Loading...
HomeMy WebLinkAbout6F(1) Resolution No. 2749~~ ~~~ -SOUTH 6 - • ~ p ,1,1~,~I'~i~~~1O ti ~ ~ ~~ ~ ~/., ~ ~ '~.. r , r',r ..,.. a Community & Economic Development ~~ ~~"""'~~ 1665 1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 To: Redevelopment Commission, Board of Public Works From: Bill Schalliol, Economic Development Planner ;nj Subject: Resolution 2749 and Addendum To Master Agency Agreement Main-Lafayette Connector Project Date: August 16, 2010 Attached to this memorandum is Resolution 2749 and Addendum To Master Agency Agreement for the Main-Lafayette Connector Project. Attached to the Addendum is a copy of the professional services proposal from Lawson-Fisher Associates P.C. to provide project design services for the development of construction drawings and right-of-way plans for the development of the connector roadway. In December 2002, the Redevelopment Commission approved and confirmed by resolution the designation of the South Side Development Area. As part of the development process, the staff working with a local consulting firm developed a land use and infrastructure master plan for the entire development area. One of the infrastructure concepts that was proposed in the plan was the Main-Lafayette Crossover. The purpose of the crossover was to move south bound Main Street traffic to Lafayette Boulevard which was to become a new signalized intersection and entrance into the proposed Erskine Commons development. The crossover would also have an east-west component that would connect Michigan Street into the Kerasotes Theater complex to allow development of outlot parcels at the theater site as well as bring more visibility and access to the theater. In 2010, as part of a refresh of the infrastructure element of the master plan, the crossover project was re-studied and location of the crossover roundabout was moved to the north and the connector leg to the east was moved to connect into Barbie Street extended. Lawson-Fisher Associates P.C. was the firm involved with the redesign and schematic process for this project. Because of the success of the Erskine Commons site and the overall health of the TIF Allocation Area in the South Side Development Area, funding will be available over a period of years to complete this project and create new development sites, improved infrastructure and circulation within this section of the development area. The next step in the process for this project is to complete construction drawings and right-of-way plans to assist in right-of-way acquisition and design. Staff requests approval of Resolution 2749 and the Addendum To Master Agency Agreement for the Main-Lafayette Connector Project. What We Do Today Makes A Difference! RESOLUTION NO. 2749 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN ADDENDUM TO THE MASTER AGENCY AGREEMENT (Main-Lafayette Connector Design Project) WHEREAS, effective January 1, 2010, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission") and the South Bend Board of Public Works (the "BPW") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2010; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Main-Lafayette Connector Design Project to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Addendum to Master Agency Agreement (Main-Lafayette Connector Design Project) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on August 20, 2010, at 10:00 a.m., in Room 1308, County-City Building, South Bend, Indiana 46601. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission ADDENDUM TO MASTER AGENCY AGREEMENT (Main-Lafayette Connector Design Project) This Addendum to Master Agency Agreement (this "Addendum"), made and entered into as of the 23rd day of August, 2010, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the ``Commission") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the '`BPW") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Main-Lafayette Connector Design Project (the 'Project"). WHEREAS, effective January 1, 2010, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2010; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Main-Lafayette Connector Design Project to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement. to act as the Commission's a~=ent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being more specifically described in "Exhibit A", attached hereto and made a part hereof. 