HomeMy WebLinkAbout6D(1)f~ ~ C ~~ • , SpUTH BF Iv~O\\~ri r~// s Community & Economic Development ~`~~~~~~~ 1865 . 1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 To: Redevelopment Commission From: Bill Schalliol, Economic Development Planner ~~~- Subject: Professional Service Proposal -Lawson-Fisher Associates P.C. ~ Engineering Service Proposal: S Michigan and Norman Date: August 2, 2010 Attached is a professional service proposal from Lawson-Fisher Associates to provide engineering services for an access study for Norman Street at South Michigan Street. The purpose of the proposal is to study traffic patterns at and around the intersection and to make determinations if the lane restrictions made on South Michigan Street can be modified to provide safer access to Norman Street. Improved access to Norman Street would help Culver's Restaurant currently located at the intersection as well as improve the developability of the land to the north of Norman Street. The proposal is a not to exceed amount of $2,500.00. Staff requests favorable approval of this proposal. What We Do Today Makes A Difference! ~ni JOHN E. FISHER, P.E. GREGORY L. HOLDEN, P.E. PAULA. HUMMEL, P.E. PIPER C. TITTLE, P.E. LAWSON-FISHER ASSOCIATES P.C. 9019.36 July 28, 2010 Mr. Bill Shalliol Economic Development Planner South Bend Redevelopment Commission 227 West Jefferson Blvd., Suite 1200S South Bend, Indiana 46601 RE: Engineering Services Proposal South Michigan at Norman Street Access Study Dear Mr. Shalliol: JOHN A. MIDDLETON, P.E. THOMAS S. SHARP, P.E. THERESA E. HARRISON, P.E. JON E. RIEMKE, P.E. JEFFREY L. McKEAN, P.E. RANDOLPH J. LINDLEY, P.E. CHRISTOPHER J. JETER, P.E. DENNIS A. ZEBELL, P.E. BENJAMIN P. HOLDEN, P.E. DAN G. DELGADO, P.E. MICHAEL J. GUZIK, P.E. MICHAEL F. JOHNSTON, P.E. JEFFREY M. BYRD, P.E. JARED M. HUSS, P.E. SKY K. MEDORS, P.E. Based upon several conversations, e-mails, and our meeting with you and Carl Littrell on July 12, 2010, Lawson-Fisher Associates P.C. is submitting this proposal to provide Professional Engineering Services for a Traffic Access Study and Report at the referenced intersection. The following is a Project Description, Scope of Services, Fee and Schedule for the project: PROJECT DESCRIPTION Problem Statement In 2007, the City completed an LPA reconstruction project of the intersection of South Michigan Street and Ireland Road. The project included improvements to the existing street and drive approaches from south of the intersection north to the intersection of South Michigan and Chippewa Avenue. Part of those improvements was the construction of anon-mountable concrete center curb from the Ireland Road intersection north to a point approximately 36-feet north of the intersection of South Michigan Street and Norman Street. The purpose of the center curb was to add to/replace a concrete divider used for access control and channelization (protection) of the high volume of left turn traffic on the southbound approach to the signal at South Michigan and Ireland Road. This treatment was also constructed on the eastbound and northbound approaches. Since the completion of construction in 2007, the City has been requested to remove the concrete center curb directly in front of the Norman Street approach in order to allow southbound Michigan Street traffic access for turns onto Norman Street. The City has been mindful of those requests; however, it has considered that traffic should be allowed sufficient time to become operationally accustomed to the intersection, as well as to ascertain if overall traffic volumes would increase at the intersection. 525 WEST WASHINGTON AVENUE • SOUTH BEND, INDIANA 46601 •574-234-3167.574-236-1330 (FAX) L FA~~~~ Mr. Bill Shalliol Economic Development Planner July 28, 2010 Page 2 It appears that the traffic volume growth may be less than anticipated, and that nothing indicates that the center curb should be extended further to the north on this southbound approach. Driver awareness of the purpose and use of the south bound double left turn lanes appears to be substantially complete, as well as the use of the center left turn lanes immediately north of the concrete center curb. Therefore, the City is considering a change in access control, and needs a traffic engineering study to determine if and what changes should be made. SCOPE OF SERVICES, FEE AND SCHEDULE Engineering services to be provided by LFA include: • Determining the type of field information (traffic counts, gap studies, crash records) needed. • Coordinating and communicating the field work to and from City staff. • Analysis of data. • Preparation of a Traffic Engineering Access Report and Recommendations for draft review and final completion of the study. This will include meetings, sketch drawings, and field reviews. • We anticipate that our recommendations and the City's final determination will involve a considerable amount of engineering judgment and past experience in access control. We propose to complete the Traffic Access Study and Report on an hourly basis in accordance with Attachment "A". The estimated fee is $2,500 based on the above Scope of Services and fourteen (14) hours of engineering time, with two (2) hours of support/administrative time. Traffic counting, gap measurements, and Construction Plan Services are not included in the estimated fee. We will start the Project immediately