HomeMy WebLinkAbout01/10/11 Board of Public Works MeetingBOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
1.OPENING OF BIDS
A.Demolition of Structures for Olive Road Widening – Project No. 110-090
1.Funding: AEDA TIF (324.1050.460.39.82)
2.AWARD BID, APPROVE CONSTRUCTION CONTRACT, AND ACCEPT BID
TAB
A.Memorial Hospital Streetscape Improvements - Bid Package #2 – Project No.
109-091B
1.Company: Ancon Construction Co., Inc.
2.Amount: $943,063.22; Base Bid and Bid Alternate #1
3.Funding: Medical TIF (426.1050.460.31.02)
3.REJECT BID AWARD AND APPROVE REQUEST TO RE-ADVERTISE
A.Two (2) More or Less, 2010 or Newer 33-Cubic Yard Side-Loading Refuse
Trucks
1.Company: Pyramid Equipment
2.Comments: Requested Truck Configuration Exceeds Legal and Safety Load
Weight Limits
4.CHANGE ORDERS
A.Raw Pump No.1 Upgrade – Project No. 109-039
1.Company: Thieneman Construction, Inc.
2.Change Order No.: 2
3.Increase Amount: $2,564
4.Percent of Increase: 0.81%
5.New Contract Amount: $318,564
6.Funding: Sewer Bond (642.0630.415.43.66)
B.Southern View Drive Culvert Replacement – Project No. 109-008
1.Company: Underground Services
2.Change Order No.: 2
3.Increase Amount: $1,444.04
4.Percent of Increase: 3.20%
5.New Contract Amount: $50,862.04
6.Funding: Sewers/Other Contractuals (641.0621.792.63.35)
C.Kennedy Park Sewer Separation – Phase I – Project No. 109-003
1.Company: C&E Excavating, Inc.
2.Change Order No.: 3
3.Increase Amount: $44,183.25
4.Percent of Increase: 2.75%
5.New Contract Amount: $1,651.020.66
6.Funding: 2007B Sewer Bond (651.0621.415.31.02/651.0621.665.66.11)
Page 1 of 7
BOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
D.Kennedy Park Sewer Separation – Phase II – Project No. 110-003
1.Company: C&E Excavating, Inc.
2.Change Order No.: 2
3.Increase Amount: $3,490
4.Percent of Increase: 0.35%
5.New Contract Amount: $994,248.30
6.Funding: 2007B Sewer Bond (651.0621.415.31.02/651.0621.665.66.11)
E.Embedded Sensor CSO Monitoring Project – Phase II – Project No. 109-019
1.Company: HRP Construction Company, Inc.
2.Change Order No.: Amended #7 – Error in Math on Previously Approved
Change Order #7 (Corrected from $2,316,315.63 to $2,326,315.63)
3.Increase Amount: $61,913.72
4.Percent of Increase: 2.73%
5.New Contract Amount: $2,326,315.63
6.Funding: SRF
F.Blower Nos. 1A & 1B – Project No. 109-074
1.Company: Bowen Engineering Corp.
2.Change Order No.: 3
3.Increase Amount: $7,962.29
4.Percent of Increase: 0.37%
5.New Contract Amount: $2,183,725.29
6.Funding: Sewer Bond (651.0630.415.42.06)
G.Procurement of Miscellaneous Water Fittings – Project No. 109-066
1.Company: Underground Pipe and Valve
2.Change Order No.: 2
3.Increase Amount: $1,658.27
4.Percent of Increase: 2.46%
5.New Contract Amount: $68,970.47
6.Funding: SRF
5.CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT
A.Kennedy Park Sewer Separation – Project No. 109-003
1.Company: C&E Excavating, Inc.
2.Change Order No.: 4 (Final)
3.Decrease Amount: ($188,090.90)
4.Percent of Decrease: (5.66%)
5.Total Percent of Decrease: (3.32%)
6.Revised Contract Amount: $3,132,391.85
7.Funding: 2007B Sewer Bond (651.0621.415.31.02/651.0621.665.66.11)
Page 2 of 7
BOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
6.CERTIFICATES OF SUBSTANTIAL COMPLETION
A.Raw Pump No. 1 Upgrade – Project No. 109-039
1.Company: Thieneman Construction, Inc.
