Laserfiche WebLink
WQ <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Downtown South Bend <br />Cross Streets, Phase I <br />Project No. 11117'-041A <br />For Bids Due April 10, 2018 <br />11 IN 61 [Q0 F_.,v A -.]I I-IM601 q;f-,W-ATJ 4 Z 111:� <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />'i <br />2 <br />Construction Engineering <br />CRM Schedule <br />I <br />1 <br />LS <br />LS <br />$ 9,250.00 <br />$ 500.00 <br />$ 9,250,00 <br />Is 500.00 <br />3 <br />CPM Schedule, Monthly <br />6 <br />EA <br />$ 50.00 <br />$ 300,00 <br />4 <br />Maintaining Traffic <br />1 <br />LS <br />$19,521.00 <br />$ 19,521,00 <br />5 <br />Video Record <br />1 <br />LS <br />$ 4,000.00 <br />$ 4,0010.010 <br />6 <br />7 <br />Mobilization and Demobilization <br />Clearing of Right of Way <br />1 <br />I <br />LS <br />LS <br />$90,640.00 <br />$32,071.00 <br />$ 90,640.00 <br />$ 32,071 ,00 <br />8 <br />Additional Common Excavation, <br />Undistributed <br />50 <br />CYS <br />$ 200.00 <br />$ 10,000.00 <br />9 <br />10 <br />Surface Milling, Asphalt, 1 % IN <br />Pavement, Remove <br />930 <br />1,556 <br />SYS <br />SYS <br />$ 7.00 <br />$ 20.00 <br />$ 6,5%00 <br />$ 31,120.00 <br />11 <br />Sidewalk, Concrete, Remove <br />750 <br />SYS <br />$ 26.00 <br />$ 19,500,00 <br />12 <br />Curb, Concrete, Remove <br />690 <br />LFT <br />$ 15.00 <br />$ 10,350.00 <br />13 <br />Remove & Salvage Cantilever Sign <br />Structure, <br />4 <br />EA <br />$ 500,00 <br />$ 2,000.00 <br />14 <br />Lightpole & Foundation, Remove <br />5 <br />EA <br />$ 250.00 <br />$ 1,2501.00 <br />15 <br />16 <br />Tree Remove <br />Vault Closure - Griffon <br />3 <br />1 <br />EA <br />LS <br />$ 300.00 <br />$11,145.00 <br />$ 900.00 <br />$ 11,145.00 <br />17 <br />Vault Closure - Palais Royale <br />1 <br />LS <br />$10,082.00 <br />$ 10,082.00 <br />18 <br />Vault Closure - Cinco <br />1 <br />LS <br />$71,0158.00 <br />$ 71,058.00 <br />19 <br />20 <br />Vault Closure - Rotary Club <br />Vault Repair - LaSalle Grill <br />1 <br />1 <br />LS <br />LS <br />$ 8,770.00 <br />$15,000.00 <br />$ 8,770.00 <br />$ 15,000.00 <br />21 <br />Temporary Erosion Control <br />1 <br />LS <br />$ 1,500,00 <br />$ 11,500,00 <br />22 <br />Temporary Inlet Protection <br />10 <br />EA <br />$ 100,00 <br />$ 1,000-00 <br />23 <br />Inlet, Type J-10 <br />4 <br />EA <br />$ 3,1652.00 <br />$ 14,608.00 <br />24 <br />Manhole Type C-4 <br />I <br />EA <br />$ 5,996.00 <br />$ 5,996.00 <br />25 <br />Storm Sewer Pipe, 12 IN <br />502 <br />LFT <br />$ 72.00 <br />$ 36,144.00, <br />26 <br />Existing Brick Pavers,, Remove and <br />Reset <br />20 <br />SYS <br />$ $ 117,00 <br />$ 2,340,00 <br />27 <br />Concrete Header, Remove <br />290 <br />LFT <br />$ 26.00 <br />$ 7,540.00 <br />Addendum #2 <br />Version 4/5/2018 Contractor's Bid for Public Works - 7 <br />