upon receipt of a Notice to Proceed and complete the Study in approximately 15 days, exclusive of field work scheduling delays. You may accept this proposal by signature in the space provided below. We look forward to working with you on this project. If you have any questions or comments, please let us know. Very truly yours, LAWSON-FISHER ASSOCIATES P.C. ~y Paul A. Hummel, P.E. Senior Vice President/Senior Civil Engineer PAH/bsa Encls. c: Michael F. Johnston, P.E. w/Encls. L FA~~~~ Mr. Bill Shalliol Economic Development Planner July 28, 2010 Page 3 ACCEPTED and APPROVED this day of , 2010. CITY OF SOUTH BEND REDEVELOPMENT COMMISSION L FA~~~~ ATTACHMENT A LAWSON-FISHER ASSOCIATES P.C. PAYMENTS TO ENGINEER 1. Methods of Payment for Services and Expenses of ENGINEER. OWNER shall pay ENGINEER for professional Services and Expenses as follows: 1.1 Basic Services• 1.1.1 General. For Services rendered an amount equal to ENGINEER's Salary Costs times a factor of 2.37 for all time for Basic Services rendered by principals and employees engaged directly on the Project. 1.1.2 Resident Project Services. For services of ENGINEER'S Resident Project Representative (and assistants) furnished for the project on the basis of Salary Costs times a factor of 2.37 for services rendered by principals and employees assigned to Resident Project representation. 1.1.3 Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Basic Services, the amount billed to ENGINEER therefor times a factor of 1.10. 1.1.4 Operational Phase Services. For Operational Phase services furnished, an amount equal to ENGINEER'S Salary Costs times a factor of 2.37 for services rendered by principals and employees engaged directly on the Project. 1.2 Additional Services: 1.2.1 General. For Additional Services of Engineer's principals and employees engaged directly on the Project and rendered (except services as witness), on the basis of ENGINEER'S Salary Costs times a factor of 2.37. 1.2.2 Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Additional Services, the amount billed to ENGINEER therefor times a factor of 1.10. 1.2.3 Serving as a Witness. For services rendered by ENGIlVEER's principals and employees as consultants or witnesses in any litigation, arbitration or other legal or administrative proceeding at the rate of 1.35 times the rates in Pazagraph 1.2.1. Compensation for ENGINEER's independent professional associates and consultants will be on the basis provided in paragraph 1.2.2. 1.3 Reimbursable Expenses. In addition to payments provided for in paragraphs 1.1 and 1.2, OWNER shall pay ENGINEER the actual costs (except where specifically provided otherwise) of all Reimbursable expenses incurred in connection with all Basic and Additional Services. 1.4 Specialized Equipment. In addition to payments set out above, a chazge may be made for specialized equipment usage as required. 2. Times of Payments. 2.1 Engineer shall submit invoices covering each calendaz month for Basic and Additional Services rendered and for Reimbursable Expenses incurred. OWNER shall pay ENGINEER promptly within thirty (30) calendaz days following the ENGINEER'S rendering of these invoices to the OWNER. Page 1 of 2 1/16/08 3. Other Provisions Concerning Payments: 3.1 If OWNER should fail to make any payment due ENGINEER for services and expenses within sixty (60) calendaz days after receipt of ENGINEER's statement therefor, the amounts due ENGINEER will be increased at the rate of 1% per month from said sixtieth day, and in addition, ENGINEER may, after giving seven days written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and chazges. 3.2 In the event of termination by OWNER upon the completion of any phase of the Basic Services, progress payments due ENGINEER for services rendered through such phase shall constitute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER also will be reimbwsed for the chazges of independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for services rendered dwing that phase on [he basis of ENGINEER's Salary Costs times a factor of 2.37 for services rendered during that phase to date of termination by ENGINEER's principals and employees engaged dn•ectly on the Project. In the event of any such termination, ENGINEER will be paid for all unpaid Additional Services and unpaid Reimbwsable Expenses, plus all termination expenses. Termination expenses mean additional Reimbursable Expenses duectly attributable to termination, which, if termination is at Owner's convenience, shall include an amount computed as a percentage of total compensation for Basic Services earned by ENGINEER to the date of termination, as follows: 20% if termination occurs after commencement of the Preliminazy Design Phase but prior to commencement of the Final Design Phase; or 10% if termination occurs after commencement of the Final Design Phase. 3.3 Records of ENGINEER'S Salary Costs pertinent to ENGINEER'S compensation under this Agreement will be kept in accordance with generally accepted accounting practices. Copies will be made available to OWNER at cost, if requested prior to final payment for ENGINEER'S services. 3.4 Whenever a factor is applied to Salary Costs in determining compensation payable to ENGINEER, that factor may be adjusted periodically and equitably to reflect changes in the various elements that comprise such factor. All such adjustments will be in accordance with generally accepted accounting practices as applied on a consistent basis by ENGINEER and consistent with ENGINEER's overall compensation practices and procedwes. 