Loading...
HomeMy WebLinkAbout6C(1) Professional Services AgreementVf C C l J 4 gOUTH BE, IV Community & Economic Development'��'��'� ..1865 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission From: David Relos, Economic Development Planner ' Subject: Professional Services Agreement — Phifer Environmental Services 122 E. Sample St - Phase II Date: November 19, 2010 The attached Professional Services Agreement is a proposal from Phifer Environmental Services for a Phase II site assessment for 122 E. Sample St, Enyart Electric Motor Repair. A Phase I was completed by Phifer Environmental for this property on July 06, 2010, which revealed certain Recognized Environmental Conditions. A Phase II is recommended to ensure the building's industrial use as an electric motor repair and service shop, have not contaminated surrounding soil. This proposal includes doing four Geoprobe soil borings, to a depth of up to 30 feet, for laboratory testing. These four soil boring sites will then be used to gather ground water, which will also be tested. This data will then be reviewed and compiled into a Phase II report, with an opinion given whether further site assessment is needed. Total project services cost is a not to exceed of $5,305. Staff requests approval of this Professional Services Agreement, to allow a Phase II environmental site assessment to be completed before we move forward with the acquisition of this property. What We Do Today Makes A Difference! J November 03, 2010 Mr. David Relos, Economic Development Planner Community and Economic Development City of South Bend 1200 County -City Building 227 West Jefferson Boulevard South Bend, Indiana 46601 Subject: Proposal for Phase II Environmental Site Assessment Enyart Electric Motor Repair Facility 122 E. Sample Street Elkhart, Indiana PES Proposal #P10 -117 Dear Mr. Relos: Phifer Environmental Services, LLC. has recently completed a Phase I Environmental Site Assessment of the property identified as the Enyart Electric Motor Repair facility, located at 122 E. Sample Street. The current tenant, Mr. Rich Siri, owns the business, and leases the facility from the property owner, identified as the Patricia Enyart Revocable Trust. Also owned by the Patricia Enyart Revocable Trust and included as part of this Phase I Environmental Site Assessment, are adjoining former residential lots that include, by address, 117, 119, 121 and 123 E. Ohio Street, with such lots being vacant or serving as access drives and gravel covered parking areas. Together the subject lots constitute approximately 0.4875 -acres of land. As documented by the Phase I Environmental Site Assessment, the following Recognized Environmental Conditions were identified for their potential for environmental impact to the subsurface environmental: 1) The subject site (122 E. Sample Street) was identified as a location of a former 6,000 gallon heating oil tank by the regulatory database search. The UST, which was removed from the ground in January 1990, was reportedly assessed for potential releases at the time of the tank removal. However, no records of the assessment were available through the current tenant or search of the IDEM Virtual File Cabinet. We note that in 1990, the requirements were for retention of records for only a period of up to three years. Therefore, in the absence of any available information regarding the assessment of the UST at the time of removal; the former UST system is considered to be a Historical Recognized Environmental Condition. We note that the use of the UST was as an on -site consumptive fuel (heating oil), and that the system would be considered "exempt" by current regulations. 2502 Lincoln Way West P.O. 430 Mishawaka, IN 46546 (574)968 -7191 (574) 255 -4699 2) The facility (122 E. Sample Street) was identified as a RCRA CESQG by the regulatory database search, with waste streams identified as Not Defined (D000), Ignitable Hazardous Wastes (D001) and Spent Non - halogenated solvents (F003). Such wastes are generally the result of mixed wastes generated by two parts washing basins containing mineral spirits. Such mineral spirits, as well as waste oils generated on site, and received from off -site, are burned within an on -site waste oil furnace. Overall, an estimated 200 - gallons of mineral spirits and 275 - gallons are burned annually by the waste oil furnace, with introduction by an aspirating (air compressor) system. The waste oil /solvent mix is stored within aboveground storage tanks that are adjoining the furnace unit. As a result of transfer operations and blow -down from the air compressor unit (aspirator), significant staining of the concrete flooring was identified in the area of the waste oil furnace. Some level of subsurface contamination may have resulted as a result of the incidental releases associated with the waste oil furnace operations (Recognized Environmental Condition). 