2. All of the terms and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Carl Littrell, Member Don Inks, Member ATTEST: Linda Martin, Clerk Exhibit "A" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT See attached proposal from Lawson-Fisher Associates P.C. dated August 9, 2010 JOHN E. FISHER, P.E. GREGORY L. HOLDEN, P.E. PAUL A. HUMMEL, P.E. PIPER C. TITTLE, P.E. LAWSON-FISHER ASSOCIATES P.C. 9018.95 August 9, 2010 Mr. Bill Schalliol Community & Economic Development Specialist City of South Bend 227 West Jefferson Boulevard, Suite 1200S South Bend, Indiana 46601 RE: South Main Street to Lafayette Boulevard Connector and Development Area Design, Construction Plans and Specifications Scope of Professional Engineering Services First Project Phase Dear Mr. Schalliol: JOHN A. MIDDLETON, P.E. THOMAS S. SHARP, P.E. THERESA E. HARRISON, P.E. JON E. RIEMKE, P.E. JEFFREY L. McKEAN, P.E. RANDOLPH J. LINDLEY, P.E. CHRISTOPHER J. JETER, P.E. DENNIS A. ZEBELL, P.E. BENJAMIN P. HOLDEN, P.E. DAN G. DELGADO, P.E. MICHAEL J. GUZIK, P.E. MICHAEL F. JOHNSTON, P.E. JEFFREY M. BVRD, P.E. JARED M. HUSS, P.E. SKY K. MEDORS, P.E. Lawson-Fisher Associates P.C. (LFA) is pleased to submit this proposal to provide Professional Engineering Services to the City of South Bend (City) for the Main Street to Lafayette Boulevard Connector, Roundabout and Street Improvements. The proposal includes the following documents: • Contract Services Agreement, Attachment "A" • Scope of Design Services, Attachment "B" • Manhour Justification, Attachment "C" • Project Schedule, Attachment "D" • Project Construction Stages Map, Attachment "E" • Land Acquisition Map, Attachment "F" The proposal was prepared on the basis of your approval of the Preliminary Design Report and direction received in early March, 2010 and our meeting on July 12, 2010. Anticipating a September, 2010 Notice to Proceed, we foresee completing the Design within the Schedule Attachment "D". We propose this Scope of Services be performed on an hourly basis for a budgetary fee of $436,000. Payments to LFA will be in accordance with Attachment "A". If you would like to include the Project Enhancement, we will generate a revised Scope of Services and agreement for your approval. 525 WEST WASHINGTON AVENUE • SOUTH BEND, INDIANA 46601 •574-234-3167.574-236-1330 (FAX) L FA~1~~ Mr. Bill Schalliol August 9, 2010 Page 2 Please indicate your acceptance of this proposal by signing in the space provided below and returning one copy to our office. Thank you for the opportunity to provide additional professional engineering services to the City of South Bend. If you have any questions or comments, please do not hesitate to contact us. Very truly yours, LAW ON-FISHER ASSOCIATES P.C. G~ regory L. Holden, P.E. President, Senior Structural Engineer Paul A. Hummel, P.E. Senior Vice President/Senior Civil Engineer GLH:PAH/cas Encls. c: Carl Littrell, P.E. City Engineer Michael F. Johnston, P.E. ACCEPTED AND APPROVED this day of , 2010. (Authorization is also Notice to Proceed) CITY OF SOUTH BEND REDEVELOPMENT COMMISSION L FA~~~~ ATTACHMENT A LAWSON-FISHER ASSOCIATES P.C. PAYMENTS TO ENGINEER 1. Methods of Payment for Services and Expenses of ENGINEER. OWNER shall pay ENGINEER for professional Services and Expenses as follows: 1.1 Basic Services: 1.1.1 General. For Services rendered an amount equal to ENGINEER'S Salary Costs times a factor of 2.37 for all time for Basic Services rendered by principals and employees engaged directly on the Project. 1.1.2 Resident Proiect Services. For services of ENGINEER'S Resident Project Representative (and assistants) furnished for the project on the basis of Salary Costs times a factor of 2.37 for services rendered by principals and employees assigned to Resident Project representation. 