To: Redevelopment Commission
From: Bill Schalliol, Economic Development Planner ~~~
Subject: Oliver Industrial Park -Design Services -Arnold Street/West Property line
Date: July 7, 2010
At the April 23~d meeting of the Redevelopment Commission, the Commission approved a
proposal from Danch, Harner & Associates ("DHA") to provide a variety of planning and
design services related to planned improvements within and adjacent to the Oliver Industrial
Park on Chapin Street. On May 21St, the Commission approved a second proposal with
DHA to provide design services for entry park signage.
The third request, attached to this memorandum, is a proposal from Danch, Harner &
Associates is to provide design services for the western edge of the Oliver Industrial Park
along Arnold Street. With the recent opening of Underground Pipe & Value located towards
the rear of the park, the completion of the retention area in the northwest corner of the park
and soon the acquisition of the final two parcels on Ford Street, there is a strong need to
address the western side of the park. For years, the neighbors along Arnold Street were
separated from the Oliver site by a large building built right to the sidewalk, but with that
demolition a few years ago and new industrial development filling the park, a buffer zone
needs to be created.
The proposal for the project is projected to be $9,750.00 with cost for Bidding & Negotiation
(Task 4) and Construction Inspection (Task 5) to be expensed at a time & materials
amount. The project includes topographic survey, site analysis, land use planning and
design concepts and construction plans for buffering along Arnold Street. Staff would
propose approval of Tasks 1-5 with aNot-To-Exceed amount of $11,000.00.
Staff requests Commission approval of this proposal.
What We Do Today Makes A Difference!
~~ Danch, Harner & Associates, Inc.
Michael J. Danch, L.A.
Ron Hamer, P.S.
June 28, 2010
Mr. Bill Schalliol
Community & Economic Development
12~' Floor County City Building
South Bend, Indiana 46601
Land Surveyors • Professional Engineers
Landscape Architects • Land Planners
Re: Proposal for Landscape Architecture, Planning, and Engineering services for:
a) Site Analysis and Land Use Planning along the west boundary of Oliver Industrial Park, alongside
Arnold Street.
b) Construction documents for screening buffer and related site improvements as a result of
planning and analysis.
Dear Mr. Schalliol,
Danch Harner & Associates is please to submit this proposal for professional Landscape Architecture,
Planning, and Engineering services for your consideration. It is our understanding that this project will
consist of analyzing the existing residential properties to the west of Oliver Industrial Park to determine
how they may be accessed, utilized within the industrial park, and aesthetically buffered from the adjacent
neighborhood. Construction plans will then be provided to execute the results of the planning effort.
These plans will be incorporated into the construction documents for the Oliver Trail and the Chilled Plow
Memorial project.
Task 1: Topographic Survey:
a) Topographic Survey: This work will include a detailed topographic survey of the above-mentioned
area to delineate existing conditions, features, infrastructure, and grade elevations. This survey will
be used as a base for improvements and landscape screening application.
Cost for this task would be $3,900
Task 2: Analysis and Planning:
a) Site Analysis: This will include a detail analysis of the existing conditions such as infrastructure,
vegetation, soils, surface drainage, and utility access in the outlined area. This information will be
utilized during the planning phase to make determinations on infrastructure need, access, and land
use.
b) Land Use Planning: Being that these properties are being incorporated into the Industrial Park; we
will utilize input from City staff and the site analysis to determine the highest and best use for the
property. This will include pedestrian and vehicle access, and future infrastructure need.
c) Landscape screening & buffer: This will include designing a landscape buffer on the west side of
the Industrial Park, along Arnold Street. This will be in the form of a low berm and landscape placed
to enhance and blend into the adjacent neighborhood, while providing a buffer from the light
industrial uses to the east.
1643 Commerce Drive • South Bend, IN 46628 208 West Mars • Berrien Springs, MI 49103
Office: (574)234-4003 / (800)594-4003 • Fax: (574)234-4119 Office: (61671-3010 • Fax: (616)471-7237
-2-
Cost for this task would be $2,250
Task 3: Construction Documents:
)une 28, 2010
a) Construction Documents: After review and approval from City staff, Danch Hamer will provide bid
ready, final construction drawings that will include existing conditions, layout plan, landscape plans,
details, specifications, and final construction cost estimates for the improvements. These plans
will be included with the construction plans for the Oliver Trail and Chilled Plow Memorial.
Cost for this task would be $3,600
Task 4: Bidding:
a) Bidding: Danch Harner will provide bidding and negotiating services at a time and material basis.
Task 5: Construction Inspection:
a) Construction inspection: If required, construction inspection services will be provided at a time and
material basis and will consist of monitoring day to day construction methods and practices to
insure proper installation of the trail, amenities, landscape, and any other project components.
Weekly progress reports will be sent to the City and Contractor for review and action. A final punch
list would be developed and issued to the City and Contractor before issuing substantial completion.
Summary of Fees:
Task Fee
1 Topographic Survey $3,900
2 Analysis and Planning $2,250
3 Construction Documents $3,600
4 Bidding & Negotiation Time & Materials
5 Construction Inspection Time & Materials
Project Total: $9,750
Revisions to the plans requested by the City would be completed at our standard hourly rates (attached).
If you have any questions, please feel free to call our office.
Items approved to proceed:
Approved By & Date:
Sincerely,
Jeri-e~y r. a a,ua.~-cL
Jeffrey Ballard, RLA
Senior Landscape Architect
Danch Harner & Associates, Inc.