2.Date of Substantial Completion: November 8, 2010
3.Funding: Sewer Bond (642.0630.415.43.66)
B.Bartlett Street Parking Structure Façade Renovation – Project No. 110-027
1.Company: Ziolkowski Construction, Inc.
2.Date of Substantial Completion: November 30, 2010
3.Funding: Medical TIF (426.1050.460.31.02)
C.Embedded Sensor Phase II – Project No. 109-019
1.Funding: Sewer Bond
7.PROJECT COMPLETION AFFIDAVIT
A.Jefferson Boulevard & Wayne Street Electrical Outlet Repairs – Project No. 110-
068
1.Company: Concord Electric
2.Amount: $8,843
3.Funding: SBCDA TIF (420.1050.460.42.01)
B.ARRA Mill and Fill – Project No. 109-060
1.Company: Reith-Riley - INDOT
2.Funding: ARRA (Stimulus) (101.0602.2431.31.06)
Ironwood Drive Water Main Extension – Project No. 109-052
C.
1.Company: C&E Excavating, Inc.
2.Amount: $293,851.35
3.Funding: Bond
8.REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS
A.Trucking of Belt-Pressed Wastewater Biosolids
1.Funding: Wastewater O&M (641.0630.793.63.35)
B.Diamond Avenue Trunk Storm Sewer - Project No. 109-033 (With Title Sheet)
1.Funding: 2010 Sewer Bond/EDIT
9.RESOLUTIONS
A.Resolution No. 01-2011 – A Resolution Of The South Bend Board Of Public
Works For The Trade Of One (1) 1993 Case Loader For One (1) LDR/Backhoe
Of Greater Value From The South Bend Division of Streets to McDonald
Machinery Co.
B.Resolution No. 02-2011 – A Resolution Of The South Bend Board Of Public
Works For The Trade Of Three (3) 2008 Harley Davidson Road King
Motorcycles For Three (3) 2011 Electra Glide Harley Davidson Motorcycles Of
Page 3 of 7
BOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
Greater Value From The South Bend Police Department To McDaniel’s Harley
Davidson
C.Resolution No. 03-2011 – A Resolution of the City of South Bend, Indiana Board
of Public Works for the Disposal of Surplus Property
1.Property: .40 Caliber Sig Sauer Gun – Corporal Thomas Leszcz Retirement
D.Resolution No. 04-2011 – A Resolution of the City of South Bend, Indiana Board
of Public Works for the Disposal of Surplus Property
1.Property: .40 Caliber Sig Sauer Gun – Sergeant Marian Nicks-Walker
Retirement
E.Resolution No. 05-2011 – A Resolution of the South Bend Board of Public Works
on Disposal of Unfit and/or Obsolete Property
1.Property: Unit 392, 1995 Giant Leaf Vac, VIN 249833
F.Resolution No. 06-2011 – A Resolution of the South Bend Board of Public Works
on Disposal of Unfit and/or Obsolete Property
1.Property: IT Computers
10.AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
A.Agreement for Services – CBCinnovis, Inc.
1.Service: Credit Reporting Services for HUD Counseling and the REWARD
and SBHIP Programs
2.Amount: $2,400
3.Funding: CED General Fund (211.1001.460.31.19)
B.Professional Services Agreement – Greeley & Hansen
1.Service: Review LFA Plans for East Bank Sewer Separation Project with
LTCP – Project No. 109-070
2.Amount: $17,500
3.Funding: Wastewater Engineering (641.0630.793.31.02)
C.Agreement – Notre Dame University
1.Service: Five Year Agreement for Fire Department Emergency Medical
Services
2.Amounts Paid to City: 2011- $10,717.52; 2012- $10,931.87; 2013-2015- To
be Computed Based on Salary Ordinance
D.Contract – Notre Dame University
1.Service: Five Year Contract for Emergency Medical Services for Special
Events
2.Amounts Paid to City: Hourly Rates Dependent on Personnel
E.Customer Service Agreement – Integra
1.Service: Document Destruction and Recycling Service
2.Amount: $1,500
3.Funding: (101.0101.413.33.03)
F.Preventative Maintenance Agreement – Herrman & Goetz, Inc.