1.1.3 Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Basic Services, the amount billed to ENGINEER therefor times a factor of 1.10. 1.1.4 Operational Phase Services. For Operational Phase services furnished, an amount equal to ENGINEER'S Salary Costs times a factor of 2.37 for services rendered by principals and employees engaged directly on the Project. 1.2 Additional Services: 1.2.1 General. For Additional Services of Engineer's principals and employees engaged directly on the Project and rendered (except services as witness), on the basis of ENGINEER'S Salary Costs times a factor of 2.37. 1.2.2 Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Additional Services, the amount billed to ENGINEER therefor times a factor of 1.10. 1.2.3 Serving as a Witness. For services rendered by ENGINEER's principals and employees as consultants or witnesses in any litigation, arbitration or other legal or administrative proceeding at the rate of 1.35 times the rates in Paragraph 1.2.1. Compensation for ENGIIVEER's independent professional associates and consultants will be on the basis provided in paragraph 1.2.2. 1.3 Reimbursable Expenses. In addition to payments provided for in paragraphs 1.1 and 1.2, OWNER shall pay ENGINEER the actual costs (except where specifically provided otherwise) of all Reimbursable expenses incurred in connection with all Basic and Additional Services. 1.4 Specialized Equipment. In addition to payments set out above, a charge may be made for specialized equipment usage as required. 2. Times of Payments. 2.1 Engineer shall submit invoices covering each calendar month for Basic and Additional Services rendered and for Reimbursable Expenses incurred. OWNER shall pay ENGINEER promptly within thirty (30) calendar days following the ENGINEER'S rendering of these invoices to the OWNER. Page 1 of 2 1/16/08 L FA~1~~ ATTACHMENT "B" SCOPE OF DESIGN SERVICES Environmental Screening, Final Design, Right-of-Way Engineering and Legal Descriptions, Construction Plans, and Bidding South Main St, to Lafayette Connector & Roundabout Stage 1 of Development Area Topographical, Location and Control Survey The project area will be field surveyed as follows: Lafayette Blvd. from Ireland Road to Chippewa Ave. Main St. from Walter St. to Chippewa Ave. Barbie St. (extended) from Main St. to Michigan St. Walter St. (extended) from Lafayette Blvd. to Michigan St. The survey will correlate to the preferred design set forth in the July 2009 Preliminary Design Report and Plans. This design level survey will include collection of topographical data and the location of all surface features within the anticipated construction limits for the project. Existing monumentation and new horizontal and vertical control will be re-established and/or set to provide project mapping and plan preparation. Our sub-consultant, DLZ, will develop project control utilizing legal monuments for the preparation of Location Route Control Survey as the basis for acquisition and legal descriptions of property to be acquired. The Location Route Control Survey for this Project Stage as well as the other two future stages will be performed in this scope of services. The topographical and project control survey for the two future stages are not included in this scope of services. The location and arrangement of the Three Stages is included with Project Stages Map in Attachment "1/". The survey will be prepared according to local and City approved methods of gathering and recording field data. As a basis for existing utility features contacts will be established for the coordination and identification of buried and surface located utility features. Contact will be made with the Indiana Underground Protection Service, to request a field marking of underground at the time of the field survey. All apparent utility features will be referenced and incorporated into the mapping. A review of as-built and record drawings will be conducted to further identify buried utility lines. A list of utility owners and contact personnel will be updated for information and future project reference. Apparent property line and R/W lines