary manifold. 14 M. All cylinders, control valves, hoses and hydraulic fittings shall be of.domestic convention (no metric adapters perrnitted). a. Hoses must all be high pressured and wire braid reinforced with a minimum safety factor of 4: 1. b. Cylinders must all have micro -honed I.D. cylinder tubing, chrome shafts, top grade packing and protective rod wipers. c. The hydraulic filtration system shall consist of the following: i. Suction strainer ii. Return line filter, capable of providing 10-micron nominal filtration iii. Pressure filter capable of providing 5-micron nominal filtration. Outriggers A. Unit shall be stabilized by two (2), hydraulically operated outrigger assemblies. B . The outriggers shall be Elliott "MH" or equivalent, type out -and -down design with an 18 foot spread. The vertical legs shall telescope under the bed floor, C. The secondary outriggers shall be "A" type underslung with a 12 foot 6 inch spread, D. Horizontal and vertical movement of the outriggers shall be individually controlled. E. Vertical outrigger cylinders shall be of the double acting type equipped with integral pilot operated check valves capable of preventing drill from both the retracted and the extended positions even in the event of loss of hydraulic power or line failure. F. The outrigger assemblies shall be solidly mounted to the subframe assembly. G. Penetration of outrigger shoes shall not be less than six (6) inches below normal ground level. Interlock A. Interlock systems, ANSI required system that prevents boom elevation unless outriggers are deployed. Operator Control System A. The medium for transmitting control signals from the platform to the lower control station shall be by means of electric cable. B. The aerial device controls located at the platform shall consist of three (3) control handles for operating boom extension, lift and rotation. Actuation of these three (3) functions shall be accomplished by means of proportional electric controls. C. Controls shall be meter pilot operated pressure compensated modulating views. D. Control handles shall incorporate safety collars for unlocking handles prior to movement. E. The aerial device controls located at the platform shall include a remote chassis engine, start stop system. F. The lower boom controls shall have individual control valve handles to override boom function. G. The lower boom controls shall be mounted on the roadside of the turret above rotation. H. The lower controls shall include engine speed and start/stop switches, along with upper/lower controls switch to oveff ide upper controls. 1. The outrigger-boorn selector shall be mounted at the rear, under the bed. 15 J. The outrigger controls shall be mounted at the rear, under each comer of the bed with roadside valve controlling roadside outriggers and curbside valve controlling curbside outriggers. K. The outrigger controls shall include a truck level bullseye. Body A. The bed shall be 14-foot long aluminum two piece with tie down rails on both sides. B. Top of bed shall be covered with grip deck coating. C. A standard DOT type bumper shall be installed at the rear of bed with taillights. D. White anti -sail spray suppressant, splashguards shall be provided. E. Step shall be provided on each side at the rear of the body to provide access to the, walk - around control platform with non -slip steps and grab handles. Heavy -Duty Hydraulic Boom Winch A. Winch shall be a high efficiency planetary type with integral load -holding brake. B. The winch shall be rated for 5,000 pounds bare drum. C. The winch shall be controlled from an additional valve section of the lower control valve. It shall be pressure compensated to allow feathering the winch and one boom section simultaneously. D. Winch shall be mounted at the base of the boom for a long fleet angle and flat, level spooling of cable. E. The winch shall be supplied with 180 feet of 3/8" diameter 6X37 Improved Plow Steel Iron Wire Rope Core wire rope and a weighted swivel hook. F, Unit shall be equipped with anti-2-block switch, weight and hydraulic valve to protect the unit from damage due to lifting the hook into the boom. G. Three -ton top dead end snatch block shall be provided to operate with 2-part line. H. One (1) 50 pound down haul ball required. 1. Required lifting rating 600 pounds at 45-feet radius, 5,900 pounds at 3 foot radius with platform removed. J. Main boom section shall be equipped with a retainer at platform end to stow cable when not in use. Platform JIB Winch A. Winch shall be high -efficiency planetary type with integral load -holding brake. B. The winch shall be rated for 1,000 pounds bare drum. C. Winch capacity shall be minimum 5,00 pounds in all operating positions. D. The winch shall be controlled from an additional valve section on the lower control valve. It shall be pressure compensated to allow feathering the winch and one boom section simultaneously. E. The winch shall be controlled by an additional electric, single action joystick located in the upper platform control box. F The jib winch, winch arm and support shall stow in the platform. 