3) Numerous floor drains were identified throughout the workshop area of the building. Although attempts had been made to "close" several of the drains, there remains some doubt as to how effective such closure was in sealing off potential entry of waste oils and other potential contaminants. Other drains remained operational and were located in areas of the building whereby the introduction of waste oils and potentially solvents (i.e., mineral spirits) was possible. The discharge point for drains is thought to be the municipal sanitary sewer (unconfirmed); however the likelihood exists that at least one of the drains (principally installed to facilitate the removal of snow melt) may discharge to the on -site dry well located within the rear parking area of the facility. Staining of the concrete in areas surrounding the floor drains was visually apparent. Based on the aforementioned factors, the floor drains and the potential introduction of waste oils and possibly solvents to the subsurface environment throughout 45 years of motor repair service, is considered a Recognized Environmental Condition. It should also be noted that the immediate area of the subject site has been the location of significant industrial activity dating to the early 1900s, and that potential sources of contamination in the immediate area of the subject site may not be fully delineated. As such, the potential exists that as yet "undiscovered or unreported" releases may be identified in the future (i.e. off -site sources). We also note that the chemical and physical characteristics of the primary Contaminant of Concern (Tetrachloroethylene) for both the Sibley Foundry and Ziker Cleaners Corrective Action Plan activities (north of site), to that of waste oils and mineral spirits identified as being associated with historical Enyart Electric Motor Repair operations, are distinctly different. Thus, the potential for on -site environmental impact as a result of material handling activities conducted at the Enyart Electric Motor Repair /Service facility cannot be discounted based solely on the groundwater date from two nearby, off -site well locations installed during assessment of Tetrachloroethylene associated with the Sibley Foundry and Ziker Cleaners. Based upon the aforementioned, PES has recommended a Phase II Environmental Site be undertaken for the purpose of assessment the extent to which, if any, the historical activities have potentially impacted the subsurface environment. Accordingly, the following sections present our approach toward conducting the Phase II Environmental Site Assessment, projected costs and a tentative schedule for completion. PROPOSED SCOPE OF SERVICES Soil Sampling via Geoprobe Methodology Geoprobe methodologies (small track mounted hydraulically driven sampling probe) will be used to collect soil samples from a total of three locations across the subject site. A fourth soil boring location is proposed for the interior of the building, within the area that has been identified as the location of former heating oil UST system. Because of the interior location, a concrete coring device will likely be required in order to gain access to undertling soils. It is anticipated that the soil sample from this location will be collected at a depth of 10 to 12 -feet, below the bottom of the former UST system. For each of the Geoprobe boring locations, discrete soil samples will be collected at 5- foot intervals throughout the soil profile to a depth of 30 feet below ground surface. Each soil sample interval will be screened for the presence of volatile organics by placing a portion of the soil sample into a plastic bag, allowing time for equilibration, and insertion of a photo ionization detector (PID) probe to observe a reading of "total VOCs" in parts per million (ppm). All data associated with the field screening of VOCs will be recorded for future reference (Soil Boring Logs). In addition, a portion of each discrete sampling interval will also be collected for submittal to the laboratory. PES proposes to submit one soil samples from each of the four boring locations based on the PID field screening results and /or other indications of the presence of potential contamination (visual or olfactory). In the event that field screening with a PID, visual or olfactory observations do not indicate the presence of contamination; the depth interval immediately above the soil /groundwater interface will be submitted for laboratory analysis. Each of the soil samples selected for laboratory analysis will be analyzed for the presence of Volatile Organic Compounds (VOCs), TPH Extended Range Organics (TPH -ERO) and Polynuclear Aromatic Hydrocarbons (PAHs). PES will utilize IDEM guidance Terra -Core Methods to collect soil samples from each discrete sampling interval for the analysis of VOCs. Soil samples to be analyzed for TPH -ERO and PAHs will be collected within pre - cleaned, laboratory provided 4 -ounce jars. All soil samples will be labeled, packed on ice and forwarded to the laboratory under chain -of- custody procedures. Temporary Geoprobe Well Installation for Groundwater Sampling PES proposes to convert each of the three Geoprobe soil borings to temporary wells with insertion of a Geoprobe groundwater sampling device, which allows for the extension of a stainless steel slotted screen for collection of a groundwater sample from the point at which the saturated or water - bearing zone is encountered. For this proposal, PES has assumed that the water - bearing zone will be encountered within 30- feet of land surface. We propose that the three temporary wells for consist of: 1) an up gradient location, assumed to be along the southern property boundary 2) two down gradient locations, assumed to be the western property boundary (within the adjacent common alleyway with Mason's Heating & A /C), and along the sidewalk area at the front of the building. Once installed, each temporary well would be purged until such time as the water discharge becomes relatively free of