will be included in project mapping. Property ownership will be shown for all parcels adjacent to the project construction limits. - 1 - Lawson-Fisher Associates P. C. Project File 90/8.95 August, 2010 L FA~~~~ Roadway Design Features The design of the South Main Street to Lafayette Connector will include the fundamental elements developed in the South Main Street to Lafayette Boulevard Connector and Development Area - Preliminary Design Report and Plans completed in 2009. This first stage of design will include the realignment of existing Lafayette Blvd. and South Main Street from Ireland Road to existing South Main Street approximately 400 ft. south of Chippewa Avenue, a total distance of approximately 1,600 ft. The Connector will be designed as a four lane arterial. A modern two-lane roundabout will be constructed on this connector just south of the Chippewa Station Post Office branch office, mid-distance between Chippewa Avenue and Ireland Road. Atwo-lane/three- lane collector type roadway will be constructed as a crossing element of the roundabout providing a connection from the Showplace 16 Movie Theatre east to the roundabout with an approach and future extension to South Michigan Street further to the east. For truck and factory access (to Kulzer Inc. and Lock Joint Tube, Inc.) atwo-lane local street will be designed connecting industrial/commercial drives on the west side of Lafayette Blvd. to a minor intersection with the Connector approximately 750 ft. south of the roundabout. This local street will align with and extend eastward to the existing section of Walter Street between South Main and South Michigan. Detail of the conceptual design is included with Land Acquisition Map in Attachment "F". The following list documents the anticipated lengths and widths of the various elements of the system: South Main St. to Lafayette Connector: 600 LFT 4-lane widening of existing 1,000 LFT 4-Lane on new alignment Traffic Signal Modernization (Lafayette at Ireland) (Estimated 80 ft. Right-of--Way) Modern Two-Lane Roundabout: Collector Roadway: Local Street: Surface Drainage: City Utilities Miscellaneous Design Elements: Approximately 230 ft. Diameter 670 LFT 2-Lane/3-Lanes on new alignment (Estimated 60 ft. Right-of-Way) 350 LFT 2-lanes on new alignment (Estimated 50 ft. Right-of--Way) Combined curb and gutter, inlets, manholes and enclosed drainage system Water, sanitary sewer extensions on new alignment sections. Sidewalks, ADA ramps, concrete drives, traffic signage, pavement markings, small segmental block retaining walls (as needed), Roadway design elements will be consistent with applicable City of South Bend-and AASHTO standards and specifications. - 2 - Lawson-Fisher Associates P. C. Project File 9018.95 August, 20/0 L FA~~~1 Utility Coordination LFA will provide utility coordination as well as utility plan requests and reviews. Coordination will involve securing accurate plan locating in accordance with AASHTO guidelines. Level B locating will be using IUPS locates identified in the survey. Level A locating (pot-holing/earth extraction) is not included in the scope of design services. If the City desires this level of locating, LFA can provide these additional services under supplemental agreement. Any utility relocation agreements will be prepared by the City of South Bend. Geotechnical /nvesti_gation and Report LFA's Sub-Consultant, Earth Exploration, Inc., will prepare the geotechnical investigation and report. Geotechnical procedures will be in accordance with City of South Bend and AASHTO guidelines. The geotechnical investigation and reports for the two future stages are not included in this scope of services. Construction Plan Preparation Process The Project will be designed according to current City of South Bend requirements. The submittal requirements for the Project will include: • Preliminary Plans and Environmental Screening Report •....PreliminaryFfeld Check .............................................40% Design and Design Information Reviewed. •....R/W Plans-and Legal Descriptions .....Public Information Meeting Plans .....Final Plans .................. .....Final Tracings Submission .. • Bid Documents and Bidding ,Proposed Permanent, Temporary R/W, and Easements. ..................... Exhibits of Proposed Construction Plans. 