16 G. Winch cable shall be 3/16" diameter and 100 feet long galvanized aircraft cable. H. Load hook shall be I -ton rated with swivel capability and safety latch. 1. Horizontal arm of jib to manually extend up to three (3) positions. The stroke shall be 2 5.7 5 ". J. The jib shall be capable of deployment by one (1) person. Miscellaneous A. The master control switch with indicator lights shall be installed in truck cab. B. U/L approved 2-1/2 lbs., 5:13C dry chemical fire extinguisher shall be installed in the truck cab. C. A holder for operator's manuals shall be provided. Placard/Decal Labels, Manuals, Video, Etc. A. Each control and switch shall be clearly labeled to define function and direction of operation. B. Two (2) safety harnesses and 72" lanyards shalt be delivered with the unit. C. Three (3) complete sets of operating, service, maintenance and parts manuals applicable to the aerial unit, as delivered, containing detailed parts and maintenance information inclusive of all optional equipment installed shall accompany the vehicle at the time of delivery. D. One (1) safety and operating video, covering safe use of the manufacturer's products shall accompany the vehicle at the time of delivery. Options A, Rotation lockout shall prevent boom ftorn rotating to side where "MH" out -and -down outriggers are not fully extended horizontally. B. Two (2) Sign forks shall be located on platform, one (1) on each side. C. 98" X 36" X 24" aluminum treadplate cross body box located in front of bed, behind cab. D. Three (3) 36" X 24" X 24" aluminum underbody boxes to be located under aluminum bed. E. Cab windshield guard and platforni walkway. Provides boom rest that replaces standard boom rest. F. Two (2) LED strobe lights, mounted on each side of turret. Includes switch in cab. G. Two (2) LED work lights mounted on each side of boom, Includes switch in cab. H. Two (2) Whelen Par -36 LEG work lights mounted on front edge of operator platform. 1. Two (2) rubber wheel chocks with holders mounted on driver side above rear axle, J. Traffic cone holder with three (3) orange traffic cones mounted at rear of bed, center. K. Four (4) 24" X 24" X 4" wooden outrigger pads. Includes two (2) steel holders, mounted on each side at rear of bed. L. Radio rernotes with hardwire backup platform. To be provided in lieu of standard upper control box in platform. 17 M. Miller Bobcat, or equivalent, 225 gasoline engine — 225 amp welder/generator to be mounted above cross box. Paint A. Aerial to be painted standard Elliot white, or equivalent, to include turret box, turret, boom and platform. Main "MH" outriggers and extending front stabilizers to be painted standard Elliot red, or equivalent. Subframe, reservoir, rear bumper and cab guard to be painted black. *** THE SPECIFICATIONS INCLUDED HEREIN ARE REPRESENTATIVE OF THE DESIGN AND MODEL BEING REQUESTED BY THE CITY OF SOUTH BEND. THE CITY WILL ACCEPT AN EQUAL OR BETTER THAN PRODUCT. WE THANK YOU FOR YOUR INTEREST IN MEETING OUR NEEDS.*** General Reouirements Bidder Qualifications: It is the intent of these specifications to acquire the described equipment from a bonafide utility fleet service establishment with experience in providing similar equipment to the utility industry, and capable of providing complete and complex service locally. Name Plate: All control functions, levers, buttons, switches, etc., shall be clearly labeled as to their function and position using permanent type markers, Plastic peel -and -stick "label maker" tape is not acceptable. Manuals: The successful bidder shall furnish two (2) copies of parts, service, maintenance, and overhaul manuals covering the complete unit upon delivery of the equipment to South Bend, IN. Warranty: The warranty on the cab and chassis shall be the manufacturer's full standard warranty. The warranty on the aerial device shall be 12 months minimum. Compliance with Specifications: Your bid must be in strict compliance with the specifications, and offer the same equal equipment. Exceptions are to be listed separately, otherwise, it is fully understood that the equipment offered is exactly as specified. Use of Brand Names & References: Unless otherwise stated, the use of manufacturer's name and product are for descriptive purposes, and establishing general quality levels only. They are not intended to be restrictive. 18 Quote Number: 427380 - I Altec, Inc. Alec. April 9, 2018 Our 89th Year Shila Tg; Bill To: CITY OF SOUTH BEND CITY OF SOUTH BEND 1045 W SAMPLE 1045 W SAMPLE SOUTH BEND, IN 46601 SOUTH BEND, IN 46601 us United States Attn: Office of the Board of Public Works Phone: Email: Altec Quotation Number: 427380-1 Account Manager: Mark Willman Technical Sales Rep: Joey Moore ft _em Description Q-ty ,Unit I LS60, 1 2. Single 2-Man Platform, Aluminum (Non -insulated), 60" x 36" x 45" 3. Single Function, Multiple Handle Controller - Four (4) single axis joysticks. 