Page 4 of 7
BOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
1.Service: HVAC Preventative Maintenance for 2011 at Water Works Facilities
2.Amount: $10,400
3.Funding: Water Works Ops (620.0640.602.31.35)
G.Professional Services Agreement – Perkin Elmer
1.Service: Repair and Maintenance for Wastewater Lab Equipment – Two Year
Contract through 12/31/2012
2.Amount: $21,456 for Two Years
3.Funding: Wastewater Ops
H.Professional Services Agreement – DLZ Indiana
1.Service: Design for Expansion of Steel Warehouse over CSO 003 Trunk
Sewer – Project No. 111-007
2.Amount: $19,500
3.Funding: Bond
I.Contract – On-Site Health Solutions
1.Service: Wellness Screenings and Case Management for City Employees
2.Amount: $41,800 (1,100 Employees at $38 Each )
3.Funding: Health Insurance Fund (711.0401.671.31.06)
J.Gibson Insurance Agency, Inc.
1.Service: Advisory and Brokerage Services to City for Property and Casualty
Insurance Requirements
2.Amount: $90,000
3.Funding: Business Insurance (226.0417.672.31.06)
K.Agreement – ME Simpson Company
1.Service: 2011 Leak Detection Survey for 575 Miles of Water Main, 42,000
Stop Boxes, and 5,500 Fire Hydrants
2.Amount: $73,900
3.Funding: Water Operating Budget (620.0640.605.31.06)
L.Professional Services Agreement – DLZ Indiana, LLC
1.Service: Michigan Street Lift Station Relocation Feasibility Study – Project
No. 111-008
2.Amount: $12,500
3.Funding: Wastewater Professional Services (641.0630.793.31.02)
11.RECOMMENDATIONS
A.License Renewal
1.Type: Massage Establishment
a)Applicant: Perfect Balance
b)Location: 1518 Mishawaka Avenue
c)Favorable Recommendations
B.Processions
1.Martin Luther King, Jr. Day Walk
Page 5 of 7
BOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
a)Applicant: Ivy Tech Community College
b)Date/Time: January 17, 2011; 1:00 p.m. to 2:30 p.m.
c)Favorable Recommendations
2.Right to Life Walk (Walk the Talk Event)
a)Applicant: Knights of Columbus
b)Date/Time: January 16, 2011; 2:00 p.m. to 3:00 p.m.
c)Favorable Recommendations
3.Homeward Bound Walk & Run
a)Applicant: Indiana Association for Community Development
b)Date/Time: April 2, 2011; 8:00 a.m. to 10:30 a.m.
c)See Comments: Parks Department, Customer Service
12.TRAFFIC CONTROL DEVICES
A.Denied - - Handicapped Accessible Parking Space Sign
1.Location: 1141 College Street
2.Has not Met Requirements – Applicant has Driveway that Provides Better
Access to Home
13.CONSENT TO ANNEXATION AND WAIVER OF RIGHTS TO
REMONSTRATE
A.17410 Darden Road– Water
14.MONTHLY REPORTS - DEPARTMENT OF PUBLIC WORKS
A.Water Works
15.SAFETY REPORTS - DEPARTMENT OF PUBLIC WORKS
A.Water Works
16.CERTIFICATES OF INSURANCE
A.Ryan Fireprotection, Inc. – Noblesville, Indiana
B.Schawartz Electric, Inc. – Wakarusa, Indiana
17.RATIFY BONDS
A.Excavation Bonds
1.Asplundh Construction Corp. – Approved December 30, 2010
2.S&L Concrete & Excavating, LLC – Approved December 30, 2010
18.CLAIMS
19.PRIVILEGE OF THE FLOOR
Page 6 of 7
BOARD OF PUBLIC WORKS
MEETING
January 10, 2011 – 9:30 a.m.
Location: 1308 County-City Building
South Bend, Indiana 46601
20.ADJOURNMENT