95% Final Plans, Computations, Quantities for Review. ...........................100% Final Plans, Ready for Letting. Environmental Documentation Our Sub-Consultant, ASC Group, will perform the following screening level environmental tasks for this Project Stage as well as the other two future stages. The entire project area (as described in the July 2009 Preliminary Design Report and Plans) will be reviewed for possible hazardous material in the individual property structures and below ground. Additionally, a screening level investigation will be conducted for any significant historical resources within the entire project area. The purpose of the environmental process will be to determine if there are any documented resources or existing hazardous material that may be encountered in the construction of the roadway improvements. The design submittal process will include the following associated permitting and environmental documents: • Environmental Screening Report • Rule 5 Submission -3- Lawson-Fisher Associate`e P. C. Project File 9018.95 August, 2010 L FA~~~1 Construction Phase Consultation LFA will provide answers to bidder's questions, provide any addendums and attend the pre-construction conference. LFA designers will provide any construction changes as directed by the City. The LFA designers will internally track the construction project in weekly progress meetings from the pre- construction conference to final acceptance. Construction En_gineerin_g and Inspection This proposal does not include a defined scope of services for construction engineering and inspection. If the City desires this service, LFA will provide a scope and cost proposal under a separate or supplemental agreement. Right-of--Way Services LFA will prepare Construction Plans including Right-of--Way needed for the project. Our Sub- Consultant, DLZ, will perform R/W engineering services and prepare the Location Control Route Survey Plat, Legal Descriptions, and Transfer Documents for Acquisition by the City of South Bend. This proposal does not include a defined scope of services for title research, appraisals, buying, relocation assistance or asbestos inspection and clean-up monitoring. It has been assumed for the purpose of this proposal, that the City will use its own resources or other R/W agents for these services. If the City desires these services, LFA will provide a scope and cost proposal under a separate or supplemental agreement. PROJECT ENHANCEMENT -ROUNDABOUT DESIGN, PEER REVIEW The use of roundabouts as solutions for intersecting traffic continues to increase nationally and in this State. The City of South Bend has shown an embracement of this solution to alleviate stopped vehicle delay and reduce personal injury accidents and their severity. We believe that motorists will continue to adapt their driving habits to the various traffic control devices and geometric improvements made by successive designs. What this means practically is that designers should be open to and aware of local performance as well as national changes in the use of the latest improvements in traffic control and geometric design. It may be desirable to have a peer review of the roundabout design by our Sub- Consultant, DLZ. Certainly both firms are qualified in complex road design and can independently design a functional roundabout. The enhancement, through having a peer review of the basic design(s), a broader range and experience of design expertise is provided; and, therefore, creating the most successful project possible. - 4 - Lawson-Fisl~er Associates P. C. Project File 9018.95 August, 20/0 L FAQ... ATTACHMENT "C" CITY OF SOUTH BEND, INDIANA SOUTH MAIN ST TO LAFAYETTE CONNECTOR AND ROUNDABOUT STAFF HOUR JUSTIFICATION -PROJECT DESIGN DEVELOPMENT l k F W No. STAFF I10URS BY CLASSIFICATION Total SUBCONSl1LTANT or ement , Shts. Proj. Manager Senior Eng Civil Eng. Senior