4. Definitions: 4.1 The Salary Costs used as a basis for payment mean salaries and wages (basic and incentive) paid to all ENGINEER'S personnel engaged directly on the Project, including, but not limited to, engineers, architects, swveyors, designers, draftsmen, specification writers, estimators, other technical and business personnel; plus the cost of customary and statutory benefits including, but not limited to, social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday pay and other group benefits. The amount of customary and statutory benefits of all personnel of ENGINEER will be considered to be equal to 33% of the salaries and wages, subject to equitable adjustment to reflect changes in ENGINEER's overall compensation procedwes and practices. 4.2 Reimbwsable Expenses mean the actual expenses incurred by ENGINEER or ENGINEER'S independent professional associates or consultants directly or indirectly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining the bids or proposals from Contractor(s); providing and maintaining field office facilities including furnishings and utilities; subsistence and transportation of Resident Project Representatives and their assistants; toll telephone calls and telegrams; reproduction of Reports, Drawings, Specifications, Bidding Documents and similaz Project-related items in addition to those required under Section 1; and if necessary, overtime work required higher than regular rates. Page 2 of 2 1/16/08 3. Other Provisions Concerning Payments: 3.1 If OWNER should fail to make any payment due ENGINEER for services and expenses within sixty (60) calendar days after receipt of ENGINEER'S statement therefor, the amounts due ENGINEER will be increased at the rate of 1% per month from said sixtieth day, and in addition, ENGINEER may, after giving seven days written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and charges. 3.2 In the event of termination by OWNER upon the completion of any phase of the Basic Services, progress payments due ENGINEER for services rendered through such phase shall constitute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER also will be reimbursed for the charges of independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for services rendered during that phase on the basis of ENGINEER'S Salary Costs times a factor of 2.37 for services rendered during that phase to date of termination by ENGINEER's principals and employees engaged dvectly on the Project. In the event of any such termination, ENGINEER will be paid for all unpaid Additional Services and unpaid Reimbursable Expenses, plus all termination expenses. Termination expenses mean additional Reimbursable Expenses directly attributable to termination, which, if termination is at Owner's convenience, shall include an amount computed as a percentage of total compensation for Basic Services earned by ENGINEER to the date of termination, as follows: 20% if termination occurs after commencement of the Preliminary Design Phase but prior to commencement of the Final Design Phase; or 10% if termination occurs after commencement of the Final Design Phase. 3.3 Records of ENG]NEER's Salary Costs pertinent to ENGINEER'S compensation under this Agreement will be kept in accordance with generally accepted accounting practices. Copies will be made available to OWNER at cost, if requested prior to final payment for ENGINEER'S services. 3.4 Whenever a factor is applied to Salary Costs in determining compensation payable to ENGINEER, that factor may be adjusted periodically and equitably to reflect changes in the various elements that comprise such factor. All such adjustments will be in accordance with generally accepted accounting practices as applied on a consistent basis by ENGINEER and consistent with ENGINEER'S overall compensation practices and procedures. 4. Det-nutions• 4.1 The Salary Costs used as a basis for payment mean salaries and wages (basic and incentive) paid to all ENG]NEER's personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, draftsmen, specification writers, estimators, other technical and business personnel; plus the cost of customary and statutory benefits including, but not limited to, social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday pay and other group benefits. The amount of customary and statutory benefits of all personnel of ENGINEER will be considered to be equal to 33% of the salaries and wages, subject to equitable adjustment to reflect changes in ENGINEER'S overall compensation procedures and practices. 4.2 Reimbursable Expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly or indirectly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining the bids or proposals from Contractor(s); providing and maintaining field office facilities including furnishings and utilities; subsistence and transportation of Resident Project Representatives and their assistants; toll telephone calls and telegrams; reproduction of Reports, Drawings, Specifications, Bidding Documents and similar Project-related items in addition to those required under Section 1; and if necessary, overtime work required higher than regular rates. Page 2 of 2 1/16/08