4. Aluminum Jib - Platform mounted with 500 lb (227kg) capacity and three (3) manual pinning positions,. Uses 100 ft (30.,5m) 3116" wire rope, 5. Planetary Winch, 5,000 LB 6. Crane Winch Load Line, 5,0010 LB 7. Winch line tensioner. allows the operator to maintain constant tension on the winch line. 8. Outriggers, Primary, Out And Down (LS60) 9. Outriggers, Auxiliary, Down Only (LS60) 10. Subbase (LS60) 11, 120 volt AC power at platform, 20 amp GFGI with weather-resistaint cover. 12. Powder Coat Base Boom Altec White 13, Powder Coat Outriggers Custom Color To be painted Red, per customer approval of paint code 14. Powder Coat Pedestal/Subbase Custom Color To be painted Altec White 15. Powder Coat Turntable Altec White 16. Powder Coat Upper Booms Custom Color Altec White We Wish To Thank You For Giving Us The Pleasure And Opportunity of Serving You Page I of 7 UTILITY EQUIPMENT AND BOD�IES SINCE 1929 Quote Number: 427380 - 1 Atec. Altec, Inc. Item DescriRtion -0—ty 17. Unit Placards, English, LS60 1 18. Welding cable in hose carrier - 1/0 flexible welding cable with electrode and work quick 2 disconnects at the boomtip and at turntable. Unit & Hydraulic Acc. 19. LS60 Unit Installation Components 1 20, Downhaull Weight for 9/16 inch IWRC Load Line and Thimble with Hook `1 21. Two-part load: line kit for turntable winch, includes snatch block and clevis. `1 22. Other Hydraulic Reservoir 35 Gallon Hydraulic Reservoir 1 23, HVI-22 Hydraulic Oil (Standard). 45 24. Standard Pump For PTO 11 25. Hot shift PTO for automatic transmission 1 26. Standard Al�tec PTO/Machine Functionality: PTO won't engage until parking brake is 1 set. -Once parking (holding) brake is set, PTO and machine functions are enabled. -if parking (holding) brake is disengaged, both PTO and machine functions are disabled. 27. Altec Body 28. Aluminum Body 29. Body Is To Be Built In Accordance With The Following Altec Standard Specifications: I A. Basic Body Fabricated From 3003 Grade Mill finish Aluminum. B. All Doors Are Full, Double Paneled, Self -Seated With Built -In Drainage For Maximum Weather-Tilghtness, Aluminum Hinge Rods Extend'! Full Length Of Door. C. Welded Aluminum Frame Construction With Structural Channel Crossmembers. D. Integrated Door Header Drip Rail At Top For Maximum Weather Protection. E. Fender Panels Are Either Roll Formed Or Have Neoprene Fenderettes Mechanically Fastened. F. Aluminum Treated For Improved Primer Bond And Corrosion Resistance. G. Automotive Type Non -Porous Door Seals Fastened To The Door Facing. 30. Platform/Flatbed 1 31� Finish Paint Body Flatbed White (Applies To Steel And Aluminum) 1 32, Undercoat Body 1 33. 168" Estimated Aluminum Flatbed Length (Engineering To Determine Final Length) 1 34. Custom Body Width 98"W We Wish To Thank You For Giving Us The Pleasure And Opportunity of Serving You Page 2 of 7 UTILITY EQUIPMENT AND BODIES SINCE 1929 Quote Number: 427380 - 1 Altec, Inc. item Description 35. 3,/16"' Aluminum Treadplate Floor 36. Outrigger Cutout Required 1 37. Unit Cutout Required 1 38. Light Channels Installed At Rear Of Fl:atbed 1 39. Notch Outside Rails for Tire Clearance 1 40�. Custom, Aluminum Grab Handle Four (4) 19" removable grab handles installed at rear of 4 flatbed: 41. Additional Body Option Install one (1) tie down rail on each side of flatbed 2 42. Additional Body Option Apply non-s,kid to top of bed 1 Body and Chassis Accessories 43. ICC (Underride Protection) bumper with integral fixed Grip Strut steps on curbside and 1 streetside 44, Custom Towing Device Include: 1 - Pintle Hook Mount Receiver, M.V.L. 2,000 lbs. - 8-Ton Combination Hitch, M.V,L. 3,000 lb&, 2-5/16 Ball 45. Receiver Hitch, 2", Class 3 1 46. Compartment Top Access Step from Body Floor 1 47. Platform Access Step From Top of Body Compartment 1 48. Mud Flaps With Altec Logo (Pair) 1 49. 5 LB Fire Extinguisher With Light Duty Bracket, Shipped Loose 1 50. Custom Fire Extinguisher Install one (1) Zft, 5:BC dry chemical fire extinguisher in cab 1 51. Triangular Reflector Kit, Shipped Loose 1 52. Custom Safety Equipment Safety Harness and 72" Lanyard (Fits Medium To Xlargile) 2 Includes Pouch and Placards 53. Bubble Level Round, for use on Horizontal Surfaces 4 54. Additional Body/Chassis Accessory Add wNte anti -sail spray suppressant, 1 splashguards to be installed Electrical Accessgries 55. Lights and reflectors in accordance with FMVSS #108 lighting package, (Complete LED, 1 including LED reverse lights) We Wish To Thank You For Giving Us The Pleasure And Opportunity of ServIng You Page 3 of 7 UTILITY EQUIPMENT AND BODIES SINCE 1929 QuoteNumber: 427380-1 Altec, Inc. item Description Qty 56. Dual Tone Back -Up With Outrigger Motion Alarm 1 57. PTO Hour Meter, Digital, with 10,000 Hour Display 1 58. 