Loading...
HomeMy WebLinkAbout6D(1) Refurbishment of 2020 S. Main• rand u rn npUTH BFI /6 U \�C Community & Economic Development 1865 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission From: Bill Schalliol, Economic Development Planner Subject: EMI Site Staff Report Professional Service Proposal - EMI Building /Site Restoration Design Services Date: October 12, 2010 This memorandum is a progress report on the current status of the EMI building site at 2020 South Main Street. Over the past several months, the staff has been developing parallel track plans related to site reuse of the EMI property. One reuse plan for the site was a total demolition of the entire site creating a new shovel ready development parcel. The other track was to rehabilitate the existing building to allow for reuse of the existing structure. The following is a brief report on the status of each track and a recommendation for the site with a request for additional professional services. Option 1: Site Demolition /New Shovel Ready Parcel The Board of Public Works opened demolition bids for the site on September 13th. The bids ranged from $176,206.00 to $217,328.00. The bid tab is attached for review. The demolition plan would clear the entire site, replace all perimeter curb & walk, and prepare the site for future reuse. The upside with this option is that the site is cleared and ready for new construction. The downside is that this site is constrained by Main Street and streets to the north and south, it is a narrow parcel and is half a block wide, and because of adjacent use would most likely be used for industrial or heavy commercial uses. At this point, new development on the parcel is uncertain in the near term. Option 2: Site Rehabilitation /Site Reuse A site assessment of the building was completed by Wightman Petrie and it was determined that the structure and foundation of the building was solid, but there were environmental concerns, as well as basic building issues that would need to be addressed before the site could be reused for an industrial use. The building size, especially with the high bay section, appears to be marketable for reuse, but because of the condition of the building and site, much work would need to be done to make the site development ready. An estimate of $459,800 was given to clean and rehab the structure and make associated site improvements to the property. A copy of the budget estimate is attached for review. The upside for reuse is that no new construction is required and an existing structure could be put back into active use at a fairly reasonable cost. The downside is that the building dimensions are fixed and there are costs with the rehab of the structure that might become lost costs for a period of time while the property is on the market. Recommendation At this point, it is staff recommendation to do a hybrid approach to the site. Staff proposes to keep the building and make some minor repairs like sealing the roof and the fagade, cleaning and clearing the interior of the building, basic site demolition of the property to the north and south. What We Do Today Makes A Difference! Once this work is complete, the staff would recommend placing the property on the market with some minor conditions to encourage a sale of the property. As part of this recommendation, staff has requested a professional service proposal from Wightman Petrie to prepare refurbishment plans for the structure. The plans would create plans and specifications that would be use for the building and site improvements. Building improvements would be bid yet this year with site improvement bidding would happen in the winter /spring. The total proposal is in the amount of $21,315.00 and staff would request a not -to- exceed limit of $23,000.00. Staff requests favorable approval of this proposal. A � J- • 1'1 ,i ire Tor frw IL r �w LLI PIMP NO, O V) v c Y L O 3 L v Q O_ ro Q) U C 0 C O N 0 O a` L 0 0 0 0 0 O t � o � 11 � m o � 00 r- c L o & Ln O N m M N Ln N 00 L t U N O O O O O O 0 o 0 o o O 0 0 0 0 0 0 O Ln O Ln Ln Ln Ln w Ln O Ln cr < i lD 0 00 N O N M O °O °o °o ° O o O ri o ri ri o �.6 rI O -1 N N O t Ln O Ln Ln c i N i M O M Ln I� l0 M M N Ln vt I- LLI c-i r-I c-I Z tn- t/} t/- t� th t/} O O O O O O 06 O o0 Ln m 1,6 00 00 00 00 LfV Zt V O F I� M Ln M N Lr) N 00 W c-I -1 -1 t/)- t/} t/? O O O O O O O O O O o0 00 ON (.D O 1,0 O M lD O k. c-I' cr 1� I'D N 00 N rI I I N H V U C C m fC 3 3 0 0 o a a Q) E E cn c C Ln 06 Q p M W o Q i W W rH n v O U Z cri E m m Iv L C � .Q of° D m r4 m a E O V) = Q O O IA y m v Ln N Q L O +' N Q N CD O L O O O �D N .