solids or until at least three gallons of water have been removed. PES proposes that groundwater from each of the temporary wells be analyzed for similar constituents identified for soil samples (VOCs and PAHs). Each groundwater sample will be appropriately labeled, packed on ice, and forwarded to the laboratory (priority overnight delivery) under chain -of- custody procedures. PES will plug the boreholes /wells with bentonite once soil and groundwater sampling activities have been completed. Reporting Upon receipt of the laboratory analyses, data will be reviewed and tabularized. Comparison of the data for each respective chemical constituent will be made to the Risk Integrated System of Closure (RISC) Default Closure Values for Residential and Industrial /Commercial Properties. Upon completion of the initial data review, a "Letter Report" will be prepared which presents the sample collection and analytical methodologies used during the field phase of the assessment. Copies of the sample location maps, tabulated data and comparison to RISC Default Closure Values will also be incorporated. Recommendations for any additional assessment activities will be made for review and comment. SCHEDULE PES proposes to commence site investigation activities within one week of receipt of notification to proceed (depending on weather, utility clearance and Geoprobe availability). Upon mobilization, we anticipate completion of the Geoprobe sampling requiring one day. Laboratory analyses will be completed by Pace Analytical on standard one -week turnaround from receipt by the laboratory. Our initial discussion of results will occur within one day of receipt of laboratory analytical results. Our written "Summary Letter Report" will be submitted within one -week of the initial conference. COST ESTIMATE An ESTIMATED COST for Phase II Environmental Assessment Services with respect to the Baseline Environmental Assessment is presented as follows: Field Engineering Services /Project Management Geoprobe Rental (assumes 1 -day @ $1,400 /day, including mobilization) Equipment Rental and Expendable Sampling Supplies Laboratory Analysis: 4 soil samples for % Moisture @ $10 /sample 4 soil samples for analysis of VOCs @ $85 /sample 4 soil samples for TPH -ERO @ $50 /sample 4 soil samples for analysis of PAHs @ $85 /sample 3 groundwater samples for analysis of VOCs @ $85 /sample 3 groundwater samples for TPH -ERO @ $50 /sample 3 groundwater samples for analysis of PAHs @ $85 /sample Terra Core Sampling Kits for collection of soil samples (15 kits @ $15 /kit) Reporting ESTIMATED COST $ 900 $1,400 $ 200 $ 40 $ 340 $ 200 $ 340 $ 255 $ 150 $ 255 $ 225 $1,000 $5,305 Please note that this ESTIMATED COST should be considered a Project Maximum, which PES will not exceed without prior approval. However, should the scope of services require modification (i.e., additional borings) based upon field conditions and /or circumstances that would not have otherwise been anticipated, PES will notify the client of such "changed conditions" and resultant cost implication to the project. LIMITATIONS /QUALIFICATIONS The sampling and testing of soil, groundwater and /or other materials not specifically identified in this proposal is beyond the scope of services for this project. Cost estimates for our proposed services have been prepared based on the following assumptions: • PES will have unlimited access to the site during daylight hours; • Interior areas identified for borehole installation will be cleared to allow for sufficient access for equipment • No subsurface obstructions (buried utilities or fill debris) will interfere with our work; • Sufficient access /clearance will be provided for exterior Geoprobe locations; • Groundwater will be encountered within 30 -feet of ground surface; • Inclement weather will not interfere with the completion of our field work; • Soil cuttings and purge waters will be returned to the boring from which they were generated, with the remainder of the boring filled with bentonite pellets to land surface; This Phase II Environmental Assessment should be considered as a "tool" in the evaluation of the subject site relative to the potential presence of contaminants, and does not necessarily fulfill Indiana Department of Environmental Management (IDEM) guidelines for delineation of contaminants identified within soil or groundwater. AUTHORIZATION Phifer Environmental Services, Inc. appreciates the opportunity to be of service on this project. Should you have any questions or require additional information, please contact me at (574) 968 -7191. Please acknowledge acceptance of this proposal by signature, where indicated, as authorization for PES to proceed. Sinc ly, / 'Conley B. Phifer, CHMM Phifer Environmental Services, LLC '4o" PROPOSAL ACCEPTANCE Proposal for Phase II Environmental Site Assessment (Proposal #P10 -117), dated July 14, 2010, at the Enyart Electric Motor Repair facility, located at 122 E. Sample Street, in South Bend, Indiana is hereby accepted and authorization to proceed in accordance with the specific limitations /qualifications is hereby granted. Signature (Authorized Representative) Title Representing Point of Contact Date Telephone If accepted, please forward executed copy to Phifer Environmental Services, LLC at (574) 255 -4699. Return e-mail (conley @phiferenv.com) with proposal acknowledgement is also acceptable. 2502 Lincoln Way West P.O. 430 Mishawaka, IN 46546 (574)96$ -7191 (574)255 -4699