7-Way Trailer Receptacle (Blade Type) Installed At Rear 1 59. 120 Volt GFCI Receptacle Includes Weather -resistant Enclosure Male plug, wired to 1 platform - Installed on curb side rear 60. Power Distribution Module Is A Compact Self-Conitained Electronic System That 1 Provides A Standardized Interface With The Chassis Electrical System. (Includes Operator's Manual) 61. Additional Electrical Accessory Install rear flashing left and right arrow boards 2 - Two (2) total Fini�shina Details 62. Finish Paint Body Accessories Custom Color (Specify Color Code) Altec White 63. Altec Standard; Components mounted below frame rail shall be coated black by Altec. 1,e, step bumpers, steps, frame extension, �pintle hook mount, dock bumper mounts, D-rings, receiver tubes, accessory mounts, light brackets, under -ride protection, etc.Compo�nents mounted to under side of body shall be coated black by Altec. i.e. Wheel chock holders, mud flap brackets, pad carriers, bloxes, lighting brackets, steps, and ladders. 64. Apply Non -Skid Coating to all walking surfaces 65. Extra set of manuals. 66, English Safety And Instructional Decals 67, Vehicle Height Placard - Installed In Cab 6�8. Placard, HVI-22 Hydraulic Oil 69. Stability test unit according to ANSI requirements. 70. Non -Focus Factory Build 71. Assembly at Altec in Duluth, MN. 72. Additional Finishing Detail Components to be painted Altec White - Boom - Turntable - Pedestal - Platform 73. Additional Finishing Detail Components to be painted Altec Black - Subframe - Reservoir - Rear Bumper 74. Installation - LS60 We Wish To Thank You For Giving Us The Pleasure And Opportunity of Serving You UTILITY EQUIPMENT AND BODIES SINCE 1929 Page 4 of 7 Quote Number: 427380 - I Altec, Inc. 'Alec. Am Description Qtty 75. Stock Unit 7'6. Chassi Chassis 77. Altec Supplied Chassis 78, 2019 Model Year 79. Freightliner M2-106 80. 4x2 81. 121 Clear CA (Round To Next Whole Number) 82. Regular Cab 83. Chassis Cab 84, Other Chassis Wheelbase Length 187"WB 85, Cummins B6.7 86. 280 HP Engine Rating 87. Allison 2500 RIDS Automatic Transmission 88. GVWR 26,000 LBS 89. 10,000 LBS Front GAWR 90, 19,000 LBS Rear GAWR 91, 11 R22.5 Front Tire 92. 11 R22.5 Rear Tire 93. Hydraulic Brakes 94. Park Brake In Rear Wheels 95, 016-1 C3 - Freightliner Horizontal Exhaust (Rig ht-Horizontal-U nder Cab -Horizontal) 96. Freightliner - Clear Area Around Allison PTO Openings (362-11YO) and (363-011) 97. Freightliner - Rear Cab Crossmember Flush With Back Of Cab (561 -010) 98. Freightliner PTO Throttle Wiring for Automatic Transmission (163-004) (148-074) 1 (,87L-003) 99. Fireightliner/Aillson Body Builder Connection (34C-001) 100. No Prewire Chassis We Wish To Thank You, For Giving Us The Pleasure And Opporlunity of Serving You Page 5 of 7 UTILITY EQUIPMENT AND BODIIES SINCE 1929 Quote Number: 427380 - I Alec. Altec, Inc. item Description 21y 101. No Idle Engine Shut -Down Required 102. 50-State Emissions 103. Clean Idle Certification 104. 204-215 Freightliner 50 Gaflon Fuel Tank (Left Hand Under Cab) Heated fuel water separator with hand primer 1105. 23U-001, 43X-002 Freightliner 6 Gallon DEF Tank (Under Cab Left Hand) 106. Chassis Without Front Frame Extensions 107, Battery Under Cab Left Hand 108. Air Horn Under Cab 1109. AM/FM Radio 11,0. Bluetooth 11C 1 10VAC Outlet, OEM Supplied 111 2, Air Conditioning 11!3, Cruise Control 114. Keyless Entry 115. Power Door Locks 116. Power Windows 117. Spare Tire Include rim! 11% Tilt Steering Wheel 119,. Tinted Windshield 120. Block Heater 750 watt 121. Vinyl Bucket Seat Include dual arm rest 122. Vinyl Split Bench Seat 123. Additional Chassis Option Aluminum rims 124. Additional Chassis Option Install - Roof mounted marker lights - Visible dash mounted engine temperature gauge - Oil pressure gauge - Boltmeter gauge -Fueigauage - Electronic back up Marm - Cab assist handles - HD 160 amp alternator, heavt duty - Heavy duty electrical package We Wish To Thank You For Giving Us The Pleasure And Opportunity of Serving You UTILITY EQ,UlPMENT AND BODIES SINCE 1929 Page 6 of 7 Quote Number: 427380 - I Altec, Inc. Alec. Item, Description - Dual batteries - HD radiator, with: cold climate package 1125. Chassis Extended Warranty 5 Years 150 000 Miles (Freightliner M2-106) 126. Engine Extended Warranty Cummins Protection Plan 1 5 Years 150 000 Miles 127. Transmission Extended Warranty Allison Transmission 2 Years 1 Additional PdjdM 128. Standard Altec Warranty: One (1) year parts warranty, one (1) year labor warranty, ninety (90) days warranty for travel charges, limited lifetime structural warranty Altec Industries, Inc. W Joey Moore Notes: 1 RECOMMENDED OPTIONS AND ACCESSORIES: These options are not included in the quote total price. Selected options witl change the quote total. Option Pricing: Rotation Interlock: Included with outrigger design