Tech. Clerical Hours COST PRELIMINARY DESIGN Survev and Preliminary Plotting Field Survey 4 6 320 330 Location Route Control Survey and Plat #1 (By DLZ) $38,500 Review Survey Field Data 8 8 Coordination and Control of RW Sub-Consultant I 2 2 2 7 Preliminary Plan Submittal Designer Field Inspection 4 4 8 Establish Grade Controls, Prepare Overall Gracie Profile 4 16 12 32 Design Preliminary (ieometrics Prepare Overall Plan 2 8 24 12 46 Utility Coordination I 8 4 4 17 Prepare Preliminary Title & Index Sheets I 4 5 Prepare Preliminary Typical Cross Sections I 2 8 8 19 Prepare Preliminary Plan & Profile Sheets 2 8 16 24 50 Roundabout layout and grading Plans 4 16 24 4 48 Preliminary Right-of-Way Design 2 4 8 I4 Preliminary Drainage Design 2 12 4 18 Preliminary Sanitary Sewer Design I 10 4 15 Preliminary Water Line rksi n 2 12 4 18 Prepare Preliminary A roach & Drive Detail 2 16 18 Prepare Preliminary Structure Data 4 12 16 Prepaze Preliminary Cross Sections 4 24 24 52 Prepare Conceptual Maintenance Of Traffic 2 8 10 Preliminary Construction Cost Estimate I 2 4 I 8 Environmental Screening Report - HazMat (by ASC Group) $9,127 Environmental Screening Report - Hist. Arch (by ASC Group) $6,330 Coordination and Control of Environmental Sub-Consultant I 2 2 2 7 SUBTOTAL HOURS 0 17 76 180 464 9 746 $53,957 RIGHT-OF-WAY DESIGN Disposition of Preliminary Plan Review Comments 1 2 4 7 Field Check Plans Title Sheet and Index Sheet I 4 5 Plan & Profile Sheets 2 6 24 24 56 Signs 10 12 22 Sign Structures 12 20 32 Signals 12 6 18 Intersection Details I 2 3 12 19 Roundabout Details 24 12 24 62 Retaining WaOs 4 6 S cial Drainage Swctures 1 2 4 7 Sanitary Sewer Details 2 8 16 26 Waterline Details 2 6 12 20 Maintenance of Traffic 2 4 R 16 30 Cross Sections 8 28 42 80 Construction Cost Estimate I _ 1 I 8 Geotechnical Investigation (by Earth Exploretions, Inc.) $7,167 Coordination and Control of Geotechnical SubConsultant I 6 9 Pavement Design I 4 2 7 Utility Coordination 1 8 1 3 Hydraulics and Storm Sewer Calculations 6 16 46 Preliminary Construction Cost Estimate I 8 I 12 Field Check and Documentation 4 4 10 Disposition of Field Check Revers Comments I 4 8 I S Public Information Meeting Preparation Traffic-Maintenance Plan I 2 4 7 Displays 1 4 IZ 4 21 Public Meeting 3 3 ? 9 Disposition of Public Meetine Comments I 4 2 9 Legal Descriptions and Transfer Documents (by DLZ. Indiana. LLC1 $94,120 Coordination and Control of RW Su6Consultant I 2 7 SUBTOTAL HOURS 0 26 78 213 228 IS 563 $101,287 Larson-Fisher Assoria(es P.C. Project File Na. 90/R. 95 Atgus( 20/11 L FA`I... ATTACHMENT"C" CITY OF SOUTH BEND, INDIANA SOUTH MAIN ST TO LAFAYETTE CONNECTOR AND ROUNDABOUT STAFF HOUR JUSTIFICATION -PROJECT DESIGN DEVELOPMENT tv o. STAFF HOURS BY CLASSIFICATION Total Sl1BCONSl1LTANl' Work Element Shls. Proj. Manager Senior Eng Civil Lng. Senior Tech. Clerical Hours COST FINAL DESIGN Final Plan Submittal Title and index Sheet I I 2 3 Legend and Genral Notes Sheet I 1 4 8 13 Typical Cross Sections 6 I 2 24 24 51 Plat Shects 3 2 4 18 24 Maintenance of Traffic Plans (3 phases) 12 6 24 48 RO Plan & Profile Sheets 7 I 8 32 32 73 Approach & Drive Details 1 1 12 13 Intersection Details 3 I 2 12 18 33 Roundabout layout and rading Plans 2 2 8 8 IG 34 Pi Structure ,Water Line, Sanitary Sewer Details 4 1 8 28 28 65 Retaining Wall Sheets 1 2 8 I6 26 Pavement Marking Plans 2 8 16 32 56 Traffic Signing Plans 4 1 2 14 12 29 Traffic Signal Plans I I 6 8 6 21 Erosion Control Plans 8 1 2 IR 24 4S Riprap and Sodding Table I I 4 8 13 Ap oath Table 2 I 2 12 12 27 Ilnderdrain Tables 2 2 16 24 42 Sign Summary Tables and Sign Details 2 8 2 20 30 Road Summary Sheets 1 2 4 16 22 Cross Sections 20 1 G 40 60 107 Drainage Computations 2 2 4 Construction Cost Estimate I 2 4 I S Earthwork Computations 2 8 6 I6 Quantity Computations 2 6 16 16 40 Special Provisions 2 4 8 14 Rule 5 Sutmtission 2 2 6 2 12 UST Removal Corrdination I 2 2 5 Disposition of Final Plan Comments I 2 4 12 19 SUBTOTA[, IiOURS 84 23 101 326 470 5 925 $0 FINAL CONSTRUCTION PLANS, BID DOCUMENTS AND BIDDING Final Plan Tracings Including Cross Sections En ineers Estimate 2 4 12 18 Contract Documents and Bid Forms I 2 16 24 43 Advertisement and Bidding I 8 16 25 RFI and Addendums 6 8 8 24 Bid Tabulations and Recommendation 2 6 R 8 24 SLBi'OTAL -Preliminary Design 0 I7 76 180 464 9 746 $53,957 SUBTOTAL -Right-of Way Design 0 26 7R 213 2'_8 18 563 $101,287 SUBTOTAL -Final Design R4 ' 101 326 470 5 925 $0 Sl16TOTAL - Construction Documents and Biddin 0 8 26 60 0 40 134 $0 TOTAL HOl-RS 74 231 779 1,162 72 2,368 HOURLY RAT ES (2010) 5 16.00 S 160.00 S 115.00 $ 105.00 $ 85.00 COSTS 5 12.'