> �-t N +'O+ T i U Li- NO, O V) v c Y L O 3 L v Q O_ ro Q) U C 0 C O N 0 O a` Former EMI Site Only Refurb Cost Summary 9/8/2010 Job #2008 -5018 Site Tasks Estimated Amount Curb and Sidewalk Removal and Replacement $75,000.00 Chain Link Fence Removal and Replacement $9,500.00 Tree Removal $5,000.00 Outside Trash Removal $5,000.00 Asphalt Removal and Replacement $75,000.00 TOTAL $169 Buildine Tasks Estimated Amount Demolition $101,800.00 Remodel $170,000.00 SB Location Factor - $25,800.00 Subtotal Construction $246 10% Contingency $24,600.00 Design (8 %) $19,700.00 TOTAL $290 GRAND TOTAL $459,800.00 October 1, 2010 City of South Bend 227 W. Jefferson Boulevard South Bend, IN 46601 Attention: Mr. Bill Schalliol RE: PROPOSAL FOR REFURBISHMENT OF THE FORMER EMI, INC. BUILDING AND GROUNDS LOCATED AT 2026 S. MAIN STREET, SOUTH BEND, INDIANA 46501 Dear Bill: Wightman Petrie is pleased to submit this proposal to provide services for the property located at 2026 S. Main Street, South Bend, Indiana 46601. This proposal includes an outline of our understanding, our estimated fee and contractual information. PROJECT UNDERSTANDING The City of South Bend desires to enhance the building and grounds located at 2020/2026 S. Main Street so that the City can provide the property as a location for new commercial investment. Wightman Petrie and the City's Engineering and Redevelopment offices have met multiple times concerning this site and we have come to the conclusion that the project involves two (2) phases that will be awarded through a quote process. The first phase will begin in Fall 2010 and will concentrate on fixing the roof and walls of the building, removing all interior improvements, machinery and debris. Included in this phase will be removal of the impervious surfaces, drywells and fencing that surround the southern lot and regarding and planting with hydroseed. Wightman Petrie is prepared to design this project, deliver stamped plans and specifications, coordinate the quote process, provide design engineer guidance during the project and also provide partial construction inspection during the length of the project. The second phase consists of development of the lots north of the former EMI building into a parking area, replacement of the curb and sidewalk along portions of Bowman Street, Main Street and Donald Street and new landscaping along all tree lawns. This phase is scheduled to be put out for quotes in Spring 2011. Wightman Petrie will provide similar services as above and also include a replat of the site to incorporate the revisions of the northern lots. WIGHTMA�TPETRIE SURVFYINC: `NrIN(TRING FN11IRONMFN7.NI I.NNDSCAFT ARCI IITfCTUR.F COSB -Bill Schalliol October 1, 2010 Page 2 of 4 PROJECT FEES* Fees are based on Phase I and Phase II being 30- calendar day projects with the scopes as described within this proposal. PHASE I EMI FALL 2010: BUILDING REFURBISHMENT PLANS AND SPECIFICATIONS Site Visit — 3 hours x ($105 /hr x 2) = $630.00 Plan Preparation — 8 hours x $105 /hr = $840.00 Meeting with City to Review Plans — 2 hours x ($105 /hr x 2) _ $420.00 Plan Revisions After Review Meeting — 2 hours x $105 /hr = $210.00 Final Meeting with City — 1 hour x ($105 /hr x 2) _ $210.00 Finalize Plans — 2 hours x $105 /hr = $210.00 Engineer Final Review — 2 hours x $105 /hr = $210.00 Minor Revisions — 1 hour x $105 /hr = $105.00 Stamping Review — 1 hour x $105 /hr = $105.00 Quote Process — 6 hours x $105 /hr = $630.00 Contractor Coordination - $630.00 Meetings On -Site and Questions — 10 hours x $105 /hr = $1,050.00 Project Management — $1,050.00 Inspection by Engineer During 30 Day Project — 2hrs /day x 30 days x $105 /hr = $6,300.00 ESTIMATED TOTAL = $10,920.00 PHASE If EMI SPRING 2011: PARKING LOT, CURB & SIDEWALK AND LANDSCAPING Site Visit — 3 hours x ($105 /hr x 2) = $630.00 Plan Preparation — 3 hours x $105 /hr = $315.00 Meeting with City to Review Plans — 2 hours x ($105 /hr x 2) _ $420.00 Plan Revisions After Review Meeting — 2 hours x $105 /hr = $210.00 Final Meeting with City — 1 hour x ($105 /hr x 2) _ $210.00 Finalize Plans — 2 hours x $105 /hr = $210.00 Engineer Final Revisions — 2 hours x $105 /hr = $210.00 Minor Revisions — 1 hour x $105 /hr = $105.00 Stamping Review — 1 hour x $105 /hr = $105.00 Quote Process — Issues with Drives & Alley - 6 hours x $105 /hr = $630.00 Contractor Coordination - Meetings On -Site and Questions — 10 hours x $105 /hr = $1,050.00 Project Management — Inspection by Engineer During 30 Day Project — 2hrs /day x 30 days x $105 /hr = $6,300.00 ESTIMATED TOTAL = $10,395.00 COSB -Bill Schalliol October 1, 2010 Page 3 of 4 AUTHORIZATION Please acknowledge your acceptance of this proposal by signature, where indicated on the attached page. Receipt of acceptance will serve as WPI's authorization to proceed. Wightman Petrie, Inc. appreciates the opportunity to be of service to you on this project. Should you have any questions or require additional information regarding this proposal, please contact me at (574) 232 -4388. Sinc I , 3f Eric Zell / Environment I Department Manager I:1Proposals\C4 of South Bend\Former EMI Bldg\Refurb of Former EMI Bldg.& grounds_10- 1- 10.doc COSB -Bill Schalliol October 1, 2010 Page 4 of 4 This proposal (FOR REFURBISHMENT OF THE FORMER EMI, INC. BUILDING AND GROUNDS LOCATED AT 2026 S. MAIN STREET, SOUTH BEND, INDIANA 46501) is hereby accepted and authorization to proceed hereby granted: Accepted By: Date: Printed name and title: Business name: Billing address- Billing/account manager: Phone No.: E -mail: Fax No.: (:\Proposals \City of South Bend \Former EMI Bldg \Refurb of Former EMI Bldg.& grounds_10- 1- 10.doc