Two Sign Forks: Included in platform design Aluminum Treadplate Cross Body: ADD $3,285 Three (3) Aluminum Underbody Boxes: ADD $2,550 Cab Windhsield Guard and Platform Walkway: ADD $1,680 Two (2) LED Strobe Lights w/ Switch in Cab: ADD $483 Two (2) LED Work Lights w/ Switch in Cab: ADD $ 1,077 Two (2) Whelen Par-36 LEG Work Lights: ADD $620 Two (2) Rubber Wheel Chockls with Holders: ADD $122 One (11) Traffic Cone Holder w/ Three (3) Cones: ADD $292 Four (4) 24"x24"x4" Wooden Outrigger pads w/ Steel Holders: ADD $1,917 We Wish To Thank You For Giving Us The Pleasure And Opportunity of Serving You P,age 7 of 7 UTILITY EQUiPMENT AND BODIES SME 1929 M,q �, [ �" A �, (1 �R, F �, 'If, Non insulating I luee Stage Hydfal.flicaIly Sequenced "lelescopic Aerial Device Alu(ninurn Platfmrn, Single 2-Man 60 x 36 x 45 in 0 52/1 x 91/1.4 x 1143 nim) with 180" Rotation Hydiaulic Self-t-eveling Platfomt QUick Disconnect Platimin Sinoe Handle Electdc/Hydialdic Noportional Joystick Gonttols Out and Down Priniavy Oultriggers Down Only Auxiliary Oulfiggels Oubipger MoUon Alarm Shot[ lacking Option using Rotational Interlocks oil Outripgets I lydiatdic Overload Protection System (1-1013) E'rinergency Powe� Eng�nc Stalt/Stop at Lower and Upper Contlols Emettiermy Stop at all Control Stations CatwaN Over Chassis Cab for Platform Access Truck Level hidicators Back Up Alimi Minimum 25,999 GVVVR Under GM Chassis - multi -Handle Proprntlonal ColluolIN - 500 Ib Capacity Plattmun R) Winch Stewed at Platform - 5900 11) Himary Boom Which with Anti -Two t3lork S'witch - 2000 11) Primary Boom Winch with Anti Iwo Block Switch - PriniaTy Which Cable Cornp�ession Roller Tele, scopic Platform Material Pegs with H 0 Ib Capacity Welder/Generatm with Remote Start/Stop Weld Leads at the Platform I I OV POWel SOLHCe at the Platloi m Turiier Low Flackages Thfu Box and Undelslung Boxes fol Stolaj"�e Flalbed Body Configuialions with Wood w Steel De6 Rccommended safely leatmes indidu fad pt(Aecloft "�Y'Ocm' Whed Chocks and otiniggel pads. �1'40/OA � G(JffT'1Hqi AH Ov'/"'� OHINIAHM"!� W �i/U � liy �11'11'�'Mi Hi'14 flf:,Ht [AAGHAIVI FULLY EXTE FULLY HETRAC : Minp 11 in- mo M Vj 2— "j RIMMMMMM mmmm mml mmml m m mm WIN mm mmmm mm ME kill 70 65 60 177, 5 Q 0 re, 4 5 W T 40 !"n 30 (a: 0 5 �O �5 20 25 30 35 40 45 50 55 60 SIDE REACH FROM C/L or ROTATION (FT) Giound to BoRonr ol' Platfomi 5 15,6 It 133 in Working Height 11 60,6 It 18,5 m Maximum Side Reach 53A It 162 m I Platform Capacity 60011) 15 9 kfy Matfonn Mahon Boom Articulation 20" to 80" Rotation Continuous ..... . .. . ....... - luas&d on W in (1016 null) dms�'Js Amil Otxralion ANS� A92.2 Compliant Crane Opetalkm ASML B30,15 CompkOnt � 8,0 IA A1 t Oh(kh � A � � (A'4 � Ol � fl, �IAH, k AkH � 11'4�14AR � i R WN "k, I'%R �� b, (41 1 lW"W1, 500 GIWA(3 11 V flh !� V(AW" il`4 ill AN (Wit"A i (W1 � /'011y Rn u .... � Couq,Wke 1001 11WAICII on All� prodocts and 5orvic-, mit u� On the wel, al vwmudtoc COMI, Malurml! �-d �p-lfo-fi.- ... -bi.a to Chimle'o w4hout nolice. Fealuml units m phlo� "my �A.&� phonO le�tum'. pl'—" —It"A an Altec f., .11 .—IAA. phom. A&C and the Allec logo w. t,�giM—,d t1,1dL'1T1,11P,1 of Allo�r Inc. In [lie United Statos andmious olh�f '.uol'i.' a�mj o'oy A b" ... A witi—A V 2018 All- lo, Nt ft,ghls Rewf ved. AIM SGO 0218 � I S@AL'I E C� CO,M I A L'f r. C , G 0 M 8 0 0 . 9 5 8 . 2 5 5 5 1 S A L 111 Deviations List for LS60 City of South Bend Bid Spec E — One (1) or More 2018 or Newer 60' Aerial Two Wheel Drive Tower Track Complete - Chassis: 121 "CA in lieu of 120" CA - Chassis: Multi D Tires for rear axle in lieu of Michelin SDQ M/S Tires (these are no longer in production) - Chassis: Track Tech No Spin in lieu of driver controlled differential with hydraulic brakes, per chassis dealer - Chassis: 750 Watt Block heater in lieu of 1500 Watt, per chassis dealer - Chassis: Standard floor mat in lieu of HD floor mat, per chassis dealer - Hydraulic System: Closed Center hydraulic system in lieu of Open Center - Hydraulic System: Return line filter to provide six (6) micron nominal filtration - Outriggers: Secondary Outriggers are classified as "Down Outriggers" in lieu of A - Frame o Outriggers: Secondary Outriggers "Down Outriggers" to have 8.5' spread - Operator Control System: Platform Controls to have four (4) control levers in lieu of three (3) - Operator Control System: Controls to be Electric over Hydraulic in lieu of meter pilot operator pressure - Options: Radio Remotes are not available with this unit at this time + W.A CITY OF SO�U:TH BEND INSTRUCTIONS TO BIDDERS BID FORMS AND EXECUTION A. Bidders are expected to examine the Drawings, Specifications, Proposal and all Instructions. Failure to do so will be at the Bidder's risk. B. Each Bidder shafl furnish all information required by the Notice, Instructions to Bidders and Specifications. Bids must be made on the form provided. The Bidder shall sign the