_1 Q(h~ 544,960.00 589,585.00 5122,010.00 56.120.00 TOTAL COST $ 274,885.00 EXPENSES (Com utec Mileage R Misc.) $809.00 Construction Consultation $5.000.00 SUBCOKSULTANTS- $155,244 $155,244 TOTAL FEF $ 435,938.00 COSTS BY CATEGORY Environmental Documentation S 165.00 S 320.00 5 230.00 5 $ 170.00 516.342 Survey S R2S.00 5 L280.00 5 230.00 b 34,440.00 $ 170.00 $75.445 Geotcchnical Investigation and Rcpon $ 5 160.00 5 230.00 $ 630.00 $ - $8,187 Plans and Construction Documents S 11,055.00 5 42,880.00 5 88.665.00 5 86.940.00 $ 5.610.00 $235.150 Right-of--Way Engineerine and Legal Descriptions (42 Parcels) 5 165.00 $ 320.00 5 230.0(1 5 $ 170.00 $95,005 Construction Consultation $5,000 5 8.210.00 5 44.960.00 5 89.SSS.00 5 122.010.00 $ 6.120.00 TOTAL AGREEMENT $43s,93a Project Enhancement -Roundabout Peer Review $14,000 TOTAL AGREEMENT (with ENHANCEMENT) $449,938 LansarFisher Assorin(es P.C. Project File No. 9(1/X.95 August 10/0 2010 2013 J F M A M J J D J F M A M J J A 5 0 N D Project Milestone /Task i ~ - j Design Proposal ~ ~ -- ~ I 1 - ' -- __ - - -- -- -_ - ~ - _ _ - - - ~ _ I - - - --- Execute Desi n Contract i I ~ i - - - - - - - -- _ - ' - - _._ Authorization, NTP - J. - ~ ~ - 1 - f -- ___ _ - - - -- - _ _ - - - _ - - -- Field Survey - -- - - - _ . --- - , Stage 1 Design - - - - ~ I - - - --- - - - - - -- - - Stage 1 Plan Submittal &Review - -- _ - - - - _ - --- ~ 1 - -a - - - - - - - -- - - - _ . . --- _ -- j _ Geotechnical Investigation -- -- -- - -- -. " - - ---- --"- -- - - Preliminary Field Check Plans i -- - - Preliminary R/W Plans - -- - - -- - - - -- - - -- i -- age esign - - -- - -- - - -- - - - I - -- - - - - - - - - Submit Stage 2 Plans &Review - - - ' t - - - - ` R/W Plans - - __ - - - ---- -- -- - - - Public Involvement i ' _ - - - - ~- - - -- PermitsSubmitted Environmental Documentation, Submit CE -- __ - _ _~I ~ ~_ _ __~ ~ -- - - _- - _ - - r - ~ - -- - - l _ Approval of Environmental Documentation - - - - - -~ T_ - - - ~ Final R/W Plans - -- - - - - ~ - ~ -- -- -- - - - _ , R/W Plan Approval -- - ~ ~ _ - I ~ - -_ ~ - - ~ - I ---~.--- - -- - _ . R/W Tracings - I ~- - - - -- - - j ---- - R/W Acquisition -- i T +_ ~ _ - -- -- Utility Plans Stage 3 Design - - l - I - -~--- ~ - - 4 _ - --- _ -- - _ Submit Stage 3 Plans &Review tility Relocation Plans and Agreements I -~--- -- -- ? -- -- - --- I I I I I [ . - ~--- - - - -- _ a - _r -- - ~ - - - - - --~ - - -- r a ~ - - Submit Tracings -- - ' ~ ~--- -- Contracts and Bidding _-- ---+---~ --~~ 1IIIIIl1IIlIllIIIIlllll - - -- Construction , Consultant Design P CITY Task Activity INDOT Plan / Subm' Lawson-Fisher Associates P. C. Project File No. 90/8.9 August, 20/0 x 1= m N L a 0 x rn O m 0 o~ ~a N o ~~ a~ ~ U p o ^ o d N ~~ ~~ LAWSON-FISHER ASSDCIATE5 P.C. 525 W WASHINGTDN AVENUE SOUTH BEND, INDIANA 46601 PH. (574) 234-31 67 City of South Bend, Indiana South Main St. to Lafayette Connector and Roundabout Project Construction Stages Map 1:4,200 ~`' E 350 175 0 350 S Feet Attachment E C ~ •N C ~_ fn 3 ~ a; ~`" : ~ ~ Q- O ~ O j N .' ~ o N ~. U Q tU ~ Q ~' ~ Q N ~ t~6 'D N N ~ O ~ ~ ~ O o a e ~ a a ~, N .ai O N a E 0 U g 0 X ~~ , ~~~ ,. ,~ : ~ .~*, ~ ~~ ~. + .~ F i - X $ ; '}, {~: !: x ~ + a [. Y x. F ~q~yc.F .c3,~5~fi Tv i ~. ^I ~E.'A .. _._. ~ ~ ~a '~'.'' ~, ..._- ~~ t i~"~A ~ , } ~ ~ ~ ~, .M1F ~" l R ,~~ c c~ ca ~ (~ ~ Q. Q CC G ~ ~ ~ ~ ~ ~ + ~ 0 m ~ - N ~~ C ~ ~ ~ ~-+ ° Q c.. ~ Q ~ ~ ~ J U ~ Q 0 ^L LL W z ~~ ~: 3 U a Wo N Z~ ~ ~ ~ ~ Z V Z ~ ,~ ~Q~Y 0~ Z ZN Q ~ =p~ N IA ~m ~~ 3~a 3 ~N Jg Attachment F 9018.95 Aug., 2010 O p O N `n N C ~ N ~ U p O ~ O o Q N (9 ~