Proposal and Non-Coll�usion Affidavit, which is a part of the provided form, where indicated, provide a notary signature and provide all other information required. C. The Bidder shall sign the Proposal in the following manner: If the Proposal is made by an individual, his/her name and post office address must be shown. If made by a partnership or joint venture, the name and post office address of each member of the partnership or joint venture must be shown, If made by a corporation, the Proposal must be signed by an officer of the corporation or by a representative duly authorized by the corporation to execute the Proposal in its behalf. SEALED BIDS ONLY Bids, Proposals, Guaranty, and other required documents must be submitted in a sealed envelope marked on the outside with the general classification, of material bids, i.e. "Bid for Computer Equipment," "Bid for Front End Loader," or "Bid for Office Supplies."' B. When samples are required, such samples shall be delivered or shipped at the bidder's expense to the address specified in the Invitation to Bid. Samples must be shipped separately from bid documents and labeled clearly with the Bidder's name, address and the commodity or equipment classifications and documents, the item (and item number, if any), and Material Safety Data Sheets (if applicable). All samples must be representative of the commodities or equipment which will be supplied by the successful Bidder. All samples will become the property of the City of South Bend and none will be returned, unless otherwise stated in the Specifications. C. In the event of an inconsistency between provisions of the contract documents, the inconsistency shall be resolved by giving precedence in the following order: 3. ORDER OF PRECEDENCE A. Bid Form attached Proposal B. Amendments to Specifications C. Specifications D. Special Provision E. Instructions to Bidders F. Notice to Bidders 4. DELIVERY OF BIDS A, Bids must be delivered to the Office of the Board of Public Works, 131h Floor, County -City Building, Room 1316, 227 West Jefferson Boulevard, South Bend, Indiana 46601 (574) 235- 9251, by the time specified (local time) in the Notice to Bidders. If not delivered personally, the sealed envelope containing the Bid must be mailed to the following address - City of South Bend Clerk of the Board of Public Works 1316 County -City Building 2�27 West Jefferson Boulevard South Bend, Indiana 46,601 FIE B, The Post Office Department will be considered agent of the Bidder in delivering the bid. The City will not be responsible for deliveries. Any Bids received after the time specified will be returned unopened. C. Bids will be opened and read publicly at the time and place designated in the Notice to Bidders. Bidders, their authorized agents, and the public are invited to be present. D. Bidders may bid on one (1) or more item, provided however, that the bid submitted for each is delivered in a separate, sealed envelope, with the enveloge cleltly la on the outside as to the specific item for which the bid is being submitted. Bidders may submit separate bid bonds for each item being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all bids submitted. E. The Board may reject any bid that does not conform to these requirements as non- responsive. 5, ADDENDA — NO VERBAL INTERPRETATIONS A. No inquiries by Bidders relative to interpretation of Plans, Specifications, Special Provisions, or other Bidding Documents will be answered verbally. If any prospective Bidder is unable or unwilling to comply with one or more requirements of the bidding document, such Bidder should so inform the Board of Public Works in writing. Upon receipt of such information, consideration will be given to the advisability of issuing an Addendum which would thereupon become applicable to all Bidders. Any such inquiry must be submitted at least seven (7) days prior to the bid opening date in order to give the Board sufficient time to consider any necessary Addendum. All answers to such inquiries, in the form of Addenda, will be furnished to all prospective Bidders who have registered with the City. All Bidders are required to acknowledge receipt of any Addenda by inserting the Addendum number and the issuing date on executed Proposals. 6. REJECTION OF PROPOSALS CONTAINING ALTERATION, ERASURES, INCOMPLETE BIDS AND ETC. A. Proposals shall be rejected if they show any alteration of form, additions not called for, conditional or alternate bids (except when and insofar as are invited), incomplete bids, erasures or irregularities of any kinds. B. All blank spaces for bid prices must be filled in, in ink, with the unit price and total price for each item (This does not apply to divisible bids). In case of incorrect totaling of amounts and where the unit price and the extension thereof do not agree, the unit price for each item shall govern, and the City is authorized to correct all erroneous extension and totals for the purpose of comparing bids. 7. TRADE DISCOUNTS A. Trade discounts shall not be shown separately, but shall be incorporated in the Bidder's unit price, unless otherwise specified. 8. VEHICLE BIDS A. Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered In a separate, sealed envelope, by vehicle, with the envelope clearly labeled on Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on the outside as to the specific vehicle for which the bid is being submitted. Bidders may submit separate bid bonds for each vehicle being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all vehicle bids submitted. B. The Board may reject any bid that does not conform to these requirements as non- responsive. 9. TAX EXEMPTIONS A, The City of South Bond is exempt from the payment of federal excise and transportation taxes levied under the provision of the Internal Revenue Code. It is also exempt from the Indiana 22 State Gross Retail Tax (sales tax). The City will furnish the successful Bidder with any certificate of exemption required. 10, WITHDRAWAL OF BID A, Withdrawal of bids will be allowed only in those cases in which a written request to withdraw a bid is received by the Board of Public Works prior to the date and hour for receiving and opening bids. In such cases, the same will be returned to Bidder unopened. 11. ESCALATOR OR CONTINGENT CLAUSES A. The use of escalator clauses or other contingent clauses by the Bidder is prohibited, unless requested or permitted by the Invitation to Bid. No Proposal shall contain nor be accompanied by any writing purporting to limit or qualify the City's right to accept such Proposal or purporting to after such Proposal or any Contract which may be executed pursuant thereto. 12. PRICES MUST BE DELIVERED PRICES A. The bid price shall be a delivered price. All materials shall be shipped F.O.B. destination as specified in the Invitation to Bid. No fuel surcharges accepted. 13. AWARD —WAIVER OF TECHNICALITIES A. The Award of Bid, if any award be made, will be made within sixty (60) calendar days after the opening of Proposals to the lowest responsible and responsive Bidder who's Proposal complies with all the requirements prescribed, exclusive of technicalities waived. Until the final award of the Bid, however, the right is reserved by the City to reject any and all Proposals and to waive technical errors. 14. SPLITTING OF AWARDS/DIVISIBILE BIDS A. Bids will be awarded on the basis of the total dollar amount for all items in the Proposal unless the bid is described by the City as a Divisible Bid. The City may award a Divisible Bid to the lowest responsible and responsive Bidder for each item or class of items as indicated in the bid documents. 15, BIDDER QUALIFICATION A. The City may require any Bidder to submit evidence of qualifications, and may consider any evidence of the financial, technical, and other qualifications and abilities of the Bidder. The City will not award a Contract to a Bidder who, in its opinion, is not fully qualified on the basis of financial resources and responsibility, possession of adequate equipment, personnel, experience, and past record of performance to perform the obligations to be undertaken competently and without delay. 16. PURCHASE ORDERS A. A Purchase Order will be issued to the successful Bidder after formal acceptance of the bid is made by the City. 17. NEW MANUFACTURE A. Unless otherwise specified in the Invitation to Bid, the items offered shall all be new and the latest model of manufacture. 18, SOURCE OF -SUPPLY A, If the Bidder is not a manufacturer, the source of supply must be shown and all sub- contractors must be identified. 19. PACKAGING A. All items shall be delivered strongly packed and marked according to accepted commercial practice unless otherwise directed In the Specifications. No charge shall be made for containers and the City shall have no obligation to return containers unless otherwise provided by the Specifications or Special Provisions. Any items not received in good condition will be rejected. 20. INSPECTION OF GOODS A. The City of South Bend reserves the right to inspect and have any goods tested after delivery for compliance with the specifications. Notice of latent defects, which would make the Item 23 unfit for the purposes for which they are required, may be given at any time within one year after discovery of the defects. B. All items rejected must be removed immediately by the Contractor at the expense of the Contractor. If the Contractor falls or refuses to remove the rejected items, they may be sold by the City of South Bend. C. In some cases, at the discretion of the City, inspection of the commodities or equipment will be made at the factory, plant, or other establishment where they are produced before shipment. D. The above provision shall not be construed in limitations of any rights the City may have under any laws including the Uniform Commercial Code. 21. ASSIGNMENTS A. No person to whom a Contract has been awarded may assign his interest in the Contract without the consent, in writing, of the City. 22. CANCELLATION The City of South Bend reserves the right to cancel any Contract for failure or refusal of performance, fraud, deceit, misrepresentation, collusion, conspiracy, or any other misconduct on the part of the Contractor. 23, DEDUCTION OF DAMAGES A. If the City cancels the contract for any cause, it shall deduct from whatever is owed the Contractor on the Contract or any other Contract, any amount sufficient to compensate the City for any damages suffered by it because of the Contractors wrongdoing. 24. METHOD OF INVOICING FOR PAYMENT A. Contractor shall bill the City of South Bend 1. On regular invoice form giving a complete and detailed description of the goods delivered, including purchase order number. 2. If the Contractor allows a discount, the period of time in which the City must make payment to qualify for the discounts shall be computed from the date the City received the invoice (completely filled out), or the date the goods are delivered and accepted, whichever may be later, and shall not be less than twenty (20) days. 3. If more than one shipment is made under the Contract and on the same purchase order, the City will make partial payments on a basis that is agreeable to both parties. 25, OWNERSHIP OF GOODS A. The goods which are the subject of the Contract shall remain property of the Contractor until delivered to and accepted by the City of South Bend. 26, ESTIMATED QUANTITIES A. If the quantity set forth in the Notice to Bidders and Proposal is approximate and represents the estimated requirements of the City for a specified period of time, the unit price and the extended total price thereof shall be used only as a basis for the evaluation of bids, The actual quantities necessary may be more or less then the estimate, but the City shall neither be obligated nor limited to any specific amount. The City will, if at all possible, restrict increases to twenty percent (20%) of the estimated quantity and will, if at all possible, restrict decreases to twenty percent (20%) of the estimated quantity. 27, TERM "OR EQUAL" A. Where the term "OR EQUAL" is used in these Specifications, the Bidder deviating from specified item shall file with his/her bid a letter fully explaining and justifying his/her proposed article or equal. The City of South Bend shall be the sole judge in determining if the "OR EQUAL" offered meets the Specifications. 24 28. INDEMNIFICATION CLAUSE The Contractor agrees to indemnify, defend, and hold harmless the City of South Bend, its agents, officers, and employees from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by the Bidder or because or arising out of any defect in the goods, materials or equipment supplied by the Bidder. NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. If you are sending your bid via Federal Express or another overnight source, please confirm that your package will arrive before the bid opening time and date. 25 NOTICE TO BIDDERS Notice is hereby given that the City of South Bend, Indiana, will receive sealed bids at the Office of the Board of Public Works, 13th Floor, County -City Building, Room 1316, 227 West Jefferson, South Bend, Indiana, until the hour of 9:30 AM. Local Time, on April 10, 2018, for the following: Spec E — One (1) or More 2018 or Newer 60' Aerial Two Wheel Drive Tower Truck Complete Specifications are available for download by visiting the City of South Bend's web page at www.southbendin.gov: x Click on "Business" x Click on "City Public Bids" x Click on "Request for Proposals, Vehicles, Equipment and Miscellaneous Bi&l x Click on "Bid/Proposal Interest Form" and register your company to receive updated information x Select specification to download x Print the specification or save it to your computer There is no charge for the specifications. The specifications are also available for review only during regular working hours in the Department of Public Works, 1308 County -City Building, South Bend, Indiana 46601. Bids received after 9:30 AM, Local Time, on April 10, 2018, will be returned unopened. Bids must be on the City of South Send Bid/Proposal form provided, which includes a Non - Debarment Affidavit, Non -Discrimination Commitment form, and a Non -Collusion Affidavit Form. Certified Check or Bid Bond in the amount of not less than 10% must be submitted with the bid. A refund of the bid security will be issued upon satisfaction of Bid Award. The Board may reject any bid that does not conform to these m4ulrements as non -responsive. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best Interest of the City of South Bend. BOARD OF PUBLIC WORKS Linda M. Martin, Clerk Publish two times: March 16, 2018 March 23, 2018 Ver. 2 - 4/16/12